N69450-14-R-1756-0007.pdf

PDF 56 KB Posted

Attached to
P-100/P-099 Nuclear Power Training Facilities Joint Base Charleston, South Carolina
Solicitation number
N69450-14-R-1756
Issued by

About this file

Amendment 0007

View the file

Other files

File Type Posted
N6945014R1756-0015.pdf PDF
N69450-14-R-1756-0014.pdf PDF
N69450-14-R-1756-0013.pdf PDF
N69450-14-R-1756-0012.pdf PDF
N69450-14-R-1756-0011.pdf PDF
PPI_Log_as_of_3-14-14_Release.pdf PDF
N69450-14-R-1756-0010.pdf PDF
PPI_Log_as_of_3-12-14_Release.pdf PDF
Amendment_0010_Attachments.zip ZIP file
N69450-14-R-1756-0009.pdf PDF
PPI_Log_as_of_3-10-14_for_Release.pdf PDF
Amendment_0009_Attachments.zip ZIP file
PPI_Log_as_of_3-7-14_Release.pdf PDF
N69450-14-R-1756-0008.pdf PDF
PPI_Log_as_of_3-5-14_Release.pdf PDF
Additional_Photos.zip ZIP file
Drawings_and_Specs_Amend_0007.zip ZIP file
Attachment_L_Non-Disclosure_Agreement.docx DOCX document
PPI_Log_as_of_2-27-14_-_Release.pdf PDF
Amendment_0006_Attachments.zip ZIP file
PPI_Log_as_of_2-21-14_-_Release.pdf PDF
N69450-14-R-1756-0006.pdf PDF
Amendment_0005_Drawings.zip ZIP file
N69450-14-R-1756-0005.pdf PDF
PPI_Log_as_of_2-14-2014_-_Release.pdf PDF
PPI_Log_as_of_2-12-14_-_Release.pdf PDF
140205_NPTU_PPC_Sign-In_Sheet.pdf PDF
Presentation_Minutes.pdf PDF
N69450-14-R-1756_0004.pdf PDF
NPTU_Preproposal_Presentations.pdf PDF
PPI_Log_as_of_1-31-14_-_Release.pdf PDF
Amendment_0003.pdf PDF
I_-_JB_CHS-_Contract_Security_Form_74_-_Revised.pdf PDF
N69450-14-R-1756-0002.pdf PDF
N69450-14-R-1756-0001.pdf PDF
PPI_Log_as_of_1-24-14_-_Release.pdf PDF
PPI_Log_as_of_1-15-14_-_Release.pdf PDF
K_-_NPTU_Security_Form_-_Prefilled.pdf PDF
Drawings_Volume_6a.zip ZIP file
Drawings_Volume_5a.zip ZIP file
Drawings_Volume_7.zip ZIP file
Drawings_Volume_4.zip ZIP file
Attachments_A_-_K.zip ZIP file
Drawings_Volume_5b.zip ZIP file
Drawings_Volume_3b.zip ZIP file
P99-P100-Specification.pdf PDF
N69450-14-R-1756.pdf PDF
Drawings_Volume_3a.zip ZIP file
Drawings_Volume_3c.zip ZIP file
Drawings_Volume_6b.zip ZIP file
Show 40 more

Latest 50 of 58 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

The purpose of this amendment is as follow s:

1) Provide Attachment L - Non-Disclosure Agreement for release of MIL-STD-767 and 2041.

2) Revise the NAS JAX Base Access AMAG Form due date to March 10 at 2PM EST.

3) Provide changes to the specifications and draw ings to include amendments.

4) Correct the time for the proposal due date/time on page 13 of Amendment 6 to 2PM.

5) Additional photos from the site visit and PPI #409 have been posted to FBO under Additional Photos.

6) An updated PPI Log (PPI Log as of 3-5-14 – Release) has been posted to FBO.

