This is a request for proposal for a design-build parking lot project at Marine Corps Base Camp Blaz, Guam. The solicitation seeks proposals for the design and construction of approximately 240 parking stalls within 10,350 square yards in accordance with provided specifications. The project is estimated to cost between $10-25 million under NAICS code 238990. The contract completion period is 500 calendar days including design time. The acquisition is set aside 100% for qualified small businesses. Proposals are due by February 2023 and will be evaluated on technical approach, experience, safety, and past performance. A pre-proposal site visit is scheduled for March 2023 and interested offerors must submit required forms and documentation by February 2023 to attend.
View the file
Other files
Show all 47
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Table A‐1: Mitigation Measures Included in the MMTP for the Guam Military Relocation (2012 Roadmap Adjustments)
Commitment
ID #
Resource Area Title of Measure Description of Measure Primary
Responsible Entity
Phase Applicable to
Project Notes on Current Status with Date
(Design Phase) Notes on Current Status with Date (Con Phase)
Notes on Current Status with Date (Ops Phase)
Reference Table and/or
Page # Keywords Anticipated Benefit
BMP‐1 Geo/Soils Comply with rules/regs for Import of off‐island earth materials
Should there be a need to import off‐island earthen fill materials, follow all Guam EPA, Department of Agriculture, and local rules and regulations regarding import of off‐island earth materials.
Contractor Design, Con Final SEIS Page 2‐92 Contaminated Soils
Prevent/minimize potential for contaminated earthen materials to enter Guam.
BMP‐2 Geo/Soils Earthquake‐resistant design and construction
Follow standards of Unified Facilities Criteria 3‐310‐4 Seismic Design of Buildings, dated June 1, 2013 (or latest), during project design and construction.
Contractor Design, Con Final SEIS (Adapted)
Page 2‐92 Earthquakes Minimize potential geologic hazards associated with construction and operation.
BMP‐3a Geo/Soils, Marine Bio
Engineering Controls:
Stormwater Flow
Use drainage diversion and control to direct stormwater flow away from construction sites. Per Title 22 GAR, Chapter 10 Guam Soil Erosion and Sediment Control Regulations and Measures for the Protection of Sinkholes.
Contractor Design, Con Final SEIS Page 2‐92 and
Erosion Control Reduce erosion potential.
BMP‐3b Geo/Soils, Marine Bio
Engineering Controls: cut and fill slopes
Use benches or terraces and drainage control on cut or fill slopes higher than 15 feet to minimize erosion on slope faces. Per Title 22 GAR, Chapter 10 Guam Soil Erosion and Sediment Control Regulations and Measures for the Protection of Sinkholes.
Contractor Design, Con Final SEIS Page 2‐92 and
Erosion Control Reduce erosion potential.
BMP‐3c Geo/Soils, Marine Bio
Engineering Controls:
limit size of disturbed areas
For each project, limit the size of the unstabilized disturbed areas to less than 20 acres (8 ha) during construction. Per Title 22 GAR, Chapter 10 Guam Soil Erosion and Sediment Control Regulations and Measures for the Protection of Sinkholes.
Contractor Design, Con Final SEIS Page 2‐92 and
Erosion Control Reduce erosion potential.
BMP‐3d Geo/Soils, Marine Bio
Engineering Controls:
plan around rainfall periods and re‐vegetate and stabilize disturbed areas
Plan earth‐moving operations for periods of low rainfall. Re‐vegetate and permanently stabilize disturbed areas as soon as possible. Per Title 22 GAR, Chapter 10 Guam Soil Erosion and Sediment Control Regulations and Measures for the Protection of Sinkholes.
Contractor Design, Con Final SEIS Page 2‐92 and
Erosion Control Reduce erosion potential.
BMP‐3e Geo/Soils Engineering Controls:
environmental and hydrogeologic assessment of sinkholes
For sinkholes within the project development footprint that could be modified, used or otherwise impacted, an environmental and hydrogeologic assessment must be performed. Per Title 22 GAR, Chapter 10 Guam Soil Erosion and Sediment Control Regulations and Measures for the Protection of Sinkholes.
Contractor Design, Con Final SEIS (Adapted)
Page 2‐92 Erosion Control Reduce erosion potential and protect sinkholes.
BMP‐4 Geo/Soils, Water Resources, Marine Bio, Hazmat/waste
Erosion Control Plan
(ECP)
Plan is required before any properties can be cleared and graded and when areas require restoration resulting from operational, natural events and similar impacts. Potential erosion control BMPs may include, but may not be limited to: Check dam; diversion dike/swale; level spreader; fiber rolls; vegetated and lined waterways; rock outlet protection; erosion control blankets; and/or stabilization with vegetation, sod, mulch, or topsoil.
Contractor Design, Con, Ops
Final SEIS (Adapted)
Page 2‐92, 94, 103, 110
ECP Minimizes potential impacts to soil from erosion by diverting, controlling, and slowing runoff. Eliminates and/or minimizes the potential for nonpoint source pollution within Guam's waters, such as fertilizers, pesticides, sediment, and other pollutants present in stormwater runoff.
BMP‐5 Geo/Soils, Water Resources, Marine Bio
Stormwater Pollution Prevention Plan (SWPPP)
DoD facilities are required to comply with the Program‐level SWPPP during construction and day‐to‐day operations to ensure that stormwater remains free of contaminants. A SWPPP is a self‐implementing plan for compliance with the Construction General Permit and an installation's stormwater permit. It requires regular site inspections and development of pollution prevention measures to reduce and control pollutants in stormwater discharge. In addition to the measures listed under the Erosion Control Plan (BMP‐4), potential BMPs may include, but not be limited to: perimeter dike/swale, sediment basin, sediment trap, silt fence, gravel/sand bag berms, stabilized construction entrance/exit, storm drainage inlet protection, and/or straw bale dike.
