MIL-STD-810F NOT 2.pdf

Military Standard Rev. F PDF 5 MB Posted

Attached to
Detailed Design for a High Temperature Fuel Cell (SOFC) Based Auxiliary Power Unit
Solicitation number
ONRBAA08-024
Issued by

About this file

Also attached are requested MilStds.

View the file

Other versions and copies of MIL-STD-810F

File Revision Posted Attached to
B08-HT9427-26-R-E001-Attachment-K-MIL-STD-810H.pdf Rev. H Compact Oxygen Generation Medical Devices: Compact Oxygen Generation, Medical (COGM) and Compact Oxygen Generation, Medical – At Altitude (COGM-A)
A02-Portable-Oxygen-Carrier-COGM-RFI-Attach 6-MILSTD810H.pdf Rev. H Portable Oxygen- Compact Oxygen Generation Medical (COGM)
A02 Attachment 3 MIL STD 810H 501.7.pdf Rev. H Veterinary Centrifuge
Attachment I - MIL-STD-810H.pdf Rev. H Ultrasound Field Portable (USFP) Assessment and Development Efforts
Attachment 0002 - Profile Tables_MIL-STD-810H.pdf Rev. H Vibration Testing Equipment and Install
MIL_STD_810G Attachment.pdf Rev. G Military Ruggedized PoE Cameras
MIL-STD-810G.pdf Rev. G Military Ruggedized Tablets and Accessories
MIL_STD_810G.pdf Rev. G Bridge Anchorage
MIL-STD-810G_CN1.pdf Rev. G JEDI Cloud RFP
Attachment_0013_-_MIL_STD_810G.pdf Rev. G Bridge Protection Device (BPD) Market Survey
MIL-STD-810G_(pages_501_-_1086).pdf Rev. G RFI/Sources Sought for submersible multi fuel outboard motor
MIL-STD-810G_(pages_1_-500).pdf Rev. G RFI/Sources Sought for submersible multi fuel outboard motor
N0017812Q4044_MBIT_-_Reference_Mil-Std810G_-_GFI__12Q4044.DOCX Rev. G Quality Control, Testing and Inspection Services
MILSTD810F.pdf Rev. F UHF/VHF Antennas
MIL-STD-810F NOT 3.pdf Rev. F Detailed Design for a High Temperature Fuel Cell (SOFC) Based Auxiliary Power Unit
MIL-STD-810F NOT 1.pdf Rev. F Detailed Design for a High Temperature Fuel Cell (SOFC) Based Auxiliary Power Unit
TE I_MIL-STD-810_21Feb2025.pdf Feb 21, 2025 West Desert Test Center (WDTC) Mission Support Services (MSS) Follow On Solicitation W51EW725RA001 Amendment 0003
7074 - SOW Mil-Std-810 Racks and AIU 11-4-2015 v1.pdf Nov 4, 2015 MIL-STD-810 Environmental testing
7074 - SOW Mil-Std-810 Hemi and HGIO 9-11-2015 v1.pdf Sep 11, 2015 MIL-STD-810 Environmental testing
MIL-STD-810_Environmental.pdf Revision not stated External Video Camera System
Show all 20

Who attaches MIL-STD-810F

Other files

File Type Posted
MIL-STD-810F NOT 3.pdf PDF
Questions Answers 1.pdf PDF
MIL-STD-1332B.pdf PDF
MIL-STD-1332B NOT 1.pdf PDF
MIL-STD-810F NOT 1.pdf PDF
MIL-STD-1332B NOT 2.pdf PDF
MIL-STD-1275D.pdf PDF
milstd882d.pdf PDF
MIL-STD-705C.pdf PDF
MIL-STD-810E.pdf PDF
MIL-STD-461E.pdf PDF
Power Energy_Polkowski_Presentation_5510_7_Internet Posting.pdf PDF
CES Power Electronics and Control_Ashton.ppt PPT presentation
Power Energy_Polkowski_Presentation_5510_7.pdf PDF
DeS Presentation 8112008.pdf PDF
UM_Linic_Presentation_5510_7_Internet Posting.pdf PDF
IE_Swami_Presentation_5510_7.pdf PDF
CTPH2 Presentation —
SOFC Based APU Industry Day_Dobbs.ppt PPT presentation
SOFC SwiderLyons Aug08b.ppt PPT presentation
Auburn_Anode and Cathode Contaminant Removal.ppt PPT presentation
Ceramatec_Frost_Presentation_5510_7_Internet Release.pdf PDF
NRL_Swider_lyons_Presentation_5510_7_Internet Release.pdf PDF
IE_Swami_Presentation_5510_7_Internet release.pdf PDF
Ceramatec_Frost_Rev2_72908.ppt PPT presentation
PDM_3_workshop_PCI_presentation_Roychoudhury_Rev_05.ppt PPT presentation
Precision Combustion _ Roychoudhury_5510_7_Internet Release.pdf PDF
High Temperature —
CES_Ashton_Presentation_5510_7_Internet Release.pdf PDF
CES Power Electronics and Control.pdf PDF
RIT_Das_Presentation_5510_7.pdf PDF
ONR_Hoffman_Presentation_5510_7.pdf PDF
ONR_Hoffman_Presentation_5510_7_Internet Release.pdf PDF
CTPH2 Presentation —
CTP_Rackey_Presentation_5510_7_internet release.pdf PDF
Precision Combustion _ Roychoudhury_5510_7.pdf PDF
CES_Ashton_Presentation_5510_7.pdf PDF
Univ of Michigan_Industry Day_Nikolla_r2.ppt PPT presentation
NRL_Swider_lyons_Presentation_5510_7.pdf PDF
ONR BAA 08-024.pdf PDF
RIT_Das_Presentation_5510_7_Internet Release.pdf PDF
UM_Linic_Presentation_5510_7.pdf PDF
High Temperature —
CTP_Rackey_Presentation_5510_7.pdf PDF
Ceramatec_Frost_Presentation_5510_7.pdf PDF
P E Presentation ONR Aug11-08_rev3_Polkowski.ppt PPT presentation
TuhinPresentation_0729.ppt PPT presentation
MCSC APU Brief - 11 Aug 08_Carpenter.ppt PPT presentation
Show all 48

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

MIL-STD-810F

NOTICE 2

30 August 2002

DEPARTMENT OF DEFENSE

TEST METHOD STANDARD

ENVIRONMENTAL ENGINEERING CONSIDERATIONS AND LABORATORY TESTS

TO ALL HOLDERS OF MIL-STD-810F:

1. THE FOLLOWING PAGES OF MIL-STD-810F HAVE BEEN REVISED AND SUPERSEDE THE PAGES

LISTED:

NEW PAGE DATE SUPERSEDED PAGE DATE

Cover Page 1 January 2000 Cover Page REPRINTED WITHOUT CHANGE Part One-ii 30 August 2002 Part One-ii 1 January 2000 Part One-iii 30 August 2002 Part One-iii 1 January 2000 Part One-iv 1 January 2000 Part One-iv REPRINTED WITHOUT CHANGE Part One-v 30 August 2002 Part One-v 1 January 2000 Part One-vi 1 January 2000 Part One-vi REPRINTED WITHOUT CHANGE Part One-1 30 August 2002 Part One-1 1 January 2000 Part One-2 30 August 2002 Part One-2 1 January 2000 Part One-3 30 August 2002 Part One-3 1 January 2000 Part One-4 30 August 2002 Part One-4 1 January 2000 Part One-5 30 August 2002 Part One-5 1 January 2000 Part One-6 30 August 2002 Part One-6 1 January 2000 Part One-7 30 August 2002 Part One-7 1 January 2000 Part One-8 30 August 2002 Part One-8 1 January 2000 Part One-9 30 August 2002 Part One-9 1 January 2000 Part One-10 30 August 2002 Part One-10 1 January 2000 Part One-11 30 August 2002 Part One-11 1 January 2000 Part One-12 30 August 2002 Part One-12 1 January 2000 Part One-15 30 August 2002 Part One-15 1 January 2000 Part One-16 1 January 2000 Part One-16 REPRINTED WITHOUT CHANGE Part One-17 1 January 2000 Part One-17 REPRINTED WITHOUT CHANGE Part One-18 30 August 2002 Part One-18 1 January 2000 Part One-19 30 August 2002 Part One-19 1 January 2000 Part One-20 1 January 2000 Part One-20 REPRINTED WITHOUT CHANGE Part One-23 30 August 2002 Part One-23 1 January 2000 Part One-24 30 August 2002 Part One-24 1 January 2000

AMSC N/A AREA ENVR

DISTRIBUTION STATEMENT A. Approved for public release; distribution is unlimited.

NOTICE OF

CHANGE

NOT MEASUREMENT

SENSITIVE

NEW PAGE DATE SUPERSEDED PAGE DATE

Part One A-3 30 August 2002 Part One A-3 1 January 2000 Part One A-4 1 January 2000 Part One A-4 REPRINTED WITHOUT CHANGE Part One B-1 30 August 2002 Part One B-1 1 January 2000 Part One B-2 30 August 2002 Part One B-2 1 January 2000 Part One C-3 30 August 2002 Part One C-3 1 January 2000 Part One C-4 30 August 2002 Part One C-4 1 January 2000

Index-1 30 August 2002 Index-1 1 January 2000 Index-2 30 August 2002 Index-2 1 January 2000 Index-3 1 January 2000 Index-3 REPRINTED WITHOUT CHANGE Index-4 30 August 2002 Index-4 1 January 2000 Index-5 30 August 2002 Index-5 1 January 2000

Part Two-1 30 August 2002 Part Two-1 1 January 2000 500.4-3 30 August 2002 500.4-3 1 January 2000 500.4-4 30 August 2002 500.4-4 1 January 2000 501.4-1 30 August 2002 501.4-1 1 January 2000 501.4-2 1 January 2000 501.4-2 REPRINTED WITHOUT CHANGE 501.4-3 1 January 2000 501.4-3 REPRINTED WITHOUT CHANGE 501.4-4 30 August 2002 501.4-4 1 January 2000 501.4-5 1 January 2000 501.4-5 REPRINTED WITHOUT CHANGE 501.4-6 30 August 2002 501.4-6 1 January 2000 501.4-9 30 August 2002 501.4-9 1 January 2000 501.4-10 30 August 2002 501.4-10 1 January 2000 501.4-11 30 August 2002 501.4-11 1 January 2000 501.4-12 1 January 2000 501.4-12 REPRINTED WITHOUT CHANGE 502.4-7 30 August 2002 502.4-7 1 January 2000 502.4-8 1 January 2000 502.4-8 REPRINTED WITHOUT CHANGE 503.4-1 30 August 2002 503.4-1 1 January 2000 503.4-2 1 January 2000 503.4-2 REPRINTED WITHOUT CHANGE 503.4-3 1 January 2000 503.4-3 REPRINTED WITHOUT CHANGE 503.4-4 30 August 2002 503.4-4 1 January 2000 503.4-5 1 January 2000 503.4-5 REPRINTED WITHOUT CHANGE 503.4-6 30 August 2002 503.4-6 1 January 2000 503.4-7 1 January 2000 503.4-7 REPRINTED WITHOUT CHANGE 503.4-8 30 August 2002 503.4-8 1 January 2000 504-1 1 January 2000 504-1 REPRINTED WITHOUT CHANGE 504-2 30 August 2002 504-2 1 January 2000 504-5 30 August 2002 504-5 1 January 2000 504-6 1 January 2000 504-6 REPRINTED WITHOUT CHANGE 505.4-1 30 August 2002 505.4-1 1 January 2000 505.4-2 1 January 2000 505.4-2 REPRINTED WITHOUT CHANGE 505.4-3 30 August 2002 505.4-3 1 January 2000 505.4-4 30 August 2002 505.4-4 1 January 2000 505.4-5 30 August 2002 505.4-5 1 January 2000

505.4-6 30 August 2002 505.4-6 1 January 2000 505.4-7 30 August 2002 505.4-7 1 January 2000 505.4-8 30 August 2002 505.4-8 1 January 2000 505.4-9 30 August 2002 505.4-9 1 January 2000 505.4-10 1 January 2000 505.4-10 REPRINTED WITHOUT CHANGE 505.4-11 30 August 2002 505.4-11 1 January 2000 505.4-12 1 January 2000 505.4-12 REPRINTED WITHOUT CHANGE 505.4A-1 1 January 2000 505.4A-1 REPRINTED WITHOUT CHANGE 505.4A-2 30 August 2002 505.4A-2 1 January 2000 506.4-1 30 August 2002 506.4-1 1 January 2000 506.4-2 1 January 2000 506.4-2 REPRINTED WITHOUT CHANGE 506.4-3 30 August 2002 506.4-3 1 January 2000 506.4-4 30 August 2002 506.4-4 1 January 2000 506.4-5 30 August 2002 506.4-5 1 January 2000 506.4-6 30 August 2002 506.4-6 1 January 2000 506.4-7 30 August 2002 506.4-7 1 January 2000 506.4-8 30 August 2002 506.4-8 1 January 2000 506.4-9 30 August 2002 506.4-9 1 January 2000 506.4-10 1 January 2000 506.4-10 REPRINTED WITHOUT CHANGE 507.4-1 30 August 2002 507.4-1 1 January 2000 507.4-2 30 August 2002 507.4-2 1 January 2000 507.4-5 1 January 2000 507.4-5 REPRINTED WITHOUT CHANGE 507.4-6 30 August 2002 507.4-6 1 January 2000 507.4-7 30 August 2002 507.4-7 1 January 2000 507.4-8 1 January 2000 507.4-8 REPRINTED WITHOUT CHANGE 508.5-1 30 August 2002 508.5-1 1 January 2000 508.5-2 1 January 2000 508.5-2 REPRINTED WITHOUT CHANGE 508.5-9 30 August 2002 508.5-9 1 January 2000 508.5-10 30 August 2002 508.5-10 1 January 2000 508.5A-1 30 August 2002 NEW PAGE 508.5A-2 30 August 2002 NEW PAGE 509.4-3 30 August 2002 509.4-3 1 January 2000 509.4-4 1 January 2000 509.4-4 REPRINTED WITHOUT CHANGE 509.4-5 30 August 2002 509.4-5 1 January 2000 509.4-6 30 August 2002 509.4-6 1 January 2000 509.4-7 30 August 2002 509.4-7 1 January 2000 509.4-8 1 January 2000 509.4-8 REPRINTED WITHOUT CHANGE 510.4-9 1 January 2000 510.4-9 REPRINTED WITHOUT CHANGE 510.4-10 30 August 2002 510.4-10 1 January 2000 511.4-1 30 August 2002 511.4-1 1 November 2000 511.4-2 30 August 2002 511.4-2 1 January 2000 511.4-3 30 August 2002 511.4-3 1 January 2000 511.4-4 30 August 2002 511.4-4 1 January 2000