1. CONTRACT ID CODE PAGE OF PAGES

J 1 11

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 05-Mar-2014

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X N69450-14-R-1756

X 9B. DATED (SEE ITEM 11)

10-Jan-2014

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

05-Mar-2014

CODE

NAVFAC SOUTHEAST

IPT SOUTH CENTRAL

BLDG 135, PO BOX 30

NAS JACKSONVILLE

JACKSONVILLE FL 32212-0030

N69450 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

N69450-14-R-1756

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION SF 30 - BLOCK 14 CONTINUATION PAGE

The following have been added by full text:

AMENDMENT 0007

1. INFORMATION FOR OFFERORS is amended as follows:

(changes are bolded)

a. Attachment L – Non Disclosure Agreement is added to the list of Attachments as follows:

ATTACHMENTS:

The following attachments have been posted to FedBizOpps:

Attachment A – PPI Log Template Attachment B - NAS JAX Base Access AMAG Form Attachment C - Construction Experience Project Data Sheet Attachment D - Small Business Past Performance Attachment E - Small Business Subcontracting Plan Attachment F - Small Business Offeror Small Business Participation Breakdown Attachment G - Past Performance Questionnaire Attachment H – Redbank Club Map Attachment I – JB CHS- Contract Security Form 74 Attachment J – JB CHS- Contract Security Form 74 – Sample Attachment K –NPTU Security Form Attachment L – Non-Disclosure Agreement

b. Proposal Submission Instructions Paragraph b. is revised to change the AMAG Form due date as follows:

B. Delivery of Proposal

Address for hand-carried or UPS/FEDEX/USPS:

NAVFAC SE

ATTN: Kendra McMahon, IPT-SC Ajax Street, BLDG 135N, Rear Entrance NAS Jacksonville, FL 32212

Hand carried proposals will require access to NAS Jacksonville. If the offeror needs access to NAS Jacksonville, the offeror must complete the NAS JAX Base Access AMAG Form, Attachment B, which, for the individual who will be "driving a vehicle" onto the base. Passengers do not have to submit a form. Forms must be submitted via email as an excel attachment (not a PDF) no later than March 10, 2014 at 2PM EST and sent to kendra.mcmahon@navy.mil.

The submitted NAS JAX Base Entry AMAG form is only good for the proposal due date. If the due date is extended, the offeror will need to submit an updated NAS JAX Base Entry AMAG form to reflect the new proposal submission date.

VEHICLES WITHOUT A VEHICLE PASS WILL NOT BE PERMITTED ON THE BASE. VEHICLE PASS

REQUESTS RECEIVED AFTER THE DEADLINE WILL NOT BE ACCEPTED. VEHICLE DRIVERS

MUST

STOP AT THE SECURITY AND PASS OFFICE TO OBTAIN THEIR VEHICLE PASS.

You must have a valid picture ID, vehicle registration, and proof of insurance. Please arrive early as it may take some time to get the vehicle pass. All passengers in the vehicle must have picture ID. The Security and Pass Office is located at the Main Gate, Yorktown Gate, 1st building on your right.

All visitors MUST know the name of the command they are visiting and MUST provide the last six numbers of their SSN to the security clerk at the Pass & ID window. Be advised that ALL visitors entering NAS Jacksonville are subject to a background investigation. Visitors will be asked to fill out additional paperwork and Security will make a copy of their DL. If the visitor refuses the investigation, they will be denied access to the base.

Ultimately, it is the contractor's responsibility to ensure timely proposal submission to the specified location.

Due to heightened security/traffic, it is recommended that you allow plenty of extra time to get access to base, get into the building and turn in your proposal.

c. A paragraph regarding the release of MIL-STD 767 and MIL-STD 2041 is provided below:

MIL-STD 767 and MIL-STD 2041 are controlled documents. Therefore, a signed non-disclosure agreement is required in order for the documents to be provided. The documents must be protected at all times per the non-disclosure agreement. If you would like to request a copy of these documents, complete and sign Attachment L

– Non-Disclosure Agreement and submit to Kendra McMahon at Kendra.mcmahon@navy.mil. Upon proper completion, an electronic copy will be sent to the Data Custodian identified on the form.

