This document is a solicitation for the design and construction of a parking lot consisting of approximately 240 stalls within 10,350 square yards at Marine Corps Base Camp Blaz in Guam. The Navy seeks a design-build contract valued between $10-25 million. The parking lot will include grading, landscaping, and site lighting. The NAICS code is 238990 and the contract period is 500 calendar days. This is a 100% small business set-aside and proposals are due on or before the closing date. Evaluation criteria include technical approach, experience, safety, and past performance. A pre-proposal site visit will be held on March 8, 2023. Offerors must submit required forms and credentials by February 9, 2023 to attend. The solicitation is available at SAM.gov and questions are due by the date specified.
View the file
Other files
Show all 47
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
NATIONAL POLLUTANT DISCHARGE
ELIMINATION SYSTEM (NPDES) PROGRAM
COMPREHENSIVE CONSTRUCTION
STORM WATER POLLUTION
PREVENTION PLAN
(COMPREHENSIVE SWPPP)
for the
GUAM MILITARY RELOCATION
DPRI CONSTRUCTION PROGRAM
November 2014
GUAM MILITARY RELOCATION CONSTRUCTION PROGRAM
Final Comprehensive Construction Storm Water Pollution Prevention Plan (SWPPP), updated November 2014
TABLE OF CONTENTS
LIST OF ACRONYMS & ABBREVIATIONS
SECTION 1 INTRODUCTION ...........................................................................................1-1
1.1 Purpose and Scope of Plan ...............................................................................................1-1
1.2 Project Background ..........................................................................................................1-1
1.3 Regulatory Requirements and Guidance Documents .....................................................1-2
1.4 Site Location and Geologic Characteristics ....................................................................1-3
1.5 Water Resources and Sources of Water Quality Impairment ..........................................1-4
1.6 Organization of this SWPPP ............................................................................................1-4
SECTION 2 CONSTRUCTION STORM WATER MANAGEMENT PROGRAM ..........2-1
2.1 Navy’s Approach on Construction NPDES Permits ..................................................2-1
2.2 Roles and Responsibilities .........................................................................................2-1
2.2.1 DoN ............................................................................................................2-1
2.2.2 NAVFAC Pacific GPMO ..............................................................................2-2
2.2.3 Joint Region Marianas/NAVFAC Marianas ..................................................2-2
2.2.3.1 DPRI Office .......................................................................................2-2
2.2.3.2 ROICC/FEAD Office.........................................................................2-3
2.2.3.3 JRM/Installation EV Office ...............................................................2-5
2.2.4 Construction Management Services Contractor (CMSC) ..............................2-5
2.2.5 Design-Build Contractors & Construction Contractors .................................2-7
2.2.6 Subcontractors ................................................................................................2-7
2.3 Contract Documents & Requirements .......................................................................2-8
2.3.1 Navy Projects .................................................................................................2-8
2.4 Construction Project Execution .................................................................................2-11
2.4.1 Project Tracking .............................................................................................2-11
2.4.2 Filing of Notice of Intent (NOI).....................................................................2-12
2.4.3 Pre-Construction Meetings-Stormwater Compliance Requirements .............2-13
2.4.4 Contractor NOI and Site-Specific SWPPP Submittal ....................................2-14
2.4.5 NOI and Site Specific SWPPP Review and Approval ...................................2-14
2.4.6 Weekly Construction QC Meeting – Stormwater Compliance Req ..............2-15
2.4.7 Contractor’s BMP Compliance Inspections...................................................2-16
2.4.8 Updates to Site-Specific SWPPP ...................................................................2-16
2.4.9 Report of Non-Compliance or Discharge ......................................................2-17
2.4.10 Notice of Termination (Project Completion) .................................................2-18
2.5 Stormwater Compliance Enforcement Procedures ....................................................2-19
2.5.1 Discovery of Non-Conformance ....................................................................2-19
2.5.2 Reporting Potential Non-Compliance ............................................................2-20
2.5.3 Contractual Enforcement ...............................................................................2-20
Final Comprehensive Construction Storm Water Pollution Prevention Plan (SWPPP), updated November 2014
TABLE OF CONTENTS (CONTINUED)
2.6 Construction Stormwater Compliance Evaluation .....................................................2-22
SECTION 3 CONTRACTOR STORMWATER COMPLIANCE REQUIREMENTS
(NPDES REQUIREMENTS) ..........................................................................3-1
3.1 Guam General Construction Stormwater Treatment .................................................3-1
3.2 Guam Additional Construction Stormwater Management and Treatment for Hotspots ............................................................................................................3-2
3.3 Guam Stormwater Treatment Criteria .......................................................................3-3
3.4 Standard Best Management Practices Requirements .................................................3-3
3.4.1 Stormwater Handling ....................................................................................3-4
3.4.2 Non-Stormwater Handling, Including Hazardous Materials .........................3-10
3.4.3 Spill Prevention ..............................................................................................3-11
3.4.4 Emergency Procedures/Spill Response..........................................................3-13
3.5 Pre-Construction Phase ..............................................................................................3-15
3.5.1 Preparation of Stormwater Compliance-related Plans (NOI, SWPPP) .........3-15
3.5.2 Pre-Construction Meeting ..............................................................................3-16
3.6 Construction Phase.....................................................................................................3-16
3.6.1 Routine BMP Maintenance ...........................................................................3-17
3.6.2 Stormwater Inspections ..................................................................................3-17
