MIL-STD-810F NOT 1.pdf

Military Standard Rev. F PDF 24 KB Posted

Attached to
Detailed Design for a High Temperature Fuel Cell (SOFC) Based Auxiliary Power Unit
Solicitation number
ONRBAA08-024
Issued by

About this file

Also attached are requested MilStds.

View the file

Other versions and copies of MIL-STD-810F

File Revision Posted Attached to
B08-HT9427-26-R-E001-Attachment-K-MIL-STD-810H.pdf Rev. H Compact Oxygen Generation Medical Devices: Compact Oxygen Generation, Medical (COGM) and Compact Oxygen Generation, Medical – At Altitude (COGM-A)
A02-Portable-Oxygen-Carrier-COGM-RFI-Attach 6-MILSTD810H.pdf Rev. H Portable Oxygen- Compact Oxygen Generation Medical (COGM)
A02 Attachment 3 MIL STD 810H 501.7.pdf Rev. H Veterinary Centrifuge
Attachment I - MIL-STD-810H.pdf Rev. H Ultrasound Field Portable (USFP) Assessment and Development Efforts
Attachment 0002 - Profile Tables_MIL-STD-810H.pdf Rev. H Vibration Testing Equipment and Install
MIL_STD_810G Attachment.pdf Rev. G Military Ruggedized PoE Cameras
MIL-STD-810G.pdf Rev. G Military Ruggedized Tablets and Accessories
MIL_STD_810G.pdf Rev. G Bridge Anchorage
MIL-STD-810G_CN1.pdf Rev. G JEDI Cloud RFP
Attachment_0013_-_MIL_STD_810G.pdf Rev. G Bridge Protection Device (BPD) Market Survey
MIL-STD-810G_(pages_501_-_1086).pdf Rev. G RFI/Sources Sought for submersible multi fuel outboard motor
MIL-STD-810G_(pages_1_-500).pdf Rev. G RFI/Sources Sought for submersible multi fuel outboard motor
N0017812Q4044_MBIT_-_Reference_Mil-Std810G_-_GFI__12Q4044.DOCX Rev. G Quality Control, Testing and Inspection Services
MILSTD810F.pdf Rev. F UHF/VHF Antennas
MIL-STD-810F NOT 3.pdf Rev. F Detailed Design for a High Temperature Fuel Cell (SOFC) Based Auxiliary Power Unit
MIL-STD-810F NOT 2.pdf Rev. F Detailed Design for a High Temperature Fuel Cell (SOFC) Based Auxiliary Power Unit
TE I_MIL-STD-810_21Feb2025.pdf Feb 21, 2025 West Desert Test Center (WDTC) Mission Support Services (MSS) Follow On Solicitation W51EW725RA001 Amendment 0003
7074 - SOW Mil-Std-810 Racks and AIU 11-4-2015 v1.pdf Nov 4, 2015 MIL-STD-810 Environmental testing
7074 - SOW Mil-Std-810 Hemi and HGIO 9-11-2015 v1.pdf Sep 11, 2015 MIL-STD-810 Environmental testing
MIL-STD-810_Environmental.pdf Revision not stated External Video Camera System
Show all 20