2. Specifications and drawings to include amendments are changed as follows.

a. SPECIFICATIONS

1. Specification Section 00 01 15, paragraph 1.2 Contract Drawings:

a. The following drawings, bearing revision date of 03/04/2014, supersede drawings bearing the same number and title.

NAVFAC DRAWING NO. TITLE

15081580 (GE002) GENERAL DRAWINGS – ELECTRICAL LEGEND

15801598 (GT001) GENERAL DRAWINGS – COMMUNICATIONS AND SECURITY LEGEND

15081924 (ES109) BUILDING 2701 (P100) – SITE ELECTRICAL, COMM, & SECURITY

TEMPORARY PLAN

15082325 (EP124) BUILDING 2701 (P100) – SECOND FLOOR POWER PLAN – AREA D

15082336 (EP402) BUILDING 2701 (P100) – SECOND FLOOR POWER ENLARGED PLANS

15082341 (EP601) BUILDING 2701 (P100) – POWER ONE-LINE DIAGRAM – SHEET 1 OF 2

15082343 (EP701) BUILDING 2701 (P100) – PANELBOARD SCHEDULES

15082344 (EP702) BUILDING 2701 (P100) – PANELBOARD SCHEDULES

15082345 (EP703) BUILDING 2701 (P100) – PANELBOARD SCHEDULES

15082346 (EP704) BUILDING 2701 (P100) – PANELBOARD SCHEDULES

15082347 (EP705) BUILDING 2701 (P100) – PANELBOARD SCHEDULES

15082348 (EP706) BUILDING 2701 (P100) – PANELBOARD SCHEDULES

15082349 (EP707) BUILDING 2701 (P100) – PANELBOARD SCHEDULES

15082350 (EP708) BUILDING 2701 (P100) – PANELBOARD SCHEDULES

15082351 (EP709) BUILDING 2701 (P100) – PANELBOARD SCHEDULES

15082352 (EP710) BUILDING 2701 (P100) – PANELBOARD SCHEDULES

15082353 (EP711) BUILDING 2701 (P100) – PANELBOARD SCHEDULES

15082354 (EP712) BUILDING 2701 (P100) – PANELBOARD SCHEDULES

15082383 (FA112) BUILDING 2701 (P100) – FIRST FLOOR FIRE ALARM PLAN - AREA B

15082400 (FA501) BUILDING 2701 (P100) – FIRE ALARM DETAILS

15082403 (TN111) BUILDING 2701 (P100) – FIRST FLOOR COMMUNICATIONS PLAN –

AREA A

15082404 (TN112) BUILDING 2701 (P100) – FIRST FLOOR COMMUNICATIONS PLAN –

AREA B

15082405 (TN113) BUILDING 2701 (P100) – FIRST FLOOR COMMUNICATIONS PLAN –

AREA C

15082407 (TN115) BUILDING 2701 (P100) – FIRST FLOOR COMMUNICATIONS PLAN –

AREA E

15082409 (TN121) BUILDING 2701 (P100) – SECOND FLOOR COMMUNICATIONS PLAN –

AREA A

15082410 (TN122) BUILDING 2701 (P100) – SECOND FLOOR COMMUNICATIONS PLAN –

AREA B

15082411 (TN123) BUILDING 2701 (P100) – SECOND FLOOR COMMUNICATIONS PLAN –

AREA C

15082412 (TN124) BUILDING 2701 (P100) – SECOND FLOOR COMMUNICATIONS PLAN –

AREA D

15082413 (TN125) BUILDING 2701 (P100) – SECOND FLOOR COMMUNICATIONS PLAN –

AREA E

15082414 (TN126) BUILDING 2701 (P100) – SECOND FLOOR COMMUNICATIONS PLAN –

AREA F

15082439 (TN621) BUILDING 2701 (P100) – DATA CABINET ELEVATIONS – ROOM 112

15082440 (TN622) BUILDING 2701 (P100) – DATA CABINET ELEVATIONS – ROOM 212

15082441 (TN623) BUILDING 2701 (P100) – DATA CABINET ELEVATIONS – ROOM 304

15082443 (TR111) BUILDING 2701 (P100) – FIRST FLOOR CABLE TRAY PLAN – AREA A