3.6.3 Contractor’s Weekly QC Meetings ................................................................3-17
3.6.4 Update SWPPP and BMP Maps ...................................................................3-17
3.6.5 Non-Compliance Notice and Reporting .........................................................3-18
3.8 Post-Construction Phase ...........................................................................................3-19
SECTION 4 SITE-SPECIFIC STORM WATER POLLUTION PREVENTION PLAN ....4-1
4.1 Preparation and Approval of a SWPPP .....................................................................4-1
4.2 SWPPP and Monitoring Program Checklist ..............................................................4-1
4.2.1 Checklist ........................................................................................................4-1
4.3 Site Specific SWPPP Format .....................................................................................4-2
SECTION 5 ACCEPTABLE CONSTRUCTION STORMWATER BMPS .....................5-1
5.1 Construction Erosion and Sediment Control Measures ............................................5-1
5.2 Temporary Structural BMPs ......................................................................................5-2
5.2.1 Check Dam.....................................................................................................5-2
5.2.2 Diversion Dike/Swales ...................................................................................5-2
5.2.3 Level Spreader ...............................................................................................5-2
5.2.4 Perimeter Dike/Swales ...................................................................................5-3
5.2.5 Sediment Basin ..............................................................................................5-3
5.2.6 Sediment Trap ................................................................................................5-3
5.2.7 Silt Fence .......................................................................................................5-3
5.2.8 Fiber Rolls ......................................................................................................5-3
Final Comprehensive Construction Storm Water Pollution Prevention Plan (SWPPP), updated November 2014
5.2.9 Gravel/Sand Bag Berms .................................................................................5-3
5.2.10 Stabilized Construction Entrance/Exit ...........................................................5-3
5.2.11 Storm Drainage Inlet Protection ....................................................................5-3
5.2.12 Sump Pump ....................................................................................................5-3
5.2.13 Temporary Storm Drainage Diversion ...........................................................5-4
5.2.14 Turbidity Curtain ...........................................................................................5-4
5.3 Permanent Structural BMPs .......................................................................................5-4
5.3.1 Diversion ........................................................................................................5-4
5.3.2 Vegetated and Lined Waterways ...................................................................5-4
5.3.3 Rock Outlet Protection ...................................................................................5-4
5.3.4 Subsurface Drain ............................................................................................5-4
5.4 Vegetative Practice for Stabilization (Temporary and/or Permanent) .......................5-4
5.4.1 Erosion Control Blankets ...............................................................................5-4
5.4.2 Stabilization with Vegetation Cover or Mulch ..............................................5-5
5.5 Acceptable Post-Construction BMPs .........................................................................5-5
5.6 Low Impact Development (LID) ...............................................................................5-6
ATTACHMENTS
Attachment 1-1: Guam EPA Interim Guidance on Clearing, Grubbing, Grading and
Stockpiling Permits for DoD Projects
Attachment 2-1: Construction Stormwater QA Inspection Checklists
Attachment 2-2: Stormwater BMP Construction Inspection Checklist
Attachment 2-3: Notice of Discharge/Non-Compliance Report
Attachment 2-4: Sample Letter – Non-Conformance with SWPPP
Attachment 4-1: SWPPP Checklist
Attachment 5-1: Most Common Best Management Practices for Construction Sites
Final Comprehensive Construction Storm Water Pollution Prevention Plan (SWPPP), updated November 2014
LIST OF ACRONYMS & ABBREVIATIONS
AAFB Andersen Air Force Base AFB Air Force Base BMPs Best Management Practices CFR Code of Federal Regulations CGP EPA Construction General Permit CME Construction Management Engineer CMSC Construction Management Support Contractor CNMI Commonwealth of Northern Marianas Islands CNN Contract Notice of Non-Compliance CWA Clean Water Act DPRI Defense Policy Review Initiative DoN United States Department of the Navy GAR Guam Administrative Rules GEPA Guam EPA GPMO Guam Program Management Office EIS Environmental Impact Statement EISA Energy Independence and Security Act EPA Environmental Protection Agency Region 9 EV Environmental FEAD Facilities Engineers & Acquisition Director FHWA Federal Highway Administration FIFRA Federal Insecticide, Fungicide, & Rodenticide Act HACCP Hazard Analysis and Critical Control Point LID Low Impact Development MSDS Material Safety Data Sheet NAVFAC MAR Naval Engineering Facilities Command, Marianas NAVFAC PAC Naval Engineering Facilities Command, Pacific NCTS Naval Computer & Telecommunications Station NFM NAVFAC Marianas NFP NAVFAC Pacific NAV Notice of Apparent Violation NAVFAC Naval Engineering Command NOI Notice of Intent NOT Notice of Termination NOV Notice of Violation NPDES National Pollutant Discharge Elimination System PSC Program Support Contractor QA Quality Assurance QC Quality Control RCRA Resource Conservation & Recovery Act ROICC Resident Office In Charge of Construction SEIS Supplemental Environmental Impact Statement SWPPP Storm Water Pollution Prevention Plan
Final Comprehensive Construction Storm Water Pollution Prevention Plan (SWPPP), updated November 2014
LIST OF ACRONYMS & ABBREVIATIONS
(Continued)
UFGS Unified Facilities Guide Specifications UIC Underground Injection Control USACE United States Army Corps of Engineers USEPA United States Environmental Protection Agency USMC United States Marine Corps WQC Water Quality Certification
Final Comprehensive Construction Storm Water Pollution Prevention Plan (SWPPP), updated November 2014
1-1
SECTION 1
INTRODUCTION
1.1 PURPOSE AND SCOPE OF PLAN
The 2010 Comprehensive Construction Storm Water Pollution Prevention Plan (SWPPP or Plan) was developed to provide stormwater program management for construction activities associated with the 2010 Final Environmental Impact Statement (FEIS) for the Guam and Commonwealth of the Northern Marianas Islands (CNMI) Military Relocation and Record of Decision (ROD). The 2010 Plan was prepared in consultation with United States Environmental Protection Agency (USEPA), Region IX.