DoD and Contractor
Design, Con, Ops
Final SEIS Page 2‐93 thru 95, 103/4
SWPPP Address runoff reduction and reduce impacts to soil from erosion
Mitigation Monitoring and Tracking Program Plan (updated Nov 2017) Page 1 of 38
Table A‐1: Mitigation Measures Included in the MMTP for the Guam Military Relocation (2012 Roadmap Adjustments)
ID #
Resource Area Title of Measure Description of Measure Primary
Responsible Entity
Phase Applicable to
Project Notes on Current Status with Date
(Design Phase) Notes on Current Status with Date (Con Phase)
Notes on Current Status with Date (Ops Phase)
Reference Table and/or
Page # Keywords Anticipated Benefit
BMP‐6 Geo/Soils Tsunami hazard communications and evacuation procedures (for LFTRC Construction Workers)
Notify workers involved in construction/demolition work of potential tsunami hazard at low‐lying coastal construction areas at Apra Harbor and other coastal areas.
Contractor Design, Con Final SEIS (Adapted)
Page 2‐93 Tsunami Reduce/minimize potential human exposure to tsunami hazard during construction of the Live‐Fire Training Range Complex (LFTRC).
BMP‐7 Geo/Soils, Water Resources, Terrestrial Bio
Range Fire Management Plan (RMP)
Prepare a Range Fire Management Plan based on the Department of the Navy's (DON) Wildland Fire Management Plan (Nelson 2008) to reduce fuel loads and fire potential on ranges. The RMP must include all elements of fire management stated on pgs. 45‐46 of the 2015 BO. The Range Management Plan will include protocols for monitoring fire conditions and adjusting training as needed (e.g., certain types of training may be disallowed under certain fire conditions); location and management of fire breaks, fire‐fighting roads, and a fire‐fighting water system. Units undergoing training would be briefed on requirements suitable to the conditions of the day and protocols should a fire occur (e.g., specifying how the range would be shut down and how fire suppression action would be taken).
USFWS shall be provided 30‐day review of Draft RMP, and the Final RMP must be finalized prior to operation of the first range at LFTRC.
DoD Ops Final SEIS
2015 BO, 2017
BO
Pages 2‐ 93,94,97,100
Page 48‐49
Fire Management Reduces risk of fire originating from the range, thereby minimizing potential for fire impacts, including impacts associated with vegetation destruction and increased soil erosion.
BMP‐8 Geo/Soils, Marine Bio
Manage live‐fire ranges in accordance with range management policies and procedures
Develop range‐specific standard operating procedures, which may include but not be limited to: maintain grassy vegetation on berms;
manage stormwater at ranges; restrict vehicular activities at ranges to designated/previously identified areas; conduct monitoring and range clearance (remove expended rounds) of live‐fire ranges with impact berms at a minimum of every 5 years. See Marine Corps range management policies and procedures and MCO 3550.10 Policies and Procedures for Range Training Area Management.
DoD Ops Final SEIS Page 2‐94, MCO 3550.10 Minimize impacts to soil from erosion and potential metals contamination associated with range operations.
BMP‐9 Water Resources, Marine Bio
Compliance with Range Management Plans and Range Environmental Vulnerability Assessment
(REVA)
In compliance with DoD Instruction 4715.14, the Marine Corps will utilize the REVA program to assess the potential impacts to human health and the environment from live‐fire training operations. The purpose of the REVA is to identify whether there is a release or a substantial threat of a release of munitions constituents (MCs) from the operational range or range complex areas to off‐range areas and determine if release causes an unacceptable risk to human health and/or the environment. The Marine Corps will collect baseline data to support the assessment as part of a baseline survey conducted before the ranges are approved for use.
The REVA program will conduct an assessment on all live‐fire operational ranges after they have been in use for a minimum of a year to determine if MCs are migrating off‐ range and if follow‐on actions are required.
DoD Con, Ops Final SEIS Page 2‐95, REVA Reduced potential for release of hazardous materials and waste and contamination of water and biological resources.
BMP‐10 Water Resources, Marine Bio
Water Quality Monitoring Plan
(WQMP)
Water Quality Monitoring Plan may be required to evaluate the effectiveness of any number of different environmental permits and/or performance standards.
DoD and Contractor
Design, Con, Ops
Final SEIS Page 2‐96, WQMP Identifies ambient or control conditions at a particular site and detects deviations from those conditions resulting from a project or operations of a facility.
(updated Nov 2017) Page 2 of 38
Table A‐1: Mitigation Measures Included in the MMTP for the Guam Military Relocation (2012 Roadmap Adjustments)
ID #
Resource Area Title of Measure Description of Measure Primary
Responsible Entity
Phase Applicable to
Project Notes on Current Status with Date
(Design Phase) Notes on Current Status with Date (Con Phase)
Notes on Current Status with Date (Ops Phase)
Reference Table and/or
Page # Keywords Anticipated Benefit
BMP‐11 Water Resources, Marine Bio
Low Impact Development (LID)
LID is a design measure that requires the use of innovative methods to capture stormwater that would otherwise flow into nearby watersheds using a combination of retention devices and vegetation to allow stormwater to be retained and managed at the source rather than relying on downstream efforts to control the flow of water and contaminants.
Potential LID measures may include, but may not be limited to:
stormwater ponds (retention/detention); stormwater wetlands;
infiltration practices; filtering practices; open channel practices; and minimizing exposure. LID measures shall be consistent with guidelines provided in UFC 3‐210‐10, stormwater management techniques provided in the CNMI and Guam Stormwater Management Manual, as amended in 2010, as well as updated guidance in the 2014 Stormwater Management in the Pacific and Caribbean Islands: A Practitioner's Guide to Implementing LID.
DoD and Contractor
Design, Con, Ops
Final SEIS Page 2‐96, LID Reduction of pollutant concentrations at discharge or infiltration points through the use of measures that treat contaminants in stormwater through physical or biological means. Changes in discharge flow rates at downstream locations are minimized by added storage and infiltration of stormwater upstream.