Who attaches MIL-STD-810F

Other files

File Type Posted
MIL-STD-810F NOT 3.pdf PDF
Questions Answers 1.pdf PDF
MIL-STD-1332B.pdf PDF
MIL-STD-1332B NOT 1.pdf PDF
MIL-STD-1332B NOT 2.pdf PDF
MIL-STD-810F NOT 2.pdf PDF
MIL-STD-1275D.pdf PDF
milstd882d.pdf PDF
MIL-STD-705C.pdf PDF
MIL-STD-810E.pdf PDF
MIL-STD-461E.pdf PDF
Power Energy_Polkowski_Presentation_5510_7_Internet Posting.pdf PDF
CES Power Electronics and Control_Ashton.ppt PPT presentation
Power Energy_Polkowski_Presentation_5510_7.pdf PDF
DeS Presentation 8112008.pdf PDF
UM_Linic_Presentation_5510_7_Internet Posting.pdf PDF
IE_Swami_Presentation_5510_7.pdf PDF
CTPH2 Presentation —
SOFC Based APU Industry Day_Dobbs.ppt PPT presentation
SOFC SwiderLyons Aug08b.ppt PPT presentation
Auburn_Anode and Cathode Contaminant Removal.ppt PPT presentation
Ceramatec_Frost_Presentation_5510_7_Internet Release.pdf PDF
NRL_Swider_lyons_Presentation_5510_7_Internet Release.pdf PDF
IE_Swami_Presentation_5510_7_Internet release.pdf PDF
Ceramatec_Frost_Rev2_72908.ppt PPT presentation
PDM_3_workshop_PCI_presentation_Roychoudhury_Rev_05.ppt PPT presentation
Precision Combustion _ Roychoudhury_5510_7_Internet Release.pdf PDF
High Temperature —
CES_Ashton_Presentation_5510_7_Internet Release.pdf PDF
CES Power Electronics and Control.pdf PDF
RIT_Das_Presentation_5510_7.pdf PDF
ONR_Hoffman_Presentation_5510_7.pdf PDF
ONR_Hoffman_Presentation_5510_7_Internet Release.pdf PDF
CTPH2 Presentation —
CTP_Rackey_Presentation_5510_7_internet release.pdf PDF
Precision Combustion _ Roychoudhury_5510_7.pdf PDF
CES_Ashton_Presentation_5510_7.pdf PDF
Univ of Michigan_Industry Day_Nikolla_r2.ppt PPT presentation
NRL_Swider_lyons_Presentation_5510_7.pdf PDF
ONR BAA 08-024.pdf PDF
RIT_Das_Presentation_5510_7_Internet Release.pdf PDF
UM_Linic_Presentation_5510_7.pdf PDF
High Temperature —
CTP_Rackey_Presentation_5510_7.pdf PDF
Ceramatec_Frost_Presentation_5510_7.pdf PDF
P E Presentation ONR Aug11-08_rev3_Polkowski.ppt PPT presentation
TuhinPresentation_0729.ppt PPT presentation
MCSC APU Brief - 11 Aug 08_Carpenter.ppt PPT presentation
Show all 48

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

MIL-STD-810F

NOTICE 1

1 November 2000

DEPARTMENT OF DEFENSE

TEST METHOD STANDARD

ENVIRONMENTAL ENGINEERING CONSIDERATIONS AND LABORATORY TESTS

TO ALL HOLDERS OF MIL-STD-810F:

1. THE FOLLOWING PAGES OF MIL-STD-810F HAVE BEEN REVISED AND SUPERSEDE THE PAGES LISTED:

NEW PAGE DATE SUPERSEDED PAGE DATE

511.4-1 1 November 2000 511.4-1 1 January 2000

511.4-2 1 January 2000 511.4-2 Reprinted without change

511.4-7 1 November 2000 New page

511.4-8 1 November 2000 New page

511.4-9 1 November 2000 New page

511.4-10 1 November 2000 New page.

2. RETAIN THIS NOTICE AND INSERT BEFORE TABLE OF CONTENTS.

3. Holders of MIL-STD-810F will verify that page changes indicated above have been entered. This notice page will be retained as a check sheet. This issuance, together with appended pages, is a separate publication. Each notice is to be retained by stocking points until the standard is completely revised or canceled.

Custodians: Preparing activity:

Army – TE Air Force – 11 Navy – AS (Project ENVR-0047) Air Force – 11

AMSC N/A AREA ENVR

DISTRIBUTION STATEMENT A. Approved for public release; distribution is unlimited.

NOTICE OF

CHANGE

NOT MEASUREMENT

SENSITIVE

1 November 2000

METHOD 511.4

511.4-1

METHOD 511.4

EXPLOSIVE ATMOSPHERE

NOTES: 1. The Procedure II - Explosion containment test of MIL-STD-810E, Method 511.3, remains in effect. See pages 511.4-7 through 511.4-10.

2. Tailoring is essential. Select methods, procedures, and parameter levels based on the tailoring process described in Part One, paragraph 4.2.2, and Appendix C. Apply the general guidelines for laboratory test methods described in Part One, paragraph 5, of this standard.

1. SCOPE.

1.1 Purpose.

The explosive atmosphere test is performed to demonstrate the ability of materiel to operate in fuel-air explosive atmospheres without causing ignition.

