SOFC Based APU Industry Day_Dobbs.ppt

PPT presentation 622 KB Posted

Attached to
Detailed Design for a High Temperature Fuel Cell (SOFC) Based Auxiliary Power Unit
Solicitation number
ONRBAA08-024
Issued by

About this file

SOFC Based APU Industry Day_Dobbs

View the file

Other files

File Type Posted
MIL-STD-810F NOT 3.pdf PDF
Questions Answers 1.pdf PDF
MIL-STD-1332B.pdf PDF
MIL-STD-1332B NOT 1.pdf PDF
MIL-STD-810F NOT 1.pdf PDF
MIL-STD-1332B NOT 2.pdf PDF
MIL-STD-810F NOT 2.pdf PDF
MIL-STD-1275D.pdf PDF
milstd882d.pdf PDF
MIL-STD-705C.pdf PDF
MIL-STD-810E.pdf PDF
MIL-STD-461E.pdf PDF
Power Energy_Polkowski_Presentation_5510_7_Internet Posting.pdf PDF
CES Power Electronics and Control_Ashton.ppt PPT presentation
Power Energy_Polkowski_Presentation_5510_7.pdf PDF
DeS Presentation 8112008.pdf PDF
UM_Linic_Presentation_5510_7_Internet Posting.pdf PDF
IE_Swami_Presentation_5510_7.pdf PDF
CTPH2 Presentation —
SOFC SwiderLyons Aug08b.ppt PPT presentation
Auburn_Anode and Cathode Contaminant Removal.ppt PPT presentation
Ceramatec_Frost_Presentation_5510_7_Internet Release.pdf PDF
NRL_Swider_lyons_Presentation_5510_7_Internet Release.pdf PDF
IE_Swami_Presentation_5510_7_Internet release.pdf PDF
Ceramatec_Frost_Rev2_72908.ppt PPT presentation
PDM_3_workshop_PCI_presentation_Roychoudhury_Rev_05.ppt PPT presentation
Precision Combustion _ Roychoudhury_5510_7_Internet Release.pdf PDF
High Temperature —
CES_Ashton_Presentation_5510_7_Internet Release.pdf PDF
CES Power Electronics and Control.pdf PDF
RIT_Das_Presentation_5510_7.pdf PDF
ONR_Hoffman_Presentation_5510_7.pdf PDF
ONR_Hoffman_Presentation_5510_7_Internet Release.pdf PDF
CTPH2 Presentation —
CTP_Rackey_Presentation_5510_7_internet release.pdf PDF
Precision Combustion _ Roychoudhury_5510_7.pdf PDF
CES_Ashton_Presentation_5510_7.pdf PDF
Univ of Michigan_Industry Day_Nikolla_r2.ppt PPT presentation
NRL_Swider_lyons_Presentation_5510_7.pdf PDF
ONR BAA 08-024.pdf PDF
RIT_Das_Presentation_5510_7_Internet Release.pdf PDF
UM_Linic_Presentation_5510_7.pdf PDF
High Temperature —
CTP_Rackey_Presentation_5510_7.pdf PDF
Ceramatec_Frost_Presentation_5510_7.pdf PDF
P E Presentation ONR Aug11-08_rev3_Polkowski.ppt PPT presentation
TuhinPresentation_0729.ppt PPT presentation
MCSC APU Brief - 11 Aug 08_Carpenter.ppt PPT presentation
Show all 48

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

TARDEC Non-primary Power Source Requirements Presentation to High Temperature Fuel Cell (SOFC) Based Auxiliary Power Unit Industry Day

Herb Dobbs, US Army RDECOM-TARDEC Lead for Fuel Cells, Non-primary Power Systems Team Herbert.dobbs@us.army.mil 586 574-5157 DISTRIBUTION STATEMENT A. Authorized for full public distribution Reference to specific products in this briefing is not a recommendation or endorsement by the US Army.

