PPI_Log_as_of_1-15-14_-_Release.pdf

PDF 11 KB Posted

Attached to
P-100/P-099 Nuclear Power Training Facilities Joint Base Charleston, South Carolina
Solicitation number
N69450-14-R-1756
Issued by

About this file

PPI Log as of 1-15-14 - Release

View the file

Other files

File Type Posted
N6945014R1756-0015.pdf PDF
N69450-14-R-1756-0014.pdf PDF
N69450-14-R-1756-0013.pdf PDF
N69450-14-R-1756-0012.pdf PDF
N69450-14-R-1756-0011.pdf PDF
PPI_Log_as_of_3-14-14_Release.pdf PDF
N69450-14-R-1756-0010.pdf PDF
PPI_Log_as_of_3-12-14_Release.pdf PDF
Amendment_0010_Attachments.zip ZIP file
N69450-14-R-1756-0009.pdf PDF
PPI_Log_as_of_3-10-14_for_Release.pdf PDF
Amendment_0009_Attachments.zip ZIP file
PPI_Log_as_of_3-7-14_Release.pdf PDF
N69450-14-R-1756-0008.pdf PDF
PPI_Log_as_of_3-5-14_Release.pdf PDF
Additional_Photos.zip ZIP file
Drawings_and_Specs_Amend_0007.zip ZIP file
N69450-14-R-1756-0007.pdf PDF
Attachment_L_Non-Disclosure_Agreement.docx DOCX document
PPI_Log_as_of_2-27-14_-_Release.pdf PDF
Amendment_0006_Attachments.zip ZIP file
PPI_Log_as_of_2-21-14_-_Release.pdf PDF
N69450-14-R-1756-0006.pdf PDF
Amendment_0005_Drawings.zip ZIP file
N69450-14-R-1756-0005.pdf PDF
PPI_Log_as_of_2-14-2014_-_Release.pdf PDF
PPI_Log_as_of_2-12-14_-_Release.pdf PDF
140205_NPTU_PPC_Sign-In_Sheet.pdf PDF
Presentation_Minutes.pdf PDF
N69450-14-R-1756_0004.pdf PDF
NPTU_Preproposal_Presentations.pdf PDF
PPI_Log_as_of_1-31-14_-_Release.pdf PDF
Amendment_0003.pdf PDF
I_-_JB_CHS-_Contract_Security_Form_74_-_Revised.pdf PDF
N69450-14-R-1756-0002.pdf PDF
N69450-14-R-1756-0001.pdf PDF
PPI_Log_as_of_1-24-14_-_Release.pdf PDF
K_-_NPTU_Security_Form_-_Prefilled.pdf PDF
Drawings_Volume_6a.zip ZIP file
Drawings_Volume_5a.zip ZIP file
Drawings_Volume_7.zip ZIP file
Drawings_Volume_4.zip ZIP file
Attachments_A_-_K.zip ZIP file
Drawings_Volume_5b.zip ZIP file
Drawings_Volume_3b.zip ZIP file
P99-P100-Specification.pdf PDF
N69450-14-R-1756.pdf PDF
Drawings_Volume_3a.zip ZIP file
Drawings_Volume_3c.zip ZIP file
Drawings_Volume_6b.zip ZIP file
Show 40 more

Latest 50 of 58 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SOLICITATION N69450-14-R-1756

P-100/P-099 NUCLEAR POWER TRAINING FACILITIES

JOINT BASE CHARLESTON, SOUTH CAROLINA

Pre-Proposal Inquiry Log

Question/C omment

Question Date RFP Section/ Page/Paragraph

Question Response Requires Amendment

Y/N

13-Jan-14 Page 6, Item # 0007, Option Item 6

This is a follow-up to Comment #27 on the draft solicitaion, as the issue remains unresolved. Please confirm that there is only one survival mooring system as part of this project - that for the submarine and not the IX-516 barge, and then correct the option description to remove the reverence to IC-516. Further either correct the description or the list of attachments for consistancy to either P099 (as in the Option description) or -100 as listed on page 13, whichever is correct.

There are two survival mooring systems. P100 includes an SMS for the ship as part of the base bid for P100. Option Item 6 to P099 is an SMS for the IX-516 barge.

Unfortunately, the final design for the SMS for the barge will be provided in a forthcoming amendment. It is much less complicated than the SMS for the ship but the final location had to be confirmed based on environmental and navigation factors, which impact the calculations, which affect the drawings. The specifications are the same as the ship SMS.

Y, Forthcoming

2 13-Jan-14 Which entity will be responsible for paying for the construction/laboratory material testing and/or Special Inspection for the referenced project?

The prime contractor. N

14-Jan-14 00202.III.F.3.b.1.a.1 In Section 00202.III.F.3.b.1.a.1, General Construction Experience, item (iv) concrete pile foundation, is listed as a significant feature in the basis of evaluation that prime contractors must demonstrate it has managed in a submitted project. However, we believe that this feature of work kshould be included in the subsequent section 2, Specialized Construction Experience, as a specialized subcontractor typically performs it much like the Pier/Whart work, Industrial Support Facilities and Facility Security. In our last 2 projects for the military, both over $140M, neither had concrete pile foundations. However, if they did, a specialized subcontractor would have performed this work. Please consider moving this feature of work into the Specialized Construction Experience factor so we can submit our specialized teaming subcontractor for this requirement

The concrete and pile driving are critical pieces of this project. While we fully expect that there will be a specialized subcontractor actually performing the work, it is critical that the prime contractor has experience managing a project of the same magnitude that has dealt with these issues. We are not asking that the prime contractor self-performed this work, just that they have managed a project that included it.

N

15-Jan-14 Pre-proposal

Conference/Site Visit Can you confirm that the base access form (form 74) is required to attend the Pre-proposal conference?

The base access form (form 74) is NOT required to attend the Pre-proposal conference which precedes the site visit. The base access form is required to attend the site visit that immediately follows the pre-proposal conference.

N

5 15-Jan-14 Pre-proposal Conference/Site Visit

That these forms can be scanned and submitted to you electronically by COB, Friday, January 17, 2014

Only the NPTU Security Form can be sent electronically. The Base Access Form (Form 74) must be sent hardcopy.

N

6 15-Jan-14 Pre-proposal Conference/Site Visit

More than one representative from our company can attend the pre-proposal conference, but only one person can enter the NPTU area

More than one representative from your company can attend the pre-proposal conference AND site visit, but only one person can enter the NPTU area.

N

15-Jan-14 Pre-proposal

Conference/Site Visit The NPTU Security form has to be filled out and hand-delivered for access to the NPTU area

The base access form (form 74) must be sent hardcopy (FedEx, mail, etc.) and received by January 17, 2014. The NPTU Security form should be sent electronically and must be received by January 17, 2014.

N

File details come from the government source that posted it. Updated .