511.4-5 30 August 2002 511.4-5 1 January 2000 511.4-6 30 August 2002 511.4-6 1 January 2000 511.4-7 30 August 2002 511.4-7 1 November 2000 511.4-8 30 August 2002 511.4-8 1 November 2000 REMOVE 511.4-9 1 November 2000 REMOVE 511.4-10 1 November 2000 513.5-11 30 August 2002 513.5-11 1 January 2000 513.5-12 1 January 2000 513.5-12 REPRINTED WITHOUT CHANGE 514.5-11 30 August 2002 514.5-11 1 January 2000 514.5-12 1 January 2000 514.5-12 REPRINTED WITHOUT CHANGE 514.5-19 1 January 2000 514.5-19 REPRINTED WITHOUT CHANGE 514.5-20 30 August 2002 514.5-20 1 January 2000 514.5-21 1 January 2000 514.5-21 REPRINTED WITHOUT CHANGE 514.5-22 30 August 2002 514.5-22 1 January 2000 514.5A-5 1 January 2000 514.5A-5 REPRINTED WITHOUT CHANGE 514.5A-6 30 August 2002 514.5A-6 1 January 2000 514.5A-9 1 January 2000 514.5A-9 REPRINTED WITHOUT CHANGE 514.5A-10 30 August 2002 514.5A-10 1 January 2000 514.5A-13 30 August 2002 514.5A-13 1 January 2000 514.5A-14 30 August 2002 514.5A-14 1 January 2000 514.5A-15 1 January 2000 514.5A-15 REPRINTED WITHOUT CHANGE 514.5A-16 30 August 2002 514.5A-16 1 January 2000 514.5C-3 1 January 2000 514.5C-3 REPRINTED WITHOUT CHANGE 514.5C-4 30 August 2002 514.5C-4 1 January 2000 514.5C-5 30 August 2002 514.5C-5 1 January 2000 514.5C-6 1 January 2000 514.5C-6 REPRINTED WITHOUT CHANGE 514.5C-7 30 August 2002 514.5C-7 1 January 2000 514.5C-8 30 August 2002 514.5C-8 1 January 2000 514.5C-9 30 August 2002 514.5C-9 1 January 2000 514.5C-10 1 January 2000 514.5C-10 REPRINTED WITHOUT CHANGE 514.5C-13 30 August 2002 514.5C-13 1 January 2000 514.5C-14 1 January 2000 514.5C-14 REPRINTED WITHOUT CHANGE 514.5C-15 1 January 2000 514.5C-15 REPRINTED WITHOUT CHANGE 514.5C-16 30 August 2002 514.5C-16 1 January 2000 516.5-31 30 August 2002 516.5-31 1 January 2000 516.5-32 30 August 2002 516.5-32 1 January 2000 516.5-33 1 January 2000 516.5-33 REPRINTED WITHOUT CHANGE 516.5-34 30 August 2002 516.5-34 1 January 2000 520.2-1 30 August 2002 520.2-1 1 January 2000 520.2-2 1 January 2000 520.2-2 REPRINTED WITHOUT CHANGE 520.2-11 30 August 2002 520.2-11 1 January 2000 520.2-12 1 January 2000 520.2-12 REPRINTED WITHOUT CHANGE

520.2A-3 30 August 2002 520.2A-3 1 January 2000 520.2A-4 1 January 2000 520.2A-4 REPRINTED WITHOUT CHANGE 520.2A-5 1 January 2000 520.2A-5 REPRINTED WITHOUT CHANGE 520.2A-6 30 August 2002 520.2A-6 1 January 2000 522-3 30 August 2002 522-3 1 January 2000 522-4 30 August 2002 522-4 1 January 2000 .

2. RETAIN THIS NOTICE AND INSERT BEFORE TABLE OF CONTENTS.

3. Holders of MIL-STD-810F will verify that page changes indicated above have been entered. This notice page will be retained as a check sheet. This issuance, together with appended pages, is a separate publication. Each notice is to be retained by stocking points until the standard is completely revised or canceled.

Custodians: Preparing activity:

Army – TE Air Force – 11 Navy – AS (Project ENVR-0050) Air Force – 11

Review activities:

Army – AR, AT, AV, CE, CR, GL, HD, MI, MT, SM Navy – CH, EC, MC, OS, SH, YD Air Force – 13, 19 wrightle

THIS PAGE INTENTIONALLY BLANK

NOT MEASUREMENT

SENSITIVE

MIL-STD-810F

1 January 2000

SUPERSEDING

MIL-STD-810E

14 July 1989

DEPARTMENT OF DEFENSE

TEST METHOD STANDARD

FOR

ENVIRONMENTAL ENGINEERING CONSIDERATIONS

AND LABORATORY TESTS

AMSC N/A AREA ENVR

DISTRIBUTION STATEMENT A: Approved for public release; distribution is unlimited.

REPRINTED WITHOUT CHANGE.

30 August 2002

Part One-ii

FOREWORD

This test method standard is approved for use by all Departments and Agencies of the Department of Defense (DoD). Although prepared specifically for DoD applications, this standard may be tailored for commercial applications as well. MIL-STD-810F is a significant revision of MIL-STD-810E. Much of the standard is rewritten completely to provide clearer direction. The primary emphases are still the same -- tailoring a materiel item's environmental design and test limits to the conditions that the specific materiel will experience throughout its service life, and establishing laboratory test methods that replicate the effects of environments on materiel rather than trying to reproduce the environments themselves. However, the "F" revision has been expanded significantly up front to explain how to implement the environmental tailoring process throughout the materiel acquisition cycle.

This revision recognizes that the environmental design and test tailoring process has expanded to involve a wide range of managerial and technical interests. Accordingly, this revision orients environmental design and test direction toward three basic types of users who have distinctly different, although closely associated, interests:

program managers who, among other responsibilities, ensure proposed concepts and systems are valid and functional in intended operational environments; environmental engineering specialists (EES), who enter the acquisition process early to assist combat and materiel developer tailoring efforts by preparing life cycle environmental profiles and drafting tailored design criteria and test programs, and the design, test, and evaluation community, whose analysts, engineers, and facility operators use tailored designs and tests to meet user needs.

The most visible difference in the "F" revision is that the overall document is in two parts.