15082445 (TR113) BUILDING 2701 (P100) – FIRST FLOOR CABLE TRAY PLAN – AREA C

15082447 (TR115) BUILDING 2701 (P100) – FIRST FLOOR CABLE TRAY PLAN – AREA E

15082668 (EP112) BUILDING 2626 (P100) - FIRST FLOOR POWER PLAN – AREA B

15082670 (EP601) BULDING 2626 (P100) – ONE-LINE DIAGRAM AND SCHEDULES

15082671 (EP602) BUILDING 2626 (P100) – PANELBOARD AND MECH EQUIPMENT

SCHEDULES

15082686 (TN621) BUILDING 2626 (P100) – DATA CABINET / RACK ELEVATIONS

15082949 (EP701) BUILDING 2314 (P099) – PANELBOARD SCHEDULES

15082950 (EP702) BUILDING 2314 (P099) – PANELBOARD SCHEDULES

15082951 (EP703) BUILDING 2314 (P099) – PANELBOARD SCHEDULES

15082952 (EP704) BUILDING 2314 (P099) – PANELBOARD SCHEDULES

15082953 (EP705) BUILDING 2314 (P099) – PANELBOARD SCHEDULES

15082954 (EP706) BUILDING 2314 (P099) – PANELBOARD SCHEDULES

15082955 (EP707) BUILDING 2314 (P099) – PANELBOARD SCHEDULES

15082956 (EP708) BUILDING 2314 (P099) – PANELBOARD SCHEDULES

15082957 (EP709) BUILDING 2314 (P099) – PANELBOARD SCHEDULES

15082958 (EP710) BUILDING 2314 (P099) – PANELBOARD SCHEDULES

15082959 (EP711) BUILDING 2314 (P099) – PANELBOARD SCHEDULES

15082987 (TN111) BUILDING 2314 (P099) –FIRST FLOOR COMMUNICATIONS PLAN –

AREA A

15082991 (TN121) BUILDING 2314 (P099) –SECOND FLOOR COMMUNICATIONS PLAN –

AREA A

15082994 (TN124) BUILDING 2314 (P099) – SECOND FLOOR COMMUNICATIONS PLAN –

AREA D

15083014 (TN611) BUILDING 2314 (P099) – FIRST FLOOR COMM RISER SCHEDULES

15083015 (TN612) BUILDING 2314 (P099) – SECOND FLOOR COMM RISER SCHEDULES

15083017 (TN621) BUILDING 2314 (P099) – DATA CABINET ELEVATIONS

15083018 (TN622) BUILDING 2314 (P099) – DATA CABINET ELEVATIONS

15083019 (TN623) BUILDING 2314 (P099) – DATA CABINET ELEVATIONS

15083020 (TN624) BUILDING 2314 (P099) – DATA CABINET ELEVATIONS

15083037 (TA113) BUILDING 2314 (P099) – FIRST FLOOR SECURITY PLAN – AREA C

15083050 (TA611) BUILDING 2314 (P099) – SECURITY SCHEDULES

15083423 (EP601) BUILDING 2711 (P099) – POWER ONE-LINE DIAGRAM

15083424 (EP701) BUILDING 2711 (P099) – PANELBOARD SCHEDULES

15083425 (EP702) BUILDING 2711 (P099) – PANELBOARD SCHEDULES

15083426 (EP703) BUILDING 2711 (P099) – PANELBOARD SCHEDULES

15083427 (EP704) BUILDING 2711 (P099) – PANELBOARD SCHEDULES

15083428 (EP705) BUILDING 2711 (P099) – PANELBOARD SCHEDULES

15083429 (EP706) BUILDING 2711 (P099) – PANELBOARD SCHEDULES

15083430 (EP707) BUILDING 2711 (P099) – PANELBOARD SCHEDULES

15083431 (EP708) BUILDING 2711 (P099) – PANELBOARD SCHEDULES

15083432 (EP709) BUILDING 2711 (P099) – PANELBOARD SCHEDULES

15083433 (EP710) BUILDING 2711 (P099) – PANELBOARD SCHEDULES

15083434 (EP711) BUILDING 2711 (P099) – PANELBOARD SCHEDULES

15083435 (EP712) BUILDING 2711 (P099) – PANELBOARD SCHEDULES

