Cooper City Stormwater Master Plan (H1470 | 4673-305-P14)
Open State & local contract opportunity Posted
- Solicitation number
- RFQ2026-2
- State
- Florida
- Responses due
Opportunity facts
- Jurisdiction
- NIGP codes
- 91164 C.i.p., Utilities
- 925 Engineering Services, Professional
- 92517 Civil Engineering
- 92528 Drainage Engineering
- 92531 Electrical Engineering (Incl. Cogeneration Design Services)
- 92532 Electronic Engineering
- 92533 Engineer Services, Professional
- 92535 Environmental Engineering
- 92536 Engineering Services (Not Otherwise Classified)
- 92537 Facilities Design Services, Engineering
Show all 22
- 92538 Field Engineering
- 92542 Foundation Engineering
- 92553 Industrial Engineering
- 92555 Inspecting, General/Engineering
- 92556 Inspecting, Structural/Engineering
- 92558 Irrigation; Drainage; Flood Control/Engineering
- 92567 Mechanical Engineering
- 92570 Municipal Engineering
- 92587 Sewage Collection, Treatment, And Disposal/Engineering
- 92595 Utilities (Gas, Steam, Electric)/Engineering
- 92596 Waste Water Treatment Engineering
- 92597 Water Supply, Treatment, And Distribution/Engineering
- UNSPSC codes
- 81103400 Engineering procurement and project management services
- 81103404 Offshore engineering procurement and construction services
- 81000000 Engineering and Research and Technology Based Services
- 81100000 Professional engineering services
- 81101529 Acoustic engineering
- 81101531 Sanitation engineering service
- 81101606 Marine engineering
- 81102702 Process control system design and engineering service
- 76121701 Sewage treatment services
- 81102501 Mine permitting service
Show all 34
- 81101515 Plant or facility infrastructure engineering
- 70171803 Flood protection or control services
- 81103300 Geomatics engineering
- 81101500 Civil engineering
- 81101700 Electrical and electronic engineering
- 72151706 Construction HSE management service
- 81101602 Mechanical product enclosures design
- 81101603 Machine tool design
- 81101605 Electromechanical services
- 81101501 Well engineering
- 81103402 Front-end engineering design services
- 81103403 Detailed engineering services
- 81103405 Onshore engineering procurement and construction services
- 81101518 Lighting engineering service
- 81101701 Electrical engineering services
- 81101607 Textile engineering service
- 81103406 Conceptual Studies and Pre-Front-end engineering design services
- 71161608 Vendor/shop inspection service
- 71161609 Asset management inspection service
- 73121615 Metallurgical inspection
- 70171800 Drainage services
- 81101600 Mechanical engineering
- 81101527 Wastewater engineering
- 81101528 Stormwater engineering
- Point of contact
-
- Tyrone White twhite@coopercity.gov (954) 434-4300
Opportunity details come from procurement.opengov.com. Updated .
About this opportunity
The City of Cooper City, Florida is soliciting sealed proposals from qualified engineering firms for a Citywide Stormwater Master Plan, with a non-mandatory pre-proposal meeting on November 4, 2026 and proposals due November 30, 2026. The City will retain one consultant or team under a non-exclusive professional services agreement. The project is funded entirely through a FEMA Hazard Mitigation Grant Program award administered by the Florida Division of Emergency Management.
Proposers must have an active Florida Professional Engineer license on staff and at least five years of relevant experience in stormwater management, master planning, or related services. Prime proposers must provide three references for completed municipal Stormwater Master Plans within the past ten years, and each subconsultant must provide at least one relevant reference. Submissions use Standard Form 330 and include federal and state affidavits, proof of insurance, and compliance certifications.
The plan addresses existing and future drainage conditions, flood-prone areas, stormwater quality practices, and prioritized infrastructure improvements for the 8.5-square-mile city. Task 1 is a preliminary plan due 12 months after project start, covering data inventory and stormwater management criteria. Task 2 revises and completes the plan, adds Local Mitigation Strategy adoption documentation and ISO/CRS submittal, and is due 26 months after start. Public engagement is required throughout. The consultant must comply with Davis-Bacon, Copeland Anti-Kickback, Clean Air Act, Federal Water Pollution Control Act, and Byrd Anti-Lobbying requirements, and must carry professional liability coverage with a $1 million minimum.
The grant budget totals $281,000, with $260,000 for Task 1 deliverables and $21,000 for Task 2, funded 75 percent federally ($210,750) and 25 percent non-federally ($70,250). Compensation is negotiated after selection. The contract term is 17 months from Notice to Proceed, with an extension of up to 180 calendar days by mutual agreement and City Commission approval. All work must be completed by April 19, 2028, with grant closeout by May 19, 2028. Liquidated damages of 5 percent of applicable grant deliverable values may be assessed for missed grant deadlines caused by proposer fault. A Cone of Silence restricts communications with City officials during the procurement.
Questions are due November 11, 2026 at 12:00 p.m. Proposals are due November 30, 2026 at 9:00 a.m. EST through the OpenGov Procurement Portal. Proposal review and candidate selection occur December 4, presentations and final ranking December 8, and award recommendation December 9, with City Commission award anticipated December 15, 2026.
Opportunity text
The City of Cooper City ("City") is seeking sealed proposals from qualified proposers capable of providing professional engineering and related planning services for the Citywide Stormwater Master Plan (SWMP).
Files
On GovTribe
Work this opportunity
- Track it in your pipeline
- Similar opportunities
- Ask GovTribe AI about this opportunity