This document summarizes a request for proposal for design-build services for a parking lot project at Marine Corps Base Camp Blaz in Guam. Key details include that the project scope involves the design and construction of a 240-space parking lot within 10,350 square yards, including grading, landscaping and site lighting. The estimated value is between $10-25 million. The NAICS code is 238990 and the period of performance is 500 calendar days. The acquisition is set aside 100% for small businesses. The RFP was issued on February 14, 2023 and proposals are due on April 14, 2023. A site visit is scheduled for March 08, 2023 and interested offerors must submit required forms by February 09, 2023 to attend. The Navy is the contracting agency.
View the file
Other files
Show all 47
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DEPARTMENT OF THE NAVY
NAVAL FACILITIES ENGINEERING SYSTEMS COMMAND PACIFIC
258 MAKALAPA DR STE 100
PEARL HARBOR HI 96860-3134
Notice No. 4 5 April 2023
PRE-PROPOSAL QUESTIONS & ANSWERS
RFP N62742-23-R-1308
FY20, MCON PROJECT P-459B, MCB CAMP BLAZ PARKING,
US NAVSUPPACT, MCB CAMP BLAZ, GUAM
NOTE: The following questions and answers are provided for INFORMATION ONLY.
The RFP remains unchanged unless it is amended in writing on a Standard Form 30.
34. Please clarify the response to question #29 in Notice 3.
Is section G20201.1 permeable pavement no longer allowed on the project?
Please note our preliminary calculations using the criteria of the SDDCTEA show that it may not be possible to achieve the minimum required parking spaces of 235 within 70% of the 10,150 square yards provided for impermeable surfaces and still comply with the pamphlet for minimum parking space size, aisle width, and offsets and setbacks.
We are respectfully requesting a three-week extension to allow for our team including NAVFAC to assess our concerns since it will have a major impact on achieving the project’s program. The additional time will ensure a complete and thorough assessment and incorporate changes into our design and technical narrative.
RESP: Permeable pavement will not be allowed for the project. The 10,150 SY BFR is the total allowable paved area that may be constructed. The Contractor should utilize this entire amount for parking, not just 70%. Proposal receipt date remains unchanged.
35. The RFP states that the connection point to the 13.8kV three phase 60 Hertz electrical power system is Pad Mounted Switchgear SW574-8. Please provide “as-built” or record drawings showing the location of Pad Mounted Switchgear SW574-8.
RESP: See forthcoming Amendment 0004, refer to sheet E-131 in “2021-2-15 PCO 002 Site.”
36. The RFP states to extend the 13.8kV three phase 60 Hertz electrical power system across Iceberg Street using two existing 6 inch PVC Schedule 40 conduits. Please provide “as-built” or record drawings showing the location of the two existing 6 inch PVC Schedule 40 conduits.
RESP: See forthcoming Amendment 0004, refer to sheet E-131 in “2021-2-15 PCO 002 Site” and E-518 in “J-001B DWGS FINAL (PART 12)_Signed.”
Subj: RFP N62742-23-R-1308, FY20, MCON PROJECT P-459B, MCB CAMP BLAZ
PARKING, US NAVSUPPACT, MCB CAMP BLAZ, GUAM
37. In reference to the shared boring logs for J-001B Project, it was shown that B-14 has reddish-brown elastic silt soil which is very soft if over-excavation due to soft soils and cavities/voids is encountered during the construction will this be considered additional work to the contractor? Or can the government provide a separate line item for the over-excavation for bid uniformity?
RESP: Boring B-14 was drilled prior to the start of the grading work of the J-001B project. The plan drawings for the J-001B project have been also included with the RFP. Over-excavation due to soft soils and cavities/voids encountered during construction should be included in the cost for earthwork.
38. In reference to Q&A item 31, it was mentioned that no spare conduits are available.
Please confirm if the intent of the RFP is to construct a new duct bank up to the existing SW574-8 that will cross the existing asphalt road for bid uniformity.
RESP: The intent of the RFP is to construct a new duct bank from SW574-8 to the two existing 6 inch PVC schedule 40 conduits shown on sheet E-131 in “2021-2-15 PCO 002 Site”, and construct a new duct bank from the other end of the same two existing 6 inch PVC schedule 40 conduits to the project site.
End of Notice