15083436 (EP713) BUILDING 2711 (P099) – PANELBOARD SCHEDULES

15083437 (EP714) BUILDING 2711 (P099) – PANELBOARD SCHEDULES

15083500 (TN621) BUILDING 2711 (P099) – DATA CABINET ELEVATIONS – ROOM 129

15083501 (TN622) BUILDING 2711 (P099) – DATA CABINET ELEVATIONS – ROOM 244

15083502 (TN623) BUILDING 2711 (P099) – DATA CABINET ELEVATIONS – ROOM 326

15083629 (MS623) PIER X-RAY NORTH - PIPE SUPPORT DETAILS – SHEET 3

2. Specification Section 01 46 00.00, paragraph 3.3 PRE-INSTALLATION REQUIREMENTS

a. Add the following sub-paragraph:

“g. Contractor shall prepare weld samples and perform inspections of weld samples as specified.”

3. Specification Section 01 46 00.00, paragraph 3.9 WELDING:

a. Add the following sub-paragraph:

"e. Contractor shall prepare a minimum of three preproduction weld samples prior to beginning any welding. In addition, throughout the construction process, Contractor shall prepare a minimum of one sample at the beginning of each work shift, whenever the purge source bottle is changed and when the automatic welding equipment is changed. All samples shall be inspected for conformation to ASME BPE as specified. However, the preparation of weld samples does not relax the Contractor's responsibility to track and inspect each weld as specified."

4. Specification Section 01 91 00.00 10, paragraph 1.1.p:

a. Change to read as follows:

i. “Warranty Period – warranty period for Support Systems, including equipment components. Support Systems warranty begins at Substantial Completion and extends for at least five years.”

5. Specification Section 05 50 20, paragraph 1.2 System Description:

a. Change the paragraph to read as follows:

i. “Provide a blast resistant roof hatch. Hatch shall be the manually operated, side hinged, swinging type. Hatch assembly shall include the frame, anchors, hardware, and accessories and shall be provided as an integral system by one provider. The basis of design and conforming calculations have been previously provided by Electric Power Door, 522 West 27th Street, Hibbing, MN 55746, 800-346-5760. Frames and anchors shall be capable of transferring blast and rebound reactions to the adjacent supporting structure.”

6. Specification Section 13 50 02, paragraph 2.1.4 Pile Anchors:

a. Delete the fourth sentence that reads: “Pipe shall be in accordance with API Spec 5L Grade B steel or better.”

7. Specification Section 13 50 03 IX-516 Survival Mooring System:

a. Add this new specification section.

8. Specification Section 26 23 00, paragraph 2.2.2.1 Enclosure:

a. Change the first sentence to read: “The switchboard enclosure shall be NEMA 1.”

9. Specification Section 26 27 14.00 20, paragraph 2.1.2.x:

a. Change to read: “Meter shall have a standard 4-year manufacturer’s warranty.

