MIL-STD-810G_CN1.pdf
PDF 22 MB Posted
- Attached to
- JEDI Cloud RFP Federal contract opportunity
- Solicitation number
- HQ003418R0077_JEDI_CLOUD_RFP
- Issued by
- DOD Washington Headquarters Service
About this file
MIL-STD-810G CN1
View the file
Other files for this federal contract opportunity
Show all 50
JEDI Cloud RFP has more files on GovTribe.
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
NOT MEASUREMENT
SENSITIVE
MIL-STD-810G
w/Change 1 15 April 2014
SUPERSEDING
MIL-STD-810G
31 October 2008
DEPARTMENT OF DEFENSE
TEST METHOD STANDARD
ENVIRONMENTAL ENGINEERING CONSIDERATIONS
AND LABORATORY TESTS
AMSC N/A AREA ENVR
DISTRIBUTION STATEMENT A. Approved for public release; distribution is unlimited.
NOTICE OF
CHANGE
Source: https://assist.dla.mil -- Downloaded: 2014-05-07T13:56Z Check the source to verify that this is the current version before use.
MIL-STD-810G
w/CHANGE 1
PART ONE
PART ONE-ii
FOREWORD
1. This Standard is approved for use by all Departments and Agencies of the Department of Defense (DoD).
Although prepared specifically for DoD applications, this Standard may be tailored for commercial applications as well. This Change Notice to version G incorporates updates and clarifications to the earlier edition. The primary emphases are still the same - (with the exception of Method 528) tailoring a materiel item's environmental design and test limits to the conditions that the specific materiel will experience throughout its service life, and establishing laboratory test methods that replicate the effects of environments on materiel, rather than trying to reproduce the environments themselves. The goal is to provide an up-front explanation of how to implement the environmental tailoring process throughout the materiel acquisition cycle.
This revision recognizes that the environmental design and test tailoring process has expanded to involve a wide range of managerial and technical interests. Accordingly, this revision orients environmental design and test direction toward three basic types of users who have distinctly different, although closely associated, interests:
Program Managers who, among other responsibilities, ensure proposed concepts and systems are valid and functional in intended operational environments; environmental engineering specialists (EES), who enter the acquisition process early to assist combat and materiel developer tailoring efforts by preparing life cycle environmental profiles and drafting tailored design criteria and test programs; and the design, test, and evaluation community, whose analysts, engineers, and facility operators use tailored designs and tests to meet user needs.
2. Part One describes management, engineering, and technical roles in the environmental design and test tailoring process. It focuses on the process of tailoring materiel design and test criteria to the specific environmental conditions a materiel item is likely to encounter during its service life. Annex A contains complete descriptions of environmental engineering tasks, including additional guidance on Task 402, Life Cycle Environmental Profile (LCEP). These tasks, along with management information in Annex B and EES guidance in Annex C, will help to ensure the environmental design and test tailoring process is implemented and documented according to the disciplined, but flexible approach to materiel acquisition called for in Department of Defense (DoD) 5000-series documents (DoDD 5000.1). Terms used in this Standard relating to the materiel acquisition process are limited to terms used in the DoD 5000-series documents; to avoid confusion and promote simplicity, service-specific terms/processes are not used.
3. Part Two contains environmental laboratory test methods to be applied according to the general and specific test tailoring guidelines described in Part One. It is important to emphasize that, with the exception of Method 528, these Methods are not to be called out in blanket fashion, nor applied as unalterable routines, but are to be selected and tailored to generate the most relevant test data possible. Methods 500 through 527 now contain the Note, “Tailoring is essential. Select methods, procedures and parameter levels based on the tailoring process described in Part One, paragraph 4.2.2, and Annex C. Apply the general guidelines for laboratory test methods described in Part One, paragraph 5 of this Standard.” Prior to the start of testing, all deviations as a result of tailoring shall be approved by the proper authorities. It should further be noted that the rationale for such deviations and/or tailoring shall be recorded in the test report.
To support the tailoring process described in Part One, each test method in Part Two contains some environmental data and references, and identifies tailoring opportunities for the particular method. Some methods afford a wide latitude for tailoring; some can be tailored up to established limits, and some have relatively few tailoring options.
Whenever possible, each method contains background rationale to help determine the appropriate level of tailoring.
Each test method supports the test engineer and test facility operator by describing preferred laboratory test facilities and methodologies. Any specific tailoring information and values contained in these test methods should be supplanted by more up-to-date field/fleet or program-specific information when available.
When applied properly, the environmental management and engineering processes described in this Standard can be of enormous value in generating confidence in the environmental worthiness and overall durability of materiel system design. However, it is important to recognize that there are limitations inherent in laboratory testing that make it imperative to use proper caution and engineering judgment when extrapolating these laboratory results to results that may be obtained under actual service conditions. In many cases, real-world environmental stresses (singularly or in combination) cannot be duplicated practically or reliably in test laboratories. Therefore, users should not assume that a system or component that passes laboratory tests of this Standard also would pass
PART ONE-iii field/fleet verification trials. DoD 5000-series documents call for component technology to be demonstrated in relevant environments to reduce risk on components and subsystems that have been demonstrated only in laboratory environments (DoDI 5000.2).