This update reflects changes to the relocation plan described in the Final Supplemental EIS (SEIS) for the Guam and CNMI Military Relocation (2012 Roadmap Adjustments). The purpose of this Plan is to provide an integrated, comprehensive approach to stormwater management for all construction projects associated with the Guam military relocation. This Plan provides the procedures and practices to prevent discharge of pollutants from construction sites and to protect water resources in Guam. It addresses Guam’s unique geologic features and water resources, and potential pollution sources from construction activities. The Plan also describes the proposed locations of construction sites and projects, roles and responsibilities for implementation and execution of the construction stormwater management, including regular monitoring and inspection, evaluation, training, and reporting requirements.
This SWPPP will be used by the Navy construction management team and the construction contractors to properly manage stormwater and non-stormwater discharges through the use of erosion and sediment control and pollution prevention measures. The contractors will also use this SWPPP, along with Contract Documents, to prepare their Site-Specific SWPPP.
1.2 PROJECT BACKGROUND
As part of an international agreement with the Government of Japan, the Department of the Navy (Navy) originally planned to relocate approximately 8,600 United States Marine Corps (USMC) military personnel & 9,000 dependents to Guam as described in the 2010 FEIS. In 2012, the military relocation plan was adjusted to relocate 5,000 USMC military personnel & 1,300 dependents to Guam as described in the SEIS. In support of the relocation, the Navy is proposing to construct a new USMC main cantonment and live-fire training range complex.
Further description of the proposed relocation and associated construction activities are described in the Draft SEIS (Final SEIS anticipated to be available early 2015) located at website http://guambuildupeis.us/. The preferred alternative is for a Main Cantonment at Finegayan, Family Housing at Anderson Airforce Base and an LFTRC at Northwest Field described in the Draft SEIS Section 2.4.4.5 (Finegayan Cantonment/AAFB Family Housing
– Alternative E) and 2.5.4.5 (Northwest Field LFTRC – Alternative 5).
Final Comprehensive Construction Storm Water Pollution Prevention Plan (SWPPP), updated November 2014
1-2
For the preferred alternative, major construction activities will occur mostly in the northern region of Guam with facilities, training range, roadway and utilities projects. Improvements to existing facilities and infrastructure, including utilities (power, water, wastewater, and IT/COMM) and roads are also planned to meet the future demands of the military relocation.
Construction would typically include demolition, site clearing and grubbing, and grading, placement of utilities, infrastructure and roadways, and construction of facilities buildings and structures,housing, training areas, and landscaping.
1.3 REGULATORY REQUIREMENTS AND GUIDANCE DOCUMENT
The Island of Guam is an unincorporated territory of the United States, and is subject to all federal environmental requirements, and local Guam regulations that EPA has delegated authority to (i.e. RCRA, SWDA, FIFRA). Under the Clean Water Act, a National Pollutant Discharge Elimination System Permit is required for all construction projects that disturb one or more acres. An NPDES Permit is also required for construction projects that disturb less than 1 acre and are part of a larger common plan of development (like projects associated with the Guam military relocation).
For Guam, a Notice of Intent (NOI) is submitted to USEPA to seek coverage under the USEPA NPDES Construction General Permit (CGP). By submitting an NOI, the owner or operator of the project, acknowledges that it is eligible for coverage under the CGP and agrees to the conditions in the CGP. A Site-Specific Stormwater Pollution Prevention Plan (SWPPP) must also be prepared and readily available on-site as a condition of the CGP.
For the Guam military relocation construction program, this Comprehensive SWPPP will serve as an “Umbrella SWPPP” for the Navy’s construction stormwater management program.
The Navy will seek permit coverage by submitting an NOI for individual projects, as required by the CGP. As projects within these areas are awarded, the construction contractors will seek separate CGP coverage by preparing a Site-Specific SWPPP for Navy approval and filing an NOI with USEPA as part of the Navy’s construction stormwater management program.
In addition, the contractor shall apply for a Guam EPA Clearing, Grubbing, Grading and Stockpiling Permit to comply with substantive and procedural requirements of 22 GAR Chapter 10 as described in Attachment 1-1.
The following provides federal and local regulatory requirements and technical guidance documents on construction stormwater management.
Federal Standards and Guidance Documents
Clean Water Act or Federal Water Pollution Control Act, 1972, & 1987 & 1990 amendments (Parts 301, 304, 306, 308, 402, and 501), 33 United States Code (U.S.C.) 1311, 1314, 1316, 1318, 1342, and 1361.
