Q1_2025_-_Business_Case_-_Concourse_A_Ramp_Level_Upgrade.pdf

PDF 903 KB Posted

Attached to
Concourse A Ramp Level Office Upgrades
Solicitation number
26-020-ITB
Issued by
Bell County, Kentucky

About this file

This is a Business Case document and contract solicitation for the Kenton County Airport Board (KCAB) related to Concourse A Ramp Level Office Upgrades at Cincinnati/Northern Kentucky International Airport (CVG). The project involves General Contractor services for the renovation of approximately 20,000 square feet of space on the Ramp Level of Concourse A. The scope encompasses four primary components: establishing a permanent Emergency Operations Center (EOC) by formally upgrading the existing temporary facility with casework demolition, partition walls, doors, finishes upgrades, LED lighting, MEP upgrades, data systems, and security access; creating a new conference room (SAMS Area) to replace the displaced original space through casework and partition demolition and finish upgrades; relocating and upgrading offices for Environmental Services with finish upgrades, LED lighting, and data improvements; and completing common area upgrades including entrances, lobbies, restrooms, and new changing rooms with miscellaneous demolition, new partitions, finishes upgrades, and fixture replacements. A pre-bid meeting and site visit is scheduled for Wednesday, April 1, 2026 at 10:00 am at CVG Airport. Questions are due by 11:59 pm on Friday, April 17, 2026, with answers posted by Tuesday, April 21, 2026 at 11:59 pm. Bids must be received by Thursday, April 30, 2026 at 2:00 pm. The project area is currently approximately 50 percent occupied with critical Airport Operations and Housekeeping functions requiring phased construction to maintain operational continuity.

The total project cost is estimated at $951,000.00, comprising design costs of $63,000.00, construction/installation costs of $790,000.00, a contingency of $79,000.00 (minimum 10 percent), force labor of $15,000.00, and miscellaneous costs of $4,000.00. The construction cost estimate, based on preliminary Rough Order of Magnitude (ROM) pricing of $40 per square foot across 19,752 square feet, includes demo, finishes updates, fire suppression relocation, HVAC redistribution and diffuser replacement, lighting/power/data/communications/fire alarm upgrades, wall additions, and door installations. The project is funded through CapEx and is expected to be completed by Q3 2025, with construction estimated to take approximately four months. The project requires a phased construction approach due to ongoing occupancy by essential airport services. Known risks include potential cost variance between ROM pricing and final design documents, inadequate MEP and life safety provisions resulting from space repurposing without comprehensive design, varying existing improvements throughout the space, and coordination challenges with current occupants during construction.

View the file

Other files

File Type Posted
Concourse_A_Ramp_Level_Office_Upgrades_(Addendum_#4_Revision).pdf PDF
26-020-ITB_Conc_A_Ramp_Level_Office_Upgrades_-_Dwgs_04.22.26.pdf PDF
26-020-ITB_Conc_A_Ramp_Level_Offices_-_Tech_Specs_04.22.26.pdf PDF
Concourse_A_Ramp_Level_Office_Upgrades_(Addendum_#3_Revision).pdf PDF
26-020-ITB_Conc_A_Ramp_Level_Offices_-_Tech_Specs_04.16.26.pdf PDF
26-020-ITB_Question_#17_Signage_-_Addendum_#2.pdf PDF
26-020-ITB_Conc_A_Ramp_Level_Office_Upgrades_-_Exh_A_-_Proposal_Forms_04.14.26.PDF PDF
26-020-ITB_Conc_A_Ramp_Level_Office_Upgrades_-_Dwgs_04.14.26.pdf PDF
26-020-ITB_Pre-Bid_Sign_In_Sheets.pdf PDF
26-020-ITB_Pre-Bid_Meeting_Agenda.pdf PDF
Concourse_A_Ramp_Level_Office_Upgrades.pdf PDF
26-020-ITB_Conc_A_Ramp_Level_Office_Upgrades_-_Ad.pdf PDF
KCAB_-_RSVP_Instructional_Guide_for_OpenGov.pdf PDF
26-020-ITB_Conc_A_Ramp_Level_Office_Upgrades_-_Exhibit_A_-_Proposal_Forms.pdf PDF
26-020-ITB_Conc_A_Ramp_Level_Office_Upgrades_-_Drawings.pdf PDF
26-020-ITB_Conc_A_Ramp_Level_Office_Upgrades_-_Technical_Specs.pdf PDF
26-020-ITB_Conc_A_Ramp_Level_Office_Upgrades_-_Exhibit_B_-_Contract_&_Bonds.pdf PDF
Conc_A_Upgrade_100%_Drawings.pdf PDF
Conc_A_Upgrade_100%_Specifications.pdf PDF
Conc_A_Ramp_Level_Pricing_Table_Template.xlsx XLSX spreadsheet
EEO_Certification.docx DOCX document
NonSegregated_Facilities_Certification.docx DOCX document
Buy_American_Certification-Equipment-Building_Projects.docx DOCX document
Affirmative_Action_Certification.docx DOCX document
Disclosure_of_Lobbying_Activities_Certification.docx DOCX document
Certification_of_Offeror-Bidder_Regarding_Tax_Delinquency_and_Felony_Convictions.docx DOCX document
Non_Debarment_or_Suspension_Certification.docx DOCX document
Buy_American_Certification-Construction_Projects.docx DOCX document
Show all 28

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Concourse A Ramp Level Upgrade

Current Situation/Background Information

The identified Concourse A, ramp level space, is semi-occupied, and utilized by multiple departments. The goal of this project is to concert the needs into a singular upgrade. The four needs are:

1. EOC

-- The catalyst for upgrading this area was identifying a space for an interim EOC, because the previous location (ARFF Training Facility) was demolished.

2. Concourse A Conference Room (SAMS Area)

-- The original SAMS Area was displaced by a make-shift EOC. Upgrading this space will allow for a new conference space to be utilized by SAMS, C&BD, and other meetings.

3. Relocate Environmental Services

-- In the general vicinity, Housekeeping is returning to their previous location. Additionally, vacant rooms on the perimeter require an upgrade to support the increased occupancy and utilization of staff.

4. Common Areas Finish Upgrades

-- Common spaces in the area (offices, entrances, restrooms, breakroom, etc.) require an upgrade for uniformity and function to support the various uses.

Project Definition

Utilize idle space at Concourse A Ramp Level to address the needs of the following four efforts.