4. Part Three contains a compendium of climatic data and guidance assembled from several sources to include AR 70-38, “Research, Development, Test and Evaluation of Materiel for Extreme Climatic Conditions,” (1979), Draft AR 70-38 (1990) that was assembled using 1987 Air Land Battlefield Environment (ALBE) report information, “Environmental Factors and Standards for Atmospheric Obscurants, Climate, and Terrain,” and MIL-HDBK-310, Global Climatic Data for Developing Military Products.
Part Three provides planning guidance for realistic consideration (starting points) of climatic conditions in the research, development, test, and evaluation (RDTE) of materiel and materials used throughout their life cycles in various climatic regions throughout the world. It is intended that this and related documents will help achieve the objective of developing materiel that will perform adequately under the environmental conditions likely to be found throughout its life cycle in the areas of intended use.
5. The US Department of Defense would like to thank the following individuals for their contributions toward the development and publication of MIL-STD-810G Change Notice 1:
Army Army
Jimmie Barnett – Dugway Proving Ground Scott Walton – Aberdeen Test Center
Michael Barry – Aberdeen Test Center
William (Bill) Barber – Redstone Test Center Air Force
Michael (Troy) Bedsole – Redstone Test Center Dwayne Bell – Eglin AFB
William (Skip) Connon – Aberdeen Test Center Cheryl Copes – ASC/ENRS, Wright-Patterson Air Force Base
Jeff Dallman – White Sands Missile Range Lorraine Wright – ASC/ENRS, Wright-Patterson Air Force Base
Herb Egbert – DTC (Retired) Sean Mortara – ASC/ENFS, Wright-Patterson Air Force Base
Rick Errhalt – Electronic Proving Ground
Judy Galloway – Aberdeen Test Center Navy
Mike Hale – Redstone Test Center Brian Haugen – NAWC, China Lake
Anthony Ham – ATEC, APG James E. Howell III – NSWC
John Harris – Redstone Test Center Andrew Johnson – NSWC, Dahlgren
Michael Bartosiak – SDDCTEA, Scott AFB Wayne Johnson – NAWC, Patuxent River
Jessica Knight – ATEC, APG Ron Merritt – NAWC, China Lake
Paul Krause – COE, TEC (Retired) Luke Martin – NSWC, Dahlgren
Matthew Lucas – Redstone Test Center Brett Tanner – NAWC, China Lake
Bob McKinnon – Aberdeen Test Center
Joe Nash – AMRDEC Private Industry
Randy Patrick – Yuma Test Center Vesta Bateman – Mechanical Shock Consulting
Rick Reynaud – White Sands Missile Range George Coonley – KHS Tech. Lighting
Steve Sanders – AMRDEC Chris Peterson – Consultant
Brendt Sigvart – Dugway Proving Ground
Jamie Sullivan – Redstone Test Center Organizations
Eric Tessier – White Sands Missile Range IEST – Institute of Environmental Sciences and Technology
Ken Thompson – ATEC, APG SAVE – Shock and Vibration Exchange
PART ONE-iv
The MIL-STD-810 Working Group wishes to recognize with great appreciation Mr. Ken Thompson, MIL-STD-810 Committee Chairman, for his exemplary leadership, guidance, and dedication to bringing this collaborative project to fruition.
6. This Standard is intended to be a "living document" that will be updated as new concepts, technologies, and methodologies evolve.
Questions about this document’s technical content may be addressed to the following offices:
US Army Test and Evaluation Command, 2202 Aberdeen Blvd, ATTN: CSTE-TM, Aberdeen Proving Ground, MD 21005-5055; Commercial Tel: (443) 861-9338; DSN 848-9338; Fax: (443) 861-9927.
Aeronautical Systems Center, ATTN: ASC/ENFS, 2530 Loop Road West, Wright-Patterson AFB, OH 45433-7101;
Commercial Tel: (937) 255-8517 or 904-5863; DSN 785-8517 or 674-5863; Fax: (937) 476-4546 or 255-2363.
Naval Air Warfare Center, Aircraft Division, ATTN: Code AIR-4.3.4, Patuxent River, MD 20670; Commercial Tel:
(301) 342-8049; DSN 342-8049; Fax: (301) 757-1213.
Naval Air Warfare Center, Weapons Division, ATTN: Code 476300D, China Lake, CA 93555-6100; Commercial Tel: (760) 939-4667; DSN 437-4667; Fax: (760) 939-1065.
The Preparing Activity for MIL-STD-810 transferred from Air Force Code 11 to Army Code TE on 14 November 2008.
Comments, suggestions, or questions on this document should be addressed to US Army Test and Evaluation Command, 2202 Aberdeen Blvd, ATTN: CSTE-TM, Aberdeen Proving Ground, MD 21005-5001; or e-mailed to usarmy.apg.atec.mbx.atec-standards@mail.mil. Since contact information can change, you may want to verify the currency of this address information using the ASSIST Online database at https://assist.dla.mil.