BMP‐12 Water Resources, Marine Bio, Utilities
LID BMP Operations and Maintenance Inspection Checklist
Establish a LID BMP O&M Inspection Checklist to be implemented during operations to assess whether appropriate LID measures are designed/sited, properly maintained, monitored, and effective during operations. Any deficiencies would lead to corrective actions.
DoD and Contractor
Ops Final SEIS Page 2‐96, 104, 110
LID Impacts to aquifer and near shore waters reduced through stormwater management.
BMP‐13 Water Resources, Marine Bio, Hazmat/waste
Spill Prevention and Response Procedures
Develop written procedures for cleaning up spills or leaks, notifying the appropriate personnel, and following the reporting procedures.
DoD and Contractor
Design, Con, Ops
Final SEIS Page 2‐96, 105, 111
Spill Response Reduce/avoid potential impacts to water resources from spills or release of other contaminants and pollutants.
BMP‐14 Water Resources, Marine Bio
Routine Facility Inspections and Compliance with the Multi‐Sector General Permit (MSGP)
The MSGP requires the preparation of an Industrial Activity SWPPP. The Industrial Activity SWPPP should (or shall or must) include installation/maintenance of pollutant control measures, monitoring of stormwater at discharge outfalls, and employee training. Qualified facility personnel must regularly inspect all areas of the facility where industrial materials or activities are exposed to stormwater for ongoing good housekeeping, spill control equipment, and outdoor storage.
DoD and Contractor
Ops Final SEIS Page 2‐97, MSGP Reduce/avoid potential impacts of facility operations to water resources from spills or release of other contaminants and pollutants.
BMP‐15 Water Resources, Marine Bio
Employee Training Training must be given to all employees who work in areas where industrial materials or activities are exposed to stormwater and must include spill response, good housekeeping, and material management practices.
DoD and Contractor
Design, Con, Ops
Final SEIS Page 2‐97, Training Reduce/avoid potential impacts of facility operations to water resources from spills or release of other contaminants and pollutants.
(updated Nov 2017) Page 3 of 38
Table A‐1: Mitigation Measures Included in the MMTP for the Guam Military Relocation (2012 Roadmap Adjustments)
ID #
Resource Area Title of Measure Description of Measure Primary
Responsible Entity
Phase Applicable to
Project Notes on Current Status with Date
(Design Phase) Notes on Current Status with Date (Con Phase)
Notes on Current Status with Date (Ops Phase)
Reference Table and/or
Page # Keywords Anticipated Benefit
BMP‐16 Water Resources, Marine Bio
Road and Bridge Design Design measures shall place construction work and facilities (including roads) outside of wetlands and other waters of the U.S. to the maximum extent practicable.
Contractor Design, Con Final SEIS Page 2‐97, Wetlands Avoidance
Work would be designed and constructed to avoid and minimize impacts to wetlands and other waters of the U.S. to the maximum extent practicable.
BMP‐17 Air Quality Diesel Emissions Control on Off‐Road Equipment
Comply with USEPA's Tier 2 engine emission standards, use ultra‐low sulfur diesel fuel, and minimize truck idling time.
DoD and Contractor
Con, Ops Final SEIS Page 2‐98 Diesel Emissions Reduces air quality impacts at nearby residences and other occupied areas.
BMP‐18 Air Quality Dust Control Plan Implement a Dust Control Plan with the following measures when feasible: minimize land disturbance; construct stabilized construction entrances per construction standard specifications; cover trucks when hauling soil, stone, and debris; use water trucks to minimize dust;
stabilize or cover stockpiles; minimize dirt tracking by washing or cleaning trucks before leaving the construction site.
Contractor Con Final SEIS Page 2‐98 Dust Control Reduces construction period air quality impacts at nearby residences and other occupied areas.
BMP‐19 Noise Equipment Sequencing during Construction
Plan work such that noise producing heavy equipment is not concentrated in areas adjacent to sensitive receptors.
Contractor Con Final SEIS Page 2‐98 Construction Methods
Reduces construction noise levels at nearby residences and other sensitive receptors.
BMP‐20 Noise Vegetation Attenuation and Earthen Berms
Retain dense foliage and/or construct earthen berms between LFTRC and sensitive receptors.
DoD and Contractor
Con Final SEIS Page 2‐98 Construction Methods
Reduces construction noise levels at nearby residences and other sensitive receptors.
BMP‐21 Land Use Installation Master Planning UFC 2‐100‐1
Ensures efficient and compatible land use (identifying and respecting natural and man‐made constraints) and maximizes facility utilization.
DoD Design, Ops Final SEIS Page 2‐98 UFC 2‐100‐1 Resolves land use incompatibilities within the installation boundaries.
BMP‐22 Recreational Construction Period/Construction Site Traffic Management Plan
Identify traffic management measures to be implemented during construction phase.
DoD and Contractor
Design, Con Final SEIS Page 2‐98 Traffic Management
Reduce delays in access to recreational sites.
BMP‐23 Recreational, Marine Transportation
Notice to Mariners DoD (USMC range control) will regularly provide range usage schedules to the U.S. Coast Guard for Notices to Mariners. The U.S. Coast Guard will announce in the Notice to Mariners the schedule for the use of the LFTRC in advance of training events to inform vessel operators of the periods of potential usage.
DoD Ops Final SEIS (Adapted)
Page 2‐98, Access Notice to Mariners will direct vessel operators to navigate clear of the Surface Danger Zone (SDZ) to avoid potential impacts from use of the LFTRC.
BMP‐24 Terrestrial Bio, Marine Bio
Contractor Education Program
The DON education program will ensure that contractor personnel are informed of the biological resources in the project area, including invasive species, special‐status species, avoidance measures, and reporting requirements. This BMP satisfies a conservation measure on pg.
44 of the 2017 Biological Opinion.
DoD and Contractor
Design, Con Final SEIS, 2015
BO, 2017 BO
Page 2‐99, 105 Page 39, Training Reduce/avoid inadvertent impacts to terrestrial biological resources due to lack of awareness of resource presence, sensitivities, and protective measures.