10. Specification Section 27 10 00, paragraph 2.5.3 Optical Fiber Connectors:

a. Change paragraph to read as follows:

“Provide in accordance with TIA-455-21. Optical fiber connectors shall be SC or LC as indicated in accordance with TIA/EIA-604-3 and TIA/EIA-604-10A. Optical fiber connectors shall be field installed fusion splice connector in accordance with GR-326- CORE for connectors and TIA/EIA 568-C.3 for cabling, compatible with 50/125 multimode and 8/125 single-mode fiber. The connectors shall provide a maximum attenuation of 0.3 dB at 1550 nm with less than a 0.2 dB change after 500 mating cycles.”

11. Specification Section 27 53 19, paragraph 1.4:

a. Change paragraph number from “.1.4” to “1.4”

12. Specification Section 27 53 19, paragraph 1.9 Alternatives:

a. Delete this paragraph in its entirety.

13. Specification Section 27 53 19, paragraph 1.10.b.3:

a. In the first sentence, delete “in Section 1.07A with submittal of bid response.”

14. Specification Section 27 53 19, paragraph 1.12, SD-01 Preconstruction Submittals:

a. In the twelfth paragraph “Acceptance Test Plan”, change “Section 1.09” to “the performance requirements within this specification.”

15. Specification Section 27 53 19, paragraph 1.12 SD-06 Test Reports:

a. In the first paragraph “WSP DAS”, delete “of Section 1.09A have been met”.

b. In the second paragraph “PSN DAS”, delete “of Section 1.09B have been met”.

c. In the seventh paragraph “Warranty Documents”, delete ‘of Section 1.13 and 1.14”.

16. Specification Section 27 53 19, paragraph 1.14 Warranty:

a. In the second paragraph “Contract Warranty”, delete “as specified in Section 1.09”.

17. Specification Section 27 53 19, paragraph 1.15 Extended Warranty and Maintenance:

a. Delete this paragraph in its entirety.

18. Specification Section 27 53 19, paragraph 2.1.a:

a. Replace sentence with “a. System shall be provided as an integrated system from one manufacturer.”

19. Specification Section 27 53 19, paragraph 2.1.b:

a. Delete this paragraph in its entirety.

20. Specification Section 27 53 19, paragraph 2.2:

a. In the paragraph “Broadband Donor Antennas”, delete subparagraph 4 “Approved Manufacturer” in its entirety.

b. In the paragraph “Omnidirectional Coverage”, delete subparagraph 6 “Approved Manufacturer” in its entirety.

c. In the paragraph “Directional Coverage Antennas”, delete subparagraph 6 “Approved

Manufacturer” in its entirety.

d. In the paragraph “Fiber-Optic Cable and Connectors”, change the entire subparagraph 1.j

“Approved Manufacturer” to read “Fiber Optic Cable shall contain TerraSpeed Single Mode Optical Fiber.”

e. In the paragraph “Fiber-Optic Pigtails”, change the entire subparagraph 1.a.7) “Approved Manufacturer” to read “Provide single reinforced buffered 900 micron, single-mode fiber with angled polished connector.”

f. In the paragraph “Air Dielectric, Plenum Rated Cable”, delete subparagraph 5 “Approved Manufacturer” in its entirety.

g. In the paragraph “Foam Dielectric Cable”, delete subparagraph 6 “Approved Manufacturer” in its entirety.

h. In the paragraph “Splitters, Combiners, Couplers, Coax Jumpers and Connectors”, delete subparagraph 1 “Approved Manufacturer” in its entirety.

i. In the paragraph “Bi-Directional Amplifier”, delete subparagraph 3 “Approved Manufacturer” in its entirety.

j. In the paragraph “Fiber-Optic Master Unit”, delete subparagraph 3 “Approved Manufacturer” in its entirety.

k. In the paragraph “Fiber-Optic Remote Units”, delete subparagraph 2 “Approved Manufacturer” in its entirety.

21. Specification Section 27 53 19, paragraph 3.1:

a. Change the second paragraph to read: “The Contractor shall install the DAS in accordance with the submitted and approved scope of work.”