CONTENTS
PART ONE -- ENVIRONMENTAL ENGINEERING PROGRAM GUIDELINES
Paragraph Page
1. SCOPE ................................................................................................................................... PART ONE-1
1.1 Purpose ................................................................................................................................... PART ONE-1
1.2 Application ............................................................................................................................. PART ONE-2
1.3 Limitations ............................................................................................................................. PART ONE-3
2. APPLICABLE DOCUMENTS .............................................................................................. PART ONE-4
2.1 General ................................................................................................................................... PART ONE-4
2.2 Government Documents ........................................................................................................ PART ONE-4
2.2.1 Specifications, Standards, and Handbooks............................................................................. PART ONE-4
2.2.2 Other Government Documents, Drawings, and Publications ................................................. PART ONE-5
2.3 Non-Government Publications ............................................................................................... PART ONE-5
2.4 Order of Precedence ............................................................................................................... PART ONE-5
3. DEFINITIONS ....................................................................................................................... PART ONE-5
3.1 Terms ..................................................................................................................................... PART ONE-5
3.2 Acronyms ............................................................................................................................... PART ONE-9
4. GENERAL PROGRAM GUIDELINES ................................................................................ PART ONE-9
4.1 Program Managers ................................................................................................................. PART ONE-9
4.1.1 Roles of the Program Manager .............................................................................................. PART ONE-9
4.1.2 Guidance for Program Managers ........................................................................................... PART ONE-9
4.1.2.1 Concept of Operations (CONOPS) ...................................................................................... PART ONE-11
4.1.2.2 System Requirements Document (SRD) .............................................................................. PART ONE-12
4.1.2.3 Initial Capabilities Document (ICD) .................................................................................... PART ONE-12
Source: https://assist.dla.mil -- Downloaded: 2014-05-07T13:56Z Check the source to verify that this is the current version before use.
mailto:usarmy.apg.atec.mbx.atec-standards@mail.mil https://assist.dla.mil/
PART ONE-v
CONTENTS - Continued Paragraph Page
4.1.2.4 Capabilties Development Document (CDD) ........................................................................ PART ONE-12
4.1.2.5 Capabilties Production Document (CPD) ............................................................................ PART ONE-12
4.1.2.6 System Engineering Management Plan (SEMP).................................................................. PART ONE-12
4.1.2.7 Test and Evaluation Master Plan (TEMP) ........................................................................... PART ONE-12
4.2 Environmental Engineering Specialists (EES) ..................................................................... PART ONE-13
4.2.1 Roles of Environmental Engineering Specialists ................................................................. PART ONE-13
4.2.2 Environmental Engineering Tailoring Tasks ....................................................................... PART ONE-13
4.2.2.1 General ................................................................................................................................. PART ONE-13
4.2.2.2 Preparing an Environmental Engineering Management Plan (EEMP), Task 401 ............................................................................................................................... PART ONE-13
4.2.2.3 Developing an Environmental Test and Evaluation Master Plan (ETEMP) ........................ PART ONE-14
4.2.2.4 Preparing a Detailed Environmental Test Plan (DETP), Task 405 ...................................... PART ONE-14
4.2.2.5 Preparing an Environmental Test Report (ETR), Task 406 ................................................. PART ONE-14
4.3 Design and Test Engineers and Facility Operators .............................................................. PART ONE-15
4.3.1 Roles of Design Engineers ................................................................................................... PART ONE-15
4.3.2 Roles of Test Engineers/Facility Operators.......................................................................... PART ONE-15
4.3.3 Guidance for Design and Test Engineers and Test Facility Operators ................................. PART ONE-15
4.3.3.1 Natural Environment (Field/Fleet) Testing .......................................................................... PART ONE-15
4.3.3.2 Laboratory Testing ............................................................................................................... PART ONE-15
5. GENERAL LABORATORY TEST METHOD GUIDELINES .......................................... PART ONE-18
5.1 Test Conditions .................................................................................................................... PART ONE-18
5.2 Tolerances for Test Conditions ............................................................................................ PART ONE-18
5.3 Test Instrumentation. ........................................................................................................... PART ONE-19
5.3.1 Suitability for Environment.................................................................................................. PART ONE-19
5.3.2 Calibration............................................................................................................................ PART ONE-19
5.4 Stabilizing Test Temperature. .............................................................................................. PART ONE-19
5.4.1 Test Item Operating. ............................................................................................................ PART ONE-19
5.4.2 Test Item Non-Operating. .................................................................................................... PART ONE-19
5.5 Test Sequence. ..................................................................................................................... PART ONE-20
5.6 Test Level Derivation. .......................................................................................................... PART ONE-20
5.7 Pretest Information for Facility Operators. .......................................................................... PART ONE-20