BMP‐25 Terrestrial Bio Biosecurity Outreach and Education
Continue to implement a targeted, comprehensive outreach and education program for DoD and civilian populations for biosecurity focused on prevention. The DON Biosecurity Outreach and Education program was initiated concurrent with the actions that were initiated under the 2010 EIS ROD. The DON will develop additional informational videos, expand the radio PSAs broadcasts, and other print media as well as active public outreach concurrent with the arrival of the first major influx of USMC personnel in 2020 and continue for an additional 5 years.
See also 2017 BO.
DoD Design, Con, Ops
Final SEIS, 2015
BO, 2017 BO
Page 2‐99 Page 41 Page 45‐46
Biosecurity Reduce/avoid inadvertent impacts to terrestrial biological resources due to lack of awareness of resource presence, sensitivities, and protective measures.
BMP‐26 Terrestrial Bio Incorporate Biosecurity Measures
Incorporate biosecurity measures (e.g., brown treesnake interdiction measures, on‐site vegetation waste management procedures, outreach/education, Guam Landscaping Guidelines, Hazard Analysis Critical Control Point (HACCP) Planning, and monitoring to evaluate effectiveness of HACCP into construction, operations, or training events).
DoD and Contractor
Design, Con, Ops
Final SEIS Page 2‐99 Biosecurity Reduce/avoid the inadvertent spread of non‐ native species on Guam or to other locations off Guam. The implementation of biosecurity measures decreases the likelihood of introducing pests harmful (either predation or outcompeting native species) to native vegetation, invertebrates, vertebrates, as well as human health.
(updated Nov 2017) Page 4 of 38
Table A‐1: Mitigation Measures Included in the MMTP for the Guam Military Relocation (2012 Roadmap Adjustments)
ID #
Resource Area Title of Measure Description of Measure Primary
Responsible Entity
Phase Applicable to
Project Notes on Current Status with Date
(Design Phase) Notes on Current Status with Date (Con Phase)
Notes on Current Status with Date (Ops Phase)
Reference Table and/or
Page # Keywords Anticipated Benefit
BMP‐27 Terrestrial Bio Brown Treesnake Interdiction
The DON will fund any increase of current federally funded brown treesnake interdiction measures (in Guam, CNMI, and Hawaii) where the increase is related to direct, indirect and induced growth caused by the USMC relocation to Guam. The FY 2010 level of funding for the Federal interagency BTS interdiction effort on Guam, CNMI, and Hawaii and 2010 transportation levels associated with outbound cargo from Guam for the U.S. or U.S. territories will be used as the baseline. Any increase in funding will continue and become part of the DON's Brown Treesnake interdiction funding under authority of the Brown Tree Snake Control and Eradication Act (7 USC § 8501 note) (USFWS 2010a). The Service agrees that it is not DON’s responsibility to fund increased interdiction measures that are identified more than one year after the end of the fiscal year both USMC relocation construction has ended and the permanent non‐ transient USMC military units have relocated to Guam. For the purposes of this BMP, interdiction is defined as: “to hinder, prohibit, or prevent the brown treesnake from becoming established in new locations by conducting inspection and suppression processes.”
Coordination with the USGS regarding the Brown Treesnake Research Closed Population Facility at NWF. The DON will ensure through briefings or information packages that the personnel using the LFTRC know the importance of the facility and maintaining the integrity of the fence. An SOP will be developed as part of the RMP for the LFTRC to ensure the above and that USGS will be immediately notified in the event that the fence is accidentally damaged so the fence can be quickly repaired.
DoD Con, Ops Final SEIS
2015 BO
Page 2‐99
Biosecurity Reduce/avoid inadvertent spread of brown treesnake to other locations off Guam.
BMP‐28 Terrestrial Bio Hazard Analysis and Critical Control Point (HACCP) Plan
Construction contracts will contain a requirement to develop a HACCP Plan which will identify risks and potential pathways for non‐native species and will outline procedures for controlling and removing risks identified.
Construction contracts will also contain a requirement for inspections and proper re‐use or disposal of vegetation to avoid contributing to the further spread of the coconut rhinoceros beetle. This plan will be approved and inspected by the biological monitor.
Contractors are responsible for implementing and documenting HACCP measures as well as worker awareness training, and ensuring employees receive applicable environmental and OSHA training and keep updated on regulatory requirements for specific training for the type of work being conducted onsite. The contractor is required to establish appropriate facilities that comply with all environmental laws and regulations, provide training for proper vehicle hygiene, and promptly take corrective and preventative actions for noncompliance. This includes vehicle washdown and inspection for soil and other materials.
DoD and Contractor
Design, Con Final SEIS 2017
BO
Page 2‐100
Biosecurity Reduce/avoid the inadvertent spread of non‐ native species on Guam or to other locations off Guam.
BMP‐29 Terrestrial Bio Navy monitoring to evaluate effectiveness of
HACCP
The DON shall provide training, review, and technical guidance on HACCP plan development, implementation, and revision during the construction phase of the buildup on Guam. To document the effectiveness of the HACCP implementation at construction sites, the DON has developed and implemented a long‐term monitoring program for terrestrial vegetation.
For any clearing of vegetation that is adjacent to or contiguous with recovery habitat, the perimeter and 98.4 ft. (30 m) into the habitat will be surveyed to identify baseline vegetation community species composition.
This survey will be repeated six months and at one year after vegetation removal to ensure effectiveness of HACCP implementation (clean equipment, supplies, and materials) during construction activities. If new nonnative, invasive species are detected, the DON will notify the Service and the DON will develop and implement an eradication plan or control effort to prevent infestation.The DON will develop an early detection and rapid response component for when an incipient invasive species is discovered in the proposed action area.
DoD Con 2015 BO and
2017 BO
2015 BO Page
43 2017 BO
Biosecurity Reduce/avoid the inadvertent spread of non‐ native and/or invasive species on Guam or other locations off Guam.