Part One describes management, engineering, and technical roles in the environmental design and test tailoring process. It focuses on the process of tailoring materiel design and test criteria to the specific environmental conditions a materiel item is likely to encounter during its service life. New appendices support the succinctly presented text of Part One. Appendix A contains complete descriptions of environmental engineering tasks. These tasks, along with management information in Appendix B and EES guidance in Appendix C, will help to ensure the environmental design and test tailoring process is implemented and documented according to the disciplined, but flexible approach to materiel acquisition called for in Department of Defense (DoD) 5000-series documents (DoDD 5000.1). Terms used in this standard relating to the materiel acquisition process are limited to terms used in the DoD 5000-series documents; to avoid confusion and promote simplicity, service-specific terms/processes are not used.

Part Two contains environmental laboratory test methods to be applied according to the general and specific test tailoring guidelines described in Part One. It is important to emphasize that these methods are not to be called out in blanket fashion nor applied as unalterable routines, but are to be selected and tailored to generate the most relevant test data possible.

To support the tailoring process described in Part One, each test method in Part Two contains some environmental data and references, and identifies tailoring opportunities for the particular method. Some methods afford a wide latitude for tailoring; some can be tailored up to established limits, and some have relatively few tailoring options.

Whenever possible, each method contains background rationale to help determine the appropriate level of tailoring.

Each test method supports the test engineer and test facility operator by describing preferred laboratory test facilities and methodologies. Any specific tailoring information and values contained in these test methods should be supplanted by more up-to-date or program-specific information when available.

When applied properly, the environmental management and engineering processes described in this standard can be of enormous value in generating confidence in the environmental worthiness and overall durability of materiel system design. However, it is important to recognize that there are limitations inherent in laboratory testing that make it imperative to use proper caution and engineering judgment when extrapolating these laboratory results to results that may be obtained under actual service conditions. In many cases, real-world environmental stresses (singularly or in combination) cannot be duplicated practically or reliably in test laboratories. Therefore, users

SUPERSEDES PAGE PART ONE-II OF MIL-STD-810F.

Part One-iii should not assume that a system or component that passes laboratory tests of this standard also would pass field/fleet verification trials. DoD 5000-series documents call for component technology to be demonstrated in relevant environments to reduce risk on components and subsystems which have been demonstrated only in laboratory environments (DoDI 5000.2).

The US Department of Defense would like to thank the following individuals for their contributions toward the development and publication of MIL-STD-810F:

Anderson, Andy – United Defense Merritt, Ron – US Navy, Naval Air Warfare Center

Bair, Jim – US Air Force, Wright-Patterson AFB Moriceau, Jacques – LRBA, France

Bell, Dwayne – US Air Force, Eglin AFB Moss, Ron – Ordnance Board, United Kingdom

Caruso, Hank – G’s and Degrees Sullivan, Jamie – US Army, Redstone Technical Test Center

Connon, Skip – US Army, Aberdeen Test Center Tanner, Steve – US Navy, Naval Air Warfare Center

Egbert, Herb – US Army Developmental Test Command

Walton, Scott – US Army, Aberdeen Test Center

Galloway, Judy – US Army, Aberdeen Test Center Weaver, Earl – US Air Force, Wright-Patterson AFB

Henry, Connie – US Air Force, Wright-Patterson AFB Williamson, Roger – US Army Test and Evaluation Command

MacMartin, Dave – National Defence Headquarters, Canada

Also, a special thank you to Herb Egbert, Chairman of the MIL-STD-810 revision committee for his leadership, dedication, and perseverance in revising this document.

This standard is intended to be a "living document" that will be updated as new concepts, technologies, and methodologies evolve. Address beneficial comments (recommended changes, additions, deletions) along with clear, supporting rationale and any pertinent data that may improve this document to: ASC/ENOI, Bldg. 560, 2530 Loop Road West, Wright-Patterson AFB OH 45433-7101. Use the Standardization Document Improvement Proposal (DD Form 1426) appearing at the end of this document or send a letter detailing the paragraph/page number, recommended wording, and reason/rationale for the recommendation.

Address technical questions to the following offices:

Aeronautical Systems Center, ATTN: ASC/ENFS, 2530 Loop Road West, Wright-Patterson AFB OH 45433-7101;

Commercial Tel: (937) 255-8357 or 904-5863; DSN 785-8357 or 674-5863; Fax: (937) 476-4546 or 255-2363.

Naval Air Warfare Center, Weapons Division, ATTN: Code 476400D, China Lake CA 93555-6100; Commercial Tel: (619) 939-4667; DSN 437-4667; Fax: (619) 939-1065.

US Army Developmental Test Command, 314 Longs Corner Road, ATTN: CSTE-DTC-TT-M, Aberdeen Proving Ground MD 21005-5055; Commercial Tel: (410) 278-1476; DSN 298-1476; Fax: (410) 278-4243/1475.

Comments on this document may be submitted to the Preparing Activity’s Website at:

http://public.ascen.wpafb.af.mil/engstds/engstds.asp or e-mail Engineering.Standards@wpafb.af.mil.

SUPERSEDES PAGE PART ONE-III OF MIL-STD-810F.

http://public.ascen.wpafb.af.mil/engstds/engstds.asp mailto:Engineering.Standards@wpafb.af.mil

1 January 2000

Part One-iv

Part One-v

PART ONE -- ENVIRONMENTAL ENGINEERING PROGRAM GUIDELINES

TABLE OF CONTENTS

Paragraph Page

1. SCOPE

1.1 Purpose

1.2 Application

1.3 Limitations

2. APPLICABLE DOCUMENTS

2.1 General

2.2 Government Documents

2.2.1 Standards

2.2.2 Other government documents

2.3 Non-government Documents

2.4 Order of Precedence

3. DEFINITIONS

3.1 Terms

3.2 Acronyms

4. GENERAL PROGRAM GUIDELINES

4.1 Program Managers

4.1.1 Roles of the program manager

4.1.2 Guidance for program managers

4.1.2.1 Mission Need Statement (MNS)

4.1.2.2 Operational Requirements Document (ORD)

4.1.2.3 Systems Acquisition Master Plan (SAMP)

4.1.2.4 Test and Evaluation Master Plan (TEMP)

4.2 Environmental Engineering Specialists (EES)

4.2.1 Roles of environmental engineering specialists

4.2.2 Environmental engineering tailoring tasks

4.2.2.1 General

4.2.2.2 Preparing an Environmental Engineering Management Plan (EEMP), Task 401

4.2.2.3 Developing an Environmental Test and Evaluation Master Plan (ETEMP)

4.2.2.3.1 Defining a Life Cycle Environmental Profile (LCEP), Task 402

4.2.2.3.2 Developing Operational Environment Documentation (OED), Task 403

4.2.2.3.3 Developing an Environmental Issues/Criteria List (EICL), Task 404

4.2.2.4 Preparing a Detailed Environmental Test Plan (DETP), Task 405

4.2.2.5 Preparing an Environmental Test Report (ETR), Task 406

4.3 Design and Test Engineers and Facility Operators

4.3.1 Roles of design engineers

4.3.2 Roles of test engineers/facility operators

4.3.3 Guidance for design and test engineers and test facility operators

4.3.3.1 Natural environment (field/fleet) testing

4.3.3.2 Laboratory testing

5. GENERAL LABORATORY TEST METHOD GUIDELINES

5.1 Standard Ambient Test Conditions

5.2 Tolerances for Test Conditions

SUPERSEDES PAGE PART ONE-V OF MIL-STD-810F.