5.8 Test Setup............................................................................................................................. PART ONE-20
5.8.1 Installing the Test Item in Test Facility. .............................................................................. PART ONE-20
5.8.2 Test Item Operation. ............................................................................................................ PART ONE-21
5.9 Pretest Baseline Data. .......................................................................................................... PART ONE-21
5.10 Information During Test. ..................................................................................................... PART ONE-21
5.11 Interrupted Tests. ................................................................................................................. PART ONE-21
5.11.1 In-Tolerance Interruptions. .................................................................................................. PART ONE-21
5.11.2 Out-of-Tolerance Interruptions ............................................................................................ PART ONE-21
5.11.3 Interruption Due to Test Item Operation Failure. ................................................................. PART ONE-22
5.11.4 Scheduled Interruptions. ...................................................................................................... PART ONE-22
5.12 Combined Tests. .................................................................................................................. PART ONE-22
5.13 Post-Test Data. ..................................................................................................................... PART ONE-22
5.14 Environmental Effects and Failure Criteria. ........................................................................ PART ONE-24
5.15 Environmental Test Reports. ................................................................................................ PART ONE-24
5.16 Water Purity. ........................................................................................................................ PART ONE-24
5.17 Analysis of Results............................................................................................................... PART ONE-24
5.18 Monitoring. .......................................................................................................................... PART ONE-25
5.18.1 Monitoring Test Chamber Parameters. ................................................................................ PART ONE-25
5.18.2 Monitoring the Item Under Test. ......................................................................................... PART ONE-25
PART ONE-vi
Paragraph Page
5.19 Total High Temperature Exposure Duration ........................................................................ PART ONE-25
5.20 Temperature Change Rate .................................................................................................... PART ONE-26
6. NOTES ................................................................................................................................. PART ONE-26
6.1 Intended Use. ....................................................................................................................... PART ONE-26
6.2 Acquisition Requirements .................................................................................................... PART ONE-26
6.3 Subject Term (Key Word) Listing ...................................................................................... PART ONE-26
6.4 International Standardization Agreement Implementation .................................................. PART ONE-27
6.5 Changes from Previous Issue ............................................................................................... PART ONE-27
FIGURES
Figure 1-1. Environmental engineering program guide ......................................................................... PART ONE-1 Figure 1-2. Roles of acquisition personnel in environmental design/test tailoring process ................... PART ONE-2 Figure 1-3. Environmental test program tailoring process ................................................................... PART ONE-10 Figure 1-4a. Generalized life cycle histories for military hardware ...................................................... PART ONE-16 Figure 1-4b. Generalized life cycle histories for military hardware ...................................................... PART ONE-17 Figure 1-5. Interrupted test cycle logic ................................................................................................ PART ONE-23
Annex Page
A Environmental Management and Engineering Tasks ..............................................................PART ONE-A-1 Task 401 – Environmental Engineering Management Plan (EEMP) ............................. PART ONE-A-2 Task 402 – Life Cycle Environmental Profile (LCEP) ................................................ PART ONE-A-3 Task 403 – Operational Environment Documentation (OED) ................................... PART ONE-A-15 Task 404 – Environmental Issues/Criteria List (EICL) ............................................. PART ONE-A-17 Task 405 – Detailed Environmental Test Plans (DETP) ........................................... PART ONE-A-18 Task 406 – Environmental Test Report (ETR) .......................................................... PART ONE-A-21
B Detailed Program Management Guidance ............................................................................... PART ONE-B-1 C Environmental Tailoring Guidelines for Environmental Engineering Specialists (EES) ................................................................................................................ PART ONE-C-1 D Terminology for Dynamic (Mechanical) Test Methods ..........................................................PART ONE-D-1
PART ONE, ANNEX C FIGURES
C-1 Areas of occurrence of climatic categories A1, A2, & A3 ................................................. PART ONE-C-5 C-2 Areas of occurrence of climatic categories B1, B2, & B3 ................................................. PART ONE-C-6 C-3 Areas of occurrence of climatic categories C1, C2, & C3 ................................................. PART ONE-C-7
PART ONE, ANNEX C TABLE
C-I Summary of climatic conditions and daily cycles of temperature, solar radiation, and relative humidity.......................................................................................................... PART ONE-C-8
C-II Summary of potential environments for the Storage Phase ............................................... PART ONE-C-9 C-III Summary of potential environments for the Transportation Phase .................................... PART ONE-C-9 C-IV Summary of potential environments for the Deployment Phase ...................................... PART ONE-C-10
PART TWO -- LABORATORY TEST METHODS Page
500.6 Low Pressure (Altitude) .................................................................................... 500.6-i - 500.6-8
501.6 High Temperature ............................................................................................. 501.6-i - 501.6-14
502.6 Low Temperature ............................................................................................. 502.6-i - 502.6-10
