M_DPRI_ProjctsCultrlHistrcResrceProcedre_for_InadvrtntDiscoveries.pdf

PDF 421 KB Posted

Attached to
FY20 MCON PROJECT P-459B, MCB CAMP BLAZ PARKING, US NAVSUPPACT MCB, GUAM
Solicitation number
N62742-23-R-1308
Issued by

About this file

This document contains a cultural/historic resource procedure for inadvertent discoveries on military relocation projects in Guam as well as a solicitation for the design and construction of a parking lot at Marine Corps Base Camp Blaz in Guam.

The cultural/historic resource procedure outlines steps to follow if potentially significant cultural or historic resources are discovered during work. These include immediately stopping work, protecting the discovery, evaluating it, and if significant, following stipulations in the 2011 Programmatic Agreement among DoD, the ACHP and SHPOs regarding discoveries and emergencies. The solicitation is for the design and build of a 240-stall parking lot at MCB Camp Blaz in Guam with a budget between $10-25 million under NAICS code 238990. The acquisition is set aside 100% for small businesses and proposals are due by March 2023 with award by April 2023. A site visit is scheduled for March 8, 2023 and interested parties must submit forms for base access and camera passes by February 9, 2023.

View the file

Other files

File Type Posted
P459B_Pt6-AttachB-RefDwgs_Amd6.pdf PDF
23R1308_Amd0006-Issued.pdf PDF
P459B_Pt6-AttachB-RefDwgs_Amd6_J-001B Specs.pdf PDF
23R1308_Amd0006-Specs.pdf PDF
23R1308-P459B Note 6-Issued.pdf PDF
23R1308_Amd0005-Issued.pdf PDF
23R1308-P459B Note 5-Issued.pdf PDF
P459B_Pt6-AttachB-RefDwgs_Amd5.pdf PDF
23R1308_Amd0004-Issued.pdf PDF
23R1308-P459B Note 4-Issued.pdf PDF
P459B_Pt6-AttachB-RefDwgs_Amd3.pdf PDF
23R1308_Amd0003-Issued.pdf PDF
23R1308-P459B Note 3-Issued.pdf PDF
23R1308_Amd0003-Specs.pdf PDF
23R1308-P459B Note 2-Issued.pdf PDF
23R1308_Amd0002-Issued.pdf PDF
23R1308_P459B_Amd2-Specs.pdf PDF
23R1308-P459B Note 1.pdf PDF
AMD 01 23R1308.pdf PDF
N_DPRI_ProjectsCulturalHistoricResourcePA_AppendixG.pdf PDF
A. J-037 Boring Logs.pdf PDF
A. J-001B Boring Logs.pdf PDF
A. J-301 Boring Logs.pdf PDF
D. 3D_J001B DP3FINAL WELLHD PROTECT PLAN 04JAN19.pdf PDF
C_ComprehensiveConstructionSWPPP(Nov 2014).pdf PDF
I_COMPREHENSIVE_WMP(Updated July 2015)-P459.pdf PDF
G_SMART_GRID_REQUIREMENTS_v4.0_8-23-2019.pdf PDF
J_GEPA_GuamSoilandErosionControlRegulations(April2000).pdf PDF
P_FinalGuamLandscapingGuidelines29June2011.pdf PDF
R_DesignApprovalConstructionPermitting(DACP).pdf PDF
B. J-001B_Dwgs_23Aug2019.pdf PDF
CDP_20140221.pdf PDF
N62742-23-R-1308 DB RFP.pdf PDF
O_(Alt) COCONUT RHINOCEROS BEETLE (CRB) AND LITTL FIRE ANT (LFA) MANAGEMENT PROCEDU.pdf PDF
O_CoconutRhinocerosBeetle(CRB)ManagementProcedures.pdf PDF
L_Clarif_of_Guidelnes Restrictns_for_Condctng_Topo_Survey.pdf PDF
D_MRESS_Amend No 7 Jan20r.pdf PDF
E. MILCON_Bedrock_Determination_Map.pdf PDF
F_Pre-Final_InstallationMasterPlan16April2018.pdf PDF
Q_OSD_WaterUseforLandscapeArch(3-10-17).pdf PDF
E_MCBG IAP_Final(April2011).pdf PDF
F. 02_210301 - J-301 Civil Dwgs - Rev2_signed.pdf PDF
K_GuamDPRI_PesticideSoilsManagementPlan_Nov2011.pdf PDF
C. J001B DOC DP2FINAL V9 DRAINAGE RPT 21NOV19.pdf PDF
A_MDACS-Final(Sept 2017).pdf PDF
H_MMTP.pdf PDF
B_NFM_PWUC_Rev2_(2018-11-15)Final(ApprovedSigned).pdf PDF
Show all 47

