KTR Questions and Answers.xlsx

XLSX spreadsheet 15 KB Posted

Attached to
T56 Series 3. 0/-15 and 3. 5/-15A Joint Follow on Contract
Solicitation number
FA812126R0010
Issued by

About this file

This file contains Questions and Answers from an Industry Day for the T56 Series 3.0/-15 and 3.5/-15A Joint Follow-on Contract (FA812126R0010), a competitive Multiple Award IDIQ contract for T56 engine repair and overhaul services. The solicitation closes May 22, 2026 at 3:00 PM CDT and covers a 10-year period of performance (1 five-year basic with 1 five-year option) supporting United States Air Force, United States Navy, and Foreign Military Sales customers. To be eligible for award, contractors must obtain SAR (Source Approval Request) approval and Rolls Royce certification; the Government is not obligated to delay award pending SAR completion. Task orders will be awarded based on requirements and complexity rather than a fixed split formula, and contractors must propose on all FONs (Funding Opportunity Notices) for which they are eligible or risk removal from the program. All work must be performed by SAR-approved, Rolls Royce-certified contractors; work location is not restricted to CONUS. Contractors must use only new and unused parts from Government-approved sources, OEM, or authorized distributors with no used or reclaimed material permitted. Key compliance requirements include Service Contract Act rates, Level 2 NIST scoring with DCMA compliance verification, wall-to-wall inventory management per USAF requirements, Commercial Asset Visibility reporting for Navy material, and submission of Supply Chain Risk Management Plans within 15 days of award. Additional requirements include First Article Inspections per PWS 1.2.1, database access within 45 days of award, a 20 percent surge capacity, phase-out plans per PWS 1.17, and completion of SCRM documentation and post-award conference as minimum obligations for on-ramped contractors.

View the file

Other files

File Type Posted
PWS_APPENDIX_A_PERFORMANCE WORK STATEMENT (06 April 2026 Rev 1).pdf PDF
PWS_APPENDIX_A_PERFORMANCE_WORK_STATEMENT06April2026Rev1.pdf PDF
PWS_APPENIX_C_ELIN_Matrix_T56_CLIN 20APR2026.open permissions.xlsx XLSX spreadsheet
SOL_Attach_18_TRNSPDATA_REPORT.pdf PDF
SOL_Attach_17_(B1)_CAVAF_Report_Matrix 17MAR26.pdf PDF
SOL_Attach_17_(B1)_CAVAF_Report_Matrix 17MAR26.xlsx XLSX spreadsheet
SOL_Attach_6_DATA ITEM DESCRIPTIONS.pdf PDF
SOL_Attach_2_Section M Evaluation Criteria_T56.pdf PDF
PWS_Attach_C_Definitions.pdf PDF
PWS_Attach_D_Material Review Board Exemptions.pdf PDF
SOL_Attach_9_RECOMMENDED QUALITY ASSURANCE PROVISIONS AND SPECIAL INSPECTION REQUIREMENTS.pdf PDF
SOL_Attach_16_CAVAF.pdf PDF
SOL_Attach_12_MILITARY CRITICAL TECHNICAL DATA AGREEMENT.pdf PDF
PWS_Attach_G_CEMS ACCESS SECURITY CHECK PROCESS.pdf PDF
PWS_Attach_F1_NAVY CRITICAL SAFETY ITEMS.pdf PDF
PWS_Attach_F_Navy Specific Requirements.pdf PDF
SOL_Attach_1_Section L Instructions to Offerors_T56.pdf PDF
PWS_APPENDIX_C_ELIN_Matrix_T56_CLIN 17MAR2026.xlsx XLSX spreadsheet
PWS_APPENDIX_B_GOVERNMENT PROPERTY MANAGEMENT.pdf PDF
PWS_Attach_E_Acronyms.pdf PDF
PWS_Attach_B_Initial Production Evaluation of Critical and Sensitive Repair Procedures.pdf PDF
FA812126R0010.pdf PDF
SOL_Attach_20_GFP.xlsx XLSX spreadsheet
SOL_Attach_7_ITEM DESCRIPTIONS.pdf PDF
SOL_Attach_8_REPAIR DATA LISTS.pdf PDF
SOL_Attach_5_CDRL_A001 - A014.pdf PDF
PWS_Attach_F2_NAVY CIM.pdf PDF
SOL_Attach_3_Ordering Procedures_T56.pdf PDF
PWS_Attach_K_GOVERNMENT FURNISHED MATERIAL_MISTR.pdf PDF
PWS_Attach_H_Supplemental Packaging Instructions.pdf PDF
PWS_APPENDIX_A_PERFORMANCE WORK STATEMENT (11 March 2026 Rev 1).pdf PDF
PWS_Attach_A_USAF Tech Orders and Time Compliance Technical Orders.pdf PDF
PWS Exhibit A - Contract Data Requirements List 12-16-2025 REV 1.xlsx XLSX spreadsheet
SOL_Attach_19_PKGRQMT_REPORT.pdf PDF
SOL_Attach_21_Personnel and Skill Requirements.pdf PDF
SOL_Attach_15_SPECIAL PACKAGING INSTRUCTIONS.pdf PDF
SOL_Attach_10_FA812126R0010 CLAUSES DAF.pdf PDF
SOL_Attach_13_ITEM UNIQUE IDENTIFICATION (IUID) CHECKLIST.pdf PDF
SOL_Attach_14_TERMS OF AGREEMENT (TOA).xlsx XLSX spreadsheet
SOL_Attach_4_RQR-1-T56 Rev.1.pdf PDF
PWS_Attach_J_T56_DRC_GFE_Listing_Rev5.pdf PDF
PWS_Attach_I_Supply Chain Risk Management (SCRM).pdf PDF
Show all 42