503.6 Temperature Shock ........................................................................................... 503.6-i - 503.6-14
504.2 Contamination by Fluids ................................................................................... 504.2-i- 504.2C-2
505.6 Solar Radiation (Sunshine) ................................................................................ 505.6-i - 505.6C-8
506.6 Rain ................................................................................................................. 506.6-i - 506.6-14
PART ONE-vii
Paragraph Page
507.6 Humidity .......................................................................................................... 507.6-i - 507.6A-2
508.7 Fungus ............................................................................................................. 508.7-i - 508.7B-2
509.6 Salt Fog ........................................................................................................... 509.6-i - 509.6-10
510.6 Sand and Dust .................................................................................................. 510.6-i - 510.6-14
511.6 Explosive Atmosphere ...................................................................................... 511.6-i - 511.6-10
512.6 Immersion ........................................................................................................ 512.6-i - 512.6-8
513.7 Acceleration ..................................................................................................... 513.7-i - 513.7A-8
514.7 Vibration .......................................................................................................... 514.7-i - 514.7F-F2
515.7 Acoustic Noise .................................................................................................. 515.7-i - 515.7B-4
516.7 Shock ............................................................................................................... 516.7-i - 516.7B-8
517.2 Pyroshock ........................................................................................................ 517.2-i - 517.2A-10
518.2 Acidic Atmosphere ........................................................................................... 518.2-i - 518.2-8
519.7 Gunfire Shock .................................................................................................. 519.7-i - 519.7E-8
520.4 Temperature, Humidity, Vibration, and Altitude ................................................. 520.4-i - 520.4-24
521.4 Icing/Freezing Rain ................................................................................................... 521.4-i - 521.4-8
522.2 Ballistic Shock ................................................................................................. 522.2-i - 522.2-20
523.4 Vibro-Acoustic/Temperature ............................................................................. 523.4-i - 523.4A-9
524.1 Freeze / Thaw ................................................................................................... 524.1-i - 524.1-6
525.1 Time Waveform Replication ............................................................................. 525.1-i - 525.1B-10
526.1 Rail Impact....................................................................................................... 526.1-i - 526.1-10
527.1 Multi-Exciter Test ............................................................................................ 527.1-i - 527.1E-38
528.1 Mechanical Vibrations of Shipboard Equipment (Type I - Environmental and
Type II - Internally Excited) ................................................................................. 528.1-i - 528.1B-4
PART THREE -- WORLD CLIMATIC REGIONS – GUIDANCE
1. SCOPE .......................................................................................................................................... PART THREE-1
2. DISTRIBUTION OF CLIMATIC DESIGN TYPES. ................................................................... PART THREE-3
3. NATURAL AND INDUCED ENVIRONMENT AND ASSOCIATED ELEMENTS ................ PART THREE-8
4. ENVIRONMENT ELEMENTS - CLIMATIC DESIGN TYPES - NATURAL
AND INDUCED. ........................................................................................................................ PART THREE-10
5. ADDITIONAL ENVIRONMENTAL ELEMENTS. .................................................................. PART THREE-25
6. REFERENCED / RELATED DOCUMENTS ............................................................................ PART THREE-39
PART THREE
Annex
Page
A Weather and Climatic Extremes – A Brief Summary .......................................................... PART THREE A-1 B Terminology ......................................................................................................................... PART THREE B-1 C Comparison of AR 70-38 with MIL-HDBK-310 ................................................................. PART THREE C-1
PART ONE-viii
(This page is intentionally blank.)
PART ONE-1
PART ONE –
ENVIRONMENTAL ENGINEERING PROGRAM GUIDELINES
1. SCOPE.
1.1 Purpose.
This Standard contains materiel acquisition program planning and engineering direction for considering the influences that environmental stresses have on materiel throughout all phases of its service life. It is important to note that this document does not impose design or test specifications. Rather, it describes the environmental tailoring process that results in realistic materiel designs and test methods based on materiel system performance requirements. Figure 1-1 summarizes this direction.
DEVELOP ENVIRONMENTAL ENGINEERING
MANAGEMENT PLAN (EEMP).
(TASK 401, REF PARAGRAPH 4.2.2.2)
SCHEDULE TASKS 402-406, PLUS TASK SUPPORT.
CONSIDER ALTERNATIVES TO TESTING HARDWARE.
PREPARE COST/BENEFIT/RISK ANALYSIS FOR
ALTERNATIVE(S) TO TESTING HARDWARE.
PREPARE LIFE CYCLE
ENVIRONMENTAL PROFILE (LCEP).
(TASK 402, REF PARAGRAPH 4.2.2.3.1)
PREPARE ENVIRONMENTAL
ISSUES/CRITERIA LIST (EICL).
(TASK 404, REF PARAGRAPH 4.2.2.3.3)
BASE ON RESULTS FROM TASKS 402 & 403.
LIST ALL TAILORED ISSUES & CRITERIA.
PROVIDE RATIONALE FOR THEIR
DERIVATIONS.
PREPARE DETAILED ENVIRONMENTAL
TEST PLAN (DETP).
(TASK 405, REF PARAGRAPH 4.2.2.4)
LABORATORY TEST PLANS: USE METHODS IN THIS
STANDARD, SELECTED & TAILORED TO THE
SPECIFIC TEST ITEM.
FIELD/FLEET TEST PLANS: DEVELOPMENT/
OPERATIONAL TEST AGENCIES USE THEIR OWN
PLAN REQUIREMENTS/FORMATS. TAILORED
TO THE SPECIFIC TEST ITEM.
ALTERNATIVE(S): EXPLAIN METHODOLOGY.
PERFORM ENVIRONMENTAL TESTS.
LABORATORY TESTS: USE METHODS IN THIS
STANDARD SELECTED & TAILORED TO THE
SPECIFIC TEST ITEM.
FIELD/FLEET TESTS: DEVELOPMENT/
OPERATIONAL TEST AGENCIES USE THEIR OWN
METHODS, SELECTED & TAILORED TO THE
SPECIFIC TEST ITEM.
ALTERNATIVE(S): EXECUTE METHODOLOGY.
PREPARE ENVIRONMENTAL
TEST REPORTS (ETR).
(TASK 406, REF PARAGRAPH 4.2.2.5)
LABORATORY TEST REPORTS: USE THE
FORMAT IN TASK 406.
FIELD/FLEET TEST REPORTS:
DEVELOPMENT/OPERATIONAL TEST
AGENCIES USE THEIR OWN TEST
REPORT REQUIREMENTS/FORMATS.
ALTERNATIVE(S): APPROPRIATE REPORT(S).
ENVIRONMENTAL TEST & EVALUATION MASTER PLAN (ETEMP)
(TASKS 402, & 404 REF PARAGRAPH 4.2.2.3)
NOTE 1:
NOTE 2:
NOTE 3:
COMPLETE TASK DESCRIPTIONS ARE IN
APPENDIX A.
INCLUDE EEMP & ETEMP WITH OTHER
SYSTEM PLANS & PROPOSALS TO
ALLOW REALISTIC COST ESTIMATING.
MAKE CONTRACT PROVISIONS FOR THE
EQUIPMENT SUPPLIER TO UPDATE EEMP &
ETEMP ON A PERIODIC BASIS AS ADDITIONAL
INFORMATION BECOMES AVAILABLE.
