N69450-14-R-1756-0012.pdf

PDF 21 KB Posted

Attached to
P-100/P-099 Nuclear Power Training Facilities Joint Base Charleston, South Carolina
Solicitation number
N69450-14-R-1756
Issued by

About this file

Amendment 0012 - This amendment is only open to those determined to be in the competitive range.

View the file

Other files

File Type Posted
N6945014R1756-0015.pdf PDF
N69450-14-R-1756-0014.pdf PDF
N69450-14-R-1756-0013.pdf PDF
N69450-14-R-1756-0011.pdf PDF
PPI_Log_as_of_3-14-14_Release.pdf PDF
N69450-14-R-1756-0010.pdf PDF
PPI_Log_as_of_3-12-14_Release.pdf PDF
Amendment_0010_Attachments.zip ZIP file
N69450-14-R-1756-0009.pdf PDF
PPI_Log_as_of_3-10-14_for_Release.pdf PDF
Amendment_0009_Attachments.zip ZIP file
PPI_Log_as_of_3-7-14_Release.pdf PDF
N69450-14-R-1756-0008.pdf PDF
PPI_Log_as_of_3-5-14_Release.pdf PDF
Additional_Photos.zip ZIP file
Drawings_and_Specs_Amend_0007.zip ZIP file
N69450-14-R-1756-0007.pdf PDF
Attachment_L_Non-Disclosure_Agreement.docx DOCX document
PPI_Log_as_of_2-27-14_-_Release.pdf PDF
Amendment_0006_Attachments.zip ZIP file
PPI_Log_as_of_2-21-14_-_Release.pdf PDF
N69450-14-R-1756-0006.pdf PDF
Amendment_0005_Drawings.zip ZIP file
N69450-14-R-1756-0005.pdf PDF
PPI_Log_as_of_2-14-2014_-_Release.pdf PDF
PPI_Log_as_of_2-12-14_-_Release.pdf PDF
140205_NPTU_PPC_Sign-In_Sheet.pdf PDF
Presentation_Minutes.pdf PDF
N69450-14-R-1756_0004.pdf PDF
NPTU_Preproposal_Presentations.pdf PDF
PPI_Log_as_of_1-31-14_-_Release.pdf PDF
Amendment_0003.pdf PDF
I_-_JB_CHS-_Contract_Security_Form_74_-_Revised.pdf PDF
N69450-14-R-1756-0002.pdf PDF
N69450-14-R-1756-0001.pdf PDF
PPI_Log_as_of_1-24-14_-_Release.pdf PDF
PPI_Log_as_of_1-15-14_-_Release.pdf PDF
K_-_NPTU_Security_Form_-_Prefilled.pdf PDF
Drawings_Volume_6a.zip ZIP file
Drawings_Volume_5a.zip ZIP file
Drawings_Volume_7.zip ZIP file
Drawings_Volume_4.zip ZIP file
Attachments_A_-_K.zip ZIP file
Drawings_Volume_5b.zip ZIP file
Drawings_Volume_3b.zip ZIP file
P99-P100-Specification.pdf PDF
N69450-14-R-1756.pdf PDF
Drawings_Volume_3a.zip ZIP file
Drawings_Volume_3c.zip ZIP file
Drawings_Volume_6b.zip ZIP file
Show 40 more

Latest 50 of 58 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

This amendment is only open to those determined to be in the competitive range.

The purpose of this amendment is as follow s:

1) Provide revisions to the specifications.

1. CONTRACT ID CODE PAGE OF PAGES

J 1 2

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 21-Apr-2014

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X N69450-14-R-1756

X 9B. DATED (SEE ITEM 11)

10-Jan-2014

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

21-Apr-2014

CODE

NAVFAC SOUTHEAST

IPT SOUTH CENTRAL

BLDG 135, PO BOX 30

NAS JACKSONVILLE

JACKSONVILLE FL 32212-0030

N69450 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

N69450-14-R-1756

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION SF 30 - BLOCK 14 CONTINUATION PAGE

The following have been added by full text:

AMENDMENT 0012

This amendment is only open to those determined to be in the competitive range

1. Specifications are changed as follows.

a. SPECIFICATIONS

1. Specification Section 00 01 15, paragraph 1.3.3. Subsurface Data:

a. Add the following at the end of the paragraph:

“The subsurface information and data is for information only, does not form a part of these contract documents, and does not include or state requirements for conformance by the Contractor. Refer to 31 00 00 and drawings for earthwork requirements.”

2. Specification Section 01 14 00.00 25, paragraph 1.2.n Special Scheduling Requirements:

a. Change the paragraph to read as follows:

“n. The Government will open the Port Security Barrier to allow for the movement of construction materials and equipment. Planned duration and frequency of requested openings and relocations shall be included in the Security Phasing Plan. Provide at least 30 calendar days’ notice prior to the scheduled need to move equipment or materials across the Port Security Barrier. Openings and relocations longer in duration than 5 consecutive calendar days may require additional notice to allow coordination of Government and non-Government resources to accommodate the activity. Material and water-borne craft inspections are still required for all movement through the barrier.”

3. Specification Section 33 71 02.00 20, paragraph 2.1.3 Plastic Duct for Concrete Encasement:

a. Change the text “NEMA TC 6 & 8 and ASTM F512, UL 651, EPC-40-PVC or as indicated.” to read as follows:

i. “UL 651 and ASTM F512, NEMA TC 6 & 8, Type EB-35-PVC. Provide UL 651 and

ASTM F512, NEMA TC 6 & 8, EPC-40-PVC elbows and at friction points (reamed for smooth transition).”

(End of Summary of Changes)

File details come from the government source that posted it. Updated .