About this file

This document contains a solicitation for a design-build project to construct a parking lot at Marine Corps Base Camp Blaz in Guam. Key details include:

  • The project scope is for the design and construction of a 240-stall parking lot covering 10,350 square yards, including grading, landscaping, and site lighting. The estimated value is between $10-25 million.

  • The NAICS code is 238990 for All Other Specialty Trade Contractors. Responses are due by February 09, 2023. The contract completion period is 500 calendar days.

  • The acquisition is set aside 100% for small businesses. The source selection will be based on a best value tradeoff of technical and price proposals.

  • Evaluation factors include technical approach, construction and design experience, safety record, and past performance.

  • A mandatory site visit will be held on March 08, 2023. Instructions are provided for obtaining necessary access credentials for attendees with and without existing Defense Biometric Identification System credentials.

  • Responses must follow instructions for submitting all required forms and information to the Naval Base Guam Visitor Control Center for processing base access.

View the file

Other files

File Type Posted
P459B_Pt6-AttachB-RefDwgs_Amd6.pdf PDF
23R1308_Amd0006-Issued.pdf PDF
P459B_Pt6-AttachB-RefDwgs_Amd6_J-001B Specs.pdf PDF
23R1308_Amd0006-Specs.pdf PDF
23R1308-P459B Note 6-Issued.pdf PDF
23R1308_Amd0005-Issued.pdf PDF
23R1308-P459B Note 5-Issued.pdf PDF
P459B_Pt6-AttachB-RefDwgs_Amd5.pdf PDF
23R1308_Amd0004-Issued.pdf PDF
23R1308-P459B Note 4-Issued.pdf PDF
P459B_Pt6-AttachB-RefDwgs_Amd3.pdf PDF
23R1308_Amd0003-Issued.pdf PDF
23R1308-P459B Note 3-Issued.pdf PDF
23R1308_Amd0003-Specs.pdf PDF
23R1308-P459B Note 2-Issued.pdf PDF
23R1308_Amd0002-Issued.pdf PDF
23R1308_P459B_Amd2-Specs.pdf PDF
23R1308-P459B Note 1.pdf PDF
AMD 01 23R1308.pdf PDF
N_DPRI_ProjectsCulturalHistoricResourcePA_AppendixG.pdf PDF
A. J-037 Boring Logs.pdf PDF
A. J-001B Boring Logs.pdf PDF
A. J-301 Boring Logs.pdf PDF
C_ComprehensiveConstructionSWPPP(Nov 2014).pdf PDF
I_COMPREHENSIVE_WMP(Updated July 2015)-P459.pdf PDF
G_SMART_GRID_REQUIREMENTS_v4.0_8-23-2019.pdf PDF
M_DPRI_ProjctsCultrlHistrcResrceProcedre_for_InadvrtntDiscoveries.pdf PDF
J_GEPA_GuamSoilandErosionControlRegulations(April2000).pdf PDF
P_FinalGuamLandscapingGuidelines29June2011.pdf PDF
R_DesignApprovalConstructionPermitting(DACP).pdf PDF
B. J-001B_Dwgs_23Aug2019.pdf PDF
CDP_20140221.pdf PDF
N62742-23-R-1308 DB RFP.pdf PDF
O_(Alt) COCONUT RHINOCEROS BEETLE (CRB) AND LITTL FIRE ANT (LFA) MANAGEMENT PROCEDU.pdf PDF
O_CoconutRhinocerosBeetle(CRB)ManagementProcedures.pdf PDF
L_Clarif_of_Guidelnes Restrictns_for_Condctng_Topo_Survey.pdf PDF
D_MRESS_Amend No 7 Jan20r.pdf PDF
E. MILCON_Bedrock_Determination_Map.pdf PDF
F_Pre-Final_InstallationMasterPlan16April2018.pdf PDF
Q_OSD_WaterUseforLandscapeArch(3-10-17).pdf PDF
E_MCBG IAP_Final(April2011).pdf PDF
F. 02_210301 - J-301 Civil Dwgs - Rev2_signed.pdf PDF
K_GuamDPRI_PesticideSoilsManagementPlan_Nov2011.pdf PDF
C. J001B DOC DP2FINAL V9 DRAINAGE RPT 21NOV19.pdf PDF
A_MDACS-Final(Sept 2017).pdf PDF
H_MMTP.pdf PDF
B_NFM_PWUC_Rev2_(2018-11-15)Final(ApprovedSigned).pdf PDF
Show all 47

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

NAVFAC PACIFIC/MARIANAS

WELLHEAD PROTECTION PLAN

FINAL SUBM ITTAL

10/23/ 2018

TABLE OF

CONTENTS 1 PROJECT LOCATION………………………………… 1

2 PROJECT DESCRIPTION…………………………………2

3 PURPOSE

4 STORM WATER DRAINANGE……………………

4.1 STORMWATER REQUIREMENTS ................. …….5

4.2 DESIGN APPROACH

5 CONCLUSION

6 REFERENCES …………………………………………9

7 APPENDIX

APPENDICES

A EXHIBIT A: WELL HEADS IMPACTED BY THE NEW SITE LAYOUT

B EXHIBIT B: CONFLICTING HIGH RISK ACITVITIES WITH WELL HEAD

PROTECTION AREAS

C EXHIBIT C: ONSITE INFILTRATION BASIN/SWALE DETAILS

1 PROJECT LOCATION

The site is located in Finegayan in Northern Guam, adjacent to the junction of Route 3 and Route 3A.

2 PROJECT DESCRIPTION

The J-001B USMC Main Cantonment project is a new operations base for the Marine Corps in Guam.