1.2 Application.

This method applies to all materiel designed for use in the vicinity of fuel-air explosive atmospheres associated with aircraft, automotive, and marine fuels at or above sea level. Use other explosive atmosphere safety tests (e.g., electrical or mine safety) if more appropriate.

1.3 Limitations.

a. This test utilizes an explosive mixture that has a relatively low flash point which may not be representative of some actual fuel-air or aerosol (such as suspended dust) mixtures.

b. The explosive atmosphere test is a conservative test. If the test item does not ignite the test fuel-air mixture, there is a low probability that the materiel will ignite prevailing fuel-vapor mixtures in service.

Conversely, the ignition of the test fuel-air mixture by the test item does not mean the materiel will always ignite fuel vapors that occur in actual use.

c. This test is not appropriate for test altitudes above approximately 16km where the lack of oxygen inhibits ignition.

d. This method is not appropriate for determining the capability of sealed materiel to contain an explosion.

2. TAILORING GUIDANCE.

2.1 Selecting the Explosive Atmosphere Method.

After examining requirements documents and applying the tailoring process in Part One of this standard to determine where explosive atmospheres are foreseen in the life cycle of the test item, use the following to confirm the need for this method and to place it in sequence with other methods.

2.1.1 Effects of explosive atmosphere environments.

Low levels of electrical energy discharge or electrical arcing by devices as simple as pocket transistor radios can ignite mixtures of fuel-vapor and air. A "hot spot" on the surface of the case of a hermetically sealed, apparently inert materiel case can ignite fuel-air mixtures. Fuel vapors in confined spaces can be ignited by a low energy discharge such as a spark from a short circuited flashlight cell, switch contacts, electrostatic discharge, etc.

2.1.2 Sequence among other methods.

a. General. See Part One, paragraph 5.5.

SUPERSEDES PAGE 511.4-1 OF MIL-STD-810F.

1 January 2000

METHOD 511.4

511.4-2

b. Unique to this method. Considering the approach to conserve test item life by applying what are perceived to be the least damaging environments first, generally apply the explosive atmosphere test late in the test sequence. Vibration and temperature stresses may distort seals and reduce their effectiveness, thus making ignition of flammable atmospheres more likely. Recommend the test item(s) first undergo vibration and/or temperature testing.

2.2 Selecting Procedure Variations.

This method has one procedure. However, the test procedure may be varied. Before conducting this test, complete the tailoring process by selecting specific procedure variations (special test conditions/techniques for this procedure) based on requirements documents, Life Cycle Environmental Profile, Operational Environment Documentation (see Part One, figure 1-1), and information provided with this procedure. Consider the following in light of the operational purpose and life cycle of the materiel.

2.2.1 Fuel.

Unless otherwise specified, use n-hexane as the test fuel, either reagent grade or 95% n-hexane with 5% other hexane isomers. This fuel is used because its ignition properties in flammable atmospheres are equal to or more sensitive than the similar properties of both 100/130-octane aviation gasoline, JP-4 and JP-8 jet engine fuel. Optimum mixtures of n-hexane and air will ignite from hot-spot temperatures as low as 223°C, while optimum JP-4 fuel-air mixtures require a minimum temperature of 230°C for auto-ignition, and 100/130 octane aviation gasoline and air requires 441°C for hot-spot ignition. Minimum spark energy inputs for ignition of optimum fuel-vapor and air mixtures are essentially the same for n-hexane and for 100/130-octane aviation gasoline. Much higher spark energy input is required to ignite JP- 4 or JP-8 fuel and air mixtures. Use of fuels other than hexane is not recommended.

2.2.2 Fuel-vapor mixture.

Use a homogeneous fuel-air mixture in the correct fuel-air ratios for the explosive atmosphere test. Fuel weight calculated to total 3.8 percent by volume of the test atmosphere represents 1.8 stoichiometric equivalents of n-hexane in air, giving a mixture needing only minimum energy for ignition. This yields an air/vapor ratio (AVR) of 8.33 by weight (reference f).

a. Required information to determine fuel weight:

(1) Chamber air temperature during the test.

(2) Fuel temperature.

(3) Specific gravity of n-hexane (see figure 511.4-1).

