P-100/P-099 Nuclear Power Training Facilities Joint Base Charleston, South Carolina
Solicitation number
N69450-14-R-1756
Issued by

About this file

Amendment 0005

View the file

Other files

File Type Posted
N6945014R1756-0015.pdf PDF
N69450-14-R-1756-0014.pdf PDF
N69450-14-R-1756-0013.pdf PDF
N69450-14-R-1756-0012.pdf PDF
N69450-14-R-1756-0011.pdf PDF
PPI_Log_as_of_3-14-14_Release.pdf PDF
N69450-14-R-1756-0010.pdf PDF
PPI_Log_as_of_3-12-14_Release.pdf PDF
Amendment_0010_Attachments.zip ZIP file
N69450-14-R-1756-0009.pdf PDF
PPI_Log_as_of_3-10-14_for_Release.pdf PDF
Amendment_0009_Attachments.zip ZIP file
PPI_Log_as_of_3-7-14_Release.pdf PDF
N69450-14-R-1756-0008.pdf PDF
PPI_Log_as_of_3-5-14_Release.pdf PDF
Additional_Photos.zip ZIP file
Drawings_and_Specs_Amend_0007.zip ZIP file
N69450-14-R-1756-0007.pdf PDF
Attachment_L_Non-Disclosure_Agreement.docx DOCX document
PPI_Log_as_of_2-27-14_-_Release.pdf PDF
Amendment_0006_Attachments.zip ZIP file
PPI_Log_as_of_2-21-14_-_Release.pdf PDF
N69450-14-R-1756-0006.pdf PDF
Amendment_0005_Drawings.zip ZIP file
PPI_Log_as_of_2-14-2014_-_Release.pdf PDF
PPI_Log_as_of_2-12-14_-_Release.pdf PDF
140205_NPTU_PPC_Sign-In_Sheet.pdf PDF
Presentation_Minutes.pdf PDF
N69450-14-R-1756_0004.pdf PDF
NPTU_Preproposal_Presentations.pdf PDF
PPI_Log_as_of_1-31-14_-_Release.pdf PDF
Amendment_0003.pdf PDF
I_-_JB_CHS-_Contract_Security_Form_74_-_Revised.pdf PDF
N69450-14-R-1756-0002.pdf PDF
N69450-14-R-1756-0001.pdf PDF
PPI_Log_as_of_1-24-14_-_Release.pdf PDF
PPI_Log_as_of_1-15-14_-_Release.pdf PDF
K_-_NPTU_Security_Form_-_Prefilled.pdf PDF
Drawings_Volume_6a.zip ZIP file
Drawings_Volume_5a.zip ZIP file
Drawings_Volume_7.zip ZIP file
Drawings_Volume_4.zip ZIP file
Attachments_A_-_K.zip ZIP file
Drawings_Volume_5b.zip ZIP file
Drawings_Volume_3b.zip ZIP file
P99-P100-Specification.pdf PDF
N69450-14-R-1756.pdf PDF
Drawings_Volume_3a.zip ZIP file
Drawings_Volume_3c.zip ZIP file
Drawings_Volume_6b.zip ZIP file
Show 40 more

Latest 50 of 58 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

The purpose of this amendment is as follow s:

1) Provide revisions to the draw ings and specifications.

2) The Pre-Proposal Inquiry (PPI) cut-off date is close of business February 18, 2014.

3) Extend the proposal due date to March 5, 2014 at 2:00 PM EST.

4) An updated PPI Log (PPI Log as of 2-14-14 – Release) has been posted to FBO.

1. CONTRACT ID CODE PAGE OF PAGES

J 1 5

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 14-Feb-2014

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X N69450-14-R-1756

X 9B. DATED (SEE ITEM 11)

10-Jan-2014

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

14-Feb-2014

CODE

NAVFAC SOUTHEAST

IPT SOUTH CENTRAL

BLDG 135, PO BOX 30

NAS JACKSONVILLE

JACKSONVILLE FL 32212-0030

N69450 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

N69450-14-R-1756

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION SF 30 - BLOCK 14 CONTINUATION PAGE

The following have been added by full text:

AMENDMENT 0005

SPECIFICATIONS

1. Specification Section 00 01 15, paragraph 1.2 Contract Drawings:

a. The following drawings, bearing revision date of 2/14/2014, supersede drawings bearing the same number and title.

