SOLICITATION N69450-14-R-1756
P-100/P-099 NUCLEAR POWER TRAINING FACILITIES
JOINT BASE CHARLESTON, SOUTH CAROLINA
Pre-Proposal Inquiry Log
Question/C omment
Question Date RFP Section/ Page/Paragraph
Question Response Requires Amendment
Y/N
13-Jan-14 Page 6, Item # 0007, Option Item 6
This is a follow-up to Comment #27 on the draft solicitaion, as the issue remains unresolved. Please confirm that there is only one survival mooring system as part of this project - that for the submarine and not the IX-516 barge, and then correct the option description to remove the reverence to IC-516. Further either correct the description or the list of attachments for consistancy to either P099 (as in the Option description) or -100 as listed on page 13, whichever is correct.
There are two survival mooring systems. P100 includes an SMS for the ship as part of the base bid for P100. Option Item 6 to P099 is an SMS for the IX-516 barge.
Unfortunately, the final design for the SMS for the barge will be provided in a forthcoming amendment. It is much less complicated than the SMS for the ship but the final location had to be confirmed based on environmental and navigation factors, which impact the calculations, which affect the drawings. The specifications are the same as the ship SMS.
Y, Forthcoming
2 13-Jan-14 Which entity will be responsible for paying for the construction/laboratory material testing and/or Special Inspection for the referenced project?
The prime contractor. N
14-Jan-14 00202.III.F.3.b.1.a.1 In Section 00202.III.F.3.b.1.a.1, General Construction Experience, item (iv) concrete pile foundation, is listed as a significant feature in the basis of evaluation that prime contractors must demonstrate it has managed in a submitted project. However, we believe that this feature of work kshould be included in the subsequent section 2, Specialized Construction Experience, as a specialized subcontractor typically performs it much like the Pier/Whart work, Industrial Support Facilities and Facility Security. In our last 2 projects for the military, both over $140M, neither had concrete pile foundations. However, if they did, a specialized subcontractor would have performed this work. Please consider moving this feature of work into the Specialized Construction Experience factor so we can submit our specialized teaming subcontractor for this requirement
The concrete and pile driving are critical pieces of this project. While we fully expect that there will be a specialized subcontractor actually performing the work, it is critical that the prime contractor has experience managing a project of the same magnitude that has dealt with these issues. We are not asking that the prime contractor self-performed this work, just that they have managed a project that included it.
N
15-Jan-14 Pre-proposal
Conference/Site Visit Can you confirm that the base access form (form 74) is required to attend the Pre-proposal conference?
The base access form (form 74) is NOT required to attend the Pre-proposal conference which precedes the site visit. The base access form is required to attend the site visit that immediately follows the pre-proposal conference.
N
5 15-Jan-14 Pre-proposal Conference/Site Visit
That these forms can be scanned and submitted to you electronically by COB, Friday, January 17, 2014
Only the NPTU Security Form can be sent electronically. The Base Access Form (Form 74) must be sent hardcopy.
N
6 15-Jan-14 Pre-proposal Conference/Site Visit
More than one representative from our company can attend the pre-proposal conference, but only one person can enter the NPTU area
More than one representative from your company can attend the pre-proposal conference AND site visit, but only one person can enter the NPTU area.
N
15-Jan-14 Pre-proposal
Conference/Site Visit The NPTU Security form has to be filled out and hand-delivered for access to the NPTU area
The base access form (form 74) must be sent hardcopy (FedEx, mail, etc.) and received by January 17, 2014. The NPTU Security form should be sent electronically and must be received by January 17, 2014.
N