Amendment_0004_to_P16PS00660.pdf
PDF 130 KB Posted
- Attached to
- Arch Museum Exhibits (JEFF 199869B) Federal contract opportunity
- Solicitation number
- P16PS00660
About this file
Amendment 0004 to P16PS00660
View the file
Other files for this federal contract opportunity
Show all 50
Arch Museum Exhibits (JEFF 199869B) has more files on GovTribe.
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
JEFF 199869B
Museum Exhibits
P16PS00660 / Amendment 0004 Attachment #1
09/20/2016
The purposes of Amendment 0004 are to:
1) Delete and replace the RFP document in its entirety due to the below listed changes in the clauses and provisions.
2) Delete the following clause and provision:
a. Clause 52.222‐13 COMPLIANCE WITH CONSTRUCTION WAGE RATE REQUIREMENTS AND
RELATED REGULATIONS (MAY 2014)
b. Provision 52.222‐5 CONSTRUCTION WAGE RATE REQUIREMENTS – SECONDARY SITE OF THE
WORK (MAY 2014)
3) Add the following clauses:
a. Clause 52.222‐41 SERVICE CONTRACT LABOR STANDARDS (MAY 2014).
b. Clause 52.222‐42 STATEMENT OF EQUIVALENT RATES FOR FEDERAL HIRES (MAY 2014).
c. Clause 52.222‐44 FAIR LABOR STANDARDS ACT AND SERVICE CONTRACT LABOR STANDARDS
– PRICE ADJUSTMENT (MAY 2014).
d. Clause 52.222‐49 SERVICE CONTRACT LABOR STANDARDS – PLACE OF PERFORMANCE
UNKNOWN (MAY 2014).
e. Clause 52.246‐19 WARRANTY OF SYSTEMS AND EQUIPMENT UNDER PERFORMANCE
SPECIFICATIONS OR DESIGN CRITERIA (MAY 2001) – ALTERNATE III (APR 1984).
4) Delete and replace Attachment W, Wage Determination in its entirety. The Construction Wage
(Davis Bacon) rate determination is hereby removed. The Service Contract Act Wage Rate, Wage
Determination No: WD 2015‐5075 dated 05/05/2016 is hereby incorporated.
5) Delete and replace Attachment E, Supplementary Specifications in its entirety.
6) The following drawing sheets in Attachment O, Contract #1 Drawings (Drawing Set No. 366/130323) are hereby replaced as follows:
a. 9489 (-) MWE 000 Rev A. (Drawing Issue Register)
b. 9489 (E) MWE 4811 Rev A. (Area 8 - Building the Arch, Display Tables for Saarinen's
Tour Interactive)
c. 9489 (F) MWE 502 Rev A. (Proposed Flooring Layout Central Exhibit Space Museum and the Hubs)
d. 9489 (Z) MWE 1525 Rev A. (Area 1 – Heading West and, Area 2 - Hubs, and Audio
Visual Schematics)
e. 9489 (Z) MWE 1530 Rev. A (Area 9 - Tram Lobby and the Arch, Audio Visual Schematic)
7) Provide contractor questions and government response.
The proposal deadline remains Thursday, October 6, 2016 at 3:00pm Mountain Time (MT) as stated in
Amendment 0002. The question deadline remains Tuesday, September 27, 2016 at 3:00pm Mountain
Time (MT) as stated in Amendment 0002.
File details come from the government source that posted it. Updated .