This solicitation requests proposals for a design-build project to construct a 240-stall parking lot and perform associated site work at Marine Corps Base Camp Blaz in Guam. Offerors must submit both technical and price proposals, with evaluation factors including technical approach, experience, safety, and past performance. Proposals are due February 14, 2023, with award anticipated within 500 calendar days of award. The project value is estimated between $10-25 million. The solicitation is set aside 100% for small businesses. A pre-proposal site visit will be held on March 8, 2023. Interested firms must submit required forms and credentials by February 9, 2023 to attend. The Navy will issue the award.

View the file

Other files

File Type Posted
P459B_Pt6-AttachB-RefDwgs_Amd6.pdf PDF
23R1308_Amd0006-Issued.pdf PDF
P459B_Pt6-AttachB-RefDwgs_Amd6_J-001B Specs.pdf PDF
23R1308_Amd0006-Specs.pdf PDF
23R1308-P459B Note 6-Issued.pdf PDF
23R1308_Amd0005-Issued.pdf PDF
23R1308-P459B Note 5-Issued.pdf PDF
P459B_Pt6-AttachB-RefDwgs_Amd5.pdf PDF
23R1308_Amd0004-Issued.pdf PDF
23R1308-P459B Note 4-Issued.pdf PDF
P459B_Pt6-AttachB-RefDwgs_Amd3.pdf PDF
23R1308_Amd0003-Issued.pdf PDF
23R1308-P459B Note 3-Issued.pdf PDF
23R1308_Amd0003-Specs.pdf PDF
23R1308-P459B Note 2-Issued.pdf PDF
23R1308_Amd0002-Issued.pdf PDF
23R1308_P459B_Amd2-Specs.pdf PDF
23R1308-P459B Note 1.pdf PDF
AMD 01 23R1308.pdf PDF
A. J-037 Boring Logs.pdf PDF
A. J-001B Boring Logs.pdf PDF
A. J-301 Boring Logs.pdf PDF
D. 3D_J001B DP3FINAL WELLHD PROTECT PLAN 04JAN19.pdf PDF
C_ComprehensiveConstructionSWPPP(Nov 2014).pdf PDF
I_COMPREHENSIVE_WMP(Updated July 2015)-P459.pdf PDF
G_SMART_GRID_REQUIREMENTS_v4.0_8-23-2019.pdf PDF
M_DPRI_ProjctsCultrlHistrcResrceProcedre_for_InadvrtntDiscoveries.pdf PDF
J_GEPA_GuamSoilandErosionControlRegulations(April2000).pdf PDF
P_FinalGuamLandscapingGuidelines29June2011.pdf PDF
R_DesignApprovalConstructionPermitting(DACP).pdf PDF
B. J-001B_Dwgs_23Aug2019.pdf PDF
CDP_20140221.pdf PDF
N62742-23-R-1308 DB RFP.pdf PDF
O_(Alt) COCONUT RHINOCEROS BEETLE (CRB) AND LITTL FIRE ANT (LFA) MANAGEMENT PROCEDU.pdf PDF
O_CoconutRhinocerosBeetle(CRB)ManagementProcedures.pdf PDF
L_Clarif_of_Guidelnes Restrictns_for_Condctng_Topo_Survey.pdf PDF
D_MRESS_Amend No 7 Jan20r.pdf PDF
E. MILCON_Bedrock_Determination_Map.pdf PDF
F_Pre-Final_InstallationMasterPlan16April2018.pdf PDF
Q_OSD_WaterUseforLandscapeArch(3-10-17).pdf PDF
E_MCBG IAP_Final(April2011).pdf PDF
F. 02_210301 - J-301 Civil Dwgs - Rev2_signed.pdf PDF
K_GuamDPRI_PesticideSoilsManagementPlan_Nov2011.pdf PDF
C. J001B DOC DP2FINAL V9 DRAINAGE RPT 21NOV19.pdf PDF
A_MDACS-Final(Sept 2017).pdf PDF
H_MMTP.pdf PDF
B_NFM_PWUC_Rev2_(2018-11-15)Final(ApprovedSigned).pdf PDF
Show all 47

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DPRI (Military Relocation) Projects Cultural/Historic Resource Programmatic Agreement (PA) Appendix G

Standard Operating Procedure for Discovery of Human Remains Revised April 2011

If human remains (or remains thought to be human) are discovered during the performance of activities on a DPRI project, the Contractor shall immediately cease all activities in the vicinity of the find, secure the area and follow the procedures outlined below.

1. The Contractor shall notify the ROICC and Government DPRI Archaeologist.

2. The ROICC and DPRI Archaeologist will further protect and secure the remains and any associated cultural material.

3. The DPRI Archaeologist shall determine if the skeletal remains are animal or human. This shall be done through a professional trained in the identification of human remains (such as an archaeologist, physical anthropologist, forensic specialist).

4. If the remains are human and were uncovered during a Navy construction project, the DPRI Archaeologist/CJRM CRM shall notify the contracting officer associated with the specific project per the contract clause referencing these procedures. Work shall stop within the immediate vicinity of the find. The contracting officer shall also be notified of all subsequent consultations regarding the remains.

5. Once determined to be human, the DPRI archaeologist, in association with the CJRM cultural resource manager, shall determine the age of deposition (time period) and ethnicity:

a. If the remains are determined to be modern, Naval Criminal Investigative Services (NCIS) will be notified by the DPRI Archaeologist or CJRM CRM.

b. If the remains are determined to be from World War II (WWII), pending jurisdiction, one of the following entities will be notified by the DPRI Archaeologist or CJRM CRM: NAVFAC Marianas Community Affairs/Public Relations Office, Joint POW/ MIA Accounting Command, or Consulate General of Japan. In all cases, a courtesy call will be made to the Guam SHPO to inform them that human skeletal remains from WWII were uncovered. However, the agencies listed above have jurisdiction over human remains from this time period.

c. If the remains are determined to be older than 50 years and not associated with WWII, the DPRI archaeologist, under the oversight of the CJRM cultural resource manager, shall notify the SHPO within three working days of the identification that the skeletal remains are human and are historic or prehistoric in nature.

d. If the age and/or ethnicity of the remains cannot be determined, the DPRI Archaeologist shall notify and consult with the Guam SHPO. Based on the consultation, a decision will be made to either preserve the remains in place or to remove them for further analysis in hopes that the age of deposition and ethnicity can eventually be determined so that the appropriate protocols can be followed.

File details come from the government source that posted it. Updated .