1. EOC Area: Formally upgrade the make-shift EOC and support offices

-- The scope involves casework demo; demising partition walls and doors to accommodate security and egress; finishes upgrades (paint, carpet, ceiling pads, etc.);

LED lighting upgrades; MEP upgrades to accommodate occupancy loads; data upgrades; security access systems.

2. Conference Room (SAMS Area): Modify space to accommodate a new conference room displaced by the EOC.

-- The scope involves casework and partition demo; finish upgrades (paint, carpet, ceiling pads, etc.); LED lighting upgrades; required MEP upgrades to accommodate occupancy loads; and data upgrades.

3. Relocate Environmental Services: Upgrade offices for the return of Environmental Services.

-- The scope involves finish upgrades (paint, carpet, ceiling patch.); LED lighting upgrades; data upgrades.

4. Common Areas Upgrade: Upgrade common space (Entrances, lobby, restrooms, and create new changing rooms).

-- The scope involves new finishes in existing common space. Miscellaneous demo of existing casework; constructing new partitions and openings to provide new changing rooms; finish upgrades (paint, carpet, ceiling pads, etc.); bathroom tile and grout cleaning; miscellaneous toilet partition and bathroom accessories replacements; reinstall new water fountains; existing bathroom fixture cleaning and valve replacements as required; LED lighting upgrades are required.

The business objectives: P&D has contracted with on-call designer (GRW), to provide: bid documents; construction estimate; and permit, for CVG to request GC bidders to commence with the work in Quarter 1, 2025. Upgrades will require construction while occupied, displacing some personnel into perimeter vacant rooms.

A four month construction project is expected.

Project Justification: Efficiently fulfill the needs of multiple departments as a single project utilizing vacant available space.

Project Approach

Step 1: Confirm the scope of the four efforts by sharing on-call designer's finished schedule

Step 2: Develop bid documents, construction estimate and obtain permit

Step 3: Solicit General Contractor (GC) bids to complete the project by Q3 2025

Alternatives

1. Do not upgrade the area and utilize as is with aged finishes and no MEP adjustments for the new use

2. Prioritize the four needs and move forward on one or two of the upgrade projects

3. Identify another location to fulfill the needs of the multiple departments

Recommendation

Advise the on-call to move forward with scope finalization, then create bid documents, obtain a construction estimate and acquire a permit. Finally, solicit bids from

GCs to complete the work by Q3 2025.

Cost

Design: $63,000.00

Construction/Installation: $790,000.00

Contingency (min 10%): $79,000.00

Force Labor: $15,000.00

Miscellaneous: $4,000.00

Total Cost: $951,000.00

Project Funding

CapEx

Project Schedule

Complete construction by Q3 2025

Strategic Plan Fit Sustainability FitMaster Plan Fit

Known Risks & Limitations

Current upgrades ROM pricing established prior to the development of design documents can misrepresent actual costs for development. Repurposing existing vacant space without design risks providing inadequate MEP and life safety requirements per code and occupancy changes. The existing space has varying degrees of improvements. Existing storage and old furnishings will need to be disposed of or relocated. Coordination and displacement of existing occupants will need to be managed during construction. Anticipate Construction Estimate by end of year.

Candace McGraw

Dil Gruffydd

Concurrence Leader, Adam Kressler

Executive Sponsor, Shannon Oldfield

Business Unit Leader, Bill Siemer

Sponsor/Originator, Damian Weller

Visuals

Shannon R. Oldfield (Jan 30, 2025 10:43 EST) Shannon R. Oldfield

Dilwyn Gruffydd (Feb 3, 2025 17:03 EST)

Candace McGraw (Feb 3, 2025 17:16 MST) Candace McGraw https://cvgairport.na2.adobesign.com/verifier?tx=CBJCHBCAABAA361HO0d2i-u37JXhWssUj95ao0qrMSJr https://cvgairport.na2.adobesign.com/verifier?tx=CBJCHBCAABAA361HO0d2i-u37JXhWssUj95ao0qrMSJr https://cvgairport.na2.adobesign.com/verifier?tx=CBJCHBCAABAA361HO0d2i-u37JXhWssUj95ao0qrMSJr https://cvgairport.na2.adobesign.com/verifier?tx=CBJCHBCAABAA361HO0d2i-u37JXhWssUj95ao0qrMSJr https://cvgairport.na2.adobesign.com/verifier?tx=CBJCHBCAABAA361HO0d2i-u37JXhWssUj95ao0qrMSJr https://cvgairport.na2.adobesign.com/verifier?tx=CBJCHBCAABAA361HO0d2i-u37JXhWssUj95ao0qrMSJr

CVG Concourse A Ramp Refresh, Prelim ROM Rev 1 12/18/2024

Units Unit Unit Cost Total

Demo 19752 SF 2 39504

Finishes Updates 19752 SF 18 355536

Fire Suppression relocate heads 5500 SF 3.5 19250

HVAC redistribution 5500 SF 4 22000

HVAC replace diffusers 19752 SF 1.5 29628

Lighting / Power / Data / Comm / Fire Alarm 19752 SF 9 177768

Add Walls 1160 SF 18 20880

Add Doors 9 EA 2500 22500

Subtotal 687066

Contingency 15% 103060

Total $790,126

Cost / SF 19752 SF $40

Proposed AE Fee SD, CD, CA $62,485

Rev 1 removed the following:

3941 SF of space not required for current program but may be needed in future.

3007 SF of space that has already had lighting and finishes updates.

GRW NO. 5035-09

ROOM FINISH SCHEDULE

ROOM IDENTIFICATION FLOOR WALLS CEILING

COMMENTSROOM

NUMBER ROOM NAME AREA (SF) FLOOR FINISH -

EXISTING

BASE

FINISH

BUILDING ORIENTATION INDICATES PLAN NORTH

CEILING

MATERIAL

CEILING

FINISH

CEILING

HEIGHT

(A.F.F.)