(updated Nov 2017) Page 5 of 38
Table A‐1: Mitigation Measures Included in the MMTP for the Guam Military Relocation (2012 Roadmap Adjustments)
ID #
Resource Area Title of Measure Description of Measure Primary
Responsible Entity
Phase Applicable to
Project Notes on Current Status with Date
(Design Phase) Notes on Current Status with Date (Con Phase)
Notes on Current Status with Date (Ops Phase)
Reference Table and/or
Page # Keywords Anticipated Benefit
BMP‐30 Terrestrial Bio DON's Final Guam Landscaping Guidelines
All DON construction activities and associated non‐DON projects covered under the Final SEIS and BO (such as FHWA/DAR projects) shall adhere to the DON’s Final Guam Landscaping Guidelines.
This BMP satisfies a conservation measure on pg. 44 of the 2017 Biological Opinion.
Contractor Con Final SEIS
2015 BO and
2017 BO
Page 2‐100
Page 40, 41
Landscaping Helps to reduce potential impacts associated with non‐native vegetation, promotes habitat for native species, reduces water consumption, and reduces the need for fertilizers.
BMP‐31 Terrestrial Bio, Marine Bio
LFTRC Range Berm Controls
LFTRC range berms will contain native or non‐invasive herbaceous vegetation and other engineering controls.
This BMP also satisfies a conservation measure in the 2015 Biological Opinion.
DoD and Contractor
Design, Con, Ops
Final SEIS
2015 BO
Page 2‐100, Landscaping Helps to manage stormwater runoff, control erosion, and minimize the number of bullets that may fall outside the range footprint.
BMP‐32 Terrestrial Bio Contractor Plans and Specifications
All construction will occur within the limits of construction shown in the Contractor Plans and Specifications.
This BMP also satisfies a conservation measure in the 2015 Biological Opinion.
Contractor Design, Con Final SEIS
2015 BO
Page 2‐100
Construction Area Reduce habitat loss.
BMP‐33 Terrestrial Bio Coordinate with Guam Department of Agriculture: Forestry Division and GDAWR.
To the greatest extent practicable, the DON shall coordinate escorted access to project sites for Guam Department of Agriculture (GDAWR) staff prior to vegetation clearing activities. As part of the escorted access, GDAWR will be allowed a reasonable period to perform surveys in areas where vegetation removal is proposed to identify native plant species for the potential extraction of seeds, seedlings, and other specimens.
GDAWR may use their findings to assist the DON in practicable efforts to minimize natural resource impacts during project design development.
Access will be subject to reasonable scheduling, and when applicable, the completion of required UXO/MEC awareness training.
DoD Design, Con Final SEIS Page 2‐101 Pre‐Construction Surveys
Promote local initiatives to propagate native vegetation and leverage local expertise in exploring practicable project‐level options for further minimization of losses to habitat.
BMP‐34 Terrestrial Bio Pre‐Construction Surveys for the Mariana Fruit Bat
Superseded by 2017 BO.
For projects within or in the vicinity of suitable fruit bat habitat, surveys following USFWS‐approved JRM protocol will be conducted 1 week prior to the onset of work. If a fruit bat is present within 492 feet of the project site, the work must be postponed until the bat has left the area.
This BMP also satisfies a conservation measure in the 2017 Biological Opinion.
DoD Design, Con Final SEIS
2017 BO
Page 2‐101
Pre‐Construction Surveys
Avoid and minimize impacts to fruit bats.
BMP‐35 Terrestrial Bio, Marine Bio
Lighting Installation Superseded by 2017 BO for Mariana Fruit Bat.
Lighting will be designed to meet minimum safety, sustainability, antiterrorism, and force protection requirements. Hooded lights will be used to the maximum extent practicable at all new roads and facilities within sea turtle land habitat and fruit bat roost areas. Either hooded or "night‐ adapted" lights will be installed at the LFTRC. Illumination of forest, coastline, or beach will be consistent with range safety and security requirements and kept to an absolute minimum including the shielding of lights and directing lighting away from the forest or other wildlife habitat.
This BMP also satisfies a conservation measure in the Biological Opinion.
DoD and Contractor
Design, Con, Ops
Final SEIS
2017 BO
Page 2‐101, Lighting Avoid and minimize impacts to fruit bats.
BMP‐36 Terrestrial Bio Pre‐Construction Surveys for Nesting Mariana Common Moorhens
For projects within or in the vicinity of suitable moorhen habitat, surveys following the USFWS‐approved JRM protocol will be conducted 1 week prior to the onset of work. If nesting Mariana common moorhens are present within the limits of construction, clearing and construction will be postponed until the chicks have fledged. If work stops for more than 1 week, preconstruction surveys will be repeated.
DoD Design, Con Final SEIS Page 2‐102 Pre‐Construction Surveys
Avoid and minimize impacts to nesting moorhens.
(updated Nov 2017) Page 6 of 38
Table A‐1: Mitigation Measures Included in the MMTP for the Guam Military Relocation (2012 Roadmap Adjustments)
ID #
Resource Area Title of Measure Description of Measure Primary
Responsible Entity
Phase Applicable to
Project Notes on Current Status with Date
(Design Phase) Notes on Current Status with Date (Con Phase)
Notes on Current Status with Date (Ops Phase)
Reference Table and/or
Page # Keywords Anticipated Benefit
BMP‐37 Terrestrial Bio Protection of Mariana Eight‐spot Butterfly and Host Plants
The DON will conduct pre‐construction surveys to identify any stages of the Mariana eight spot butterfly prior to the commencement of construction activities. If any life stage of the Mariana eight spot butterfly (e.g., eggs, caterpillar, and chrysalis) is located within a project footprint during pre‐construction surveys, it will be relocated onto an appropriate host plant (e.g., relocate pre‐diapause larvae to Procris pedunculata or Elatostema calcareum) within similar sites away from the project footprint. This can be conducted by clipping the host plant and grafting the plant to another plant outside the project footprint (Cook and Delisle 2010). This method has been conducted successfully for the Sacramento Mountains checkerspot butterfly (Euphydryas anicia cloudcrofti) (USWFS 2002a, 2002b).
