23R1308-P459B Note 5-Issued.pdf

PDF 271 KB Posted

Attached to
FY20 MCON PROJECT P-459B, MCB CAMP BLAZ PARKING, US NAVSUPPACT MCB, GUAM
Solicitation number
N62742-23-R-1308
Issued by

About this file

This notice provides information regarding a solicitation for a design-build project at Marine Corps Base Camp Blaz in Guam. The Navy is seeking proposals for the design and construction of a 240-space parking lot and associated site work with an estimated value between $10-25 million. Proposals are due on February 14, 2023. The project is set aside exclusively for small businesses and will be awarded based on a best value determination considering technical approach, experience, safety, past performance, and price. A mandatory site visit will be held on March 8, 2023, with all attendees required to have proper credentials and personal protective equipment. Interested offerors must submit required documentation by February 9, 2023 to request access to the site visit.

View the file

Other files

File Type Posted
P459B_Pt6-AttachB-RefDwgs_Amd6.pdf PDF
23R1308_Amd0006-Issued.pdf PDF
P459B_Pt6-AttachB-RefDwgs_Amd6_J-001B Specs.pdf PDF
23R1308_Amd0006-Specs.pdf PDF
23R1308-P459B Note 6-Issued.pdf PDF
23R1308_Amd0005-Issued.pdf PDF
P459B_Pt6-AttachB-RefDwgs_Amd5.pdf PDF
23R1308_Amd0004-Issued.pdf PDF
23R1308-P459B Note 4-Issued.pdf PDF
P459B_Pt6-AttachB-RefDwgs_Amd3.pdf PDF
23R1308_Amd0003-Issued.pdf PDF
23R1308-P459B Note 3-Issued.pdf PDF
23R1308_Amd0003-Specs.pdf PDF
23R1308-P459B Note 2-Issued.pdf PDF
23R1308_Amd0002-Issued.pdf PDF
23R1308_P459B_Amd2-Specs.pdf PDF
23R1308-P459B Note 1.pdf PDF
AMD 01 23R1308.pdf PDF
N_DPRI_ProjectsCulturalHistoricResourcePA_AppendixG.pdf PDF
A. J-037 Boring Logs.pdf PDF
A. J-001B Boring Logs.pdf PDF
A. J-301 Boring Logs.pdf PDF
D. 3D_J001B DP3FINAL WELLHD PROTECT PLAN 04JAN19.pdf PDF
C_ComprehensiveConstructionSWPPP(Nov 2014).pdf PDF
I_COMPREHENSIVE_WMP(Updated July 2015)-P459.pdf PDF
G_SMART_GRID_REQUIREMENTS_v4.0_8-23-2019.pdf PDF
M_DPRI_ProjctsCultrlHistrcResrceProcedre_for_InadvrtntDiscoveries.pdf PDF
J_GEPA_GuamSoilandErosionControlRegulations(April2000).pdf PDF
P_FinalGuamLandscapingGuidelines29June2011.pdf PDF
R_DesignApprovalConstructionPermitting(DACP).pdf PDF
B. J-001B_Dwgs_23Aug2019.pdf PDF
CDP_20140221.pdf PDF
N62742-23-R-1308 DB RFP.pdf PDF
O_(Alt) COCONUT RHINOCEROS BEETLE (CRB) AND LITTL FIRE ANT (LFA) MANAGEMENT PROCEDU.pdf PDF
O_CoconutRhinocerosBeetle(CRB)ManagementProcedures.pdf PDF
L_Clarif_of_Guidelnes Restrictns_for_Condctng_Topo_Survey.pdf PDF
D_MRESS_Amend No 7 Jan20r.pdf PDF
E. MILCON_Bedrock_Determination_Map.pdf PDF
F_Pre-Final_InstallationMasterPlan16April2018.pdf PDF
Q_OSD_WaterUseforLandscapeArch(3-10-17).pdf PDF
E_MCBG IAP_Final(April2011).pdf PDF
F. 02_210301 - J-301 Civil Dwgs - Rev2_signed.pdf PDF
K_GuamDPRI_PesticideSoilsManagementPlan_Nov2011.pdf PDF
C. J001B DOC DP2FINAL V9 DRAINAGE RPT 21NOV19.pdf PDF
A_MDACS-Final(Sept 2017).pdf PDF
H_MMTP.pdf PDF
B_NFM_PWUC_Rev2_(2018-11-15)Final(ApprovedSigned).pdf PDF
Show all 47

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DEPARTMENT OF THE NAVY

NAVAL FACILITIES ENGINEERING SYSTEMS COMMAND PACIFIC

258 MAKALAPA DR STE 100

PEARL HARBOR HI 96860-3134

Notice No. 5 7 April 2023

PRE-PROPOSAL QUESTIONS & ANSWERS

RFP N62742-23-R-1308

FY20, MCON PROJECT P-459B, MCB CAMP BLAZ PARKING,

US NAVSUPPACT, MCB CAMP BLAZ, GUAM

NOTE: The following questions and answers are provided for INFORMATION ONLY.

The RFP remains unchanged unless it is amended in writing on a Standard Form 30.

RESPONSE REVISED FROM NOTICE NO. 4 DATED APRIL 5, 2023:

34. Please clarify the response to question #29 in Notice 3.

Is section G20201.1 permeable pavement no longer allowed on the project?

Please note our preliminary calculations using the criteria of the SDDCTEA show that it may not be possible to achieve the minimum required parking spaces of 235 within 70% of the 10,150 square yards provided for impermeable surfaces and still comply with the pamphlet for minimum parking space size, aisle width, and offsets and setbacks.

We are respectfully requesting a three-week extension to allow for our team including NAVFAC to assess our concerns since it will have a major impact on achieving the project’s program. The additional time will ensure a complete and thorough assessment and incorporate changes into our design and technical narrative.

RESP: Permeable pavement will not be allowed for the project. Although Permeable Pavement is stated in Part 4, Section G2020 1.1, according to the last sentence of G20 General, “only the RFP Part 4 requirements that apply to the project and further define the RFP Part 3 project specific requirements are required.”

The 10,150 SY BFR is the total allowable paved area that may be constructed. The Contractor should utilize this entire amount for parking, not just 70%. Proposal receipt date remains unchanged.

End of Notice