(4) Test altitude: ambient ground or as otherwise identified.

(5) Net volume of the test chamber: free volume less test item displacement expressed in liters.

b. Calculation of the volume of liquid n-hexane fuel for each test altitude:

(1) In metric units:

Volume of 95 percent n-hexane (ml) = hexanenofgravityspecificxKtempchamber pascalspressurechamberxlitersvolchambernet 10x27.4 4

(2) In English units:

Volume of 95 percent n-hexane (ml) =

− hexanenofgravityspecificxRtempchamber psiapressurechamberxftvolchambernet 41.150

REPRINTED WITHOUT CHANGE

MIL- STD-810F

METHOD 511.4

511.4-7

EXPLOSIVE ATMOSPHERE TEST

SECTION II

II-1 APPARATUS. A test chamber capable of producing the required test conditions shall be used. Appendix A describes one type of chamber that may be used.

II-1.1 Fuel. Unless otherwise specified, n-hexane (i.e., normal hexane) of at least 95 percent purity shall be used.

II-2 PREPARATION FOR TEST. The test item shall be prepared in accordance with General Requirements, 5.2.2.

II-2.1 Procedure I - Operation in explosive atmosphere.

Step 1. The test item shall be installed in the test chamber in such a manner that normal electrical operation is possible and mechanical controls may be operated through the pressure seals from the exterior of the chamber.

External covers of the test item shall be removed or loosened to facilitate the penetration of the explosive mixture.

Large test items may be tested one or more units at a time by extending electrical connections through the cable port to the remainder of the associated equipment located externally.

Step 2. The equipment shall be operated to determine if it is functioning properly and to observe the location of any sparking or high temperature components which could cause an explosion.

Step 3. Mechanical loads on drive assemblies and servomechanical and electrical loads on switches and relays may be simulated when necessary if proper precaution is given to duplicating the normal load in respect to torque, voltage, current, inductive reactance, etc. In all instances, it is preferable to operate the equipment as it normally functions in the system during service use.

Step 4. A thermocouple shall be placed on the most massive component of the test item.

Step 5. At least two thermocouples shall be placed on the inside of the test chamber walls. These thermocouples (from steps 4 and 5) should be instrumented for monitoring outside the test chamber when the chamber is sealed.

II-2.2 Procedure II - Explosion containment test.

Step 1. The equipment, or a model of the equipment of the same volume and configuration, shall be placed within the case and the case installed in the explosion chamber.

NEW PAGE

METHOD 511.4

511.4-8

Step 2. Make provision to circulate the fuel-air mixture into the case being tested. In the case of forced-air-cooled equipment, the cooling air must contain the proper fuel-air mixture. For equipment not using forced-air cooling, it is necessary to drill the case for insertion of a hose from a blower. Take adequate precautions to prevent ignition of the ambient mixture by backfire or release of pressure through the supply hose. Any modification to facilitate the introduction of ignitable vapor shall not alter the case internal volume by more than ±5%.

Step 3. Provide a positive means of igniting the explosive mixture within the case. The case may be drilled or tapped for a spark gap, or a spark gap may be mounted internally. Points of ignition should not be more than 0.5 inch from any vent holes or flame arresting devices, and as many of such ignition sources should be installed within the case as there are vent holes or flame arresting devices. Where the design of equipment makes this impractical, use as many points of ignition as are practical.

Step 4. A thermocouple inserted into the case and attached to a sensitive galvanometer outside the test chamber may be used to detect explosions within the case.

Step 5. Ensure that the air within the test chamber has a water vapor dewpoint lower than 10°C (50°F).

Step 6. If the site atmospheric pressure at the test location is less than 633mm Hg, make provisions to pressurize the test chamber to at least 633mm Hg. Ground level pressures referred to in II-3.2 step 5 shall consist of pressures from 633 to 800mm Hg, inclusive.

Step 7. Perform steps 4 and 5 of II-2.1.

II-3 PROCEDURES

II-3.1 Procedure I - Operation in explosive atmosphere

Step 1. Perform the preparation for test.

Step 2. Seal the chamber with the test item mounted inside.

Step 3. Raise the ambient temperature of air inside the chamber to that determined in I-3.2.3. Wait until the temperatures of the test item and test chamber inner walls come to within 11°C of the chamber ambient air temperature.