DoD Design, Con Final SEIS, 2017
BO
Page 2‐102, Pre‐Construction Surveys
Avoid and minimize direct impacts to adult, larvae, eggs and host plants of Mariana eight‐spot butterfly.
BMP‐38 Terrestrial Bio Road and Bridge Design to reduce impacts to wetlands
Disturbance to streambeds, wetland soils, and other vegetation will be avoided to the maximum extent practicable. Pre‐cast bridges, especially for long spans, will be used to allow installation with minimal contact with the wetland. Maintain existing elevations and install retaining walls, as appropriate, to reduce disturbance and side slope fill. The extent of fill needed on top of a crossing structure will be minimized to the maximum extent practicable by limiting the increase of the road grade as it approaches the crossing point.
Contractor Design, Con Final SEIS Page 2‐102 Wetlands Avoidance
Work will be designed and constructed to avoid and minimize impacts to wetlands to the maximum extent practicable.
BMP‐39 Terrestrial Bio, Cultural Resources
High Value Trees Survey and Handling Requirements
The DON will identify high value tree (HVT) species that will require additional handling and processing procedures. The list of trees has been determined by the Government natural resources personnel in coordination with the Government of Guam, Department of Chamorro Affairs (DCA). The trees will be marked with flagging tape and/or paint.
Marked trees shall not be disturbed until the Government determines that the trees have been properly handled.
Specific HVT handling requirements may be required at the project level, but at minimum the General Handling Requirements for High Value Trees will be followed.
DoD and Contractor
Design, Con 2011 PA High Value Trees Identify natural resources of cultural importance and protected plants or plants that host protected species (e.g. butterflies) ahead of construction for avoidance and subsequent processing or salvage.
BMP‐40 Marine Bio Implementation of Elements of the AAFB Sea Turtle Management Plan
The Andersen Air Force Base (AAFB) Sea Turtle Management Plan requires education of recreational users of AAFB controlled beaches, limits beach access during nesting season, restricts vehicle and all‐ terrain vehicle usage, and establishes a curfew for campers at Tarague Basin.
DOD shall ensure that the Sea Turtle Mangement Plan requirements are enforced and shall periodically assess their effectiveness.
DoD Ops Final SEIS Page 2‐106 Access Avoid and minimize impacts to sea turtles on AAFB and in the nearshore waters from increased visitor usage of Tarague Beach by military and civilian personnel.
BMP‐41 Marine Bio Recreational Buoys Recreational buoys shall be installed (as appropriate) where the proposed action may result in increased, localized recreational use of marine biological resources.
DoD Ops Final SEIS Page 2‐106 Access Avoid and minimize impacts to coral and essential fish habitat as a result of increased recreational use.
BMP‐42 Cultural Resources
Orientation Brief for Incoming Marines
The DON will conduct initial orientation briefs for all incoming Marine Corps personnel, their families, and contractors. Briefs shall disucss the sensitivity of the historic properties in the area. All Marine Corps personnel and contractors working on Guam will also receive annual refresher training. The DON will develop educational briefs and other training materials in consultation with the appropriate State Historic Preservation Office (SHPO) and will provide SHPO with a copy of the final materials.
DoD Ops Final SEIS (Adapted)
Page 2‐106 Training Reduce the potential for certain types of indirect adverse effects on historic properties (such as an increase in population or visitation in areas where historic properties are located).
BMP‐43 Visual Resources Installation Appearance Plan
The new cantonment and family housing will be designed to be consistent with the 2011 Installation Appearance Plan. While the installation will not be routinely accessible to the public, some features will be publicly visible, including the entrance gates, perimeter fencing, peripheral landscaping, and vertical infrastructure (e.g., light posts and water tanks). These features, as well as other facilities on the installation, will present a unified design template as outlined in the Installation Appearance Plan.
Contractor Design Final SEIS Page 2‐107 Installation Appearance Plan
Avoid and minimize visual resource impacts.
(updated Nov 2017) Page 7 of 38
Table A‐1: Mitigation Measures Included in the MMTP for the Guam Military Relocation (2012 Roadmap Adjustments)
ID #
Resource Area Title of Measure Description of Measure Primary
Responsible Entity
Phase Applicable to
Project Notes on Current Status with Date
(Design Phase) Notes on Current Status with Date (Con Phase)
Notes on Current Status with Date (Ops Phase)
Reference Table and/or
Page # Keywords Anticipated Benefit
BMP‐44 Ground Transportation
Construction Period/ Construction Site Traffic Management Plan
The DON/DoD and/or its construction manager or general contractor shall meet with the appropriate Guam Department of Public Works officials to determine traffic management strategies to reduce, to the maximum extent feasible, traffic congestion and the effects of parking demand by construction workers during construction of this project and other nearby projects being constructed simultaneously. The DON/DoD and/or its construction manager or general contractor shall develop a Construction Management Plan for review and approval by the Guam Department of Public Works and/or other Guam agencies. Note: there are 12 specific elements that the plan must include, as detailed in the Final SEIS.
DoD and Contractor
Design, Con Final SEIS Pages 2‐107, Traffic Management
Reduce impacts to traffic during construction.
Reduce any adverse effects of construction to existing roadway infrastructure.
Minimize the impacts to vehicle circulation and/or access of adjacent properties during construction.
BMP‐45 Marine Transportation
Observation Towers Trained observers will scan the SDZ prior to and during live‐fire training to ensure that there are no vessels within or approaching the SDZ. If vessels are at risk from operation of the range, use of the range will be suspended until the vessel clears the SDZ area.
DoD Ops Final SEIS Page 2‐109 Access Reduce the chance of adverse impact on vessels.
BMP‐46 Utilities Construction Coordination
Utility projects will be closely coordinated with utility providers to minimize utility outages and with managers of other construction projects in affected areas to enhance coordination and proper sequencing of the various projects, including roadways.