NAVFAC DRAWING NO. TITLE

15071729 (C202) BUILDING 2701 (P100) – SITE LAYOUT PLAN –AREA 2

15071735 (C208) BUILDING 2701 (P100) – SITE LAYOUT PLAN – AREA 8

15081873 (C523) BUILDING 2701 (P100) – RAINWATER HARVESTING SYSTEM DETAILS

15081904 (L502) BUILDING 2701 (P100) – LANDSCAPE SITE DETAILS

15081940 (ES522) BUILDING 2701 (P100) – SITE POWER POLES DETAILS AND

SCHEDULES SHEET 2

15081976 (ES701) BUILDING 2701 (P100) – SITE PANELBOARD SCHEDULES

15082033 (S202) BUILDING 2701 (P100) – ELEVATION - GRID B

15082074 (S402) BUILDING 2701 (P100) – HIGH BAY AREA SCHEDULES

15082143 (A602) BUILDING 2701 (P100) – DOOR SCHEDULE SECOND FLOOR

15082218 (MH123) BUILDING 2701 (P100) – HVAC PLAN SECOND FLOOR – AREA C

15082250 (M309) BUILDING 2701 (P100) - HVAC SECTIONS

15082261 (M625) BUILDING 2701 (P100) - CONTROL SCHEDULES AHU-101

15082278 (P101) BUILDING 2701 (P100) – PLUMBING PLAN BELOW GRADE – AREA A

15082280 (P103) BUILDING 2701 (P100) – PLUMBING PLAN BELOW GRADE – AREA C

15082284 (P111) BUILDING 2701 (P100) – PLUMBING PLAN FIRST FLOOR - AREA A

15082286 (P113) BUILDING 2701 (P100) – PLUMBING PLAN FIRST FLOOR – AREA C

15082567 (DS501) BUILDING 2701 (P100) – TANK DETAILS

15083081 (S102) BUILDING 2711 (P099) - PILING/FOUNDATION PLAN-AREA B

15083083 (S111) BUILDING 2711 (P099) - FIRST FLOOR SLAB PLAN-AREA A

15083084 (S112) BUILDING 2711 (P099) - FIRST FLOOR SLAB PLAN-AREA B

15083117 (S306) BUILDING 2711 (P099) - FOUNDATION SECTIONS

15083318 (MH133) BUILDING 2711 (P099) – HVAC PLAN THIRD FLOOR–AREA C

15083346 (M625) BUILDING 2711 (P099) – CONTROL SCHEDULES AHU-101

15083349 (M628) BUILDING 2711 (P099) – CONTROL SCHEDULES AHU-103

15083594 (MS404) PIER X-RAY NORTH MECHANICAL PLAN – AREA 4

15083607 (MS505) PIER X-RAY NORTH MECH SECTIONS & ENLARGED PLANS

15083608 (MS506) PIER X-RAY NORTH MECH SECTIONS & ENLARGED PLANS

15083615 (MS524) PIER X-RAY NORTH - FLASH TANK DETAIL

15083633 (MS701) PIER X-RAY NORTH – PIER MECHCANICAL VALVE SCHEDULES

15083643 (ES402) PIER X-RAY NORTH ELECTRICAL PLAN AREA 2

2. Specification Section 00 01 15, paragraph 1.3.4 Sub-Bottom Data:

a. Add the “SUB-BOTTOM PROFILE SURVEY REPORT”.

3. Specification Section 01 14 00.00 25, paragraph 1.2 Special Scheduling Requirements:

a. Add subparagraph as follows:

“p. Precast pile caps for the new pier extension shall not be fabricated until all piles for the associated bent have been completely driven.”

4. Specification Section 01 33 00, Submittal Register:

a. Add the “G” reviewer per the applicable specification provisions to the following submittals:

i. 28 31 76 (all submittals)

ii. 07 84 00 (all submittals)

5. Specification 01 57 19.00 25, paragraph 3.1.2:

a. Delete the following lines under the paragraph beginning “The following permits to support construction activities have been or will be obtained by the Government:”

i. c. Marine Mammal Protection Act (16 U.S.C. 1361-1407)

ii. d. Section 106: State Historic Preservation Officer

iii. e. Native American Graves Protection and Repatriation Act

iv. f. Coastal Zone Management Plan (15CFR930, Subpart C)

6. Specification Section 01 50 00.00 25, paragraph 3.2.2 Payment for Utility Services:

a. Delete subparagraphs a. and b. in their entirety and replace with the following:

“Reasonable amounts of the following utilities will be made available to the Contractor without charge: Electricity, Potable Water, Sanitary Sewer. The point at which the Government will deliver such utilities or services and the quantity available shall be as indicated on the drawings. If services and quantities are not indicated on the drawings, the point at which the Contractor is to connect shall be coordinated with the Contracting Officer. The Contractor shall pay all costs incurred in connecting, converting, and transferring the utilities to the work. The Contractor shall make connections, including providing backflow-preventing devices on connections to domestic water lines and providing transformers for electrical connections, and make disconnections.”