Part One-vi

TABLE OF CONTENTS (CONT’D).

Paragraph Page

5.3 Test Instrumentation

5.3.1 Suitability for environment

5.3.2 Calibration

5.4 Stabilizing Test Temperature

5.4.1 Test item operating

5.4.2 Test item non-operating

5.5 Test Sequence

5.6 Test Level Derivation

5.7 Pretest Information for Facility Operators

5.8 Test Setup

5.8.1 Installing the test item in test facility

5.8.2 Test item operation

5.9 Pretest Baseline Data

5.10 Information During Test

5.11 Interrupted Tests

5.11.1 In-tolerance interruptions

5.11.2 Out-of-tolerance interruptions for methods 503, 506, 510, 511, 514, 515, 516, 517, 519, 522, and 523

5.11.3 Out-of-tolerance interruptions for methods 500, 501, 502, 504, 505, 507, 508, 509, 512, 513, 518, 520, and 521

5.12 Combined Tests

5.13 Post-test Data

5.14 Environmental Effects and Failure Criteria

5.15 Environmental Test Reports

5.16 Water Purity

5.17 Analysis of Results

5.18 Monitoring

5.18.1 Monitoring test chamber parameters

5.18.2 Monitoring the item under test

6. NOTES

6.1 Intended Use

6.2 Issue of DoDISS

6.3 Subject Term (key word) Listing (Also see, Subject Index, page Index –1)

6.4 International Standardization Agreement

6.5 Changes from Previous Issue

FIGURES

1-1 Environmental engineering program guide................................................................................ viii 1-2 Roles of acquisition personnel in environmental design/test tailoring process 4-1 Environmental test program tailoring process 4-2a Generalized life cycle histories for military hardware 4-2b Generalized life cycle histories for military hardware 5-1 Interrupted test cycle logic, Method 503, 506, 510, 511, 514, 516, 517, 519, 522, and 523

Part One-1

PART ONE -- ENVIRONMENTAL ENGINEERING PROGRAM GUIDELINES

1. SCOPE.

1.1 Purpose.

a. This standard contains materiel acquisition program planning and engineering direction for considering the influences that environmental stresses have on materiel throughout all phases of its service life. It is important to note that this document does not impose design or test specifications. Rather, it describes the environmental tailoring process that results in realistic materiel designs and test methods based on materiel system performance requirements. Figure 1-1 summarizes this direction.

b. This document supports the functions of three different groups of personnel involved in the materiel acquisition process. Each of these groups is critical to the goal of successfully incorporating environmental considerations into materiel design, test, and evaluation. Although each group has different tasks to perform, none of these tasks can be isolated from the others in a successful acquisition program. As shown on figure 1-2, this information is intended for the following:

(1) Materiel acquisition program managers among whose responsibilities is ensuring materiel will function as required in intended operational environments. (See paragraph 4.1 below.)

(2) Environmental engineering specialists (EES) who assist combat and materiel developers throughout the acquisition process to tailor their materiel designs and test designs to environmental stresses/constraints expected during the materiel's service life. (See paragraph 4.2 below.)

(3) Design, test, and evaluation community analysts, engineers, and facility operators who meet user needs by focusing on tailored designs and tests. (See paragraph 4.3 below, and Part Two of this standard.)

1.2 Application.

The tailoring process described in this standard (i.e., systematically considering detrimental effects that various environmental factors may have on a specific materiel system throughout its service life) applies throughout the materiel acquisition cycle to all materiel developed for military or commercial applications, including nondevelopment item (NDI) procurements, procurements, or modifications of Allied systems or equipment, and cooperative development opportunities with one or more Allied nations to meet user and interoperability needs (DoDD 5000.1).

a. Part One lays out a disciplined, tailored approach for acquiring systems that will withstand the stresses of climatic, shock and vibration environments that they expect to see in their service lives. The basic process for acquiring materiel that satisfies users' needs from this environmental engineering viewpoint is at figure 1-1.

b. Part Two also is an integral part of the environmental tailoring process. It contains tailoring information, environmental stress data, and laboratory test methods. The environmental data contained in the methods may help, but should not be used exclusively, to define environmental stresses that materiel will encounter throughout its service life. This will help engineers to tailor analyses and tests to specific materiel and its defined life cycle. It is not valid to call out all of the methods in this standard in a blanket fashion for a materiel system; nor is it valid, once a method is determined appropriate, to regard the environmental stress data, test criteria, and procedures in the method as unalterable.

c. Guidance and test methods of this standard are intended to:

(1) Define environmental stress sequences, durations, and levels of materiel life cycles.

(2) Be used to develop analysis and test criteria tailored to the materiel and its environmental life cycle.

(3) Evaluate materiel performance when exposed to a life cycle of environmental stresses.

(4) Identify deficiencies, shortcomings, and defects in materiel design, materials, manufacturing processes, packaging techniques, and maintenance methods.

SUPERSEDES PAGE PART ONE-1 OF MIL-STD-810F.

Par

(5) Demonstrate compliance with contractual requirements.

program manager environmental engineering specialists design engineers test engineers facility operators

MNS ORD TEMP EEMP LCEP OED DETP ETR

tailoring field/fleet testing laboratory testing

FIGURE 1-2. Roles of acquisition personn

1.3 Limitations.

Although environmental analysis, design analysis, acquisition process, there are inherent limitations i recognized. The methods in Part Two of this stand functions that may affect materiel performance or in methods are limited in their abilities to simulate syn sequence) stress applications, aging, and other po field/fleet service environments. Use caution when d Part Two test methods purposely do not address the fo

a. Electromagnetic interference (EMI).

b. Lightning and magnetic effects.

c. Nuclear, biological, chemical weapons or t

d. Certain aspects of munitions and pyrotechn

e. Piece parts such as bolts, wires, transistors

f. Packaging performance or design.

g. Suitability of clothing or fabric items that a

h. Environmental stress screening (ESS) meth

i. Reliability testing.

j. Safety testing.

SUPERSEDES PAGE PART ONE-2 OF MIL-STD-8

MISSION NEED STATEMENT

OPERATIONAL REQUIREMENTS

DOCUMENT

SYSTEMS ACQUISITION

MASTER PLAN

TEST & EVALUATION MASTER

PLAN

ENVIRONMEN

MANAGEMEN

LIFE CYCLE E

OPERATIONA

DOCUMENTAT

TAILORED EN

DESIGN/TEST

ENVIRONMEN

PLANS/REPOR

MIL-

ENVIRONMEN

TAILORIN

ENVI

ENG

SP

PROGRAM

MANAGER

t One-2 el in environmental design/test tailoring process.

and laboratory testing are valuable tools in the materiel n analysis and laboratory testing techniques that must be ard do not include many of the naturally-occurring forcing tegrity in service use. Further, analytic and laboratory test ergistic or antagonistic stress combinations, dynamic (time tentially significant stress combinations present in natural efining and extrapolating analyses, test criteria, and results.

llowing but may, in some cases, be applied:

heir effects.

ics safety testing.

and integrated circuits.

re described in specific specifications.

ods and procedures.