DoD and Contractor
Con Final SEIS Page 2‐109 Construction Coordination
Reduce project delays, overall project costs, and disruption to the public by minimizing duplicative work (such as road paving). Project activity overlaps/interferences, and utility outage number and duration. Also can minimize stop actions during construction by permitting agencies.
BMP‐47 Utilities Comply with National Energy Conservation Policy Act (1978), Energy Policy Act (2005), and EO 13221 (2001)
Reduce energy and water consumption through conservation, efficiency, use of Energy Star appliances, building orientation and insulation to reduce energy use, setback thermostats, cool roof technology, solar energy, efficient and/or natural lighting, among others.
DoD and Contractor
Design, Ops Final SEIS Page 2‐109 Conservation Reduced future needs for additional electrical generating capacity; reduced air pollution; reduced use of non‐ renewable energy sources; reduced potable water demand; reduced wastewater flow and subsequent treatment and disposal costs.
BMP‐48 Utilities Wastewater Pretreatment Program
Install and maintain pretreatment systems in facilities generating industrial wastewater in accordance with the JRM Pretreatment Program.
DoD and Contractor
Con, Ops Final SEIS Page 2‐109 Wastewater Reduces or avoids introduction of pollutants from industrial sources which may pass through or interfere with wastewater treatment processes or which may contaminate sewage sludge.
BMP‐49 Utilities Solid Waste Recycling/EO 13514 (EO 2009)
Recycle material from municipal solid waste, such as glass, paper, and metals.
DoD and Contractor
Con, Ops Final SEIS Page 2‐109 Solid Waste Reduces volume of solid waste disposed in landfills, thus reducing over time the cost of waste disposal.
BMP‐50 Utilities Comprehensive Waste Management Plan, August 2010 (or any applicable update) and Integrated Solid Waste Management Plan for DoD Bases, Guam, February 20, 2013
Process green waste on‐site for reuse (goal of 100%) during construction.
Meet 60% diversion rate goal for construction/demolition debris through reuse (including such actions as concrete crushing and reuse as base material and grinding and reuse of asphaltic concrete from roads). Meet goal of 50% diversion rate from disposal for project non‐construction/demolition solid waste (not directly generated from materials used for erecting structures).
Contractor Con, Ops Final SEIS BO Page 2‐110
Solid Waste Reduces volume of project derived wastes (e.g. construction and demolition debris and green waste) that would otherwise be disposed of at permitted disposal facilities.
BMP‐51 Utilities Periodic maintenance of wastewater systems/Title 22 Guam GAR, Chapter 12 Individual Wastewater Disposal System Regulations
Periodically clean temporary toilet facilities and individual sewage disposal systems.
DoD and Contractor
Con, Ops Final SEIS Page 2‐110 Wastewater Reduces potential hazards associated with sewage spills and ensures proper treatment and disposal.
BMP‐52 Hazmat/waste Routine Inspections for hazardous materials/wastes
Qualified facility personnel must regularly inspect all areas of the facility where hazardous materials and waste are stored for ongoing good housekeeping, record keeping, and spill control equipment.
DoD and Contractor
Con, Ops Final SEIS Page 2‐111 Inspections Reduce/avoid potential impacts to soil and water resources from spills.
BMP‐53 Hazmat/waste Employee Training Training must be given to all employees who handle hazardous materials and waste, and must include spill response, good housekeeping, record keeping and material management practices.
DoD and Contractor
Con, Ops Final SEIS Page 2‐111 Training Reduce/avoid potential impacts to soils and water resources from spills.
(updated Nov 2017) Page 8 of 38
Table A‐1: Mitigation Measures Included in the MMTP for the Guam Military Relocation (2012 Roadmap Adjustments)
ID #
Resource Area Title of Measure Description of Measure Primary
Responsible Entity
Phase Applicable to
Project Notes on Current Status with Date
(Design Phase) Notes on Current Status with Date (Con Phase)
Notes on Current Status with Date (Ops Phase)
Reference Table and/or
Page # Keywords Anticipated Benefit
BMP‐54 Hazmat/waste Radon Control Measures Radon control measures would be incorporated into facility designs and periodic monitoring would be conducted to ensure that radon levels are within acceptable levels to protect human health.
DoD and Contractor
Design, Ops Final SEIS Page 2‐111 Radon Reduce/eliminate accumulation of radon gas in structures.
BMP‐55a Public Health/Safety
Naval Ordnance Safety and Security Activity Instruction 8020.15D:
Approval of Explosive Safety Submission
At munitions response sites, no site operations may begin unless Naval Ordnance Safety and Security Activity and the DoD Explosive Safety Board have reviewed and approved the Explosives Safety Submission.
DoD Con, Ops Final SEIS Page 2‐111 Explosives Safety Reduces the risk to workers and the public from explosive hazards.
BMP‐55b Public Health/Safety
Naval Ordnance Safety and Security Activity Instruction 8020.15D:
Comply with Explosive Safety Submission
Comply with the approved Guam Explosives Safety Submission for on‐site construction support where the likelihood of encountering MEC is determined to be moderate or high and where ground‐disturbing activities may occur in areas known or suspected to contain UXO.
DoD and Contractor
Con, Ops Final SEIS Page 2‐111 Explosives Safety Reduces the risk to workers and the public from explosive hazards.
BMP‐56a Public Health/Safety
Mosquito Control ‐ Remove standing water sources and/or promote proper drainage per GCA
(10 GCA 36)
To limit the amount of standing water at construction sites, drain or fill indepressions, puddles, and ditches to prevent stagnant water; remove containers that catch/trap water (e.g., buckets, old tires, cans).
DoD and Contractor
Con, Ops Final SEIS Page 2‐111 Mosquito Control Reduces the opportunities for an outbreak of water‐ related diseases.