Unclassified

Current Ground Combat Vehicle Non-primary Power Systems

Ground Vehicle Platform Current NPS Solution Available Engine-Off Energy Continuous Power & Energy Requirement Fuel Consumption Requirement Available Space Claims (in addition to battery boxes)

From Common NPS Specification 275 L 200 L 100 L 6T VRLA = Valve Regulated Lead Acid Batteries, i.e. “Hawker” 6TMF = Maintenance Free Flooded Lead Acid Batteries Engine-Off Power Requirements From Common NPS Specification 275 L 200 L 100 L

6T VRLA

6T VRLA

6TMF

2 Batteries for Vehicle Auxiliaries 2 Batteries for Engine Starting 8 Batteries for Vehicle Auxiliaries 4 Batteries for Engine Starting 4 Batteries for Vehicle Auxiliaries + 1 24V Turret Battery 2 Batteries for Engine Starting Battery Type

Abrams M1A2 SEPv2 10.6 kW-Hrs 8 kW (Threshold) 10 kW (Objective) for 12 hour mission [ 96 kW-hrs (T) 120 kW-hrs (O) ] 1.75 gal/hr (T)

1.5 gal/hr (O)

Bradley M3A35.8 kW-Hrs
Stryker FOV2.6 kW-Hrs

TARDEC’s Non-primary Power Source Engine-Off Project Portfolio

X

TARDEC NPS Program Fielded Army NPS Solution Current Platform Requirement Technology Readiness Level X

X CERDEC NPS Program Noise Level Continuous Power*

* For 10 hour mission

Decreasing Noise

Increasing Power

70kW 40kW 20kW

Requirements Trend M1A2 EAPU Diesel APU 3 kW Abrams SEPv4 CDD ~40 kW

FCS NLOS-C

51 kW

FCS RSV

70 kW

M1A2 SEP v2 8 Hawker AGM Lead Acid Batteries 1 kW TARDEC Fuel Cell Program 10-20 kW Predicted Patrick Power Rotary APU 10 kW Honeywell HGT-80 Turbine APU 12 kW Abrams SEPv3 Bradley Stryker MRAP II 10 kW

M88 Diesel APU 14 kW M915 Proposed No-Idle APU

2.8 kW

Common Non-primary Power Source Performance Requirements Requirement Traceability:

APU requirement traces back to the M1A2 ORD page 11, paragraph 4.b (4) to require an under armor APU (UAAPU) on the tank.
The PEO GCS/TARDEC Common Modular Power System (CMPS) IPT completed a gap analysis of Abrams, Bradley and Stryker on-board power requirements through FCS Spinout 1.
This resulted in the Common Non-primary Power System (CNPS) performance specification and a Request for Information (RFI) was sent to industry 1st QTR 2006
AbramsStryker Bradley
275 L200 L100 L
Abrams, Bradley and Stryker CNPS Performance Requirements
Continuous Power8 kW (Threshold) / 10 kW (Objective)
Mission Duration12 hours
Fuel Consumption1.75 gal / hour (Threshold) / 1.5 gal / hour (Objective)
NPS Volume

NPS Weight 205 kg Abrams/Bradley (internal cooling system) 115 kg Stryker (can use engine’s cooling system) Procurement Cost < $40K

Current TARDEC NPS Programs

* Contractor production estimate

NPS Technology OptionPatrick Power Gen III Rotary APUHoneywell HGT-80 Gen II Turbine APUHatz M88FOV APU
Maximum Continuous Power10 kW12 kW14 kW

(6 kW Electric/8 kW Hydraulic)

Fuel Consumption1.6 gal/hr @10kW6.4 gal/hr @10 kW~2 gal/hr @ 14 kW
Size264 L
(14 inch height)220 L
(13 inch height)318 L

(18.88 inch height)

Weight108 kg93 kg205 kg
Production Cost*~$35-50K~$100-120K20K
TRL (Gov’t Assessment)558
Current StatusGen II hardware laboratory tested and integrated into M1A2 SEP space claim

Met Power and Fuel Consumption Met Abrams Space Claim Gen II meets TRL 5 definition.

Gen III NPS Hardware to be delivered 1st QTR FY09 Designed to meet CNPS requirements at TRL 6 Prototype hardware from a modified commercial aircraft APU delivered in FY06 for performance characterization.

Met power requirements Failed fuel consumption requirement Did not fit Abrams compartment.

Gen II unit Sized for UAAPU compartment Planned delivery in 4th QTR FY08 Currently fielded in M88A2 Hercules vehicles and the FAASV platforms.