PREPARE OPERATIONAL ENVIRONMENT
DOCUMENTATION (OED).
(TASK 403, REF PARAGRAPH 4.2.2.3.2)
DOCUMENT REAL-WORLD PLATFORM
CHARACTERISTICS.
OBTAIN DATA FROM DATABASES, MODELS,
SIMULATIONS.
OBTAIN REMAINING DATA BY MEASURING
REALISTIC PLATFORM ENVIRONMENTS.
TEST
HARDWARE/
PROTOTYPES
? NO
YES
(SEE TASK 401
REF PARAGRAPHS
4.1.2, 4.2.2.1, &
APPENDIX B, PARA. F)
ALTERNATIVES.
SELECT ALTERNATIVE
(e.g., MODELING &
SIMULATION, COUPON
SAMPLES, SIMILARITY,
OTHER ANALYSES.)
SCHEDULE AND JUSTIFY
ALTERNATIVE(S) IN
TASK 401.
Figure 1-1. Environmental engineering program guide.
PART ONE-2
This document supports the functions of three different groups of personnel involved in the materiel acquisition process. Each of these groups is critical to the goal of successfully incorporating environmental considerations into materiel design, test, and evaluation. Although each group has different tasks to perform, none of these tasks can be isolated from the others in a successful acquisition program. As shown on Figure 1-2, this information is intended for the following:
a. Materiel acquisition Program Managers among whose responsibilities is ensuring materiel will function as required in intended operational environments. (See 4.1, below.)
b. Environmental engineering specialists (EES) who assist combat and materiel developers throughout the acquisition process to tailor their materiel designs and test designs to environmental stresses/constraints expected during the materiel's service life. (See 4.2, below.)
c. Design, test, and evaluation community analysts, engineers, and facility operators who meet user needs by focusing on tailored designs and tests. (See 4.3, below, and Part Two of this Standard.)
Figure 1-2. Roles of acquisition personnel in the environmental design/test tailoring process.
1.2 Application.
The tailoring process described in this Standard (i.e., systematically considering detrimental effects that various environmental factors may have on a specific materiel system throughout its service life) applies throughout the materiel acquisition cycle to all materiel developed for military or commercial applications, including foreign and non-development item (NDI) procurements, procurements, or modifications of Allied systems or materiel, and cooperative development opportunities with one or more Allied nations to meet user and interoperability needs
(DODD 5000.1).
a. Part One lays out a disciplined, tailored approach for acquiring systems that will withstand the stresses of climatic, shock and vibration environments that they expect to see in their service lives. The basic process for acquiring materiel that satisfies users' needs from this environmental engineering viewpoint is depicted on Figure 1-1.
b. Part Two also is an integral part of the environmental tailoring process. It contains tailoring information, environmental stress data, and laboratory test methods. The environmental data contained in the Methods may help, but should not be used exclusively to define environmental stresses that materiel will encounter throughout its service life. This will help engineers to tailor analyses and tests to specific materiel and its defined life cycle. It is not valid to call out all of the Methods in this Standard in a blanket fashion for a materiel system; nor is it valid, once a Method is determined appropriate, (except
MIL-STD-810G
ENVIRONMENTAL DESIGN/TEST
TAILORING GUIDANCE
• ENVIRONMENTAL ENGINEERING
MANAGEMENT PLAN
• LIFE CYCLE ENVIRONMENTAL
PROFILE
• OPERATIONAL ENVIRONMENTAL
DESIGN/TEST REQUIREMENTS
• ENVIRONMENTAL TEST
PLANS/REPORTS
• SYSTEM REQUIREMENTS
DOCUMENT
• INITIAL CAPABILITY DOCUMENT
• CAPABILITY DEVELOPMENT
DOCUMENT
• SYSTEM ENGINEERING
MANAGEMENT PLAN
• ENGINEERING DESIGNS AND
SPECIFICATIONS
• MIL-STD-810G, PART 2
LABORATORY TEST METHODS
• NATURAL ENVIRONMENT
FIELD/FLEET TEST FACILITIES
AND PROCEDURES
PROGRAM
MANAGER
ENVIRONMENTAL
ENGINEERING
SPECIALISTS
DESIGN/TEST
ENGINEERS &
FACILITY OPERATORS
PART ONE-3
for Method 528) to regard the environmental stress data, test criteria, and procedures in the Method as unalterable.
c. Part Three provides planning guidance for realistic consideration (starting points) of climatic conditions in the research, development, test, and evaluation (RDTE) of materiel and materials used throughout their life cycles in various climatic regions throughout the world. It is intended that this and related documents will help achieve the objective of developing materiel that will perform adequately under the environmental conditions likely to be found throughout its life cycle in the areas of intended use.
d. Guidance and test Methods of this Standard are intended to:
(1) Provide guidance of the development of materiel life cycles and aid in the development of environmental stress sequences, durations, and test levels.
(2) Be used to develop analysis and test criteria tailored to the materiel and its environmental life cycle.
(3) Evaluate materiel performance when exposed to a life cycle of environmental stresses.
(4) Identify deficiencies, shortcomings, and defects in materiel design, materials, manufacturing processes, packaging techniques, and maintenance methods.
(5) Demonstrate compliance with contractual requirements.