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Sheet1

Industry Day QuestionsReferenceContractor Submitted QuestionsAnswer
Will you always award two work orders per period as split 75/25 based on price, or would this vary by period?NO, awards will be based on the requirments needed and requested in the FON
Is the current Navy T56 soliciation in source selection now absorbed in to this MAC IDIQ?NO, the Navy solicitation has nothing to do with this solicitation
Please confirm that all task orders need to be performed with the CONUS region?NO, the task orders do not need to be performed in the CONUS region. They must be performed by a contractor that is SAR approved and is Rolls Royce certified.
Will a successful bidder need to propose on all FON's?As stated in the ordering procedures, "Participation Requirement. Each Contractor must propose on all FONs they are eligible for. Failure to do so may result in removal (off-ramp) from the JFOC MAC program. If Page 5 of 7 adequate competition (two or more proposals per the RFO) is not obtained following issuance of a competitive FON, the Government may extend the proposal due date and require that all approved Contractors submit a proposal in response to the FON.
Do qualifired bidders need to be base in the US or North America?NO, contractors must be SAR approved and Rolls Royce certified to be awarded a MAC IDIQ, contractors may be onboarded at a later date as a source gets approved.
The ELIN matrix - Appendix C - The file can't be openned. Can it be provided again in Excel/spreadsheet formatAn open permissions file was sent out to all current SAR approved POCs. And an open permissions file was added to the files displayed on SAM.gov
Post Industry Day QuestionsProgram Management Requirments, Appendix A-PWS, 1.12To what extent and how will "positions needed for this requirement" be funded via repair CLIN/ELIN pricing?CLIN/ELINs are Firm Fixed Price. Bid your CLIN/ELIN appropriately to account for the cost of postions needed
CFM vs Retrograde Mat'l for repairs, PWS Attach F- Navy Spec Rqmnts, 1.6 and 1.2.10At what stage is this due to be submitted? For every bid or one time upfront?Navy will provide NRFI assets that will need to be repaired in accordance with the latest repair manuals/specs. Repair vendor will be responsible for providing all necessary piece parts and components to effect the repair. If the cost to repair the item is more than 80% of a new spare cost, then the vendor to reach out to PCO, who will engage with the Navy supply planner to determine if that repair should continue, and funding provided, or scrapped
COMMERCIAL ASSET VISIBILITY (CAV) STATEMENT OF WORK, PWS Attach F- Navy Spec RqmntsWill Para I-V or VI-X apply?This applies to all Navy Working Capital fund material
COMMERCIAL ASSET VISIBILITY (CAV) STATEMENT OF WORK, PWS Attach F- Navy Spec RqmntsDoes the Navy anticipate any FMS customer T56 module or component repairs under this contract?FMS material is not reported in CAV unless stated in the contract.
Reference to T56-A-427 NA 02B-5DG4 IPB Figure in Column C, PWS Attach F- Navy Spec RqmntsShould be referencing SIII engine models?Manual is not needed
SCRM, PWS Attach I Supply Chain Risk ManagementAt what stage is this due to be submitted? For every bid or one time upfront?As directed in PWS, the Supply Chain Risk Management Plan is due 15 days after award
SOL Attach Ordering ProceduresContractors on-ramped after the initial multiple award IDIQ contracts are awarded an IDIQ and will receive an initial task order for the contract minimum, and may receive material lay-in, and tooling. Please explain in further detail.Contractors will receive the "post award conference" as the minimum. Material lay-in/ tooling need will be identified by the Requirments Office and Engineering Office and will be issued/awarded to subject task order. This will be addressed in the FON.
RQR 1.1.3.1The RQR document in this solicitation is dated 2012. The RQR posted in the 2025 T56 solicitation was dated January 28,2020. Should the RQR date be updated to the most current 2020 RQR?Updated 2020 RQR has been attached to the solicitation amendment
Pls confirm that SAR resubmission is required if a contractor has not performed USAF work within 3 yrs for Critical Safety Items(CSI) and 7 years for Critical Application Items(CAI).YES