Step 4. Adjust the chamber air pressure to simulate the test altitude plus 2000 meters, as given in I-3.2.6, to allow for introducing, vaporizing and mixing the fuel with the air.

Step 5. Slowly introduce the required quantity of n-hexane into the test chamber as determined by I-3.2.4.

METHOD 511.4

511.4-9

Step 6. Circulate the test atmosphere and continue to reduce the simulated chamber altitude for at least three minutes to allow for complete vaporization of fuel and the development of a homogeneous mixture.

Step 7. At 1000m above the test altitude, operate the test item. Operation shall be continuous from step 7 through step 9. Make and break electrical contacts as frequently as reasonably possible.

Step 8. Slowly decrease the simulated chamber altitude by bleeding air into the chamber. Change the simulated altitude at a rate no faster than 100 meters per minute.

Step 9. Stop the altitude change at 1000 meters below test altitude or at ground level, whichever is reached first.

Step 10. Check the potential explosiveness of the air-vapor mixture by attempting to ignite a sample of the mixture by a spark-gap or glow plug ignition source having sufficient energy to ignite a 3.82-percent hexane mixture.

If ignition does not occur, return the chamber to ambient atmospheric pressure, purge the chamber of the fuel vapor, and reinitiate the test at the most recent test altitude.

Step 11.

a. If the simulated altitude reached in Step 9 is 3000 meters or greater above site level, continue testing at the next test altitude which is defined as 3000 meters below the just-completed test altitude. Repeat Steps 5-11 using the new test altitude.

b. If the simulated altitude reached in Step 9 is below 3000m, repeat Steps 5-101 using site level as the last test altitude, and then go to Step 12.

Step 12. Document test results per II-4.

II-3.2 Procedure II - Explosion containment test

Step 1. Perform preparation for the test as given in II-2.2.

Step 2. Seal the chamber with the test item inside.

Step 3. Raise the ambient air temperature inside the chamber.

Step 4. Wait until the temperatures of the test item and test chamber inner walls come to within 11ºC (20ºF) of the chamber ambient air temperature.

Step 5. Change the chamber air pressure to 2000 meters of simulated altitude above the site ambient pressure (i.e., ground level).

Step 6. Slowly introduce the required quantity of n-hexane into the test chamber to obtain optimum fuel -vapor/air mixture at site ambient pressure or as given in I-3.2.4b for n-hexane.

Step 7. Circulate the test atmosphere and continue to reduce the simulated chamber altitude for at least three minutes to allow for complete vaporization of fuel and the development of a homogeneous mixture within the test item and within the test chamber.

1 It may be necessary to perform Step 4 first if insufficient altitude remains for fuel introduction.

METHOD 511.4

511.4-10

Step 8. Slowly decrease the simulated chamber altitude to return the pressure altitude to site ambient pressure (i.e., ground level).

Step 9. Energize the internal case ignition source and confirm the occurrence of an explosion within the test item using the installed thermocouple. If no explosion occurs, purge the chamber and the test item of all air/fuel vapor and return to step 2.

Step 10. If the explosion inside the test item's case did not propagate to the fuel/air mixture outside the test item:

a. Repeat steps 5 through 10 four times if the test item's case is not in excess of 0.02 times the chamber volume;

b. If the test item volume is equal to or greater than 0.02 times the chamber volume, purge the chamber and test item of air/fuel vapor and repeat steps 2 through 10 four times.

Step 11. Check the potential explosiveness of the air/fuel-vapor mixture by attempting to ignite a sample of the mixture by a spark or glow plug. If chamber sample does not ignite, purge the chamber of all air/fuel-vapor mixture, and repeat the entire test from step 2.

Step 12. Document the test results.

II-4 INFORMATION TO BE RECORDED

a. Test item identification (manufacturer, serial number, etc.).

b. Test procedure number.

c. Chamber pressure and temperatures at each test point (simulated altitude).

d. For Procedure II, the locations of glow plugs or spark gaps installed inside test items.

e. For Procedure II, the energy requirement for the glow plug or spark gaps for operation.

f. The quantity of fuel required at each test point.

g. The off/on cycling rate for the test equipment.

File details come from the government source that posted it. Updated .