N69450-14-R-1756-0014.pdf
PDF 69 KB Posted
- Solicitation number
- N69450-14-R-1756
About this file
Amendment 0014 - This amendment is only open to those determined to be in the competitive range.
View the file
Other files
Show 40 more
Latest 50 of 58 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
This amendment is only open to those determined to be in the competitive range.
The purpose of this amendment is as follow s:
1) Incorporate CLIN 0002 – CLIN 0005 into the base bid. This w ill result in a change in the option item numbering.
2) Provide revisions to the specifications and draw ings.
1. CONTRACT ID CODE PAGE OF PAGES
J 1 11
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 24-Apr-2014
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X N69450-14-R-1756
X 9B. DATED (SEE ITEM 11)
10-Jan-2014
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
24-Apr-2014
CODE
NAVFAC SOUTHEAST
IPT SOUTH CENTRAL
BLDG 135, PO BOX 30
NAS JACKSONVILLE
JACKSONVILLE FL 32212-0030
N69450 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
N69450-14-R-1756
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION SF 30 - BLOCK 14 CONTINUATION PAGE
The following have been added by full text:
AMENDMENT 0014
This amendment is only open to those determined to be in the competitive range.
1. Section 0202 is amended as follows:
(changes are bolded)
a. Section I.B.3 CLIN Description is revised as follows:
3. The description of the basic, option and Furniture, Fixtures, and Equipment (FF&E) CLINs are as follows:
CLIN 0001: P-100 Nuclear Power Operational Training Facility, Joint Base Charleston, SC, TSB 2 (Bldg 2701), SAEP (Bldg 2626) and Site work less item 0002, 0003, 0004, 0005, 0010 and 0012.
CLIN 0002: P-100- All pier work less mechanical and electrical utilities
CLIN 0003: P-100 All mechanical and electrical utilities on pier
CLIN 0004: P-100 Site improvements (irrigation and rainwater harvesting system, plantings other than seed and sod and plantings in bioswales, second site entrance ramp, cast-in-place entrance retaining structures in lieu of mechanically stabilized earth walls, and decorative brick edging)
CLIN 0005: P-100 TSB-2 (Bldg 2701) upgraded doors and floor finishings
CLIN 0006: Option Item 1 – P-099 Nuclear Power Operational Support Facility, Joint Base Charleston, SC, TSB-2A (Bldg 2711) and TSB-1 (Bldg 2314) less CLIN 0007, 0008, 0009, 0011 and 0013.
CLIN 0007: Option Item 2 – P-099 IX-516 Survival Mooring System
CLIN 0008: Option Item 3 – P-099 TSB-2A (Bldg 2711) upgraded doors and floor finishings
CLIN 0009: Option Item 4 – P-099 Demolition and removal of existing office trailers on the north side of the site
CLIN 0010: Option Item 5 – P-100 Security (Electronic Security System (ESS) and Intrusion Detection System (IDS) Equipment for Initial Outfitting of MILCON)
CLIN 0011: Option Item 6 – P-099 Security (ESS and IDS Equipment for Initial Outfitting of MILCON)
CLIN 0012: Planned Modification: P-100 FF&E
CLIN 0013: Planned Modification: P-099 FF&E
The Government may exercise CLINs 0006 through 0011 (Option Items 1 through 6) within 365 days from date of contract award. FF&E for each MILCON will be issued as planned modifications at least six months prior to completion.
b. Section I.B.3 CLIN Description is revised to remove (if exercised) from Phase A and B as follows:
4. The completion dates are as follows:
Phase A (TSB 2 (Bldg. 2701) from CLIN 0001 and all CLIN 0005) – Completion Date: 763 calendar days from date of contract award
Phase B (All CLIN 0002 and CLIN 0003) – Completion Date: 913 calendar days from April 1, 2015
Phase C (Remainder of CLIN 0001, all CLIN 0004, and all CLINs 0006 through 0011 (if exercised)) – Completion Date: 1400 calendar days from date of contract award
The liquidated damages in the following amounts will be assessed for each calendar day of delay:
During Phase A – $22,400.00 During Phase B – $6,500.00 During Phase C – $27,900.00
2. Specifications and drawings to include amendments are changed as follows.
a. SPECIFICATIONS
1. Specification Section 03 31 29, paragraph 1.3 Submittals:
a. Under SD-06 Test Reports, delete “Durability Modeling (Using STADIUM©)
2. Specification Section 03 31 29, paragraph 1.7.2 Concrete Design Requirements
i. Add “of 50 years” to the end of the second paragraph.
3. Specification Section 03 31 29, paragraph 1.7.3.1 Previously Approved Concrete Mixtures
a. Revise subparagraph “c” to read:
i. “Copies of the previously approved trial batch test data, including the volume of permeable voids (phi).”
b. Revise subparagraph “d” to read:
i. “A log containing at least fifteen sequential test results with the calculated mean and standard deviation of the production concrete for air content, compressive strength, and volume of permeable voids (phi).”
4. Specification Section 03 31 29, paragraph 1.7.3.2 New Concrete Mixtures
a. Subparagraph “c”
i. Delete first paragraph under subparagraph “c” beginning with “Test a minimum…” Paragraph beginning with “If the concrete…” is to remain with associated subparagraphs.
ii. Delete subparagraph (4) in its entirety with all associated subparagraphs
b. Delete subparagraph “d”
5. Specification Section 03 31 29, paragraph 1.8.4.3 Quality Control Data
a. Revise paragraph to read:
i. “The Contractor shall prepare, maintain, and report separate quality control charts illustrating the slump, temperature, air content, and compressive strength test results for each lot of concrete mixture used on the project.”
6. Specification Section 03 31 29, paragraph 1.8.4.5 Non-conforming Materials
a. In the second sentence of the paragraph, delete, “transport properties out of limits,”
7. Specification Section 03 31 29, paragraph 1.8.5.1 Concrete Mixture Requirements:
a. Delete subparagraph “c”
8. Specification Section 03 31 29, paragraph 3.8.2 Hardened Concrete Properties
a. In the first sentence of the fourth paragraph, delete, “and seven 4 by 8 inch cylinder specimens for transport property testing”
9. Specification Section 03 31 29, paragraph 3.8.2.2 Transport Property Tests
a. Delete paragraph in its entirety
b. DRAWINGS
1. Building 2701 (P100) Drawing C002 P100-P099 Site Plan:
a. Change note 2 to:
i. “All work associated with Bldg 2711 construction out to the approximate bldg. 5 foot line shall be bid as part of the P099 project scope CLIN 0006. This does not include site demolition. This includes final 3 feet of site fill. All new building elements such as piles, foundations, mechanical, electrical, structural and architectural elements to support bldg. operations and site work as indicated. See notes on Drawing C042 for the portion of the final parking lot that is to be bid as part of CLIN 0006.”
b. Change detail title from “P99 Site Plan Bid Option #5” to “P99 Site Plan CLIN 0006”
2. Building 2701 (P100) Drawing C003 P100-P099 Utility Plan:
a. Change note 2 to:
i. “All work associated with Bldg 2711 construction out to the approximate bldg. 5 foot line shall be bid as part of the P099 project scope CLIN 0006. This does not include site demolition. This includes final 3 feet of site fill. All new building elements such as piles, foundations, mechanical, electrical, structural and architectural elements to support bldg. operations and site work as indicated. See notes on Drawing C042 for the portion of the final parking lot that is to be bid as part of CLIN 0006.”
b. Change detail title from “Building 2711 Area – Utility Plan (P099) (Bid Option 5)” to “Building 2711 Area – Utility Plan (P099) (CLIN 0006)”
3. Building 2701 (P100) Drawing C004 P100-P099 Grading Plan:
a. Change note 2 to:
i. “All work associated with Bldg 2711 construction out to the approximate bldg. 5 foot line shall be bid as part of the P099 project scope CLIN 0006. This does not include site demolition. This includes final 3 feet of site fill. All new building elements such as piles, foundations, mechanical, electrical, structural and architectural elements to support bldg. operations and site work as indicated. See notes on Drawing C042 for the portion of the final parking lot that is to be bid as part of CLIN 0006.”
b. Change detail title from “Building 2711 Area – Grading Plan (P099) (Bid Option 5)” to “Building 2711 Area – Grading Plan (P099) (CLIN 0006)”
4. Building 2701 (P100) Drawing C042 Phase 7 – Site Work
a. Note 1 under “Phase 7 work (On-going beyond Phase 7)”
i. Change “(Bid Option 3)” at end of note to “(CLIN 0006)”
5. Building 2701 (P100) Drawing C043 Phase 8-11 – Security Layout and Site Access
a. Change “(Bid Option 8)” at end of note 9 to “(CLIN 0009)”
6. Building 2701 (P100) Drawing C102 Site Demolition Plan Area 2
a. Change “Bid Option #8” at end of note 6 to “CLIN 0009”
7. Building 2701 (P100) Drawing C103 Site Demolition Plan Area 3
a. Change “Bid Option #8” at end of note 4 to “CLIN 0009”
8. Building 2701 (P100) Drawing C123 Demolition – Enlarged Plan of Temp Trailers Area
a. Revise note 4 to read:
i. “See reference drawing V111 and V112 for as-builts of the temporary trailer project.
Remove all utility service connections to the trailers to the nearest manhole, handhole, valve, etc. All demolition to be bid as part of CLIN 0009.”
b. Revise note 5 to read:
i. “Pole and transformers to remain until temporary office trailers are removed. Then remove pole completely. All demolition to be bid as part of CLIN 0009.”
c. Change “Bid Option #8” to “CLIN 0009” wherever shown
9. Building 2701 (P100) Drawing C202 Site Layout Plan Area 2
a. Change “Bid Option #8” to “CLIN 0009” wherever shown
10. Building 2701 (P100) Drawing C203 Site Layout Plan Area 3
a. Change “Bid Option #8” to “CLIN 0009” wherever shown
11. Building 2701 (P100) Drawing C205 Site Layout Plan Area 5
a. Revise note 3 to read:
i. “Base bid north ramp is MSE wall construction detail A1, C525. CLIN 0004 is to upgrade to case in place concrete and add south ramp. See detail A3 on C511. See enlarged view on C211 for base bid and CLIN 0004.”
12. Building 2701 (P100) Drawing C211 Enlarged Site Plan of Entry Plaza Base Bid
a. Revise note 1 to read:
i. “Base bid north ramp is MSE wall construction detail A1, C525. CLIN 0004 is to upgrade to case in place concrete for the north ramp and add south ramp site detail A3 on C511.”
b. Revise note 2 to read:
i. “South ramp is CLIN 0004 and shall be constructed of cast in place concrete. See detail
A3 on C511.”
13. Building 2701 (P100) Drawing C306 Utility Layout Plan Area 6
a. Change “Bid Option #3” to “CLIN 0004” wherever shown
14. Building 2701 (P100) Drawing C311 Utility Plan of Campus Area
a. Change “Bid Option #3” to “CLIN 0004” wherever shown
15. Building 2701 (P100) Drawing C312 Utility Plan West of 2701
a. Change “Bid Option #3” to “CLIN 0004” wherever shown
16. Building 2701 (P100) Drawing C315 Overall Storm Water Plan
a. Change “Bid Option #3” to “CLIN 0004” wherever shown
17. Building 2701 (P100) Drawing C405 Grading and Drainage Plan Area 5
a. Change “Bid Option #3” to “CLIN 0004” wherever shown
18. Building 2701 (P100) Drawing C412 Enlarged Grading and Drainage Plan – Entry Plaza
a. Change “Bid Option #3” to “CLIN 0004” wherever shown
19. Building 2701 (P100) Drawing C441 Utility Section
a. Change “Bid Option #3” to “CLIN 0004” wherever shown
20. Building 2701 (P100) Drawing C454 Storm Drain Profiles
a. Change “Bid Option #3” in Profile SD7 to “CLIN 0004”
21. Building 2701 (P100) Drawing C457 Storm Drain Profiles
a. Change “Bid Option #3” in Profile SD24 to “CLIN 0004”
22. Building 2701 (P100) Drawing C522 Rainwater Harvesting System Details
a. Change “Bid Option #3” to “CLIN 0004” wherever shown
23. Building 2701 (P100) Drawing C528 Stormwater Chamber Details
a. Change “Bid Option #3” to “CLIN 0004” wherever shown
24. Building 2701 (P100) Drawing L001 Landscape Abbreviations and Legend
a. Delete “(Additive Bid Item)” wherever shown on sheet
25. Building 2701 (P100) Drawing L100 Overall Irrigation Coverage Plan
a. Change note 10 to read:
i. “All irrigation and rainwater harvesting work shall be covered in CLIN 0004”
b. Remove “(Additive Bid Item)” from Irrigation Legend
26. Building 2701 (P100) Drawing L101 Irrigation Coverage Plan
a. Change note within BLDG 2711 borders to read:
i. “Note: Bldg 2711 is an additive bid option. In the event that Building 2711 does not get constructed, the area shown as Bldg 2711 shall be included within the irrigation area as spray heads.”
b. Change note 9 to read:
i. “All irrigation and rainwater harvesting work shall be covered in CLIN 0004”
c. Delete “(Additive Bid Item)” and “(Alternative Bid Item)” wherever shown on sheet
27. Building 2701 (P100) Drawing L102 Irrigation Coverage Plan
a. Change note 9 to read:
i. “All irrigation and rainwater harvesting work shall be covered in CLIN 0004”
b. Delete “(Additive Bid Item)” and “(Alternative Bid Item)” wherever shown on sheet
28. Building 2701 (P100) Drawing L203 Site Landscape Plan
a. Change note within BLDG 2711 borders from “(Bid Option #5) to “(CLIN 0006)”
b. Change note 10 to read:
i. “Building 2711 is CLIN 0006. Base bid to include sod for all areas included as part of the construction of Building 2711.”
29. Building 2701 (P100) Drawing L300 Hardscape Plan
a. Delete “(Additive Bid Item)” wherever shown on sheet
30. Building 2701 (P100) Drawing L301 Hardscape Plan
a. Delete note 4
b. Delete “(Additive Bid Item)” wherever shown on sheet
31. Building 2701 (P100) Drawing L302 Hardscape Plan
a. Delete note 2
b. Delete “(Additive Bid Item)” wherever shown on sheet
32. Building 2701 (P100) Drawing L503 Landscape Site Details
a. Delete “(Additive Bid Item)” wherever shown on sheet
33. Building 2701 (P100) Drawing A601 Door Schedule First Floor
a. Change note 2 to:
i. “CLIN 0005 – Provide FRP doors and aluminum frames in lieu of Hollow Metal Doors and Frames. Use HM Frame where fire rating is required.”
34. Building 2701 (P100) Drawing A602 Door Schedule Second Floor
a. Change note 1 to:
i. “CLIN 0005 – Provide FRP doors and aluminum frames in lieu of Hollow Metal Doors and Frames. Use HM Frame where fire rating is required.”
35. Building 2701 (P100) Drawing A603 Door Schedule Third Floor
a. Change note 1 to:
i. “CLIN 0005 – Provide FRP doors and aluminum frames in lieu of Hollow Metal Doors and Frames. Use HM Frame where fire rating is required.”
36. Building 2701 (P100) Drawing A608 Aluminum Frame Door Details
a. Change subscript on all details that says “Option 4” to “CLIN 0005”
37. Building 2701 (P100) Drawing A701 Room Finish Schedule First Floor
a. Change note 18 to:
i. “All epoxy flooring to be CLIN 0005, except EF-14 in Support Systems Complex, Rooms 121, 122, 122A, 123, 124.”
38. Building 2701 (P100) Drawing A702 Room Finish Schedule Second Floor
a. Change note 18 to:
i. “All epoxy flooring to be CLIN 0005, except EF-14 in Support Systems Complex, Rooms 121, 122, 122A, 123, 124.”
39. Building 2701 (P100) Drawing A703 Room Finish Schedule Third Floor
a. Change note 18 to:
i. “All epoxy flooring to be CLIN 0005, except EF-14 in Support Systems Complex, Rooms 121, 122, 122A, 123, 124.”
40. Building 2701 (P100) Drawing A704 Room Finish Schedule Material Legend
a. Change note 18 to:
i. “All epoxy flooring to be CLIN 0005, except EF-14 in Support Systems Complex, Rooms 121, 122, 122A, 123, 124.”
41. Building 2701 (P100) Drawing I104 Furniture Item Code Legend and Notes
a. Change note 1 to:
i. “All furniture, fixture & equipment is not in contract (NIC). Refer to CLIN 0011.
Shown for coordination purposes only.”
42. Building 2626 (P100) Drawing A601 Door Schedule
a. Change note 4 to:
i. “CLIN 0005 – Provide FRP doors and aluminum frames in lieu of Hollow Metal Doors and Frames.”
43. Building 2626 (P100) Drawing I101 Furniture and Equipment Plan
a. Change note 1 to:
i. “All furniture, fixture & equipment is not in contract (NIC). Refer to CLIN 0011.
Equipment (EQ-Code) is user furnished user installed (UFUI), and audio-visual (AV-
Code) is contractor furnished contractor installed and is shown for coordination purposes only.”
44. Pier X-Ray North (P100) Drawing MS401 Pier X-Ray North Mechanical Plan – Area 1
a. Revise General Note 3 to read:
i. “All mechanical and electrical work on this drawing shall be included as CLIN 0003.”
45. Pier X-Ray North (P100) Drawing MS402 Pier X-Ray North Mechanical Plan – Area 2
a. Revise General Note 3 to read:
i. “All mechanical and electrical work on this drawing shall be included as CLIN 0003.”
46. Pier X-Ray North (P100) Drawing MS403 Pier X-Ray North Mechanical Plan – Area 3
a. Revise General Note 3 to read:
i. “All mechanical and electrical work on this drawing shall be included as CLIN 0003.”
47. Pier X-Ray North (P100) Drawing MS404 Pier X-Ray North Mechanical Plan – Area 4
i. Change “Bid Option No. 2” to “CLIN 0003” wherever shown
48. Pier X-Ray North (P100) Drawing ES401 Pier X-Ray North Electrical Plan – Area 1
a. Revise General Note 1 to read:
i. “All mechanical and electrical work on this drawing shall be included as CLIN 0003.”
49. Pier X-Ray North (P100) Drawing ES402 Pier X-Ray North Electrical Plan – Area 2
a. Revise General Note 1 to read:
i. “All mechanical and electrical work on this drawing shall be included as CLIN 0003.”
50. Pier X-Ray North (P100) Drawing ES403 Pier X-Ray North Electrical Plan – Area 3
a. Revise General Note 1 to read:
i. “All mechanical and electrical work on this drawing shall be included as CLIN 0003.”
51. Pier X-Ray North (P100) Drawing ES404 Pier X-Ray North Electrical Plan – Area 4
a. Revise General Note 1 to read:
i. “All mechanical and electrical work on this drawing shall be included as CLIN 0003.”
ii. Change “Bid Option No. 2” to “CLIN 0003” wherever shown
52. Pier X-Ray South (P100) Drawing MS407 Pier X-Ray South Mechanical Plan – Area 7
i. Change “Bid Option No. 2” to “CLIN 0003” wherever shown
53. Pier X-Ray South (P100) Drawing MS408 Pier X-Ray South Mechanical Plan – Area 8
a. Revise General Note 3 to read:
i. “All mechanical and electrical work on this drawing shall be included as CLIN 0003.”
54. Pier X-Ray South (P100) Drawing MS409 Pier X-Ray South Mechanical Plan – Area 9
a. Revise General Note 3 to read:
i. “All mechanical and electrical work on this drawing shall be included as CLIN 0003.”
55. Pier X-Ray South (P100) Drawing MS410 Pier X-Ray South Mechanical Plan – Area 10
a. Revise General Note 3 to read:
i. “All mechanical and electrical work on this drawing shall be included as CLIN 0003.”
56. Pier X-Ray South (P100) Drawing ES407 Pier X-Ray South Electrical Plan – Area 7
a. Change “Bid Option No. 2” to “CLIN 0003” wherever shown
57. Pier X-Ray South (P100) Drawing ES408 Pier X-Ray South Electrical Plan – Area 8
a. Revise General Note 1 to read:
i. “All mechanical and electrical work on this drawing shall be included as CLIN 0003.”
58. Pier X-Ray South (P100) Drawing ES409 Pier X-Ray South Electrical Plan – Area 9
a. Revise General Note 1 to read:
i. “All mechanical and electrical work on this drawing shall be included as CLIN 0003.”
59. Pier X-Ray South (P100) Drawing ES410 Pier X-Ray South Electrical Plan – Area 10
a. Revise General Note 1 to read:
i. “All mechanical and electrical work on this drawing shall be included as CLIN 0003.”
60. Building 2711 (P099) Drawing C042 Phase 7 – New Site Work
a. Note 1 under “Phase 7 work (On-going beyond Phase 7)”
i. Change “(Bid Option 3)” at end of note to “(CLIN 0006)”
61. Building 2711 (P099) Drawing C043 Phase 8-12 – Security Layout and Site Access
a. Change “(Bid Option 8)” at end of note 9 to “(CLIN 0009)”
62. Building 2711 (P099) Drawing A601 Door Schedule First Floor
a. Change note 4 to:
i. “CLIN 0008 – Provide FRP doors and aluminum frames in lieu of Hollow Metal Doors and Frames. Use HM Frame where fire rating is required.”
63. Building 2711 (P099) Drawing A602 Door Schedule Second Floor
a. Change note 4 to:
i. “CLIN 0008 – Provide FRP doors and aluminum frames in lieu of Hollow Metal Doors and Frames. Use HM Frame where fire rating is required.”
64. Building 2711 (P099) Drawing A603 Door Schedule Third Floor
a. Change note 4 to:
i. “CLIN 0008 – Provide FRP doors and aluminum frames in lieu of Hollow Metal Doors and Frames. Use HM Frame where fire rating is required.”
65. Building 2711 (P099) Drawing A608 Aluminum Frame Door Details
a. Change subscript on all details that says “Option 4” to “CLIN 0008”
66. Building 2711 (P099) Drawing A701 Room Finish Schedule First & Second Floor
a. Change note 16 to:
i. “All epoxy flooring to be CLIN 0008.”
67. Building 2711 (P099) Drawing A702 Room Finish Schedule Second Floor
a. Change note 16 to:
i. “All epoxy flooring to be CLIN 0008.”
68. Building 2711 (P099) Drawing A703 Room Finish Schedule Third Floor
a. Change note 16 to:
i. “All epoxy flooring to be CLIN 0008.”
69. Building 2711 (P099) Drawing A704 Room Finish Schedule Material Legend
a. Change note 16 to:
i. “All epoxy flooring to be CLIN 0008.”
70. Building 2711 (P099) Drawing I104 Furniture Item Code Legend and Notes
a. Change note 1 to:
i. “All furniture, fixture & equipment is not in contract (NIC). Refer to CLIN 0013.
Shown for coordination purposes only.”
71. Building 2314 (P099) Drawing I104 Furniture Item Code Legend and Notes
a. Change note 1 to:
i. “All furniture, fixture & equipment is not in contract (NIC). Refer to CLIN 0013.
Shown for coordination purposes only.”
c. AMENDMENTS
1. Amendment No. 0007, Drawings Item number 1:
a. All references to “Additive Bid Item” on the Landscaping drawings shall be included as part of
“CLIN 0004” for bidding purposes.
2. Amendment No. 0009, Drawings Item #2
a. Building 2701 (P100) Drawing C200 Overall Site Layout - Revise note 12 to read:
i. “All pier work, less mechanical and electrical utilities and DFPs shall be bid as part of
CLIN 0002. All mechanical and electrical utilities on the pier (Refer to Mechanical and Electrical drawings for lines of demarcation), except work associated with the DFPs shall be bid as part of CLIN 0003.”
3. Amendment No. 0013, Drawings Item #1
a. Revise drawing reference to Drawing C009 Existing Security Layout and Access:
SECTION 00010 - SOLICITATION CONTRACT FORM
CLIN 0002
The CLIN description has changed from Option Item 1 to Base CLIN.
The CLIN extended description has changed from Option Item 1 – P-100- All pier work less mechanical and electrical utilities in accordance with specifications and drawings incorporated into this solicitation. Work performed under this CLIN shall be completed during Phase B. This option may be exercised within 365 days from date of contract award. to P-100- All pier work less mechanical and electrical utilities in accordance with specifications and drawings incorporated into this solicitation. Work performed under this CLIN shall be completed during Phase B..
The option status has changed from Option to No Status.
CLIN 0003
The CLIN description has changed from Option Item 2 to Base CLIN.
The CLIN extended description has changed from Option Item 2 – P-100 All mechanical and electrical utilities on pier in accordance with specifications and drawings incorporated into this solicitation. Work performed under this CLIN shall be completed during Phase B. This option may be exercised within 365 days from date of contract award. to P-100 All mechanical and electrical utilities on pier in accordance with specifications and drawings incorporated into this solicitation. Work performed under this CLIN shall be completed during Phase B..
CLIN 0004
The CLIN description has changed from Option Item 3 to Base CLIN.
The CLIN extended description has changed from Option Item 3 – P-100 Site improvements (irrigation and rainwater harvesting system, plantings other than seed and sod and plantings in bioswales, second site entrance ramp, cast-in-place entrance retaining structures in lieu of mechanically stable earth walls, and decorated brick edging) in accordance with specifications and drawings incorporated into this solicitation. Work performed under this CLIN shall be completed during Phase C. This option may be exercised within 365 days from date of contract award. to P-100 Site improvements (irrigation and rainwater harvesting system, plantings other than seed and sod and plantings in bioswales, second site entrance ramp, cast-in-place entrance retaining structures in lieu of mechanically stable earth walls, and decorated brick edging) in accordance with specifications and drawings incorporated into this solicitation. Work performed under this CLIN shall be completed during Phase C..
CLIN 0005
The CLIN description has changed from Option Item 4 to Base CLIN.
The CLIN extended description has changed from Option Item 4 – P-100 TSB-2 (Bldg. 2701) upgraded doors and floor finishings in accordance with specifications and drawings incorporated into this solicitation. Work performed under this CLIN shall be completed during Phase A. This option may be exercised within 365 days from date of contract award. to P-100 TSB-2 (Bldg. 2701) upgraded doors and floor finishings in accordance with specifications and drawings incorporated into this solicitation. Work performed under this CLIN shall be completed during Phase A..
CLIN 0006
The CLIN description has changed from Option Item 5 to Option Item 1.
The CLIN extended description has changed from Option Item 5 – P-099 Nuclear Power Operational Support Facility, Joint Base Charleston, SC, TSB-2A (Bldg 2711) and TSB-1 (Bldg 2314), less CLIN 0007, 0008 0009, 0011 and 0013 in accordance with specifications and drawings incorporated into this solicitation. Work performed under this CLIN shall be completed during Phase C. This option may be exercised within 365 days from date of contract award. to Option Item 1 – P-099 Nuclear Power Operational Support Facility, Joint Base Charleston, SC, TSB-2A (Bldg 2711) and TSB-1 (Bldg 2314), less CLIN 0007, 0008 0009, 0011 and 0013 in accordance with specifications and drawings incorporated into this solicitation. Work performed under this CLIN shall be completed during Phase C. This option may be exercised within 365 days from date of contract award..
CLIN 0007
The CLIN description has changed from Option Item 6 to Option Item 2.
The CLIN extended description has changed from Option Item 6 – P-099 IX-516 Survival Mooring System in accordance with specifications and drawings incorporated into this solicitation. Work performed under this CLIN shall be completed during Phase C. This option may be exercised within 365 days from date of contract award. to Option Item 2 – P-099 IX-516 Survival Mooring System in accordance with specifications and drawings incorporated into this solicitation. Work performed under this CLIN shall be completed during Phase C. This option may be exercised within 365 days from date of contract award..
CLIN 0008
The CLIN description has changed from Option Item 7 to Option Item 3.
The CLIN extended description has changed from Option Item 7 – P-099 TSB-2A (2711) upgraded doors and floor finishings in accordance with specifications and drawings incorporated into this solicitation. Work performed under this CLIN shall be completed during Phase C. This option may be exercised within 365 days from date of contract award. to Option Item 3 – P-099 TSB-2A (2711) upgraded doors and floor finishings in accordance with specifications and drawings incorporated into this solicitation. Work performed under this CLIN shall be completed during Phase C. This option may be exercised within 365 days from date of contract award..
CLIN 0009
The CLIN description has changed from Option Item 8 to Option Item 4.
The CLIN extended description has changed from Option Item 8 – P-099 Demolition and removal of existing office trailers on the north side of the site in accordance with specifications and drawings incorporated into this solicitation. Work performed under this CLIN shall be completed during Phase C. This option may be exercised within 365 days from date of contract award. to Option Item 4 – P-099 Demolition and removal of existing office trailers on the north side of the site in accordance with specifications and drawings incorporated into this solicitation. Work performed under this CLIN shall be completed during Phase C. This option may be exercised within 365 days from date of contract award..
CLIN 0010
The CLIN description has changed from Option Item 9 to Option Item 5.
The CLIN extended description has changed from Option Item 9 – P-100 Security (Electronic Security System (ESS) and Intrusion Detection System (IDS) Equipment for Initial Outfitting of MILCON) in accordance with specifications and drawings incorporated into this solicitation. Work performed under this CLIN shall be completed during Phase C. This option may be exercised within 365 days from date of contract award. to Option Item 5 – P-100 Security (Electronic Security System (ESS) and Intrusion Detection System (IDS) Equipment for Initial Outfitting of MILCON) in accordance with specifications and drawings incorporated into this solicitation.
Work performed under this CLIN shall be completed during Phase C. This option may be exercised within 365 days from date of contract award..
CLIN 0011
The CLIN description has changed from Option Item 10 to Option Item 6.
The CLIN extended description has changed from Option Item 10 – P-099 Security (ESS and IDS Equipment for Initial Outfitting of MILCON) in accordance with specifications and drawings incorporated into this solicitation. Work performed under this CLIN shall be completed during Phase C. This option may be exercised within 365 days from date of contract award. to Option Item 6 – P-099 Security (ESS and IDS Equipment for Initial Outfitting of MILCON) in accordance with specifications and drawings incorporated into this solicitation. Work performed under this CLIN shall be completed during Phase C. This option may be exercised within 365 days from date of contract award..
(End of Summary of Changes)