1.3 Limitations.
Although environmental analysis, design analysis, and laboratory testing are valuable tools in the materiel acquisition process, there are inherent limitations in analysis and laboratory testing techniques that must be recognized. The methods in Part Two of this Standard do not include many of the naturally-occurring forcing functions that may affect materiel performance or integrity in service use. Further, analytic and laboratory test methods are limited in their abilities to simulate synergistic or antagonistic stress combinations, dynamic (time sequence) stress applications, aging, and other potentially significant stress combinations present in natural field/fleet service environments. Use caution when defining and extrapolating analyses, test criteria, and results.
Part Two test methods purposely do not address the following but may, in some cases, be applied:
a. Electromagnetic interference (EMI).
b. Lightning and magnetic effects.
c. Nuclear, biological, chemical weapons or their effects.
d. Certain aspects of munitions and pyrotechnics safety testing.
e. Piece parts such as bolts, wires, transistors and integrated circuits.
f. Packaging performance or design.
g. Suitability of clothing or fabric items that are described in specific specifications.
h. Environmental stress screening (ESS) methods and procedures.
i. Reliability testing.
j. Safety testing.
k. Space – region beyond Earth’s atmosphere
PART ONE-4
2. APPLICABLE DOCUMENTS.
2.1 General.
The documents listed in this section are specified in sections 3, 4, or 5 of this Standard. This section does not include documents cited in other sections of this Standard or recommended for additional information or as examples. While every effort has been made to ensure the completeness of this list, document users are cautioned that they must meet all specified requirements of documents cited in sections 3, 4, or 5 of this Standard, whether or not they are listed.
2.2 Government Documents.
2.2.1 Specifications, Standards, and Handbooks.
The following specifications, standards, and handbooks form a part of this document to the extent specified herein.
Unless otherwise specified, the issues of these documents are those cited in the solicitation or contract.
INTERNATIONAL STANDARDIZATION AGREEMENTS
STANAG 4370 Environmental Testing
(STANAG 4370) Allied Environmental Conditions and Test Publications (AECTPs)
AECTP 100 Environmental Guidelines for Defence Materiel
AECTP 200 Environmental Conditions
AECTP 230 Climatic Conditions
AECTP 240 Mechanical Environmental Testing
AECTP 300 Climatic Environmental Tests
AECTP 400 Mechanical Environmental Tests
(Copies of these documents are available online at https://assist.dla.mil, or the North Atlantic Treaty Organization Online Library; or from the Standardization Document Order Desk, 700 Robbins Avenue, Building 4D, Philadelphia, PA 19111-5094.
DEPARTMENT OF DEFENSE SPECIFICATIONS
MIL-S-901 Shock Tests, H.I. (High Impact) Shipboard Machinery, Equipment, and Systems, Requirements for
DEPARTMENT OF DEFENSE STANDARDS
MIL-STD-167-1 Mechanical Vibrations of Shipboard Equipment (Type I – Environmental, and Type II – Internally Excited)
MIL-STD-331
MIL-STD-704
Fuze and Fuze Components, Environmental and Performance Tests for Aircraft Electrical Power Characteristics
MIL-STD-882
MIL-STD-1275
MIL-STD-1399
Standard Practice for System Safety Characteristics of 28 Volt D Electrical Systems in Military Vehicles Interface Standard for Shipboard Systems
MIL-STD-2105 Hazard Assessment Tests for Non-Nuclear Munitions
DEPARTMENT OF DEFENSE HANDBOOKS
MIL-HDBK-310 Global Climatic Data for Developing Military Products
(Copies of these documents are available online at https://assist.dla.mil, or from the Standardization Document Order Desk, 700 Robbins Avenue, Building 4D, Philadelphia, PA 19111-5094.)
https://assist.daps.dla.mil/ http://www.nato.int/docu/standard.htm http://www.nato.int/docu/standard.htm https://assist.daps.dla.mil/
PART ONE-5
2.2.2 Other Government Documents, Drawings, and Publications.
The following other Government documents, drawings, and publications form a part of this document to the extent specified herein. Unless otherwise specified, the issues of these documents are those cited in the solicitation or contract.
DEPARTMENT OF DEFENSE DIRECTIVES, INSTRUCTIONS, AND REGULATIONS
DODD 5000.1 The Defense Acquisition System
DODI 5000.02 Operation of the Defense Acquisition System
(Copies of these two documents are available online at The Defense Technical Information Center Website, and are available from DTIC Headquarters, 8725 John J. Kingman Rd., Ft. Belvoir VA 22060-6218; telephone (800) 225- 3842.)
AR 70-38 Research, Development, Test and Evaluation of Materiel for Extreme Climatic Conditions
(Copies of this Army Regulation are available online at The Army Publishing Directorate Website, and are available from the US Army Publications Distribution Center, 1655 Woodson Rd., St Louis, MO 63114-6181; telephone [314] 263-7305.)
2.3 Non-Government Publications.
The following documents form a part of this document to the extent specified herein. Unless otherwise specified, the issues of these documents are those cited in the solicitation or contract.
AMERICAN NATIONAL STANDARDS INSTITUTE (ANSI)/
NATIONAL CONFERENCE OF STANDARDS LABS (NCSL)
ANSI/NCSL Z540.1 General Requirements for Calibration Laboratories and Measuring and Test Equipment
(Copies of this document are available online at The NCSL International Website, or from NCSL International, 2995 Wilderness Place, Suite 107, Boulder, Colorado 80301-5404; telephone (303) 440-3339.)
