PWS_Attach_D_Material Review Board Exemptions.pdf

PDF 161 KB Posted

Attached to
T56 Series 3. 0/-15 and 3. 5/-15A Joint Follow on Contract
Solicitation number
FA812126R0010
Issued by

About this file

This is an appendix to a Performance Work Statement (PWS) for T56 engine maintenance and overhaul operations, effective 06 December 2024, that specifies exemptions from Material Review Board (MRB) disposition requirements.

The document outlines seven categories of material that are exempt from MRB disposition by the Government and may be dispositioned to scrap when determined to meet specified criteria and fall beyond Technical Order (T.O.) overhaul reparable limits through Contractor local engineering review. Exempt materials include: (a) material with replacement cost less than $5,000; (b) superseded or replaced configurations, specifically non-rub-tolerant 2nd and 3rd stage T56-A15 turbine vanes, non-stiffened main diaphragms, Hastelloy C T56-A15 turbine vane cases, and prop shaft seals and nose bearing plates identified by part numbers; (d) bearings; (e) electrical components rejected for electrical test criteria lacking T.O. rework specifications; (f) Consumable Floating Material (CFM) except parts and assemblies with life limits; and (g) common hardware including brackets, fasteners, and 100% replacement items such as seals, packings, and O-rings. The Government reserves the right to revise or update the exemption list based on evolving requirements, and deviations to MRB review requirements may be identified and finalized by the Procuring Contracting Officer (PCO) or Administrative Contracting Officer (ACO).

View the file

Other files

File Type Posted
KTR Questions and Answers.xlsx XLSX spreadsheet
PWS_APPENDIX_A_PERFORMANCE WORK STATEMENT (06 April 2026 Rev 1).pdf PDF
PWS_APPENIX_C_ELIN_Matrix_T56_CLIN 20APR2026.open permissions.xlsx XLSX spreadsheet
PWS_APPENDIX_A_PERFORMANCE_WORK_STATEMENT06April2026Rev1.pdf PDF
SOL_Attach_18_TRNSPDATA_REPORT.pdf PDF
SOL_Attach_17_(B1)_CAVAF_Report_Matrix 17MAR26.pdf PDF
SOL_Attach_17_(B1)_CAVAF_Report_Matrix 17MAR26.xlsx XLSX spreadsheet
SOL_Attach_6_DATA ITEM DESCRIPTIONS.pdf PDF
SOL_Attach_2_Section M Evaluation Criteria_T56.pdf PDF
PWS_Attach_C_Definitions.pdf PDF
SOL_Attach_20_GFP.xlsx XLSX spreadsheet
SOL_Attach_7_ITEM DESCRIPTIONS.pdf PDF
SOL_Attach_8_REPAIR DATA LISTS.pdf PDF
SOL_Attach_5_CDRL_A001 - A014.pdf PDF
PWS_Attach_F2_NAVY CIM.pdf PDF
SOL_Attach_3_Ordering Procedures_T56.pdf PDF
PWS_Attach_K_GOVERNMENT FURNISHED MATERIAL_MISTR.pdf PDF
PWS_Attach_H_Supplemental Packaging Instructions.pdf PDF
PWS_APPENDIX_A_PERFORMANCE WORK STATEMENT (11 March 2026 Rev 1).pdf PDF
PWS_Attach_A_USAF Tech Orders and Time Compliance Technical Orders.pdf PDF
PWS Exhibit A - Contract Data Requirements List 12-16-2025 REV 1.xlsx XLSX spreadsheet
SOL_Attach_9_RECOMMENDED QUALITY ASSURANCE PROVISIONS AND SPECIAL INSPECTION REQUIREMENTS.pdf PDF
SOL_Attach_16_CAVAF.pdf PDF
SOL_Attach_12_MILITARY CRITICAL TECHNICAL DATA AGREEMENT.pdf PDF
PWS_Attach_G_CEMS ACCESS SECURITY CHECK PROCESS.pdf PDF
PWS_Attach_F1_NAVY CRITICAL SAFETY ITEMS.pdf PDF
PWS_Attach_F_Navy Specific Requirements.pdf PDF
SOL_Attach_1_Section L Instructions to Offerors_T56.pdf PDF
PWS_APPENDIX_C_ELIN_Matrix_T56_CLIN 17MAR2026.xlsx XLSX spreadsheet
PWS_APPENDIX_B_GOVERNMENT PROPERTY MANAGEMENT.pdf PDF
PWS_Attach_E_Acronyms.pdf PDF
PWS_Attach_B_Initial Production Evaluation of Critical and Sensitive Repair Procedures.pdf PDF
FA812126R0010.pdf PDF
SOL_Attach_19_PKGRQMT_REPORT.pdf PDF
SOL_Attach_21_Personnel and Skill Requirements.pdf PDF
SOL_Attach_15_SPECIAL PACKAGING INSTRUCTIONS.pdf PDF
SOL_Attach_10_FA812126R0010 CLAUSES DAF.pdf PDF
SOL_Attach_13_ITEM UNIQUE IDENTIFICATION (IUID) CHECKLIST.pdf PDF
SOL_Attach_14_TERMS OF AGREEMENT (TOA).xlsx XLSX spreadsheet
SOL_Attach_4_RQR-1-T56 Rev.1.pdf PDF
PWS_Attach_J_T56_DRC_GFE_Listing_Rev5.pdf PDF
PWS_Attach_I_Supply Chain Risk Management (SCRM).pdf PDF
Show all 42

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

T56 PWS ATTACHMENT D

Material Review Board Exemptions 06 Dec 24 NOTE: Government retains the right to revise or update this list based on Government requirements.

The following material is exempt from MRB disposition by the Government. It may be dispositioned to scrap when it is determined to meet the following criteria and be beyond T.O.

overhaul reparable limits by Contractor local engineering review The Government retains the right to amend the list below. Deviations to MRB review requirements may be identified by the Contractor or Government and finalized by the PCO/ACO.

(a) Material of less than $5,000 replacement cost

(b) Material configuration has been superseded, or replaced by improved configuration and listed below:

Non rub-tolerant 2nd and 3rd stage T56-A15 turbine vanes Non-stiffened main diaphragm Hastelloy C T56-A15 turbine vane cases Prop shaft seal and Nose bearing plate, P/N 6851491/6846127/6875798, and 6788467/6877391

(d) Bearings

(e) Electrical components rejected for electrical test criteria where no T.O. rework criteria is specified in applicable manuals

(f) Material is CFM, except for parts and assemblies with life limits.

(g) Common hardware; brackets, fasteners, etc. and 100% replacement items; e.g. seals, packings, O-rings, etc.

File details come from the government source that posted it. Updated .