Final Comprehensive Construction Storm Water Pollution Prevention Plan (SWPPP), updated November 2014
1-3
Effluent Limitations Guidelines & Standards for the Construction & Development Point Source Category (40 CFR, Part 450), Dated December 1, 2009 – Final Rule
EPA Guidance Specifying Management Measures for Sources of Nonpoint Pollution in Coastal Waters, 1993
EPA 833-R-060-004, May 2007; EPA’s website at http://www.epa.gov/npdes/stormwater
EPA website on applying for coverage under the construction general permit:
http://cfpub1.epa.gov/npdes/stormwater/application_coverage.cfm
Local Guam Standards and Guidance Documents
Guam Water Quality Standards, 2001 revision;
http://water.epa.gov/scitech/swguidance/standards/wqslibrary/upload/2004_07_ 09_standards_wqslibrary_territories_guam_9_wqs.pdf
Soil Erosion and Sediment Control Regulations and Best Management Practices (22 GAR, Div II, Chapter 10);
http://www.guamcourts.org/compileroflaws/GAR/22GAR/22GAR002-10.pdf – Note there is an existing regulation, but there is a pending revision that is in the process of being promulgated by Guam EPA, Draft Revised Regulations, dated January 2010 is currently available.
Environmental Protection Plan (EPP) Guidance – Note the EPP submittal is required under the existing Guam Soil Erosion and Sediment Control Regulation.
Guam EPA Interim Guidance on Clearing, Grubbing, Grading and Stockpiling Permits for the Department of Defense Projects, dated July 2011 (See attachment 1-1)
Other Technical Guidance & Reference Documents
CNMI and Guam Stormwater Management Manual, dated October 2006 Caltrans Stormwater Guidance Manuals; Caltrans Website at http://www.dot.ca.gov/hq/construc/stormwater/manuals.htm USEPA, Developing Your Stormwater Pollution Prevention Plan: A Guide for
Construction Sites, dated May 2007, USEPA Website at http://www.epa.gov/npdes/pubs/sw_swppp_guide.pdf
NFM CI, Engineering and Construction Bulletin, Issue No 2010-NFM-B12-002, NPDES Permit Compliance, dated 25 November 2009
1.4 SITE LOCATIONS AND GEOLOGIC CHARACTERISTICS
The preferred location of the main cantonment, family housing and the live fire-training range complex is at Finegayan, AAFB and Northwest Field, respectively. A description of the Finegayan Cantonment/AAFB family housing preferred alternative and proposed site location is provided in the Final SEIS Section 2.4.4.5 and Figure 2.4-12. Similarly, a
Final Comprehensive Construction Storm Water Pollution Prevention Plan (SWPPP), updated November 2014
1-4 description and illustration of the preferred NWF LFTRC alternative is provided in the Final SEIS Section 2.5.4.5 and Figure 2.5-6.
The characteristics of soils and underlying rocks include stability, slope, compatibility, shear, strength and productivity. Discussions of these geological and soil resources at the preferred Main Cantonment/Family Housing and LFTRC locations are provided in the Final SEIS Sections 4.5.1 and 5.5.1, respectively.
1.5 WATER RESOURCES AND SOURCES OF WATER QUALITY
IMPAIRMENT
Water resources are defined as sources of water available for use by humans, flora, or fauna.
The Final SEIS Sections 4.5.2 and 5.5.2 describe water resources and sensitive water resources areas in Guam, such as surface water, groundwater (supplying drinking water), wetlands and nearshore/coastal waters, which are all susceptible to impacts from construction stormwater runoff. The following Figures 1, 2 and 3 identify water resources near the preferred alternative locations.
1.6 ORGANIZATION OF THIS SWPPP
The remainder of this document, including the appendices, provides the following program elements of this SWPPP.
Section 2 - describes the stormwater management program, including the Navy’s approach on construction NPDES permitting, roles and responsibilities, project execution, and the QA plan for the overall NPDES permit compliance program.
Section 3 - describes the contractor stormwater requirements from pre-construction, during construction, and post-construction.
Section 4 – provides the Contractor’s Site-Specific SWPPP, preparation procedures, instructions, and standardized template.
Section 5 – provides the acceptable BMPs for the construction program, including erosion and sediment controls measures and devices for this construction program.
Final Comprehensive Construction Storm Water Pollution Prevention Plan (SWPPP), updated November 2014
2-1
SECTION 2
CONSTRUCTION STORMWATER MANAGEMENT PROGRAM
This section describes the construction stormwater management program and addresses the Navy’s approach on construction NPDES permitting and project specific NPDES permitting for the contractors, as well as roles and responsibilities. The program will incorporate the construction stormwater compliance requirements into design and construction execution.
Construction BMPs are temporary sediment and erosion control measures that are consistent with practices under the USEPA Construction General Permit (CGP). Where there is an existing or proposed stormdrain system that discharges into receiving waters or downstream storm drainage system, an approved treatment system must be considered and installed, if feasible. The use of vegetation-covered areas will be maximized for use as treatment zones, known as bio-filters (overland flow areas) and bio-swales (vegetation lined ditches). Section
5.0 of this Plan describes the various construction stormwater BMPs. The BMPs are applied to meet the best available technology and best conventional available technology requirements, and to address compliance with Guam’s water quality standards.
2.1 NAVY’S APPROACH ON CONSTRUCTION NPDES PERMITS
The Navy will seek permit coverage under the USEPA CGP for each project by submitting an NOI based on the proposed construction schedule upon review and approval of the contractor’s SWPPP.
Upon approval of the NOI and the Site-Specific SWPPP from the Navy, the construction contractors will file a separate NOI with USEPA and seek permit coverage for their projects in accordance with the contract requirements. Construction stormwater compliance requirements are described in Section 2.3 – Contract Documents and Requirements, and in Section 3.0 - Contractor Stormwater Requirements.