BMP‐56b Public Health/Safety
Mosquito Control) ‐ Apply pesticides per GCA
(10 GCA 36)
Apply pesticides (e.g., Bacillus thuringiensis) to help control mosquitoes. DoD and Contractor
Con, Ops Final SEIS Page 2‐111 Mosquito Control Reduces the opportunities for an outbreak of water‐ related diseases.
BMP‐57 Public Health/Safety
Operational Risk Management (ORM)
Implement the Operational Risk Management process as outlined in OPNAVINST 3500.39A and MCO 3500.27B. Management measures include:
(1) Develop and clearly mark SDZs, which identify the restricted land and airspace requirements to laterally and vertically contain projectiles, fragments, debris, and components resulting from the firing of weapons.
(2) Prior to conducting training activities, clear public and non‐participating personnel from the training area.
(3) Continually assess LFTRC operations and update/revise safety measures as needed.
DoD Ops Final SEIS Page 2‐112 ORM Prevent hazards to public health from training operations.
BMP‐58 Public Health/Safety
Restrict Access to Electromagnetic Emitters
Restrict access to emitters through the use of security fencing, posting warning signs, or locking out unauthorized persons in areas, where practical. Operate electromagnetic emission sources in accordance with applicable safety standards.
DoD Ops Final SEIS Page 2‐112 ORM Minimizes the risk of exposure to electromagnetic emissions.
BMP‐59 Public Health/Safety
Construction Health and Safety Program
Implement a construction health and safety program that complies with federal and local health and safety regulations. Elements of the safety program include the following: responsibilities of construction workers and subcontractors; job site rules and regulations; emergency response procedures; safety inspections and audits; location of medical services and first aid; safety meetings, employee training, and hazard communications; personal protective equipment; standard construction procedures; accident investigation and reporting.
DoD and Contractor
Design, Con Final SEIS Page 2‐112 ORM Minimizes the risk of construction worker accidents.
BMP‐60 Public Health/Safety
Occupational Safety and Health Administration Guidelines for Hearing Protection
Enforce Operational Safety and Health Administration guidelines for hearing protection for workers. Exclude the public from entering construction and operation areas unless authorized, escorted and outfitted with appropriate safety gear.
DoD and Contractor
Con, Ops Final SEIS (Adapted)
Page 2‐113 ORM Reduce the potential for noise effects to workers and the public.
BMP‐61 Public Health/Safety
Wellhead Protection Zone
Avoid incompatible development and incompatible land use within well head protection zones during construction and operations.
DoD and Contractor
Design, Con, Ops
Final SEIS Page 2‐113 Wellhead Protection
Reduce the potential for contaminants to be introduced near water wells.
(updated Nov 2017) Page 9 of 38
Table A‐1: Mitigation Measures Included in the MMTP for the Guam Military Relocation (2012 Roadmap Adjustments)
ID #
Resource Area Title of Measure Description of Measure Primary
Responsible Entity
Phase Applicable to
Project Notes on Current Status with Date
(Design Phase) Notes on Current Status with Date (Con Phase)
Notes on Current Status with Date (Ops Phase)
Reference Table and/or
Page # Keywords Anticipated Benefit
BMP‐62 Public Health/Safety
Compliance with applicable hazardous material and waste regulations
(1) Implement Hazardous Materials Management Plans (HMMP).
(2) Implement Facility Response Plans Implementing Spill Prevention, Control and Countermeasure Plans (i.e., training, spill containment and control procedures, clean up, and notifications).
(3) Implement Hazardous Materials Minimization Plans.
(4) Ensure DoD personnel are trained as to proper container labeling, storage, staging, and transportation requirements for hazardous materials.
(5) Ensure the Defense Reutilization Marketing Office has sufficient hazardous materials storage, transportation, and disposal capacity prior to any expected increases.
(6) Verify compliance with federal, local, and DoD laws and regulations and implement corrective actions as necessary.
DoD and Contractor
Con, Ops Final SEIS Page 2‐113 HMMP Reduces the potential hazards to workers and the general public during handling, storage, transportation, and disposition of hazardous substances.
BMP‐63 Public Health/Safety
DoD Ammunition and Explosive Safety Standard (DoD Directive 6055.9)
Comply with the approved Guam Explosives Safety Submission that outlines specific measures that would be implemented to ensure the safety of workers and the public. BMPs that would be implemented include:
(1) Have qualified MEC personnel perform surveys to identify and remove potential MEC items prior to the initiation of ground‐disturbing activities.
(2) Have MEC personnel supervision during earth‐moving activities.
(3) Have MEC personnel provide MEC awareness training to construction personnel involved in grading and excavations in undisturbed areas that have a high probability of MEC.
DoD and Contractor
Con, Ops Final SEIS Page 2‐114 Explosives Safety Reduces the potential hazards related to the exposure to Munitions and Explosives of Concern (MEC).
BMP‐64 Terrestrial Bio Onsite Vegetation Waste Management Procedures
Green waste will be handled by the contractors at designated laydown areas within the limits of construction. Contractors will be required to divert all green waste. The larger‐sized green waste consisting of trees and stumps will be processed into mulch and the smaller‐sized green waste will be processed into compost. See also 2017 BO. Green waste would be processed in accordance with MCAG management procedures to prevent and reduce the spread of the invasive coconut rhinoceros beetle and little fire ant (DON 2016).
DoD and Contractor
Con 2015 BO and
2017 BO
2015 BO Page 41 and 2017 BO Page 45
Green Waste Help address invasive species pathways in compliance with Regional Biosecurity Plan
MIT‐1 Water Resources Refurbishment of the GWA Sewage System.
Section 2822(d) of the FY 2014 NDAA directed the Secretary of Defense to convene the Economic Adjustment Committee (EAC) established in Executive Order No. 127887 “to consider assistance, including assistance to support public infrastructure requirements, necessary to support the preferred alternative for the relocation of Marine Corps forces to Guam.”
Section 2822(d) further requires the EAC to submit a report to congressional defense committees which includes an Implementation Plan that addresses public infrastructure requirements necessary to support the preferred alternative identified in the Final SEIS.