10F.

TAL ENGINEERING

T PLAN

NVIRONMENTAL PROFILE

L ENVIRONMENT

ION PLAN

VIRONMENTAL

REQUIREMENTS

TAL TEST

TS

ENGINEERING DESIGNS AND

SPECIFICATIONS

MIL-STD-810F, PART TWO

LABORATORY TEST METHODS

NATURAL ENVIRONMENT

FIELD/FLEET TEST FACILITIES

AND PROCEDURES

STD-810F

TAL DESIGN/TEST

G GUIDANCE

RONMENTAL

INEERING

ECIALISTS

DESIGN/TEST

ENGINEERS &

FACILITY OPERATORS

Part One-3

2. APPLICABLE DOCUMENTS

2.1 General.

The documents listed in this paragraph are referenced in Part TWO of this standard. There are other documents cited in Part TWO of this standard that are recommended for additional information or as examples. While every effort has been made to ensure the completeness of this list, document users are cautioned that they should consider all specified requirements documents and tasks cited in paragraph 4 of this standard.

2.2 Government documents

2.2.1 Specifications, standards, and handbooks.

The following specifications, standards, and handbooks forms a part of this document to the extent specified herein.

When applying a portion of this standard that contains one of these references, cite the particular edition of the document that is listed in the current Department of Defense Index of Specifications and Standards (DoDISS), or in the DoDISS that was in effect at the time of solicitation. Unless otherwise specified, the issues of these documents are those listed in the issue of the DoDISS and supplement thereto, cited in the solicitation (see paragraph 6.2).

SPECIFICATIONS

MIL-S-901 Shock Tests, H.I. (High Impact) Shipboard Machinery, Equipment, and Systems, Requirements for

STANDARDS

MIL-STD-331 Fuze and Fuze Components, Environmental and Performance Tests for

MIL-STD-882 Standard Practice for System Safety

HANDBOOKS

MIL-HDBK-310 Global Climatic Data for Developing Military Products

(Copies of the above documents are available from the Document Automation and Production Service, Building 4/D, 700 Robbins Avenue, Philadelphia PA 19111-5094; http://astimage.daps.dla.mil/online/new/.)

2.2.2 Other government documents.

The following other Government documents and publications form a part of this document to the extent specified herein. Unless otherwise specified, the issues are those cited in the solicitation.

DIRECTIVES, INSTRUCTIONS, AND MANUALS

DoDD 5000.1 The Defense Acquisition System DoDI 5000.2 Operation of the Defense Acquisition System DoD 5000.2-R Mandatory Procedures for Major Defense Acquisition Programs (MDAPS) and Major

Automated Information System (MAIS) Acquisition Programs (Copies of the above documents may be downloaded from www.deskbook.osd.mil.)

PUBLICATIONS

AR 70-38 Research, Development, Test and Evaluation of Materiel for Extreme Climatic Conditions

(Copies of the above document are available from the U.S. Army Publications Distribution Center, 1655 Woodson Rd., St. Louis MO 63114-6181; telephone [314] 263-7305.)

2.3 Non-government documents.

The following documents form a part of this document to the extent specified herein. Unless otherwise specified, the issues of the documents that are DoD adopted are those listed in the issue of the DoDISS cited in the solicitation. Unless otherwise specified, the issues of documents not listed in the DoDISS are the issues of the documents cited in the solicitation (see 6.2).

SUPERSEDES PAGE PART ONE-3 OF MIL-STD-810F.

http://astimage.daps.dla.mil/online/new/ http://www.deskbook.osd.mil/

Part One-4

STANAG 2895 Extreme Climatic Conditions and Derived Conditions for Use in Defining Design Test Criteria for NATO Forces Materiel

STANAG 4242 Vibration Tests for Munitions Carried in Tracked Vehicles STANAG 4370 Environmental Testing QSTAG 360 Climatic Environmental Conditions Affecting the Design of Military Materiel AECTP 100 Allied Environmental Conditions and Test Publication (AECTP) 100, Environmental

Guidelines for Defence Materiel (under STANAG 4370) AECTP 200 Allied Environmental Conditions and Test Publication (AECTP) 200, Environmental

Conditions (under STANAG 4370) AECTP 300 Allied Environmental Conditions and Test Publication (AECTP) 300, Climatic

Environmental Tests (under STANAG 4370) AECTP 400 Allied Environmental Conditions and Test Publication (AECTP) 400, Mechanical

Environmental Tests (under STANAG 4370) (Copies of the above documents are available from the Document Automation and Production Service, Building 4/D, 700 Robbins Avenue, Philadelphia PA 19111-5094; http://astimage.daps.dla.mil/online/new/.)

AMERICAN NATIONAL STANDARDS INSTITUTE (ANSI)

National Conference of Standards Labs (NCSL)

ANSI NCSL Z540-1 General Requirements for Calibration Laboratories and Measuring and Test Equipment

INTERNATIONAL ORGANIZATION FOR STANDARDIZATION (ISO) STANDARDS

ISO 10012-1 Quality Assurance Requirements for Measuring Equipment - Part I: Meteorological Confirmation System for Measuring Equipment First Edition

(Copies of the above documents are available from American National Standards Institute (ANSI), 25 West 43rd Street, 4th Fl, New York NY 10036-7406 ; telephone [212] 642-4900; www.ansi.org.)

2.4 Order of precedence.

In the event of a conflict between the text of this document and the references cited herein, the text of this document takes precedence. Nothing in this document, however, supersedes applicable laws and regulations unless a specific exemption has been obtained.

3. DEFINITIONS.

3.1 Terms.

This terminology section is meant to define the general terminology as it is used in this standard. In certain cases the terminology use may be somewhat different from its use in the general engineering community. No attempt has been made to be complete, therefore limiting the glossary to such terms as are found in the standard and that are important to the application of the standard. Terminology unique to a particular method is defined, as appropriate, in that method.

NOTE: A continuation of this terminology section that contains terminology more closely related to the dynamic (mechanical) test methods such as vibration, shock, gunfire vibration, etc., is in Part One Appendix D.

a. Accelerated test. A test designed to shorten the controlled environmental test time with respect to the service use time by increasing the frequency of occurrence, amplitude, duration, or any combination of these of environmental stresses that would be expected to occur during service use.

b. Aggravated test. A test in which one or more conditions are set at a more stressful level than the materiel will encounter during service use.