NORTH SOUTH EAST WEST

MATERIAL FINISH MATERIAL FINISH MATERIAL FINISH MATERIAL FINISH

C100 VESTIBULE 47.65 CONC RB-1 CMU PT-1 CMU PT-1 CMU PT-1 CMU PT-1 SEE RCP PAINT, CEILING TILES, CLEAN GRID & CAULK CMU IF NEEDED

C101 RECEIVING 150.38 CONC RB-1 CMU PT-1 CMU PT-1 CMU PT-1 CMU PT-1 SEE RCP PAINT, CEILING TILES, CLEAN GRID & CAULK CMU IF NEEDED

C102 ELEVATOR EQUIPMENT 54.64 CONC RB-1 CMU PT-1 CMU PT-1 CMU PT-1 CMU PT-1 SEE RCP PAINT, CEILING TILES, CLEAN GRID & CAULK CMU IF NEEDED

C103 CORRIDOR 424.99 CPT RB-1 CMU PT-1 CMU PT-1 CMU PT-1 CMU PT-1 SEE RCP CARPET, PAINT, CEILING TILES, CLEAN GRID & CAULK CMU IF NEEDED

C104 HOUSEKEEPING STORAGE 155.96 CPT RB-1 CMU PT-1 CMU PT-1 CMU PT-1 CMU PT-1 SEE RCP CARPET, PAINT, CEILING TILES, CLEAN GRID & CAULK CMU IF NEEDED

C105 HOUSEKEEPING OFFICE 210.93 CPT RB-1 CMU PT-1 CMU PT-1 CMU PT-1 CMU PT-1 SEE RCP CARPET, PAINT, CEILING TILES, CLEAN GRID & CAULK CMU IF NEEDED

C106 HOUSEKEEPING STORAGE 212.45 CPT RB-1 CMU PT-1 CMU PT-1 CMU PT-1 CMU PT-1 SEE RCP CARPET, PAINT, CEILING TILES, CLEAN GRID & CAULK CMU IF NEEDED

C107 HOUSEKEEPING STORAGE 194.97 CPT RB-1 CMU PT-1 CMU PT-1 CMU PT-1 CMU PT-1 SEE RCP CARPET, PAINT, CEILING TILES, CLEAN GRID & CAULK CMU IF NEEDED

C108 CUSTOMER SERVICE STORAGE 308.41 CPT RB-1 CMU PT-1 CMU PT-1 CMU PT-1 CMU PT-1 SEE RCP CARPET, PAINT, CEILING TILES, CLEAN GRID & CAULK CMU IF NEEDED

C109 HOUSEKEEPING OFFICE 259.29 CPT RB-1 CMU PT-1 CMU PT-1 CMU PT-1 CMU PT-1 SEE RCP CARPET, PAINT, CEILING TILES, CLEAN GRID & CAULK CMU IF NEEDED

C110 HOUSEKEEPING OFFICE 259.29 CPT RB-1 CMU PT-1 CMU PT-1 CMU PT-1 CMU PT-1 SEE RCP CARPET, PAINT, CEILING TILES, CLEAN GRID & CAULK CMU IF NEEDED

C111 HOUSEKEEPING CONFERENCE 259.29 CPT RB-1 CMU PT-1 CMU PT-1 CMU PT-1 CMU PT-1 SEE RCP CARPET, PAINT, CEILING TILES, CLEAN GRID & CAULK CMU IF NEEDED

C112 HOUSEKEEPING STORAGE 259.29 CPT RB-1 CMU PT-1 CMU PT-1 CMU PT-1 CMU PT-1 SEE RCP CARPET, PAINT, CEILING TILES, CLEAN GRID & CAULK CMU IF NEEDED

C113 HOUSEKEEPING STORAGE 258.88 CPT RB-1 CMU PT-1 CMU PT-1 CMU PT-1 CMU PT-1 SEE RCP CARPET, PAINT, CEILING TILES, CLEAN GRID & CAULK CMU IF NEEDED

C114 READY ROOM 90.63 NO WORK

C115 VACANT 860.79 CPT RB-1 CMU PT-1 CMU PT-1 CMU PT-1 CMU PT-1 SEE RCP CARPET, PAINT, CEILING TILES, CLEAN GRID & CAULK CMU IF NEEDED

C116 VACANT 4,087.08 CPT RB-1 CMU PT-1 CMU PT-1 CMU PT-1 CMU PT-1 SEE RCP CARPET, PAINT, CEILING TILES, CLEAN GRID & CAULK CMU IF NEEDED

C117 VACANT 502.04 CPT RB-1 CMU PT-1 GYP. BD PT-1 CMU PT-1 GYP. BD PT-1 SEE RCP CARPET, PAINT, CEILING TILES, CLEAN GRID & CAULK CMU IF NEEDED

C118 VACANT 577.37 NO WORK

C119 PSA STORAGE 194.24 NO WORK

C120 VACANT 105.85 NO WORK

C121 VACANT 153.02 NO WORK

C122 VACANT 152.59 NO WORK

C123 CORRIDOR 612.84 CPT RB-1 CMU PT-1 CMU PT-1 CMU PT-1 CMU PT-1 SEE RCP CARPET, PAINT, CEILING TILES, CLEAN GRID & CAULK CMU IF NEEDED

C124 VACANT 264.94 CPT RB-1 CMU PT-1 CMU PT-1 CMU PT-1 CMU PT-1 SEE RCP CARPET, PAINT, CEILING TILES, CLEAN GRID & CAULK CMU IF NEEDED

C125 VACANT 506.62 CPT RB-1 CMU PT-1 CMU PT-1 CMU PT-1 CMU PT-1 SEE RCP CARPET, PAINT, CEILING TILES, CLEAN GRID & CAULK CMU IF NEEDED

C126 VACANT 117.58 NO WORK

C127 VACANT 118.12 NO WORK

C128 VACANT 118.12 CPT RB-1 CMU PT-1 CMU PT-1 CMU PT-1 CMU PT-1 SEE RCP CARPET, PAINT, CEILING TILES, CLEAN GRID & CAULK CMU IF NEEDED

C129 VACANT 118.12 CPT RB-1 CMU PT-1 CMU PT-1 CMU PT-1 CMU PT-1 SEE RCP CARPET, PAINT, CEILING TILES, CLEAN GRID & CAULK CMU IF NEEDED

C130 CORRIDOR 171.4 CPT RB-1 CMU PT-1 CMU PT-1 CMU PT-1 CMU PT-1 SEE RCP CARPET, PAINT, CEILING TILES, CLEAN GRID & CAULK CMU IF NEEDED

C131 VACANT 140.87 NO WORK

C132 VACANT 140.87 NO WORK

C133 CORRIDOR 542.08 CPT RB-1 CMU PT-1 CMU PT-1 CMU PT-1 CMU PT-1 SEE RCP CARPET, PAINT, CEILING TILES, CLEAN GRID & CAULK CMU IF NEEDED