INTERNATIONAL ORGANIZATION FOR STANDARDIZATION (ISO)
ISO 10012-1 Measurement Management Systems – Requirements for Measurement Processes and Measuring Equipment
(Copies of this document are available online at The ANSI E-standards Store and The International Organization for Standardization Website, or from ANSI, 25 West 43rd Street, 4th Floor, New York NY 10036-7406; telephone [212] 642-4900.)
2.4 Order of Precedence.
Unless otherwise noted herein or in the contract, in the event of a conflict between the text of this document and the references cited herein, the text of this document takes precedence. Nothing in this document, however, supersedes applicable laws and regulations unless a specific exemption has been obtained.
3. DEFINITIONS.
3.1 Terms.
This terminology section is meant to define the general terminology as it is used in this standard. In certain cases the terminology use may be somewhat different from its use in the general engineering community. No attempt has been made to be complete, therefore limiting the glossary to such terms as are found in the standard and that are important to the application of the standard. Terminology unique to a particular method is defined, as appropriate, in that method.
NOTE: A continuation of this terminology section that contains terminology more closely related to the dynamic (mechanical) test methods such as vibration, shock, gunfire shock, etc., is in Part One, Annex D.
http://www.dtic.mil/whs/directives/corres/ins1.html http://www.apd.army.mil/pdffiles/r70_38.pdf http://www.ncsli.org/publications/index.cfm http://webstore.ansi.org/ http://www.iso.org/iso/iso_catalogue.htm http://www.iso.org/iso/iso_catalogue.htm
PART ONE-6
a. Absolute humidity. The density of water in a particular volume of air. The most common units are grams per cubic meter, although any mass unit and any volume unit could be used. Warm air can hold more water vapor than cold air.
b. Accelerated test. A test designed to shorten the controlled environmental test time with respect to the service use time by increasing the frequency of occurrence, amplitude, duration, or any combination of these of environmental stresses that would be expected to occur during service use.
c. Aggravated test. A test in which one or more conditions are set at a more stressful level than the materiel will encounter during service use.
d. Ambient environment. The conditions, either outdoor or confined (e.g., temperature and humidity), that characterize the air or other medium that surrounds materiel.
e. Climatic categories. Specific types of world climates in which materiel is designed to withstand during operation, storage, and transit. See Part One, Annex C, Table C-I and Figure C-1.
f. Combat developer. Military specialist concerned with training, doctrine, and materiel needs documentation.
g. Critical threshold value. The level of an environment forcing function that degrades the capability of materiel significantly or requires degradation prevention measures be taken.
h. Cumulative effects. The collective consequences of environmental stresses during the life cycle of materiel.
i. Detailed Environmental Test Plan (DETP). Detailed plans for conducting environmental tests required to determine if the environmental criteria developed in Task 404 are met and their associated critical issues are satisfied, and to identify critical environmental threshold values for system effectiveness that may be evident during testing
j. Engineering judgment. Expert opinion based on engineering education and experience, especially in the area in which the judgment is made.
k. Environmental analysis. Technical activity covering an analytical description of the effects that various environments have on materiel, subsystems, and component effectiveness.
l. Environmental conditions. (See Forcing function (environment).)
m. Environmental engineering. The discipline of applying engineering practices to the effects that various environments have on materiel effectiveness.
n. Environmental engineering specialist (EES). A person or group of people skilled in one or more environmental engineering areas. Areas include, but are not necessarily limited to: natural and induced environments and their effects on materiel; expertise in measuring and analyzing in-service environmental conditions; formulating environmental test criteria; determining when environmental laboratory tests are appropriate/valid substitutes for natural in-service environmental tests; and evaluating the effects of specific environments on materiel. (See 4.2.)
o. Environmental test. A structured procedure to help determine the effects of natural or induced environments on materiel.
p. Environmental worthiness. The capability of materiel, subsystem, or component to perform its full array of intended functions in intended environments.
q. Equipment. For purposes of this standard (with the exception of Method 528), equipment includes the instrumentation, facilities, and support apparatus used to conduct or monitor tests. This does not include the test item itself or the materiel of which the test item is a sample or a part.
r. Exaggeration factors. The ratio of the test condition severity to the in-service severity and is used to develop a time compression factor for a particular failure mode.
s. External Store. Any device intended for internal or external carriage and mounted on aircraft suspension and release equipment, whether or not the item is intended to be separated in flight from the aircraft.
Aircraft stores are classified in two categories as follows: a. expendable store - An aircraft store normally separated from the aircraft in flight such as a missile, rocket, bomb, nuclear weapon, mine, torpedo, pyrotechnic device, sonobuoy, signal underwater sound device, or other similar items; b. nonexpendable store.- An aircraft store that is not normally separated from the aircraft in flight such as a tank (fuel and
PART ONE-7
spray), line-source disseminator, pod (refueling, thrust augmentation, gun, electronic attack, data link, etc.), multiple rack, target, cargo drop container, drone, or other similar items. (From Dictionary of Military and Associated Terms. US Department of Defense, 2005.)
t. Forcing function (environment). A natural or induced physical environmental stress condition on materiel that may affect its ability to function as intended or to withstand transit or storage during its service life. (Also referred to as an environmental condition or an environmental stress.)
u. Frequency of occurrence. Refers to the process used to…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it.