Based on the current scope and schedule for the Guam military relocation construction program, under the construction stormwater management program, the Navy will seek NPDES coverage from USEPA under the Construction General Permit (CGP) for each project.
2.2 ROLES AND RESPONSIBILITIES
Roles and responsibilities within the program management organization for implementation of the construction stormwater management are identified below.
2.2.1 Dept of the Navy (DoN)
Provides legislative review of environmental regulations and impacts to the DoN organizations.
Final Comprehensive Construction Storm Water Pollution Prevention Plan (SWPPP), updated November 2014
2-2
Develops environmental policies pertaining to the clean water act, including stormwater management, for the Dept of the Navy organizations.
Provides funding and legal support on stormwater compliance and other related issues.
Represents DoD actions and acts as liaison to other federal agencies and local government.
2.2.2 NAVFAC Pacific (NFP) Guam Program Management Office (GPMO)
Organization within NFP responsible for coordinating the planning and execution of the Guam military relocation related projects, primarily DRPI-related construction, including construction of the new Marine Corps Base and its facilities on Guam.
With support from NFP EV, provides technical support and guidance to NFM on stormwater management and compliance.
Assists with assessment of the overall implementation of stormwater BMPs for managing stormwater compliance.
Manages and coordinates the development of contract specifications and documents.
Manages and oversees development of design criteria.
Manages stormwater management consultant contracts, including planning and design.
Assists NFM with any construction stormwater NPDES permit coverage issues for the DPRI program, including compliance with USEPA Construction General Permit
(CGP).
Provides guidance and technical support to NFM on Notice of Violation (NOVs).
2.2.3 Joint Region Marianas/NAVFAC Marianas (NFM)
Has the primary responsibility of enforcing the Clean Water Act for DoD facilities and construction projects in Guam, including construction stormwater pollution prevention requirements.
2.2.3.1 DPRI Office
Organization within NFM responsible for planning and coordinating Guam military relocation related projects, primarily DPRI-related design and construction.
The EV leads will coordinate all environmental programs for the Guam military relocation, including the construction stormwater issues and NPDES permit
Final Comprehensive Construction Storm Water Pollution Prevention Plan (SWPPP), updated November 2014
2-3 compliance associated with construction of the new Marine Corps Base and its facilities on Guam.
EV will perform overall stormwater compliance program oversight and review project NPDES construction stormwater files, and recommend actions or methods for improvement.
With assistance from Construction Management Services Contractor (CMSC), coordinates and tracks all construction projects and the status of stormwater pollution prevention program for each project for the Guam Military Relocation Construction Program.
Meet with regulatory agencies, such as USEPA and GEPA, and the Navy’s Compliance Inspection Team to discuss stormwater issues and measures.
Provide technical and management support to ROICC/FEAD.
Participates in the QA inspection program for the Guam military relocation, and conducts QA Level 2 inspection, as described in Section 2.6 and provides recommendations for program improvements.
2.2.3.2 ROICC/FEAD Office
ROICC/FEAD Construction Management Engineer (CME)
Oversees and manages the construction and construction contractors on the project.
Has the primary responsibility of enforcing contract requirements, including the storm water pollution prevention program requirements and the Comprehensive SWPPP and the Site-Specific SWPPP.
Ensures Contractor identifies an Environmental Manager who is responsible for the implementation of the stormwater pollution prevention program, including inspection and completion of inspection forms/checklist, BMP maintenance, reporting, training, and enforcement of the site-specific SWPPP.
Ensures the CME’s project team (which includes in-house staff such as the CME and ET or reach back to DPRI EV/EV Core) has designated stormwater inspectors to provide stormwater compliance inspections in accordance with this Plan and oversight during the entire duration of the contract.
Ensures the Contractor has filed the NOI and obtained NPDES CGP coverage under the most updated EPA Construction General Permit.
Forwards copies of notice of non-compliance reports to NFM DPRI EV. NFM DPRI will forward to appropriate EV offices.
Final Comprehensive Construction Storm Water Pollution Prevention Plan (SWPPP), updated November 2014
2-4
Schedules NPDES stormwater compliance management and water pollution control as an agenda item at the pre-construction meeting and contractor’s weekly QC meeting.
Reviews and approves the NOI and the Site-Specific SWPPP prepared by the Contractor.
Maintains copies of all stormwater inspection reports in the project files.
Ensures the Contractor has adequate and sufficient BMP supplies and equipment on hand during rainy season and emergency repairs as specified for the project when rain or storm is forecasted.
Ensures the Contractor installs and maintains the BMPs in accordance with the Construction General Permit, contract specifications, and the Site-Specific SWPPP.
Ensures that BMPs that are damaged by weather, construction activities, or vandalism are repaired or replaced routinely.
Identifies changes to the plans or project schedule that require amendments to the SWPPP. Reviews and approves amendments, and ensure that they are properly inserted in the Site-Specific SWPPP.
Ensures that the Contractor submits Notices of Discharge in a timely manner, as described in this Comprehensive SWPPP.
Informs the Contractor of SWPPP non-conformance, Notice of Violation (NOVs), Administrative Civil Liabilities, and other contractual and regulatory enforcement actions and maintain written documentation of communications with the Contractor.
If non-conformance occurs, takes appropriate contractual sanctions against the Contractor based on the nature and severity of the situation. Enforcement actions are outlined in Section 2.5.
Ensures the Contractor is paid only for stormwater pollution prevention program work actually performed and deemed satisfactory by ROICC/FEAD CME.