C134 VACANT 110.03 CPT RB-1 CMU PT-1 CMU PT-1 CMU PT-1 CMU PT-1 SEE RCP CARPET, PAINT, CEILING TILES, CLEAN GRID & CAULK CMU IF NEEDED

C135 VACANT 109.81 CPT RB-1 CMU PT-1 CMU PT-1 CMU PT-1 CMU PT-1 SEE RCP CARPET, PAINT, CEILING TILES, CLEAN GRID & CAULK CMU IF NEEDED

C136 VACANT 109.81 CPT RB-1 CMU PT-1 CMU PT-1 CMU PT-1 CMU PT-1 SEE RCP CARPET, PAINT, CEILING TILES, CLEAN GRID & CAULK CMU IF NEEDED

C137 VACANT 104.31 CPT RB-1 CMU PT-1 CMU PT-1 CMU PT-1 CMU PT-1 SEE RCP CARPET, PAINT, CEILING TILES, CLEAN GRID & CAULK CMU IF NEEDED

C138 VACANT 104.31 CPT RB-1 CMU PT-1 CMU PT-1 CMU PT-1 CMU PT-1 SEE RCP CARPET, PAINT, CEILING TILES, CLEAN GRID & CAULK CMU IF NEEDED

C139 VACANT 107.61 OCCUPIED, NO WORK

C140 CORRIDOR 539.81 CPT RB-1 CMU PT-1 CMU PT-1 CMU PT-1 CMU PT-1 SEE RCP CARPET, PAINT, CEILING TILES, CLEAN GRID & CAULK CMU IF NEEDED

C141 VACANT 334.57 OCCUPIED, NO WORK

C142 VACANT 165.97 OCCUPIED, NO WORK

C143 VACANT 359.32 OCCUPIED, NO WORK

C144 KCAB OPS DEPT. BREAKROOM 359.33 OCCUPIED, NO WORK

C145 KCAB OPS DEPT. 533.87 OCCUPIED, NO WORK

C146 KCAB OPS DEPT. 503.36 OCCUPIED, NO WORK

C147 KCAB EOC CENTER 787.65 CPT RB-1 VARIES PT-1 CMU PT-1 GYP. BD PT-1 GYP. BD PT-1 SEE RCP CARPET, PAINT, CEILING TILES, CLEAN GRID & CAULK CMU IF NEEDED

C148 STORAGE 42.58 NO WORK

C149 CORRIDOR 210.38 CPT RB-1 CMU PT-1 CMU PT-1 CMU PT-1 CMU PT-1 SEE RCP CARPET, PAINT, CEILING TILES, CLEAN GRID & CAULK CMU IF NEEDED

C150 MEN'S LOCKER ROOM 231.74 CPT RB-1 CMU PT-1 CMU PT-1 CMU PT-1 CMU PT-1 SEE RCP CARPET, PAINT, CEILING TILES, CLEAN GRID & CAULK CMU IF NEEDED

C151 MEN'S RESTROOM 287.97 LVT RB-1 CMU PT-1 CMU PT-1 CMU PT-1 CMU PT-1 SEE RCP CARPET, PAINT, CEILING TILES, CLEAN GRID & CAULK CMU IF NEEDED

C152 ELEVATOR EQUIPMENT 52.42 NO WORK

C153 HOUSEKEEPING BREAKROOM 817.09 NO WORK

C154 CORRIDOR 199.95 CPT RB-1 CMU PT-1 CMU PT-1 CMU PT-1 CMU PT-1 SEE RCP CARPET, PAINT, CEILING TILES, CLEAN GRID & CAULK CMU IF NEEDED

C155 WOMEN'S RESTROOM 635.13 LVT RB-1 CMU PT-1 CMU PT-1 CMU PT-1 CMU PT-1 SEE RCP CLEAN TILE, PAINT, CEILING TILES, CLEAN GRID & CAULK CMU IF NEEDED

C156 WOMEN'S LOCKER ROOM 229.52 CPT RB-1 CMU PT-1 CMU PT-1 CMU PT-1 CMU PT-1 SEE RCP CARPET, PAINT, CEILING TILES, CLEAN GRID & CAULK CMU IF NEEDED

C157 HOUSEKEEPING OFFICE 175.75 CPT RB-1 CMU PT-1 CMU PT-1 CMU PT-1 CMU PT-1 SEE RCP CARPET, PAINT, CEILING TILES, CLEAN GRID & CAULK CMU IF NEEDED

C158 HOUSEKEEPING OFFICE 176.09 CPT RB-1 CMU PT-1 CMU PT-1 CMU PT-1 CMU PT-1 SEE RCP CARPET, PAINT, CEILING TILES, CLEAN GRID & CAULK CMU IF NEEDED

C159 READY ROOM 68.93 NO WORK

C160 FIRE PROTECTION 51.83 NO WORK

C161 JANITOR STORGE 196.85 CONC RB-1 CMU PT-1 CMU PT-1 CMU PT-1 CMU PT-1 SEE RCP PAINT, CEILING TILES, CLEAN GRID & CAULK CMU IF NEEDED

C162 CORRIDOR 918.58 CPT RB-1 CMU PT-1 CMU PT-1 CMU PT-1 CMU PT-1 SEE RCP CARPET, PAINT, CEILING TILES, CLEAN GRID & CAULK CMU IF NEEDED

C163 ELECTRICAL 39.13 NO WORK

C164 ELEVATOR EQUIPMENT 161.81 NO WORK

C165 HOUSEKEEPING STORAGE 246.88 CPT RB-1 CMU PT-1 CMU PT-1 CMU PT-1 CMU PT-1 SEE RCP CARPET, PAINT, CEILING TILES, CLEAN GRID & CAULK CMU IF NEEDED

C166 HOUSEKEEPING WOMEN'S LOCKER ROOM 283.11 CPT RB-1 CMU PT-1 CMU PT-1 CMU PT-1 CMU PT-1 SEE RCP CARPET, PAINT, CEILING TILES, CLEAN GRID & CAULK CMU IF NEEDED

C167 HOUSEKEEPING MEN'S LOCKER ROOM 287.62 CPT RB-1 CMU PT-1 CMU PT-1 CMU PT-1 CMU PT-1 SEE RCP CARPET, PAINT, CEILING TILES, CLEAN GRID & CAULK CMU IF NEEDED

C168 ELECTRICAL 92.11 NO WORK

D165 MECHANICAL 734.06 NO WORK

D166 CORRIDOR 173.28 CPT RB-1 CMU PT-1 CMU PT-1 CMU PT-1 CMU PT-1 SEE RCP CARPET, PAINT, CEILING TILES, CLEAN GRID & CAULK CMU IF NEEDED

