N69450-14-R-1756-0010.pdf

PDF 31 KB Posted

Attached to
P-100/P-099 Nuclear Power Training Facilities Joint Base Charleston, South Carolina
Solicitation number
N69450-14-R-1756
Issued by

About this file

N69450-14-R-1756-0010

View the file

Other files

File Type Posted
N6945014R1756-0015.pdf PDF
N69450-14-R-1756-0014.pdf PDF
N69450-14-R-1756-0013.pdf PDF
N69450-14-R-1756-0012.pdf PDF
N69450-14-R-1756-0011.pdf PDF
PPI_Log_as_of_3-14-14_Release.pdf PDF
PPI_Log_as_of_3-12-14_Release.pdf PDF
Amendment_0010_Attachments.zip ZIP file
N69450-14-R-1756-0009.pdf PDF
PPI_Log_as_of_3-10-14_for_Release.pdf PDF
Amendment_0009_Attachments.zip ZIP file
PPI_Log_as_of_3-7-14_Release.pdf PDF
N69450-14-R-1756-0008.pdf PDF
PPI_Log_as_of_3-5-14_Release.pdf PDF
Additional_Photos.zip ZIP file
Drawings_and_Specs_Amend_0007.zip ZIP file
N69450-14-R-1756-0007.pdf PDF
Attachment_L_Non-Disclosure_Agreement.docx DOCX document
PPI_Log_as_of_2-27-14_-_Release.pdf PDF
Amendment_0006_Attachments.zip ZIP file
PPI_Log_as_of_2-21-14_-_Release.pdf PDF
N69450-14-R-1756-0006.pdf PDF
Amendment_0005_Drawings.zip ZIP file
N69450-14-R-1756-0005.pdf PDF
PPI_Log_as_of_2-14-2014_-_Release.pdf PDF
PPI_Log_as_of_2-12-14_-_Release.pdf PDF
140205_NPTU_PPC_Sign-In_Sheet.pdf PDF
Presentation_Minutes.pdf PDF
N69450-14-R-1756_0004.pdf PDF
NPTU_Preproposal_Presentations.pdf PDF
PPI_Log_as_of_1-31-14_-_Release.pdf PDF
Amendment_0003.pdf PDF
I_-_JB_CHS-_Contract_Security_Form_74_-_Revised.pdf PDF
N69450-14-R-1756-0002.pdf PDF
N69450-14-R-1756-0001.pdf PDF
PPI_Log_as_of_1-24-14_-_Release.pdf PDF
PPI_Log_as_of_1-15-14_-_Release.pdf PDF
K_-_NPTU_Security_Form_-_Prefilled.pdf PDF
Drawings_Volume_6a.zip ZIP file
Drawings_Volume_5a.zip ZIP file
Drawings_Volume_7.zip ZIP file
Drawings_Volume_4.zip ZIP file
Attachments_A_-_K.zip ZIP file
Drawings_Volume_5b.zip ZIP file
Drawings_Volume_3b.zip ZIP file
P99-P100-Specification.pdf PDF
N69450-14-R-1756.pdf PDF
Drawings_Volume_3a.zip ZIP file
Drawings_Volume_3c.zip ZIP file
Drawings_Volume_6b.zip ZIP file
Show 40 more

Latest 50 of 58 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

The purpose of this amendment is as follow s:

1) Provide revisions to the draw ings and specifications.

2) An updated PPI Log (PPI Log as of 3-12-14 – Release) has been posted to FBO.

1. CONTRACT ID CODE PAGE OF PAGES

J 1 4

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 12-Mar-2014

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X N69450-14-R-1756

X 9B. DATED (SEE ITEM 11)

10-Jan-2014

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

12-Mar-2014

CODE

NAVFAC SOUTHEAST

IPT SOUTH CENTRAL

BLDG 135, PO BOX 30

NAS JACKSONVILLE

JACKSONVILLE FL 32212-0030

N69450 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

N69450-14-R-1756

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION SF 30 - BLOCK 14 CONTINUATION PAGE

The following have been added by full text:

AMENDMENT 0010

1. Specifications and drawings are changed as follows.

a. SPECIFICATIONS

1. Specification Section 00 01 15, paragraph 1.2 Contract Drawings:

a. The following drawings, bearing revision date of 03/10/14, supersede drawings bearing the same number and title.

NAVFAC DRAWING NO. TITLE

15082482 (TA611) BUILDING 2701 (P100) – SECURITY SCHEDULES

2. Specification Section 01 14 00.00 25, paragraph 1.2 Special Scheduling Requirements:

a. Add the following under paragraph h:

“Contractor shall assume 3 occurrences per calendar year when marine operations will be shut down for 4 hours per occurrence due to the presence of marine animals (as sighted in accordance with the approved MMO plan).”

3. Specification Section 01 14 00.00 25, paragraph 1.3.1.2 Radiological Requirements:

a. Add the following paragraph:

“c. The entire NPTU Charleston MILCON construction site is an area of exclusive federal jurisdiction.

Contractors must have a Nuclear Regulatory Commission (NRC) license or an Agreement State license with current NRC Form 241, authorizing possession, use, storage, and transfer of radioactive material (RAM) on the construction site.”

4. Specification Section 01 35 26.00 25, paragraph 1.14 Radiation Safety Requirements:

a. Delete the second paragraph that reads “Provide the Contracting Officer, JB CHS RSO, and

NPTU RSO with 30 days' advance notice prior to activities utilizing a radioactive source.”

b. In the fourth paragraph, delete “JB CHS RSO, and NPTU RSO”.

5. Specification Section 09 67 23.13, paragraph 3.3.4. Integral Cove Base:

a. Add the following sentence at the end of the paragraph;

i. Provide an aluminum cap strip at the top of the coved base.”

6. Specification Section 10 44 16, paragraph 2.3.2 Clean Agent Type:

a. Change from “13 pound for cabinet mount.” to read “13 pound for cabinet mount and surface mount.”

7. Specification Section 27 10 00, paragraph 2.4.2 Equipment Support Frame:

a. Add the following paragraph: “d. Unless indicated or specified otherwise, minimum cabinet depth shall be 36 inches.”

8. Specification Section 28 23 23.00.10, paragraph 2.7.3 Tower Mount:

a. In paragraph a, change the tower height from “25 foot” to “40 foot”.

9. Specification Section 31 62 13.20, paragraph 2.9.2 Test Piles:

a. Change the first sentence to read: “Test piles and reaction piles shall be installed in accordance with procedures required for production piles and Contractor shall submit to Contracting Officer a record of each test pile placed including all information required for production piles.”

10. Specification Section 32 31 13.53, paragraph 2.6.7 Automatic Under Vehicle Inspection System:

a. In paragraph b.2, change “20 mph” to “10 mph” in the last sentence.

b. In paragraph b.4, add “color” before “composite images” in the first sentence.

c. In paragraph b.5, add a second sentence that reads, “In addition, the system must incorporate license plate recognition.”

d. In paragraph b.6, change “20 mph” to “10 mph” in the second sentence.

11. Specification Section 33 71 01, paragraph 2.15:

a. Replace the first paragraph under 2.15 with the following:

“Voltage regulators shall comply with IEEE C57.15 and shall be of the outdoor, pad-mounted, self-cooled, 55/65 degrees C temperature rise, three-phase or three single-phase voltage regulators contained in a single tank. Windings and the load-tap-changing mechanism shall be mineral-oil-immersed. When operating under load, the regulator shall provide plus and minus 10 percent automatic voltage regulation in approximately 5/8 percent steps, with 16 steps above and 16 steps below rated voltage. A single multi-phase control module shall be provided and mounted locally on the cabinet door. The control compartment shall be pad-lockable and isolated from the line-side power termination compartment with a full metal barrier. Provide with three bushing wells and inserts for 600A terminations. Provide under-oil series surge arrestors. Provide with lifting lugs, oil level gauge, and drain valve with sampler.”

b. DRAWINGS

1. Building 2701 (P100), Drawing C202

a. Replace Note 5 with, “See Detail A2 on S009 for typical exterior equipment pad for switchgear, transformers, etc. Place pad on 12” thick gravel per detail B4 Sheet C502.”

2. Building 2701 (P100), Drawing C209:

a. Delete the call-out “12” GRAVEL” in the middle of the area for the laydown yard for the ERTT contractor materials.

3. Building 2701 (P100), Drawing A603, Third Floor Door Schedule:

a. For doors 337 and 338, change the door type from “PF” to “F”.

b. For doors 315, 316, 337, and 340, delete Remark number “4”.

4. Building 2701 (P100), Drawing A707, Signage Details, B1 Permanent Interior Toilet Room Sign Type B:

a. Change “ 7” x 7” ” to read “Provide manufacturer’s standard size”.

5. Building 2701 (P100), Drawing ES624:

a. Change the circuit labeled “48” from the ACS AND CCTV FOPP in RM 153, Building 2701 that leads to X-RAY NORTH FOPP. Remove the 48 identifier and replace with a circuit identifier for “Circuit 76”.

b. Change the circuit labeled “24” from the ACS AND CCTV FOPP in RM 153, Building 2701 that leads to X-RAY SOUTH FOPP. Remove the 24 identifier and replace with a circuit identifier for “Circuit 77”.

c. Change the circuit labeled “48” from the ACS AND CCTV FOPP in RM 117, Building 2626 that leads to TMH-8 FOSE. Remove the 48 identifier and replace with a circuit identifier for “Circuit 85”. Change the callout from “TO TMH-8 FOSE” to “TO TMH-8 via THH-8A”.

6. Building 2626 (P100), Drawing A703, Signage Details, B1 Permanent Interior Toilet Room Sign Type B:

a. Change “ 7” x 7” ” to read “Provide manufacturer’s standard size”.

7. Building 2626 (P100), Drawing A735, PF Station Details:

a. Add the following sheet note: “Reference specification section 08 34 02 (Laminated Glass) for the fixed security glass shown.”

8. Building 2314 (P99), Drawing A621:

a. Add the following sheet note: “8. The approximate clear height from floor slab to ceiling slab is 13’-0”.”

9. Building 2314 (P99), Drawing A703, Room Finish Schedule:

a. Add “RESB-1” for Base for Room 342.

b. Add “PL-1” for N, E, S, and W walls for Room 342.

10. Building 2314 (P099), Drawing P112:

a. Replace Keyed Note 4 with: “CONNECT TO EXISTING N2 PIPING IN ROOM 119A (REFER

TO ARCH DWGS FOR LOCATION). DEMOLISH ALL EXISTING N2 PIPING IN

RENOVATED ROOM 118 (FORMER DOSIMETRY LAB).”

11. Building 2711 (P99), Drawing A122, First Floor Partition Type Plan Area B:

a. Room 150B, Shop:

i. Remove partition tag “F1b” from columns and replace with reference to “Detail

C4/A623”.

12. Building 2711 (P99), Drawing A701, Finish Schedule:

a. Add “ACT-3” to Ceiling, Material Finish for Rooms 110, 111, and 112.

b. Change South Material-Finish for Rooms 116 and 117 from “CMU-1/FRP-2” to “CMU-1/FRP-1”.

13. Building 2711 (P99), Drawing A702, Room Finish Schedule – Second Floor – Continued:

a. For Room 250, change Base Material – Finish from “EFB-1/CMU-2” to “CMU-2”.

14. Building 2711 (P99), Drawing A703, Room Finish Schedule – Third Floor:

a. Rooms 304 and 328: Change Ceiling Material-Finish to PL-6.

b. Rooms 305, 306, and 329: Change Ceiling Material-Finish to PS-6.

c. Rooms 312, 318, and 319: Change Ceiling Material-Finish to PL-7.

d. Rooms 338 and 339: Change Ceiling Material-Finish to PS-7.

15. Building 2711 (P99), Drawing A707, Signage Details, B1 Permanent Interior Toilet Room Sign Type B:

a. Change “ 7” x 7” ” to read “Provide manufacturer standard size”.

16. Building 2711 (P99), Drawing A754, Section A4:

a. The horizontal panel at the base of the display case shall be PLAM-2 to match the inside top panel.

17. Submarine Survival Mooring, Drawing SM-003:

a. Add the following note: “Trenches shall be 5 feet deep by approximately 5 feet wide.”

18. Add the following as Reference Drawings:

a. 1002054 TSB1 Johnson Controls (17 drawings)

(End of Summary of Changes)

File details come from the government source that posted it. Updated .