Ensures site stabilization requirements are met and Notice of Termination is submitted by the Contractor along with the Stormwater Compliance Notebook Binder, as required by the contract.
ROICC/FEAD (QA Representative)
Reviews and becomes familiar with the Comprehensive SWPPP, and Contractor’s Site-Specific SWPPP.
Conducts the site stormwater inspections with the Contractor’s Environmental Manager or his/her designee.
Final Comprehensive Construction Storm Water Pollution Prevention Plan (SWPPP), updated November 2014
2-5
Includes stormwater pollution prevention and BMP observations in the inspector’s daily report.
Records all stormwater management activities, or inactivity and conversations with the Contractor regarding stormwater pollution prevention. Records all site visits from regulatory agencies, or non-project personnel.
Monitors the weather reports of the National Weather Service for rainfall predictions.
If rainfall is predicted, inspects the site to ensure BMPs are appropriate and provide effective controls.
If deficiencies or problems with BMPs are observed, such as discharges or threats to water resources, notifies the contractor of need to immediately address deficiencies and keep contractor informed of such problems.
Identifies changes in construction that may require amendments to the Site-Specific SWPPP and notifies the CME of these findings.
Files the Site-Specific SWPPP field reports and documentation in the project files.
2.2.3.3 JRM/Installation EV Office
Receives and responds to public inquiries made to the DoD concerning stormwater management and other environmental issues in Guam.
Coordinates and reports non-compliance discharge or events to the regulatory agencies, primarily EPA and GEPA, for DoD projects in Guam.
Responsible for all environmental-related issues for the military relocation on Guam, including construction stormwater compliance.
Provides “as needed” assistance and support to the ROICC/FEAD for stormwater compliance, including review of the Site-Specific SWPPP and NOI.
2.2.4 Construction Management Services Contractor for NFM – CMSC (If a CMSC is not available, the following roles and responsibilities shall be provided by the ROICC/FEAD CME and/or ET)
Provides assistance and support to the ROICC/FEAD, including inspectors and construction management staff.
With assistance from NFM DPRI and EV, assists with tracking the status of the construction NPDES permits and required documentations under this Plan for the Guam Military Relocation Construction Program.
Assists the ROICC/FEAD in the management of this Plan and provides oversight of Contractor’s site-specific SWPPP with the ROICC/FEAD.
Final Comprehensive Construction Storm Water Pollution Prevention Plan (SWPPP), updated November 2014
2-6
Ensures agenda items for the Pre-construction meeting cover this Plan, the site-specific SWPPP submittals & acceptance requirements, Navy’s enforcement procedures that will be used if the contractor or project is deemed to be out of compliance with USEPA Construction General Permit, Contract Specifications, this Plan, and other stormwater compliance-related issues, as an agenda item during the meeting.
Ensures the Contractor’s SWPPP inspections are conducted as required in the USEPA Construction General Permit, contract specifications, and their Site-Specific SWPPP, documented in the inspection reports, submitted to the Navy, and properly filed.
Assists the ROICC/FEAD with “non-inherently government functions” on construction stormwater management issues.
Provides on-site management engineers and quality assurance representatives to the ROICC/FEAD who will oversee the contractor’s site-specific SWPPP and this Plan in accordance with contract requirements.
Conducts BMP inspections with the Contractor’s Environmental Manager or his/her designated representative and program-wide construction BMP inspections for NFM’s construction program, and provides inspection reports to the ROICC/FEAD.
Updates and presents construction project SWPPP compliance status on BMP measures as construction progresses in phases to the ROICC/FEAD.
Coordinates, tracks, and reports non-compliance stormwater discharge or events to the ROICC/FEAD.
Reviews and recommends corrections to the Contractor’s NOI and the Site-Specific SWPPP to the Navy’s CME
Presents the Navy’s stormwater contract requirements and enforcement procedures to the Contractor during the pre-construction meeting
Provides assistance to the contractors during stormwater inspections on a regular basis.
Assists the ROICC/FEAD CME with preparation of non-compliance reports, and written responses to regulatory agency actions.
Ensures field construction personnel are properly trained in NPDES stormwater compliance and stormwater management
Final Comprehensive Construction Storm Water Pollution Prevention Plan (SWPPP), updated November 2014
2-7
2.2.5 Design-Build Contractors and Construction Contractors (General Contractors)
Comply with construction requirements on NPDES permitting and stormwater management, the applicable USEPA Construction General Permit, this SWPPP, and the site-specific SWPPP.
Assign an Environmental Manager responsible for implementation of provisions in the NOI and SWPPP.
Submit the NOI and Site-Specific SWPPP to the ROICC/FEAD for approval, at least 30 days prior to start of construction.
At least 14-days prior to start of construction, file the Notice of Intent (NOI) with USEPA and submit a copy to the ROICC/FEAD.
Upon project completion, file the Notice of Termination (NOT) with USEPA and submit a copy to the ROICC/FEAD.
Maintain a copy of the NOI and Site-Specific SWPPP and all updates, the Comprehensive SWPPP, applicable Construction General Permit (CGP), inspection reports, training documentation, and files related to the NPDES CGP at their field office in the SWPPP Compliance Notebook Binder.
Ensure all contractor and subcontractor personnel are adequately trained in stormwater management.
Report and document all discharges, releases, and spills to the ROICC/FEAD as soon as it occurs or upon discovery.