7. Specification Section 01 50 00.00 25, paragraph 3.2.3 Meters and Temporary Connection:

a. Delete this paragraph in its entirety.

8. Specification Section 01 78 00.00 25, paragraph 1.7.1.c:

a. Replace the first sentence of the paragraph with the following:

"Listing and status of delivery of all Certificates of Warranty (including those for extended warranty items) to include roofs, HVAC balancing, pumps, motors, transformers, and for all commissioned systems such as fire protection and alarm systems, sprinkler systems, lightning protection systems, etc.”

9. Specification Section 02 82 16.00 20, paragraph 1.4 Submittals:

a. In addition to “E” reviewers, add “JB” after each submittal tagged with “E”.

10. Specification Section 02 82 16.00 20, paragraph 1.3.4 Permits, Licenses, and Notifications:

a. Replace the first sentence of the paragraph with the following:

“After coordination with the Contracting Officer and JB CHS, obtain necessary permits and licenses in conjunction with asbestos removal, encapsulation, hauling, and disposition, and furnish notification of such actions required by Federal, State, regional, and local authorities prior to the start of work.”

11. Specification 04 21 26:

a. Revise specification title for section 04 21 26 to read “Prefaced Concrete Masonry Units”.

b. Paragraph 1.3 Submittal Requirements:

i. Delete requirements for “Ceramic Glazed Structural Clay Facing Tile”.

12. Specification Section 07 61 14.00 20, paragraph 1.4 Submittals:

a. Add “Warranty; E” under SD-11 Closeout Submittals.

13. Specification Section 07 84 00, paragraph 1.3 Submittals:

a. Add the “G” reviewer to the following submittals:

i. VOC Content

ii. Manufacturer’s Technical Representative

iii. Installer Qualifications

iv. Inspection

14. Specification Section 08 71 00, paragraph 2.3.10 Keys:

a. Add the following sentence at the end of the paragraph: “Keys shall be sent directly from the manufacturer to the Joint Base Charleston locksmith.”

15. Specification Section 10 26 13, paragraph 2.3.1 Resilient Wall Guards, Combination Chair/Wall Guard:

a. Add (CR-1) at the end of the sentence

16. Specification Section 11 14 00, paragraph 2.1 Security Turnstiles:

a. Change the paragraph to read as follows:

“Provide full height single and tandem security turnstiles, stainless steel and galvanized steel construction as indicated. Alvarado Mfg. Co. Inc. models MSTX-6X Full Height Bi-Directional Security Turnstiles and MST-TX- 6X Full Height Bi-Directional Tandem Security Turnstiles were used as the basis of design. Features of the turnstiles shall include: pulse relay; time out relay; rotation feedback detection; horizontal opening inspection cover;

failsafe operation both directions; card reader mounting plates; key overrides in both directions; self-adjusting speed control with self centering; and ability to convert turnstile from fail safe to fail lock and vice versa without removing the top channel. When lockarms are disengaged, the turnstile shall rotate only once and shall self-center when the Roto is spun with up to 250 lbs of force.”

17. Specification Section 11 20 00, paragraph 2.1 Security Entry Portals:

a. Change the paragraph to read as follows

i. “Provide large compartment interlocking door system meeting ADA requirements.

Features of the portal shall include: Anti piggybacking feature; remote control panel;

battery back-up; interior and exterior emergency lever, and shall accommodate electronic access control card readers. Model TAP 250 as manufactured by Boon Edam Inc. was used as the basis of design.”

18. Specification Section 12 51 00:

a. Delete this section in its entirety.

19. Specification Section 13 50 01, paragraph 1.2.4.4.c Cable Organizers:

a. Add “Nylatron” to the list of acceptable materials in the first sentence.