The RQR requires that First Article Inspections(FAIs) are required for contractors who have not performed USAF work before. How will the USAF sequence the priority for First Article Inspections if a Delivery Order is split across multiple contractors. When will the USAF begin the FAIs?IAW 1.2.1 as listed in the PWS
Will the USAF accept Lockeed Martin QEC certification in lieu of a USAF QEC SAR package?NO
Is a minimum NIST score required for this effort and how will contractors be assessed for compliance?Level 2 and DCMA will complete the compliance check
How will GFE be transferred Delivery Order after Delivery Order?Refer to PWS sections 1.16.2 & 3.2
How will the USAF assess compliance with the Government Property Management requirements?USAF 1.2.1 wall to wall inventory (WtW) and IAW other USG agencies
Is a Small Business Plan required?Yes, if a large business
Contractor is unable to open PWS Attach F1 Navy Critical Safety Items. Please provide copy that is accessible.The document is accessible
PWS Attachment F-2 Navy CIM contains headers indicating T56-A-427. Has T56 Series 4 (427) work been added into this new solicitation?Waiting on Navy to provide information
Will the Gov require previous Commercial Asset Visibility (CAV) experience and required Gov systems access?NO
Given the large volume of transactions (4000-5000 per year), a 24 hr response time is not practical for all suppliers. Many of the reporting requirements are administratively heavy and the burden on the Gov and contractor will be significant. Is it practical to apply these requirements for a MAC contract?Requirement per the CAV contractor user guide
How will the Gov manage reporting requirements with potentially multiple contractors performing?USG will manage accordingly
The numbering of CDRLS referenced in the PWS don’t correspond with numbering of CDRLs referenced in SOL_Attach_5. Can the Government please clarify.Amended PWS attached to solicitation amendment
How much time will the Gov provide Contactors to respond to individual FOPNs?Requirements Holder intends for 10 business days depending on complexity, this will be addressed in subject FONs
Confirm the Service Contract Act rates apply to this contract.YES, SCA applies
Confirm that Delivery Order will be awarded on a Low Price basis. If not, what other evaluation criteria will be used, and the weighted percentage for each criteria.Task Orders will be awarded as laid out in the individual FONs. FONs can specify criteria of need such as delivery schedule or price.
PWS 1.14What surge percentage should the contractor prepare for?April 6 PWS calls out 20%.
PWS 1.16.1Phase-out plans are not reasonable in MAC structure. Please confirm no phase-out is required.Phase out will be applicable IAW with the PWS
PWS 1.17Confirm the SCRM due 15 days after award.YES, 15 days after award
PWS 1.11.1Program Databases and Websites: Are contractors required to have access to databases A through S, prior to contract award? If not, how much time is allowed to gain access?IAW PWS, required within 45 days of post contract award
PWS 1.9.3Pls confirm that no Used Serviceable Material or reclaimed parts, are allowed be used on USAF and Navy engine repairs. Contractor(s) Furnished Material (CFM) The Contractor(s) may use the DLA as their source of supply for consumable items. The Contractor(s) shall procure new and unused parts only. Parts must be procured from Government approved sources, the Original Equipment Manufacturer (OEM), or OEM authorized parts distributors. For each occurrence that the Contractor(s) buys around DLA, the Contractor(s) shall submit a Demand Data Exchange (DDE) to DLA for the parts to only be procured by DLA.No used matieral or reclaimed parts allowed. Per PWS 1.15.7
Attach 1_Section L_B.3.b and B.3.cWhich document should be filled out for contractor self attestations?Contractors should sign the front page of the solicitation. Contractor representations are located in the Clause document SOL Attachment 10. This document contains all of the clauses for the solicitation and has the relevant information. In most circumstances, this section is in the contract, but because our solicitation was released during the RFO this was clearest and most concise way to include the clauses.