Immediately correct any stormwater BMP deficiencies found or discovered on-site, including unauthorized discharges, releases or spills.
Ensure adequate stormwater BMP supplies, materials and resources are readily available for replacement and re-enforcement pre- and post- rain event and during storm/rain events.
Take appropriate corrective measures, which may include removal of contractor and subcontractor personnel, for those who show disregard for SWPPP compliance.
Immediately implement BMP corrective maintenance and/or BMP re-enforcement measures during rain/storm events.
2.2.6 Subcontractors
Comply with all requirements of this SWPPP and the Site-Specific SWPPP, and report any deficiencies to the General Contractor.
Provide appropriate SWPPP training to their workers.
Final Comprehensive Construction Storm Water Pollution Prevention Plan (SWPPP), updated November 2014
2-8
Assists with mitigation measures of any NOV by the General Contractor.
2.3 CONTRACT DOCUMENTS AND REQUIREMENTS
To ensure compliance with construction stormwater management, the Navy included erosion and sediment control requirements in the contract documents.
2.3.1 Navy Projects
For Navy projects, construction stormwater management requirements are described in Part 2
- General Requirements, Division 1 – Temporary Environmental Controls - Section 01 57
19.00 20 and Part 4, Performance Technical Specifications, G103011 Temporary Erosion and Sediment Control, of NAVFAC’s Contract Documents, and includes the following.
Section 01 57 19.01 20, Temporary Environmental Controls, of the General Requirements from the Unified Federal Guideline Specifications (UFGS) provide environmental compliance requirements, including construction storm water management. UFGS is used for construction of military services. It contains specific language and direction regarding solid wastes, regulated wastes, environmental protection requirements, and erosion and sediment controls. Specific requirements on construction storm water management in this Section include the following requirements for the Contractors:
Comply with USEPA Construction General Permit. Pre-Construction submittal requiring Navy approval, including o Environmental Management Plan (also known as the Environmental Protection Plan per Guam EPA) o Regulatory Notifications, including NOI for coverage under the Construction General Permit o Storm Water Pollution Prevention Plan (Site-Specific SWPPP)
Report submittals, including o Erosion and Sediment Inspection Reports o Storm Water Inspection Reports o Employee Training Records
Closeout submittals requiring Navy approval, including:
o Stormwater Pollution Prevention Plan Compliance Notebook o All Employee Training Records, Inspection Reports, and all reports and documentation required under the CGP and Site-Specific SWPPP
Final Comprehensive Construction Storm Water Pollution Prevention Plan (SWPPP), updated November 2014
2-9 o Regulatory Notifications, including Notice of Termination
Required attendance at Environmental Briefs, including pre-construction meetings to discuss details of the Environmental Management Plan, including details of environmental protection to protect water resources, required reporting and permitting, and other water resources protection measures.
Appointment of a designated Environmental Manager for the project site who will be responsible for compliance with the stormwater program management requirements, including the Site-Specific SWPPP.
Content of Environmental Management Plan to include Stormwater Management and Control, including o Ground cover o Erodible soils o Temporary measures o Mechanical retardation and control of runoff o Vegetation and mulch o Effective selection, implementation, and maintenance of Best Management Practices (BMPs)
Protection of natural and biological resources, including o Requirements of the Clean Water Act o Protection of fish and wildlife by ensuring water flow patterns and native habitat adjacent to the project sites are not significantly altered or disturbed.
o Protection of trees identified as “preserve or to remain”
Protection of Erodible Soils upon completion of earthwork, brought to a final grade, including protection of the side slopes and back slopes upon completion of rough grading. Minimize the duration of exposure of unprotected soils.
Use of Temporary Protection of Erodible Soils to prevent erosion and control sedimentation during construction, including:
o Retardation and Control of Runoff and rate of runoff from the construction site by use of ditches, benches, berms, and use of silt fences and weed-free, straw bales or equivalent to retard and divert runoff to protected drainage courses. These details shall be included in the site-specific SWPPP and the Hazard Analysis and Critical Control Point (HACCP) Plan.
Final Comprehensive Construction Storm Water Pollution Prevention Plan (SWPPP), updated November 2014
2-10 o Sediment Basins to trap sediments in temporary sediment basins with a size to accommodate the runoff of a local 20-year storm. Pump dry and remove the accumulated sediment, after each storm. Use a paved weir or vertical overflow pipe for overflow. Remove collected sediment from the site.
Institute effluent quality monitoring programs. Install, inspect, and maintain best management practices (BMPs) as required by the site-specific SWPPP. If required by the site-specific SWPPP, include those inspection reports.
Use Vegetation and Mulch to provide temporary protection on sides and back slopes as soon as rough grading is completed or sufficient soil is exposed to require erosion protection. Protect slopes by accelerated growth of permanent vegetation, temporary vegetation, mulching, or netting. Stabilize slopes by hydroseeding, anchoring mulch in place, covering with anchored netting, sodding, or such combination of these and other methods necessary for effective erosion control.
Provide new seeding where ground is disturbed, but do not use seeds that are listed as noxious or prohibited. Use seeds of plants that are native or on the approved non-native plant list for the area. These details should be included in the HACCP Plan required as part of the Regional Biosecurity Program. Include topsoil or nutrient during the seeding operation necessary to establish or reestablish a suitable stand of grass.
Submittal of a BMP Inspection Reports (weekly during dry period, pre- and post-rain/storm event, and daily during rain/storm event).