SUPERSEDES PAGE PART ONE-4 OF MIL-STD-810F.

http://astimage.daps.dla.mil/online/new/ http://www.ansi.org/

Part One-5

c. Ambient environment. The conditions, either outdoor or confined (e.g., temperature and humidity), that characterize the air or other medium that surrounds materiel.

d. Climatic categories. Specific types of world climates which materiel is designed to withstand during operation, storage, and transit. See Part One, Appendix C, table C-I and figure C-1.

e. Combat developer. Military specialist concerned with training, doctrine, and materiel needs documentation.

f. Critical threshold value. The level of an environment forcing function that degrades the capability of materiel significantly or requires degradation prevention measures be taken.

g. Cumulative effects. The collective consequences of environmental stresses during the life cycle of materiel.

h. Engineering judgment. Expert opinion based on engineering education and experience, especially in the area in which the judgment is made.

i. Environmental analysis. Technical activity covering an analytical description of the effects that various environments have on materiel, subsystems, and component effectiveness.

j. Environmental conditions. (See Forcing function (environment).)

k. Environmental engineering. The discipline of applying engineering practices to the effects that various environments have on materiel effectiveness.

l. Environmental engineering specialist (EES). A person or group of people skilled in one or more environmental engineering areas. Areas include, but are not necessarily limited to: natural and induced environments and their effects on materiel; expertise in measuring and analyzing in-service environmental conditions; formulating environmental test criteria; determining when environmental laboratory tests are appropriate/valid substitutes for natural in-service environmental tests; and evaluating the effects of specific environments on materiel. (See paragraph 4.2.)

m. Environmental test. A structured procedure to help determine the effects of natural or induced environments on materiel.

n. Environmental worthiness. The capability of materiel, subsystem, or component to perform its full array of intended functions in intended environments.

o. Equipment. For purposes of this standard, equipment includes the instrumentation, facilities, and support apparatus used to conduct or monitor tests. This does not include the test item itself or the materiel of which the test item is a sample or a part.

p. Forcing function (environment). A natural or induced physical environmental stress condition on materiel that may affect its ability to function as intended or to withstand transit or storage during its service life. (Also referred to as an environmental condition or an environmental stress.)

q. Hermetic seal. A permanent, air-tight seal.

r. Induced environment. An environmental condition that is predominantly man-made or generated by the materiel platform. Also, refers to any condition internal to materiel that results from the combination of natural environmental forcing functions and the physical/chemical characteristics of the materiel itself.

s. In-service use. The anticipated use of materiel during its intended service use life.

t. Integrated Product Team (IPT). A group of individuals from different professional disciplines and organizations (government and industry) who work together on a product from concept through production stages. Individuals who cover a discipline may change from stage to stage, but the discipline is covered, and the information pertinent to that discipline is passed to the succeeding team member(s) in that discipline.

u. Life Cycle Environmental Profile (LCEP). Design and test decision baseline document outlining real-world, platform-specific, environmental conditions that a specific materiel system or component will experience during service-related events (e.g., transportation, storage, operational deployment/use) from its release from manufacturing to the end of its useful life.

SUPERSEDES PAGE PART ONE-5 OF MIL-STD-810F.

Part One-6

v. Life cycle profile. A time history of events and conditions associated with materiel from its release from manufacturing to its removal from service, including demilitarization. The life cycle should include the various phases materiel will encounter in its life, such as: packaging, handling, shipping, and storage prior to use; mission profiles while in use; phases between missions such as stand-by or storage, transfer to and from repair sites and alternate locations; and geographical locations of expected deployment.

w. Materiel. A commodity or set of commodities. A generic class of hardware designed to perform a specific function.

x. Materiel developer. An agency or group of individuals involved in designing, testing, or evaluating materiel to meet developer performance requirements.

y. Mission profile. That portion of the life cycle profile associated with a specific operational mission.

z. Operational worthiness. The capability of materiel, a subsystem, or component to perform its full array of intended functions.

aa. Parameter. Any quantity that represents a descriptive generalization of a certain characteristic physical property of a system that has a certain value at a particular time.

bb. Parameter level. The value of a physical property that documents the degree, extent, or level at which a parameter exists at a given location at a given point in time, or the value to which a variable test control is set (see test level).

cc. Platform. Any vehicle, surface, or medium that carries the materiel. For example, an aircraft is the carrying platform for installed avionics items or transported or externally mounted stores. The land is the platform for a ground radar set, for example, and a person for a man-portable radio.

dd. Platform environment. The environmental conditions materiel experiences as a result of being attached to or loaded onto a platform. The platform environment is influenced by forcing functions induced or modified by the platform and any platform environmental control systems.

ee. Program manager. The (Government) official who is in charge of the acquisition process for the materiel.

ff. Service life. Period of time from the release of materiel from the manufacturer through retirement and final disposition.

gg. Tailoring. The process of choosing design characteristics/tolerances and test environments, methods, procedures, sequences and conditions, and altering critical design and test values, conditions of failure, etc., to take into account the effects of the particular environmental forcing functions to which materiel normally would be subjected during its life cycle. The tailoring process also includes preparing or reviewing engineering task, planning, test, and evaluation documents to help ensure realistic weather, climate, and other physical environmental conditions are given proper consideration throughout the acquisition cycle.

hh. Test item. Specific materiel, a subsystem, or component being tested, including its container and packaging materials, that is representative of the materiel being developed. A representative sample of materiel that is used for test purposes.

ii. Test level. The value at which a test condition is set or recorded. (Also, see parameter level.)

jj. Test method. The criteria and procedures used to formulate an environmental test. Laboratory test methods are identified by the environment (or combinations of environments) in Part Two of this document.

kk. Test plan. A document that may include test procedures and test levels, failure criteria, test schedules, and operational and storage requirements.

ll. Test procedure. A sequence of actions that prescribes the exposure of a test item to a particular environmental forcing function or combination of environmental forcing functions, as well as inspections, possible operational checks, etc.

SUPERSEDES PAGE PART ONE-6 OF MIL-STD-810F.

Part One-7

mm. Virtual proving ground. A developing suite of tools, techniques, and procedures by which the tester will verify, validate, test, and evaluate systems, simulators, and models by stimulating them with complex synthetic environments. These simulation-based tests should supplement and be validated by live testing.

3.2 Acronyms.

Acronyms used in this document are defined below.

AECTP Allied Environmental Conditions and Test Publication ANSI American National Standards Institute DETP Detailed Environmental Test Plan DoD Department of Defense DoDD Department of Defense Directive DoDISS Department of Defense Index of Specifications and Standards EEMP Environmental Engineering Management Plan EES Environmental Engineering Specialists EICL Environmental Issues/Criteria List EMI Electromagnetic Interference ESS Environmental Stress Screening ETEMP Environmental Test and Evaluation Master Plan ETR Environmental Test Report IPT Integrated Product Team ISO International Organization for Standardization LCEP Life Cycle Environmental Profile MAIS Major Automated Information System MDAP Mandatory Procedures for Major Defense Acquisition Program MIL-HDBK Military Handbook MIL-STD Military Standard MNS Mission Need Statement NATO North Atlantic Treaty Organization NCSL National Conference of Standards Laboratories NDI Non-development Item OED Operational Environment Documentation OEDP Operational Environment Documentation Plan OEDR Operational Environment Documentation Report ORD Operational Requirements Document QSTAG Quadripartite Standardization Agreements (American, British, Canadian, and Australian) SAMP Systems Acquisition Management Plan STANAG Standardization Agreements (NATO) TEMP Test and Evaluation Master Plan

SUPERSEDES PAGE PART ONE-7 OF MIL-STD-810F.