D167 VACANT 257.54 OCCUPIED, NO WORK

D168 VACANT 170.08 OCCUPIED, NO WORK

D169 READY ROOM 90.06 NO WORK

D170 VACANT 107.83 OCCUPIED, NO WORK

D171 VACANT 107.61 OCCUPIED, NO WORK

D172 CORRIDOR 95.43 CPT RB-1 CMU PT-1 CMU PT-1 CMU PT-1 CMU PT-1 SEE RCP CARPET, PAINT, CEILING TILES, CLEAN GRID & CAULK CMU IF NEEDED

D173 VACANT 121.22 CPT RB-1 CMU PT-1 CMU PT-1 CMU PT-1 CMU PT-1 SEE RCP CARPET, PAINT, CEILING TILES, CLEAN GRID & CAULK CMU IF NEEDED

D174 VACANT 120.83 CPT RB-1 CMU PT-1 CMU PT-1 CMU PT-1 CMU PT-1 SEE RCP CARPET, PAINT, CEILING TILES, CLEAN GRID & CAULK CMU IF NEEDED

D175 STORAGE 46.02 CPT RB-1 CMU PT-1 CMU PT-1 CMU PT-1 CMU PT-1 SEE RCP CARPET, PAINT, CEILING TILES, CLEAN GRID & CAULK CMU IF NEEDED

D176 VACANT 141.31 CPT RB-1 CMU PT-1 CMU PT-1 CMU PT-1 CMU PT-1 SEE RCP CARPET, PAINT, CEILING TILES, CLEAN GRID & CAULK CMU IF NEEDED

D177 VACANT 141.31 CPT RB-1 CMU PT-1 CMU PT-1 CMU PT-1 CMU PT-1 SEE RCP CARPET, PAINT, CEILING TILES, CLEAN GRID & CAULK CMU IF NEEDED

C20 STAIR 202.36 CONC RB-1 CMU PT-1 CMU PT-1 CMU PT-1 CMU PT-1 SEE RCP PAINT, CEILING TILES, CLEAN GRID & CAULK CMU IF NEEDED

C21 STAIR 239.05 CONC RB-1 CMU PT-1 CMU PT-1 CMU PT-1 CMU PT-1 SEE RCP PAINT, CEILING TILES, CLEAN GRID & CAULK CMU IF NEEDED

C23 STAIR 317.62 CONC RB-1 CMU PT-1 CMU PT-1 CMU PT-1 CMU PT-1 SEE RCP PAINT, CEILING TILES, CLEAN GRID & CAULK CMU IF NEEDED

C24 STAIR 319.8 CONC RB-1 CMU PT-1 CMU PT-1 CMU PT-1 CMU PT-1 SEE RCP PAINT, CEILING TILES, CLEAN GRID & CAULK CMU IF NEEDED