Submittal of a Site-Specific SWPPP and an NOI to the Navy prior to commencement of work. The Site-Specific SWPPP to be submitted in conformance with this Plan for the Guam Military Relocation Program. The Site-Specific SWPPP shall, as a minimum:
o Identify potential sources of pollution which may be reasonably expected to affect the quality of storm water discharge from the site.
o Describe and ensure implementation of practices which will be used to reduce the pollutants in storm water discharge from the site.
o Ensure compliance with terms of the USEPA construction general permit for stormwater discharge.
o Select applicable BMP from USEPA 833-R-06-004, this Comprehensive SWPPP, Final CNMI and Guam Stormwater Management Manual, dated October 2006, and Caltrans Stormwater Manual.
o Include a completed copy of the Registration Statement, BMP Inspection Report Template and Notice of Termination except for the effective date.
o BMP maps, and any updates
Final Comprehensive Construction Storm Water Pollution Prevention Plan (SWPPP), updated November 2014
2-11
Submittal of a Notice of Termination upon completion of construction and satisfactory site stabilization and vegetation, as determined by the Navy.
Comply with the Site-Specific SWPPP.
All required submittals such as NOI and Site-Specific SWPPP, or any pre-construction submittals to the agency must be submitted to the Contracting Officer at least 30 days prior to the start of any land disturbance.
Maintain a copy of the EPA Construction General Permit and Site-Specific SWPPP, and BMP maps and all updates and stormwater-related inspection reports at the on-site field office. Update BMP maps as site conditions change and project progresses.
Create and maintain a 3-ring binder of documents that demonstrate compliance with the Site-Specific SWPPP and stormwater management program (SWPPP Compliance Notebook). The binder shall include a copy of the applicable USEPA CGP, submitted NOI, NOI approval the USEPA, this Comprehensive SWPPP, Site-Specific SWPPP, and updated Site Specific SWPPP and BMP maps, inspection reports, and all correspondence related to the Site-Specific SWPPP and CGP permit and management issues, including the Notice of Termination. The SWPPP Compliance Notebook shall be provided to Contracting Officer at the completion of the project.
Section G103011 - Temporary Environmental Controls, of Part 4 - Performance Technical Specifications requires development and implementation of temporary erosion and sediment control measures and other BMPs prior to or in conjunction with commencement of earthwork, as well as maintenance of BMPs in accordance with the local Erosion and Sediment Control Laws and Regulations.
2.4 CONSTRUCTION PROJECT EXECUTION
2.4.1 Project Tracking
The CMSC in coordination with the ROICC/FEAD will track all construction projects and the status of stormwater pollution prevention program for each project for the Guam Military Relocation Construction Program. NFM’s project tracking program will be used to track the status of the NOI, Site-Specific SWPPP, and the requirements of the stormwater pollution prevention program. In addition to CMSC, NFM EV and ROICC/FEAD will have access to this project tracking system. For each project, the following information will be included in the tracking system.
Project Name and Number
Contractor Name
Navy’s Construction Stormwater NPDES Permit Number, including date of issue and expiration (include renewal application submittal date).
Construction Start and End Date, including date of first and last ground disturbance
Final Comprehensive Construction Storm Water Pollution Prevention Plan (SWPPP), updated November 2014
2-12
Date Notice of Intent (NOI) submitted to USEPA, and any amendments to NOI.
Date of Pre-Construction Meeting
Date NOI was submitted, reviewed, returned with comments/required corrections, and approved (name of reviewer/approval)
Date Notice of Termination (NOT) submitted by the Contractor to the Navy and
USEPA
The following stormwater management information may also be included in the tracking system as part of project tracking:
Dates of Contractor stormwater training
Rainy season dates and implementation plan.
Dates and results of Stormwater Inspections by the ROICC/FEAD field inspectors, CMSC and staff, and contractors (weekly, pre- and post-rain event, and during rain event).
Dates and results of stormwater inspections by the Navy as part of the QA program.
Dates and results of USEPA, GEPA, and other regulatory inspections, including compliance notices, NAVs, NOVs, etc.
Dates of notices of discharge/non-compliance, and notifications to regulatory agencies
2.4.2 Filing of Project Notice of Intent (NOI)
Under USEPA’s NPDES Construction Program and this Plan, the Contractor will be required to file a Project NOI electronically with USEPA via their eNOI website (http://cfpub.epa.gov/npdes/stormwater/enoi.cfm), at least 14-days prior to start of construction for projects under the USEPA Construction General Permit. The Contractor will be required to register for an eNOI account through EPA’s Central Data Exchange (CDX).
Instructions on how to register for an account can be found at USEPA’s website (http://www.epa.gov/npdes/pubs/enoi_msgp_registrationfactsheet.pdf).
Prior to filing the Project NOI with USEPA, the Contractor will submit the NOI, along with the Site-Specific SWPPP to the ROICC/FEAD for review and approval at least 30 days prior to start of construction activities. A copy of the NOI must also be provided to the ROICC/FEAD CME as part of stormwater compliance submittal requirement prior to start of work. If changes are made to the original NOI, an amended NOI will be required for submittal to the USEPA. The Contractor shall submit a revised or amended NOI for approval to the ROICC/FEAD prior to filing with the USEPA. All amendments must be submitted to the ROICC/FEAD at least 7 days prior to submittal to USEPA. Upon receiving approval from the Navy, the Contractor shall file the amended NOI with USEPA. The
Final Comprehensive Construction Storm Water Pollution Prevention Plan…