22. Specification Section 27 53 19, paragraph 3.2:

a. Change the first paragraph to read: “Acceptance testing shall be performed confirming the performance requirements specified herein.”

b. In the second paragraph, delete “as defined in Section 1.11B.9”.

23. Specification Section 31 62 14.20, Part 2 Products:

a. Add the following paragraph:

“2.1.10.1 Splices: When approved, H-pile splices shall be the full penetration butt weld type. Perform welding, welding inspection, and corrective welding, in accordance with AWS D1.1. Use only one H-pile splice per length of pile and splice shall be located no closer than 10 feet to the tip of the prestressed concrete pile. Construct splices to maintain the true alignment and position of the pile sections. Splices shall develop the full strength of the pile in both bearing and bending.”

b. DRAWINGS

1. Building 2701 (P100), Landscaping drawings:

a. All references to "Additive Bid Item" on the Landscaping drawings shall be included as part of

"Bid Option #3" for bidding purposes.

2. Building 2701 (P100), Drawing C105, Note 5 (and similar note on other demo sheets):

a. Add the following to the end of the second sentence. "Contractor to include 10,000 linear feet of 1/2" wide by 1" deep crack repair. Crack repair includes routing out the crack to remove all loose material or debris, blowing out the crack with compressed air, and then sealing with an approved asphalt pavement sealant material."

3. Building 2701 (P100), Drawing S111, Note 6:

a. Change Note 6 to read:

i. “Equipment pads for future simulator mechanical equipment. Equipment pad (including concrete, dowels, and equipment anchoring hardware) will be provided by others.

Coordinate size and location with the Government. Provide holes in slab for post-installed #4 dowels in lieu of cast-in-place dowel bars.”

4. Building 2701 (P100), Drawing A114:

a. Revise Keynote 8 to read as follows: “Door provides access to the high bay platform (platform to be provided by ERTT supplier).”

5. Building 2701 (P100), Drawing D406:

a. Change the 2” OWS designation in sheet area A2 for the discharge line from OWS-P-3 Effluent Pump and the discharge line from OWS-P-5 Oil Transfer Pump to read 1 ½” OWS to match the line sizes shown on DW-602.

6. Building 2701 (P100), Drawing DD701:

a. Revise “Valve Position Normal” column for DI-V-18 and DI-V-19

i. From: “NO”

ii. To: “N/A”

b. Revise “Material Spec.” column for DI-V-18 and DI-V-19

i. From: “N/A”

ii. To: “PC-1”

7. Building 2701 (P100), Drawing DD702:

a. Revise “Valve Position Normal” column for DI-V-210, DI-V-211, DI-V-218, DI-V-284

i. From: “NO”

ii. To: “NS”

b. Revise “Valve Position Fail” column for DI-V-217 and DI-V-284

i. From: “N/A”

ii. To: “FAI”

c. Revise “Valve Position Fail” column for DI-V-219

i. From: “FAI ”

ii. To: “N/A”

d. Revise “Type” column for DI-V-225, DI-V-226, DI-V-227 and DI-V-228

i. From: “PVRV”

ii. To: “VRV”

e. Revise “Function” column for DI-V-225, DI-V-226, DI-V-227 and DI-V-228

i. From: “Conservation Valve”

ii. To: “Tank Vacuum Relief Valve”

f. Revise “Remarks” column for DI-V-225, DI-V-226, DI-V-227 and DI-V-228

i. From: “5 psig/0.8” V”

ii. To: “0.8” V”

g. Revise “Remarks” column for DI-V-229, DI-V-230, DI-V-231 and DI-V-232

i. From: “5.75 psig”

ii. To: “5 psig”

h. Revise “Material Spec.” column for DI-V-239

i. From: “PC-1”

ii. To: “PC-4”

8. Building 2701 (P100), Drawing DW602:

a. Add a 2” x 1/1/2” increaser in the branched line going to valve OWS-V-123. New increaser shall be upstream of valve OWS-V-123 and immediately downstream of the 1 ½” tee from which the branched line originates. The size of OWS-V-123 shall be as shown on DW701.

b. Add a 2” x 1/1/2” increaser in the branched line going to valve OWS-V-124. New increaser shall be upstream of valve OWS-V-124 and immediately downstream of the 1 ½” tee from which the branched line originates. The size of OWS-V-124 shall be as shown on DW701.