Part One-8

4. GENERAL PROGRAM GUIDELINES.

4.1 Program managers

4.1.1 Roles of the program manager.

In the context of this standard, the program manager's primary role is to ensure environmental engineering considerations are addressed systematically, thoroughly, and effectively at appropriate times throughout the materiel acquisition process. The process for accomplishing this integration is diagrammed on figure 1-1. An associated role is to ensure environmental effects information is documented, available, and communicated from one program phase to another.

4.1.2 Guidance for program managers.

a. DoD 5000-series documents call for a total systems approach through systems engineering, considering all life cycle needs, including storage, transport, and operation in natural environments (DoDD 5000.1).

Specifically, they call for a description of how performance in natural environmental conditions representative of the intended area of operations will be tested. This includes identifying test beds that are critical to determine if developmental test objectives are achieved, taking into account such stressors as temperature, vibration (random or sinusoidal), pressure, humidity, fog, precipitation, clouds, electromagnetic environment, blowing dust and sand, icing, wind conditions, steep terrain, wet soil conditions, high sea state, storm surge and tides, etc. (DoD 5000.2-R). The environmental tailoring process shown on figure 4-1 and the generalized life cycle environmental profile in figures 4-2a and b use systems engineering approaches, helping to ensure that system design and test criteria are tailored to environmental conditions within which materiel systems are to operate and that total ownership costs are reduced.

b. As indicated on figure 1-1, there may be times that the program manager has valid alternatives to testing actual hardware or hardware prototypes when conducting laboratory, development, or operational tests.

These alternatives include, but are not necessarily limited to, using simulation to reduce the costs involved in producing and testing hardware prototypes, using coupon samples instead of entire systems when specific materials are the central acquisition issue, and using analytical procedures such as verification by similarity to systems already tested and approved. An environmental engineering specialist (EES) can aid program managers to establish an engineering basis for selecting such alternatives. When these alternatives are selected, Task 401, Environmental Engineering Management Plan, must contain the rationale for their selection, including an explanation of expected cost savings, other benefits and risks to system effectiveness/safety. (See Part One, Appendix A, Task 401, and Appendix B, paragraph F.)

c. The following paragraphs, organized by major acquisition documents, capsulize environmental effects information for program managers and serve as background information for design engineers, test engineers, and environmental engineering specialists. Appendix B provides detailed direction for program managers.

SUPERSEDES PAGE PART ONE-8 OF MIL-STD-810F.

Part requirements documents tailoring platform environment natural environment forcing functions induced

FIGURE 4-1. Environmental

4.1.2.1 Mission Need Statement (MNS).

The MNS identifies environments that may constrain th induced (e.g., temperature and vibration during transpo electronic emissions during battle) in which the mission of mission capability in these environments. An EE environmental effects input to the MNS.

4.1.2.2 Operational Requirements Document (ORD)

The ORD identifies materiel performance parameters tha required capabilities and critical system characteristics, th scenarios that the materiel will experience throughout it performance requirements (e.g., design for worldwide d avoided. This input to the ORD, covering natural and m those environments, is derived from the fundamental as LCEP, prepared through the assistance of an EES as desc the ORD.

SUPERSEDES PAGE PART ONE-9 OF MIL-STD-810F.

ITEM

REQUIREMENTS

DOCUMENTS

NATURAL

ENVIRONMENTS

CHARACTERISTICS

IDENTIFY THE NATURAL

ENVIRONMENT

CHARACTERISTICS FOR

REGIONS IN WHICH ITEM

IS TO BE DEPLOYED

ITEM PLATFORM

CHARACTERISTICS

IDENTIFY CHARACTERISTICS

OF PLATFORMS ON WHICH

ITEM IS TO BE CARRIED

OR OPERATED (FIGURE 4-2)

DE

EN

BA

A) N

FO

TR

DY

B) F

IND

ITS

1. CONVENTIONAL METEOROLOGICAL DATA ARE NOT C

MILITARY HARDWARE IN MIND. GREAT CARE MUST BE T

THAT THE METEOROLOGICAL DATA USED ARE RELEVAN

MATERIEL BEING TESTED.

2. IN THIS CONTEXT, A PLATFORM IS ANY VEHICLE, SUR

THAT CARRIES THE MATERIEL. FOR EXAMPLE, AN AIRCR

CARRYING PLATFORM FOR AN AVIONICS POD, THE LAND

FOR A GROUND RADAR, AND A MAN FOR A MAN-PORTAB

DESIGN

One-9 test program tailoring process.

e operation or survivability of materiel, including natural, rtation), and special operational threat environments (e.g., is to be accomplished. The MNS defines the desired levels S can assist the program manager in formulating this t will meet the need described in the MNS. In identifying e ORD describes mission, storage, handling, and transport s service life as shown on figure 4-2. In so doing, broad eployment) that may conflict with tailored issues can be an-made environments and expected mission capabilities in pects of a Life Cycle Environmental Profile (LCEP). The ribed in Task 402 in Appendix A, supports development of

PLATFORM

ENVIRONMENTS

FINE PLATFORM

VIRONMENTS

SED ON:

ATURAL ENVIRONMENT

RCING FUNCTIONS

ANSFORMED BY PLATFORM

NAMICS

ORCING FUNCTIONS

UCED BY PLATFORM

ELF

TEST PROCEDURES

TAILOR TEST METHODS

AND PROCEDURES TO

PLATFORM ENVIRONMENTS

AND DESIGN REQUIREMENTS

REQUIREMENTS

TAILOR DESIGN

REQUIREMENTS TO

PLATFORM ENVIRONMENT

CHARACTERISTICS WHICH

WILL AFFECT ITEM,

ITEM EFFECTIVENESS AND

INTEGRITY

OLLECTED WITH

AKEN TO ENSURE

T TO THE SPECIFIC

FACE, OR MEDIUM

AFT IS THE

ITSELF

LE RADIO.

Part One-10

4.1.2.3 Systems Acquisition Master Plan (SAMP).

Program managers integrate environmental technical considerations (effects of various environments on system performance and reliability) into the SAMP. The mechanism for accomplishing this integration is provided in Task 401 in the form of an Environmental Engineering Management Plan (EEMP) prepared through the assistance of an EES. The EEMP basically lays out a schedule for implementing the remaining environmental engineering tasks, Tasks 402 through 406.

4.1.2.4 Test and Evaluation Master Plan (TEMP).

The TEMP includes plans for testing in natural (field/fleet) environments, simulated (laboratory) environments and virtual proving ground (synthetic) environments. An EES assists the program manager in preparing the TEMP by developing an Environmental Test and Evaluation Master Plan (ETEMP), the preparation of which may be merged into the Integrated Test Program Schedule. Appendix C provides information on the balance of field/fleet tests, laboratory tests, and modeling/simulation, and on the values chosen as design criteria or test criteria. Part Two of this standard provides details for developing laboratory test procedures. Component parts of the ETEMP are Tasks 402 through 404. Thus, the ETEMP contains the following:

a. Life Cycle Environmental Profile (LCEP)…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .