This notice provides information regarding a solicitation for a design-build project at Marine Corps Base Camp Blaz in Guam. The Navy is seeking proposals for the design and construction of a 240-space parking lot and associated site work with an estimated value between $10-25 million. Proposals are due on February 14, 2023. The project is set aside exclusively for small businesses and will be awarded based on a best value determination considering technical approach, experience, safety, past performance, and price. A mandatory site visit will be held on March 8, 2023, with all attendees required to have proper credentials and personal protective equipment. Interested offerors must submit required documentation by February 9, 2023 to request access to the site visit.
View the file
Other files
Show all 47
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DEPARTMENT OF THE NAVY
NAVAL FACILITIES ENGINEERING SYSTEMS COMMAND PACIFIC
258 MAKALAPA DR STE 100
PEARL HARBOR HI 96860-3134
Notice No. 5 7 April 2023
PRE-PROPOSAL QUESTIONS & ANSWERS
RFP N62742-23-R-1308
FY20, MCON PROJECT P-459B, MCB CAMP BLAZ PARKING,
US NAVSUPPACT, MCB CAMP BLAZ, GUAM
NOTE: The following questions and answers are provided for INFORMATION ONLY.
The RFP remains unchanged unless it is amended in writing on a Standard Form 30.
RESPONSE REVISED FROM NOTICE NO. 4 DATED APRIL 5, 2023:
34. Please clarify the response to question #29 in Notice 3.
Is section G20201.1 permeable pavement no longer allowed on the project?
Please note our preliminary calculations using the criteria of the SDDCTEA show that it may not be possible to achieve the minimum required parking spaces of 235 within 70% of the 10,150 square yards provided for impermeable surfaces and still comply with the pamphlet for minimum parking space size, aisle width, and offsets and setbacks.
We are respectfully requesting a three-week extension to allow for our team including NAVFAC to assess our concerns since it will have a major impact on achieving the project’s program. The additional time will ensure a complete and thorough assessment and incorporate changes into our design and technical narrative.
RESP: Permeable pavement will not be allowed for the project. Although Permeable Pavement is stated in Part 4, Section G2020 1.1, according to the last sentence of G20 General, “only the RFP Part 4 requirements that apply to the project and further define the RFP Part 3 project specific requirements are required.”
The 10,150 SY BFR is the total allowable paved area that may be constructed. The Contractor should utilize this entire amount for parking, not just 70%. Proposal receipt date remains unchanged.
End of Notice