9. Building 2626 (P100), Drawing A601, Door Schedule:

a. Door 103D, change jamb detail to C1/A603.

10. Building 2626 (P100), Drawing A621, Partition Types:

a. General Notes, change note 2 to read “Provide minimum 18 gauge metal backing plate…”

11. Building 2626 (P100), Drawing A701, Room Finish Schedule:

a. Room 109, change Wall-South Material-Finish from MWSIR-1 to MWSIR-2.

12. Building 2626 (P100), Drawing A731:

a. Add the following to Section A2: “Diagonal bracing shall be 16 gauge, 6” CEE stud.”

13. Building 2626 (P100), Drawing A722:

a. On Elevation C4, change “Sliding bulletproof glass window” to read “Bulletproof glass window”.

14. Building 2711 (P099), Drawing MH124:

a. Add carbon dioxide sensors adjacent to thermostats for Rooms 216 and 217.

15. Building 2314 (P099), Drawing A111:

a. Delete Construction Key Note “2.20” at door 144.

b. Revise Door 144 to swing out.

16. Building 2314 (P099), Drawing A512:

a. On Detail B1, change the metal locker reference from DTL-3 to DTL-1.

17. Building 2314 (P099), Drawing A601:

a. On the “Door Schedule – First Floor”, change the size of Door 144 to 3’-9” (Width) x 6’-8”

(Height).

18. Building 2314 (P099), Drawing A602:

a. On the “Door Schedule – Second Floor”, add frame Type 1 to the Frame Type column for doors 200C, 201D, 213A, 219, and 219A.

19. Pier X-Ray North, Drawing CN101:

a. Add the following to Note 3:

i. “The Contractor may, at his option, install BPE test piles prior to demolition of the existing finger pier or completion of dredging. If this option is exercised, test piles shall be located landward of the BPE footprint and west of the Utility Platform. The Contractor shall submit proposed revised test pile locations to the Government for approval. Test piles shall be produced and installed in accordance with the specifications. After installation, the Contractor shall remove test piles in their entirety.

Undamaged test piles may be re-used as production piles as approved by the Government. No adjustment will be made to the contract price for completion of the test pile program prior to demolition and dredging. No adjustment will be made to the contract price for any test piles rejected for reuse as production piles.”

20. Pier X-Ray North, Drawing S502:

a. Delete Note 2 that reads: “Contractor shall provide unit prices for add/delete per foot of pile.”

21. Add the following drawings:

NAVFAC DRAWING NO. TITLE

15083718 (SM-009) IX-516 SURVIVAL MOORING SYSTEM (P100) – GENERAL SITE PLAN

15083719 (SM-010) IX-516 SURVIVAL MOORING SYSTEM (P100) – MOORING LOCATION

15083720 (SM-011) IX-516 SURVIVAL MOORING SYSTEM (P100) – ASSEMBLY VIEW

15083721 (SM-012) IX-516 SURVIVAL MOORING SYSTEM (P100) – ANCHOR DESIGN

15083722 (SM-013) IX-516 SURVIVAL MOORING SYSTEM (P100) – KINETIC LINK

ASSEMBLY

c. AMMENDMENTS

1. Amendment No. 0006, Specifications Item number 33:

a. Included in this Amendment No. 0007 is the updated PC-7 table.

SECTION 00010 - SOLICITATION CONTRACT FORM

The required response date/time has changed from 18-Mar-2014 12:00 AM to 18-Mar-2014 02:00 PM.

(End of Summary of Changes)

File details come from the government source that posted it. Updated .