TOTAL AREA 25652.23

AutoCAD SHX Text

D3-IF33

AutoCAD SHX Text D3-1200

AutoCAD SHX Text D3-1010

AutoCAD SHX Text D3-1240

AutoCAD SHX Text D3-1220

AutoCAD SHX Text

D3-IF50A

AutoCAD SHX Text

D3-IF51

AutoCAD SHX Text

D3-IF55

AutoCAD SHX Text D3-1220A

AutoCAD SHX Text D3-1250

AutoCAD SHX Text F-121B

AutoCAD SHX Text

D3-IF36

AutoCAD SHX Text

D3-IF35

AutoCAD SHX Text

D3-IF50

AutoCAD SHX Text

D3-IF34

AutoCAD SHX Text

D3-IF32

AutoCAD SHX Text

D3-IF43

AutoCAD SHX Text

D3-IF42

AutoCAD SHX Text

D3-IF40A

AutoCAD SHX Text

D3-IF39A

AutoCAD SHX Text

D3-IF40C

AutoCAD SHX Text D3-I439B

AutoCAD SHX Text

D3-IF40B

AutoCAD SHX Text

D3-IF44

AutoCAD SHX Text

D3-IF45

AutoCAD SHX Text

D3-IF54

AutoCAD SHX Text

D3-IF49

AutoCAD SHX Text

D3-IF48

AutoCAD SHX Text

D3-IF47

AutoCAD SHX Text

D3-IF53

AutoCAD SHX Text

D3-IF46

AutoCAD SHX Text

D3-IF52

AutoCAD SHX Text

D3-IF63

AutoCAD SHX Text

D3-IF62

AutoCAD SHX Text

D3-IF61

AutoCAD SHX Text

D3-IF70

AutoCAD SHX Text

D3-IF69

AutoCAD SHX Text

D3-IF68

AutoCAD SHX Text

D3-IF67

AutoCAD SHX Text D3-1239

AutoCAD SHX Text

D3-IF66B

AutoCAD SHX Text

D3-IF66A

AutoCAD SHX Text

D3-IF65

AutoCAD SHX Text

D3-IF64

AutoCAD SHX Text D3-64A

AutoCAD SHX Text D3-64B

AutoCAD SHX Text

D3-IF64C

AutoCAD SHX Text F-135

AutoCAD SHX Text D2-1430

AutoCAD SHX Text D2-1420

AutoCAD SHX Text

D2-IF7B

AutoCAD SHX Text

D2-IF7A

AutoCAD SHX Text

D2-IF12

AutoCAD SHX Text

D2-IF13

AutoCAD SHX Text

D2-IF28

AutoCAD SHX Text D2-1300

AutoCAD SHX Text

D2-IF27

AutoCAD SHX Text D2-1454

AutoCAD SHX Text D2-1460

AutoCAD SHX Text D2-1451

AutoCAD SHX Text

D2-IF20

AutoCAD SHX Text

D2-IF19

AutoCAD SHX Text F-133

AutoCAD SHX Text F-101

AutoCAD SHX Text D2-1400

AutoCAD SHX Text D2-1410

AutoCAD SHX Text D2-1390

AutoCAD SHX Text

D2-IF16

AutoCAD SHX Text

IF-104

AutoCAD SHX Text

D2-IF17A

AutoCAD SHX Text

D2-IF17B

AutoCAD SHX Text

D2-IF11

AutoCAD SHX Text

D2-IF10

AutoCAD SHX Text

D2-IF09

AutoCAD SHX Text

D2-IF08

AutoCAD SHX Text

D2-IF06

AutoCAD SHX Text

D2-IF05

AutoCAD SHX Text

D2-IF04

AutoCAD SHX Text

D2-IF03

AutoCAD SHX Text A-34

AutoCAD SHX Text D2-1350

AutoCAD SHX Text D2-1360

AutoCAD SHX Text D2-1370

AutoCAD SHX Text D2-1381

AutoCAD SHX Text F-134A

AutoCAD SHX Text

D2-IF14

AutoCAD SHX Text

D2-IF15

AutoCAD SHX Text

D2-IF16A

AutoCAD SHX Text

D2-IF16B

AutoCAD SHX Text

D2-IF16C

AutoCAD SHX Text

D3-IF56

AutoCAD SHX Text

D3-IF57

AutoCAD SHX Text

D3-IF58

AutoCAD SHX Text

D3-IF59

AutoCAD SHX Text

D3-IF60

AutoCAD SHX Text

ELEVATOR ABOVE NO ACCESS

AutoCAD SHX Text

D2-IF18

AutoCAD SHX Text

RECEIVING

AutoCAD SHX Text C101

AutoCAD SHX Text

150.38 sf

AutoCAD SHX Text

ELEVATOR

AutoCAD SHX Text

EQUIPMENT

AutoCAD SHX Text C102

AutoCAD SHX Text

54.64 sf

AutoCAD SHX Text

VESTIBULE

AutoCAD SHX Text C100

AutoCAD SHX Text

47.65 sf

AutoCAD SHX Text

CORRIDOR

AutoCAD SHX Text C103

AutoCAD SHX Text

424.99 sf

AutoCAD SHX Text

HOUSEKEEPING

AutoCAD SHX Text

STORAGE

AutoCAD SHX Text C104

AutoCAD SHX Text

155.96 sf

AutoCAD SHX Text

HOUSEKEEPING

AutoCAD SHX Text

OFFICE

AutoCAD SHX Text C105

AutoCAD SHX Text

210.93 sf

AutoCAD SHX Text

HOUSEKEEPING

AutoCAD SHX Text

STORAGE

AutoCAD SHX Text C106

AutoCAD SHX Text

212.45 sf

AutoCAD SHX Text

HOUSEKEEPING

AutoCAD SHX Text

STORAGE

AutoCAD SHX Text C107

AutoCAD SHX Text

194.97 sf

AutoCAD SHX Text

CUSTOMER SERVICE

AutoCAD SHX Text

STORAGE

AutoCAD SHX Text C108

AutoCAD SHX Text

308.41 sf

AutoCAD SHX Text

HOUSEKEEPING

AutoCAD SHX Text

STORAGE

AutoCAD SHX Text C113

AutoCAD SHX Text

258.88 sf

AutoCAD SHX Text

HOUSEKEEPING

AutoCAD SHX Text

STORAGE

AutoCAD SHX Text C112

AutoCAD SHX Text

259.29 sf

AutoCAD SHX Text

HOUSEKEEPING

AutoCAD SHX Text

CONFERENCE

AutoCAD SHX Text C111

AutoCAD SHX Text

259.29 sf

AutoCAD SHX Text

HOUSEKEEPING

AutoCAD SHX Text

OFFICE

AutoCAD SHX Text C110

AutoCAD SHX Text

259.29 sf

AutoCAD SHX Text

HOUSEKEEPING

AutoCAD SHX Text

OFFICE

AutoCAD SHX Text C109

AutoCAD SHX Text

259.29 sf

AutoCAD SHX Text

VACANT

AutoCAD SHX Text C115

AutoCAD SHX Text

860.79 sf

AutoCAD SHX Text

VACANT

AutoCAD SHX Text C116

AutoCAD SHX Text 4,087.08 sf

AutoCAD SHX Text

VACANT

AutoCAD SHX Text C117

AutoCAD SHX Text

502.04 sf

AutoCAD SHX Text

VACANT

AutoCAD SHX Text C118

AutoCAD SHX Text

577.37 sf

AutoCAD SHX Text

VACANT

AutoCAD SHX Text C120

AutoCAD SHX Text

105.85 sf

AutoCAD SHX Text

PSA STORAGE

AutoCAD SHX Text C119

AutoCAD SHX Text

194.24 sf

AutoCAD SHX Text

VACANT

AutoCAD SHX Text C121

AutoCAD SHX Text

153.02 sf

AutoCAD SHX Text

VACANT

AutoCAD SHX Text C122

AutoCAD SHX Text

152.59 sf

AutoCAD SHX Text

CORRIDOR

AutoCAD SHX Text C123

AutoCAD SHX Text

612.84 sf

AutoCAD SHX Text

VACANT

AutoCAD SHX Text C124

AutoCAD SHX Text

264.94 sf

AutoCAD SHX Text

VACANT

AutoCAD SHX Text C125

AutoCAD SHX Text

506.62 sf

AutoCAD SHX Text

VACANT

AutoCAD SHX Text C126

AutoCAD SHX Text

117.58 sf

AutoCAD SHX Text

VACANT

AutoCAD SHX Text C127

AutoCAD SHX Text

118.12 sf

AutoCAD SHX Text

CORR.

AutoCAD SHX Text C130

AutoCAD SHX Text

171.40 sf

AutoCAD SHX Text

VACANT

AutoCAD SHX Text C131

AutoCAD SHX Text

140.87 sf

AutoCAD SHX Text

VACANT

AutoCAD SHX Text C132

AutoCAD SHX Text

140.87 sf

AutoCAD SHX Text

VACANT

AutoCAD SHX Text C129

AutoCAD SHX Text

118.12 sf

AutoCAD SHX Text

VACANT

AutoCAD SHX Text C128

AutoCAD SHX Text

118.26 sf

AutoCAD SHX Text

CORRIDOR

AutoCAD SHX Text C133

AutoCAD SHX Text

542.08 sf

AutoCAD SHX Text

VACANT

AutoCAD SHX Text C134

AutoCAD SHX Text

110.03 sf

AutoCAD SHX Text

VACANT

AutoCAD SHX Text C136

AutoCAD SHX Text

109.81 sf

AutoCAD SHX Text

VACANT

AutoCAD SHX Text C137

AutoCAD SHX Text

104.31 sf

AutoCAD SHX Text

VACANT

AutoCAD SHX Text C138

AutoCAD SHX Text

104.31 sf

AutoCAD SHX Text

VACANT

AutoCAD SHX Text C139

AutoCAD SHX Text

107.61 sf

AutoCAD SHX Text

CORRIDOR

AutoCAD SHX Text C140

AutoCAD SHX Text

539.81 sf

AutoCAD SHX Text

VACANT

AutoCAD SHX Text C141

AutoCAD SHX Text

334.57 sf

AutoCAD SHX Text

VACANT

AutoCAD SHX Text C142

AutoCAD SHX Text

165.97 sf

AutoCAD SHX Text

VACANT

AutoCAD SHX Text C143

AutoCAD SHX Text

359.32 sf

AutoCAD SHX Text

KCAB OPS DEPT.