20. Specification Section 13 50 01, paragraph 1.2.1 General Description:

a. Add the following sentence:

i. “With the exception of the strain relief cable system and detensioning system, no shore power boom components, including the boom and the saddles, shall come in contact with the ship under any other condition.”

21. Specification Section 23 00 00, paragraph 2.13.2 Desiccant Wheel (Enthalpy Wheel):

a. Modify the second to last sentence as follows: “The wheel assembly shall come with a minimum five year factory warranty.”

22. Specification Section 23 09 23.13 20, paragraph 2.1.1.12 BACnet Gateways:

a. Modify the last sentence in the second paragraph as follows: “Provide a minimum two-year factory warranty for each gateway, including parts and labor.”

23. Specification 23 65 00, paragraph 1.6 Warranty:

a. Modify the first sentence as follows: “In addition to the warranty requirements specified in

Division 00, Contract Requirements, the following major components of the cooling tower shall be covered by a five year factory warranty: fans, fan drives, electric motors.”

24. Specification 23 82 02.00 10, paragraph 1.7 Warranty:

a. Modify the first sentence as follows: “In addition to the warranty requirements specified in

Division 00, Contract Requirements, the following major components of the Variable Refrigerant Flow system shall be covered by a factory warranty:”

DRAWINGS

1. Drawing G101:

a. “Revise note XI.A.9 on drawing G101 to read as follows: “DATA SHALL BE COLLECTED BY

MMOS TO INCLUDE DATE, START AND END TIMES FOR PILE DRIVING AND

OBSERVATIONS, MARINE MAMMALS SIGHTED, AND APPROXIMATE DISTANCE

FROM THE OBSERVATION POST TO THE MARINE MAMMAL. DATA SHEETS WITH

INSTRUCTIONS WILL BE PROVIDED BY THE CONTRACTING OFFICER. COMPLETED

DATA SHEETS SHALL BE PROVIDED TO THE DESIGNATED NAVFAC

REPRESENTATIVE AT THE END OF EACH DAY OF OBSERVATION VIA EMAIL.”

2. Drawing C523:

a. Revise the last line of the note in the upper left corner of drawing reading “Pump Station

Specifications: Name: NPTU” From: “Power Requirements: 480V, 60HZ, 3PHZ, 12 FLA” To: “Power Requirements: 208V, 60HZ, 3 phase, Estimated FLA = 28A.”

3. Drawing ES502: Delete Detail A5 - POWER MANHOLE EMH-13 FOLDOUT

4. Add Drawing V115 titled “SUB BOTTOM PROFILE SURVEY”.

5. Drawing SG102: Deleted the word “Proposed” from the drawing title and from the “Overall Structural Site

Plan”.

6. Waterfront Berthing Pier Extension Drawings S101 and S102:

a. Add the following sheet note:

i. “9. Concrete pier sections and pilings from a previously demolished finger pier are expected to impact pile driving operations. Contractor shall assume 10% of the new Berthing Pier Extension piles for this contract will be impacted by unforeseen conditions requiring removal of the obstructions or relocation of the obstructed pile. Contractor shall assume a 2 work day delay on work at obstructed pile locations while awaiting direction from the Contracting Officer. Basis of bid shall include all costs associated with either removing the obstruction or relocating the pile resulting from these unforeseen conditions.”

7. Add the following as Reference Drawings:

a. Finger Pier, NAVFAC Drawings 5203022 thru 5203027.

8. Drawing A701 –Building 2626: Revise General Note 14 to read “All epoxy flooring to be additive bid item, base bid shall be sealed concrete per Option Item 4.

9. Drawing A607 – Building 2711: Detail B2/A607, provide embedded plates similar to detail B1/609 for Building 2701.

10. Drawing A601-A603 – Building 2711: Revise header detail reference for type BD doors from C3/A606 to C2/A606.

11. Drawing A401 – Building 2314: A4/A401 refers to drawing A515 for operable partition details, revise reference to A512.

12. Drawing A701-A703 – Building 2314: Delete General Note 12 and provide epoxy flooring as part of base bid for this building only.

Pre-Proposal Inquiries

The Pre-Proposal Inquiry (PPI) cut-off date is close of business February 18, 2014.

SECTION 00010 - SOLICITATION CONTRACT FORM

The required response date/time has changed from 25-Feb-2014 02:00 PM to 05-Mar-2014 02:00 PM.

(End of Summary of Changes)