Fails to meet space claim (height) requirements Having sustainment issues due to commercial engine upgrades outpacing the existing APUs manufactures discontinuing to support replacement parts

International Battery NPS solution is at TRL 3 Reference the Field Tasks on Slide 7

All testing under section 3.1 must be completed to verify TRL 4
Battery Management System has not been demonstrated as reliable
Possible failure in Deep Cycle Testing at Sypris
Failure of BMS in one TARDEC supplied unit
Possible failure in second BMS at TARDEC

TARDEC NPS Program Fielded Army NPS Solution Current Platform Requirement Technology Readiness Level X

X CERDEC NPS Program Noise Level Continuous Power*

* For 10 hour mission

3 kW Abrams SEPv4 CDD ~40 kW

FCS NLOS-C

51 kW

FCS RSV

70 kW

Lithium Ion Battery 2 NPS Modules + 2 Hawker Batteries

1.2 kW M1A2 SEP v2 8 Hawker AGM Lead Acid Batteries 1 kW TARDEC Fuel Cell Program 10-20 kW Predicted Patrick Power Rotary APU 10 kW Honeywell HGT-80 Turbine APU 12 kW Abrams SEPv3 Bradley Stryker MRAP II 10 kW

M88 Diesel APU 14 kW M915 Proposed No-Idle APU

6T Hawker Armasafe Fielding History Non-primary Power Application

After becoming familiar with the characteristics and performance of the Hawker Armasafe Plus batteries as a Starting Lighting and Ignition option, PM Abrams internal effort was undertaken to integrate an additional 6 Hawker batteries in the M1A2 SEP v2 to extend silent watch.

This configuration was successfully tested, and has been adopted by the PM as an option for Non Primary Power to extend silent watch mission duration

Current M1A2 SEP v2 Interim NPS Solution Comparison

Durability, sustainment, and safety concerns with the proposed pack solution ina relative vehicle environment are unverified and unknown.
TARDEC is planning extensive life cycle cost analysis
TARDEC has multiple ongoing and pending projects to provide performanceimprovements to the 6T sized battery.

* Based off present 44 amps continuous current draw silent watch mission profile ** Contractor estimated procurement cost based off of potential production volumes.

Current M1A2 SEP v2 Performance CapabilityProposed Lithium Ion Battery Pack Solution
Left Sponson UAAPU Space6 Hawker ARMASAFE AGM Lead Acid Batteries2 Li-Ion Battery (1100 Series) Li-Ion APU Modules
Right Sponson Vehicle Battery Box2 Hawker Lead Acid Batteries (available for silent watch) +

4 Hawker Lead Acid Batteries (reserved for vehicle start)

TRL93
Silent Watch Mission Duration*10 hrs11.6 hrs
Procurement Cost$2K~$10K**

TARDEC NPS Program Fielded Army NPS Solution Current Platform Requirement Technology Readiness Level X What is TARDEC doing about this?

X CERDEC NPS Program Noise Level Continuous Power*

* For 10 hour mission

3 kW Abrams SEPv4 CDD ~40 kW

FCS NLOS-C

51 kW

FCS RSV

70 kW

Li-Ion Battery 2 NPS Modules + 2 Hawker Batteries

1.2 kW M1A2 SEP v2 8 Hawker AGM Lead Acid Batteries 1 kW TARDEC Fuel Cell Program 10-20 kW Predicted Patrick Power Rotary APU 10 kW Honeywell HGT-80 Turbine APU 12 kW Abrams SEPv3 Bradley Stryker MRAP II 10 kW

M88 Diesel APU 14 kW M915 Proposed No-Idle APU

Future Non-primary Power Requirements

The FCS net-centric systems are driving the current forces modernization non-primary power requirements several multiples past current capability

- Example:

Increased electrical loads cause increased cooling burdens (fans, liquid cooling loops) driving total power requirements higher.

TARDEC is engaging several efforts to address these future requirements:

Embedded in PM and OEM modernization trade studies and requirements reviews to provide input and assist in requirements formulation.
Working efforts in power and thermal management to increase efficiency in how on-board power is used and to minimize the electrical burden associated with thermal management systems.
Actively working advanced vehicle power architecture specifications (Common Modular Power System IPT) to drive future vehicle architectures to common, upgradeable systems.
Continuing development efforts in fuel cell technology that have the potential to provide extremely high power and energy densities with low noise.

*Data from Abrams Evolutionary Design first round trade study with PM HBCT, TARDEC and GDLS Abrams M1A2 SEP v2 vs.

Abrams M1A2 SEP v4

<2 kWSilent Watch Average Power~40kW*
~16kWFull Combat Mode~75kW*