AutoCAD SHX Text

BREAKROOM

AutoCAD SHX Text C144

AutoCAD SHX Text

359.33 sf

AutoCAD SHX Text

KCAB OPS DEPT.

AutoCAD SHX Text C145

AutoCAD SHX Text

533.87 sf

AutoCAD SHX Text

KCAB OPS DEPT.

AutoCAD SHX Text C146

AutoCAD SHX Text

503.36 sf

AutoCAD SHX Text

KCAB EOC CENTER

AutoCAD SHX Text C147

AutoCAD SHX Text

787.65 sf

AutoCAD SHX Text

STORAGE

AutoCAD SHX Text C148

AutoCAD SHX Text

42.58 sf

AutoCAD SHX Text

CORRIDOR

AutoCAD SHX Text C149

AutoCAD SHX Text

210.38 sf

AutoCAD SHX Text

MEN'S

AutoCAD SHX Text

LOCKER ROOM

AutoCAD SHX Text C150

AutoCAD SHX Text

231.74 sf

AutoCAD SHX Text

MEN

AutoCAD SHX Text C151

AutoCAD SHX Text

287.97 sf

AutoCAD SHX Text

ELEVATOR

AutoCAD SHX Text

EQUIPMENT

AutoCAD SHX Text C152

AutoCAD SHX Text

52.42 sf

AutoCAD SHX Text

WOMEN'S

AutoCAD SHX Text

LOCKER ROOM

AutoCAD SHX Text C156

AutoCAD SHX Text

229.52 sf

AutoCAD SHX Text

WOMEN

AutoCAD SHX Text C155

AutoCAD SHX Text

635.13 sf

AutoCAD SHX Text

CORRIDOR

AutoCAD SHX Text C154

AutoCAD SHX Text

199.95 sf

AutoCAD SHX Text

HOUSEKEEPING

AutoCAD SHX Text

BREAKROOM

AutoCAD SHX Text C153

AutoCAD SHX Text

817.09 sf

AutoCAD SHX Text

HOUSEKEEP.

AutoCAD SHX Text

OFFICE

AutoCAD SHX Text C157

AutoCAD SHX Text

175.75 sf

AutoCAD SHX Text

HOUSEKEEP.

AutoCAD SHX Text

OFFICE

AutoCAD SHX Text C158

AutoCAD SHX Text

176.09 sf

AutoCAD SHX Text

JANITOR

AutoCAD SHX Text

STORAGE

AutoCAD SHX Text C161

AutoCAD SHX Text

196.85 sf

AutoCAD SHX Text

READY ROOM

AutoCAD SHX Text C114

AutoCAD SHX Text

90.63 sf

AutoCAD SHX Text

FIRE PROT.

AutoCAD SHX Text C160

AutoCAD SHX Text

51.83 sf

AutoCAD SHX Text

ELECTRICAL

AutoCAD SHX Text C163

AutoCAD SHX Text

39.13 sf

AutoCAD SHX Text

ELEVATOR

AutoCAD SHX Text

EQUIPMENT

AutoCAD SHX Text C164

AutoCAD SHX Text

161.81 sf

AutoCAD SHX Text

HOUSEKEEPING

AutoCAD SHX Text

STORAGE

AutoCAD SHX Text C165

AutoCAD SHX Text

246.86 sf

AutoCAD SHX Text

CORRIDOR

AutoCAD SHX Text C162

AutoCAD SHX Text

918.58 sf

AutoCAD SHX Text

HOUSEKEEPING

AutoCAD SHX Text

WOMEN'S

AutoCAD SHX Text

LOCKER ROOM

AutoCAD SHX Text C166

AutoCAD SHX Text

283.11 sf

AutoCAD SHX Text

HOUSEKEEPING

AutoCAD SHX Text

MEN'S

AutoCAD SHX Text

LOCKER ROOM

AutoCAD SHX Text C167

AutoCAD SHX Text

287.62 sf

AutoCAD SHX Text

ELECTRICAL

AutoCAD SHX Text C168

AutoCAD SHX Text

92.11 sf

AutoCAD SHX Text

VACANT

AutoCAD SHX Text D101

AutoCAD SHX Text

402.09 sf

AutoCAD SHX Text

READY ROOM

AutoCAD SHX Text D100

AutoCAD SHX Text

94.05 sf

AutoCAD SHX Text

VACANT

AutoCAD SHX Text D102

AutoCAD SHX Text

130.88 sf

AutoCAD SHX Text

ELEVATOR

AutoCAD SHX Text

EQUIPMENT

AutoCAD SHX Text D104

AutoCAD SHX Text

46.52 sf

AutoCAD SHX Text

VACANT

AutoCAD SHX Text D106

AutoCAD SHX Text

101.55 sf

AutoCAD SHX Text

VACANT

AutoCAD SHX Text D107

AutoCAD SHX Text

120.30 sf

AutoCAD SHX Text

VACANT

AutoCAD SHX Text D108

AutoCAD SHX Text

120.70 sf

AutoCAD SHX Text

CORR.

AutoCAD SHX Text D103

AutoCAD SHX Text

540.91 sf

AutoCAD SHX Text

MECHANICAL

AutoCAD SHX Text D165

AutoCAD SHX Text

CORRIDOR

AutoCAD SHX Text D166

AutoCAD SHX Text

173.28 sf

AutoCAD SHX Text

VACANT

AutoCAD SHX Text D173

AutoCAD SHX Text

121.22 sf

AutoCAD SHX Text

VACANT

AutoCAD SHX Text D174

AutoCAD SHX Text

120.83 sf

AutoCAD SHX Text

STOR.

AutoCAD SHX Text D175

AutoCAD SHX Text

46.02 sf

AutoCAD SHX Text

VACANT

AutoCAD SHX Text D176

AutoCAD SHX Text

141.31 sf

AutoCAD SHX Text

VACANT

AutoCAD SHX Text D177

AutoCAD SHX Text

141.31 sf

AutoCAD SHX Text

CORR.