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DPRI (Military Relocation) Projects Cultural/Historic Resource Procedure for Inadvertent Discoveries

Revised April 2011

Anything found during the course of work in an area which could have cultural and/or historic significance shall be considered an inadvertent discovery and must be evaluated by a qualified cultural resource professional. DoD is responsible for all DoD owned or leased property.

Contractors are not to collect or dispose of any materials without prior approval from the

Government.

The procedures below shall be followed upon discovery of any potentially significant cultural and/ or historic resource, such as:

skeletal remains, dark stained soil with charcoal, shell or stone artifacts, stone walls, buried refuse containing bottles, ceramics or metal, buried building foundations or other structural remnants, caves, sinkholes or other subsurface cavities.

IMMEDIATE DISCOVERY PROCEDURE

1. Activity in the vicinity of the discovery will be immediately stopped until the Government’s DPRI Archaeologist (Mr. Ronnie Rogers) has, in association with the Command Joint Region Marianas Cultural Resource Manager (CJRM CRM), Mr. Lon Bulgrin (339 - 2093), assessed the discovery.

2. The Government’s DPRI Archaeologist and the Contractor will ensure that reasonable measures are taken to protect and stabilize the discovery.

3a. If Government’s DPRI Archaeologist determines that the discovery is not significant, no additional steps are required. The Government’s DPRI Archaeologist or CJRM CRM will notify the ROICC that activity may proceed.

3b. If the Government’s DPRI Archaeologist determines that the discovery is significant, it is an historic property and Stipulation XI of the March 2011 “Programmatic Agreement (PA) Among the Department of Defense, the Advisory Council on Historic Preservation, the Guam State Historic Preservation Officer, and the Commonwealth of the Northern Mariana Islands Regarding the Military Relocation to the Islands of Guam and Tinian” shall be followed.

XI. DISCOVERIES AND EMERGENCIES

A. A DoD archaeologist will monitor ground disturbing projects with the potential to affect historic properties, oversee coordination and execution of the mitigation measures outlined in the PA, and provide quality control. The Archaeologist will be responsible for supporting the CJRM in managing any inadvertent discoveries and emergencies consistent with the procedures defined below. If during the performance of the Undertaking, previously unknown archaeological sites are discovered and are not accounted for in an archaeological monitoring plan, then:

1. Any activities within the immediate area will be halted, and reasonable measures will be taken to avoid or minimize impacts to the discovery pending further review under subpart 2 of this Stipulation.

2. The DoD Archaeologist will evaluate the discovery to assess potential effects.

DoD will determine what actions can be taken to resolve adverse effects, if any, and notify the appropriate State Historic Preservation Officer (SHPO) and the Advisory Council on Historic Preservation (ACHP) within 48 hours. The SHPO and Council shall respond within two working days of the notification.

DoD shall take into account SHPO and ACHP recommendations regarding National Register eligibility and proposed actions, and then carry out appropriate actions. DoD shall provide the SHPO and ACHP a report of the actions when they are completed.

B. If during any part of the Undertaking, human remains are discovered, the applicable Standard Operating Procedures specified in Appendix G of the PA shall be followed (see reverse).

File details come from the government source that posted it. Updated .