AutoCAD SHX Text D172

AutoCAD SHX Text

95.43 sf

AutoCAD SHX Text

VACANT

AutoCAD SHX Text D170

AutoCAD SHX Text

107.83 sf

AutoCAD SHX Text

VACANT

AutoCAD SHX Text D168

AutoCAD SHX Text

170.08 sf

AutoCAD SHX Text

VACANT

AutoCAD SHX Text D167

AutoCAD SHX Text

257.54 sf

AutoCAD SHX Text

VACANT

AutoCAD SHX Text D171

AutoCAD SHX Text

107.61 sf

AutoCAD SHX Text

VACANT

AutoCAD SHX Text C135

AutoCAD SHX Text

109.81 sf

AutoCAD SHX Text

READY ROOM

AutoCAD SHX Text D169

AutoCAD SHX Text

ELEVATOR

AutoCAD SHX Text

DA-3

AutoCAD SHX Text

55.28 sf

AutoCAD SHX Text

ELEVATOR

AutoCAD SHX Text

CA-2

AutoCAD SHX Text

58.31 sf

AutoCAD SHX Text

ESCALATOR

AutoCAD SHX Text

ELEVATOR

AutoCAD SHX Text

CA-4

AutoCAD SHX Text

68.51 sf

AutoCAD SHX Text

ESCALATOR

AutoCAD SHX Text

FE

AutoCAD SHX Text

FE

AutoCAD SHX Text

FE

AutoCAD SHX Text

FHC

AutoCAD SHX Text

FE

AutoCAD SHX Text

FE

AutoCAD SHX Text

AED

AutoCAD SHX Text L

AutoCAD SHX Text

FE

AutoCAD SHX Text

FE

AutoCAD SHX Text L

AutoCAD SHX Text

CAB. HTR. HWCH-CA-8

AutoCAD SHX Text

HOT WATER PIPING

AutoCAD SHX Text

READY ROOM

AutoCAD SHX Text C159

AutoCAD SHX Text

68.93 sf

AutoCAD SHX Text

FAN COIL UNIT FCU-6

AutoCAD SHX Text

W.H. #A-R-WH1

AutoCAD SHX Text

FEC

AutoCAD SHX Text

SOV

AutoCAD SHX Text

FE

AutoCAD SHX Text

SOV

AutoCAD SHX Text

CAB. HEATER HWCH-CA-5

AutoCAD SHX Text

FE

AutoCAD SHX Text

FHC

AutoCAD SHX Text

PIPE

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

FEC

AutoCAD SHX Text

FEC

AutoCAD SHX Text

FEC

AutoCAD SHX Text L

AutoCAD SHX Text L

AutoCAD SHX Text L

AutoCAD SHX Text

FEC

AutoCAD SHX Text

FAN COIL FCU-CA-3

AutoCAD SHX Text

SOV

AutoCAD SHX Text

FAN COIL FCU-CA-4

AutoCAD SHX Text

FAN COIL FCU-C

AutoCAD SHX Text

AIR HANDLER AHU-4

AutoCAD SHX Text

CONTROL PANEL AHU-CA-4

AutoCAD SHX Text

FEC

AutoCAD SHX Text

CAB. HTR. HWCH-CA-9

AutoCAD SHX Text L

AutoCAD SHX Text

EP #H-AA

AutoCAD SHX Text

EP #L-AA

AutoCAD SHX Text

PUMP P-CA-9

AutoCAD SHX Text

STAIR

AutoCAD SHX Text C21

AutoCAD SHX Text

239.05 sf

AutoCAD SHX Text

STAIR

AutoCAD SHX Text C23

AutoCAD SHX Text

317.62 sf

AutoCAD SHX Text

STAIR

AutoCAD SHX Text C7

AutoCAD SHX Text

129.66 sf

AutoCAD SHX Text

STAIR

AutoCAD SHX Text C6

AutoCAD SHX Text

190.98 sf

AutoCAD SHX Text

STAIR

AutoCAD SHX Text C24

AutoCAD SHX Text

319.80 sf

AutoCAD SHX Text

STAIR

AutoCAD SHX Text C20

AutoCAD SHX Text

202.36 sf

AutoCAD SHX Text

STAIR

AutoCAD SHX Text D9

AutoCAD SHX Text

217.68 sf

AutoCAD SHX Text

CAB. HTR. HWCH-CA-4

AutoCAD SHX Text

UP

AutoCAD SHX Text

UP

AutoCAD SHX Text

DOWN

AutoCAD SHX Text

UP

AutoCAD SHX Text

UP

AutoCAD SHX Text

UP

AutoCAD SHX Text

UP

AutoCAD SHX Text

UP

AutoCAD SHX Text

UP

AutoCAD SHX Text

MEP/

AutoCAD SHX Text

NO ACCESS

AutoCAD SHX Text

CNA1

AutoCAD SHX Text

14.90 sf

AutoCAD SHX Text

CAGED SMOKING AREA NO DRIVE THRU ACCESS

AutoCAD SHX Text

PIPE

AutoCAD SHX Text F

AutoCAD SHX Text F

AutoCAD SHX Text F

AutoCAD SHX Text F

AutoCAD SHX Text F

AutoCAD SHX Text F

AutoCAD SHX Text F

AutoCAD SHX Text F

AutoCAD SHX Text F

AutoCAD SHX Text F

AutoCAD SHX Text F

AutoCAD SHX Text F

AutoCAD SHX Text F

AutoCAD SHX Text F

AutoCAD SHX Text F

AutoCAD SHX Text F

AutoCAD SHX Text A-12

AutoCAD SHX Text

AutoCAD SHX Text A-11

AutoCAD SHX Text

AutoCAD SHX Text F

AutoCAD SHX Text F

AutoCAD SHX Text F

AutoCAD SHX Text F

AutoCAD SHX Text F

AutoCAD SHX Text F

AutoCAD SHX Text F

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

Business Case - Concourse A Ramp Level Upgrade
Construction ROM - GRW Rev1
Room Finish Schedule 5035-09-A601-TA
Sheets and Views
A601
Floor Plan Proposed X-5035-09-Conc.A Level
Sheets and Views
Layout1
2025-02-04T04:19:22-0800
Agreement certified by Adobe Acrobat Sign

File details come from the government source that posted it. Updated .