The project is intended to provide grading, drainage, utilities and roads to support future development in the central area of the Marine Corps Cantonment site. The site is located in Northern Guam within the limestone bedrock dominated region. The project includes storm water treatment and conveyance, water distribution, sewer services, electrical services, comm unication lines and roadways. To facilitate these utilities a water tank and treatment facility, lift stations, and an electrical substation are included in the project. The project also includes parking spaces along one portion of the new roadway system. The project will be served by six infiltration basins, three within the wellhead protection zone (Basins 1,2 and 4) and three outside of the wellhead protection zone (Basins 3,5 and 6). All six basins will be lined.

In accordance with 22GAR-7 §7130 – Wellhead Protection for Public Water Supply Wells projects that are partially or entirely located within 1,000 ft radius of any public utility potable water supply well, must obtain Guam Environmental Protection Agency (GEPA) approval to construct such facilities. This area within the 1000 ft radius is defined as the wellhead protection zone. It is the intent of this report to present the strategy that will be implemented within the wellhead protection zone to protect and preserve groundwater quality.

3 PURPOSE

The purpose of this report is to provide guidelines to

1- Preserve the potable wells within the project boundaries and outside the limits of the project area

2- Restore to an equivalent or improved condition of potable water wells upon completion of work

3- Confine construction activities to within the limits of the work indicated or specified 4- Avoid incompatible development and incompatible land use within wellhead protection zones during construction and operations.

5- Provide a summary of the stormwater management strategy within the wellhead protection area to address stormwater disposal concerns.

There are four existing Navy water wells within the project site, an offsite Navy and offsite GWA water well have wellhead protection zones that overlap the construction site, those wells are indicated in Exhibit A.

Around each well is a 305 m (1,000ft) radius wellhead protection zone in which stormwater basins and high risk pollution hot spots should be minimized and storm water treated for pollution in order to protect the water quality of the aquifer serving the wells. Four existing wells will be adjusted due to site grade changes; existing wells shall remain operational and only one well can be taken out off-line at a time for extended outages.

Exhibit B identifies high risk activities or land use within the wellhead protection area (WHPA) that meets any of the following categories:

A. Vehicle fueling stations B. Vehicle service and maintenance facilities C. Vehicular and equipment cleaning facilities D. Outdoor loading or unloading facilities (storage, warehouse, comm ercial) E. Facilities generating or storing liquid waste, solid waste, or hazardous waste F. Dining/ food preparation facilities G. Engineering training pit (outdoor area to train operators using earth moving or other large equipment) H. Storm water disposal facilities (unlined storm water basins) I. Parking Lots of more than 12 stalls

4 STORM WATER DRAINAGE

The proposed grading associated with the project will divide the site into six drainage areas each served by a regional basin. Three of the five basins (Basins 1,2 & 4) are located partially or wholly within the wellhead protection areas. In order to protect the wellheads, storm water will be treated prior to reaching groundwater zones. An integrated treatment control strategy that includes bioswales/bioretention trenches and biofiltration within infiltration basins will be incorporated into the project design to ensure the storm water pollutants are treated adequately prior to recharge to the aquifer.

Initial pollutant sources include parking lots and roadways, which will be expanded to include other land uses as the project area develops. Anticipated pollutants include pathogens, metals, nutrients, organic compounds, sediments, trash, oil & grease.

Bioretention also known as biofiltration will be the primary strategy used for stormwater treatment and has been demonstrated to be a highly effective stormwater treatment strategy that relies on physical, chemical and biological processes to treat stormwater runoff. This treatment strategy uses the natural removal processes of soil during infiltration of stormwater. For pollutant removal, bioretention is the best practice amoung BMPs (William Hunt, 2012 Stormwater Report). Common particles removed from stormwater via bioretention include particulate organic matter, phosphorus, and suspended solids. Biological processes that occur result in pollutant uptake by microorganisms in the soil. Microbial activity within the soil also contributes to the removal of nitrogen and organic matter. Nitrogen is removed by nitrifying and denitrifying bacteria, while aerobic bacteria contribute to the decomposition of the organic matter.

The removal effectiveness of bioretention has been studied during field and laboratory studies conducted by the University of Maryland (Davis et al, 2001). Removal for typical stormwater pollutants are shown in Table 1.

Table 1. Bioretention Removal Effectiveness (Davis et al. 2001)

Bioretention has also been studied and shown to function effectively overtime (Lucke and Nichols, 2015).

While local Guam manuals allow for multiple options for stormwater treatment, bioretention will be used as the primary treatment strategy due to the effectiveness to remove pollutants from stormwater and preserve groundwater quality.

4.1 STORMWATER REQUIREMENTS

In accordance with UFC 3-210-10 N the storm water treatment strategy will be designed to capture and treat 95% of the average annual runoff 55.9 mm (2.2 inches). Per the CNMI and Guam Stormwater Management Manual, the post construction storm water management strategy shall meet Recharge Criteria, Water Quality Criteria, Channel Protection Criteria and Flood Control Criteria.

The primary process for treatment will be through infiltration/biofiltration through proposed engineered soil media. The 95% percentile runoff will be completely retained and filtered. Biofiltration swales that will be constructed with check dams will provide retention of the 95% percentile runoff and allow runoff to percolate through an engineered soil media that will comprise of organics, clay, silt and sand. This strategy is high removal rates for stormwater pollutants.

4.2 DESIGN APPROACH

In accordance with UFC 3-210-10N and the CNMI and Guam Stormwater Management Manual, The 95% storm will be completely captured and treated within the roadside V and trapezoid swales, the 1 year storm will be fully captured with swales and infiltration basins, and the difference between the pre and post construction runoff for the 25 year storm will be captured within the infiltration basins. The proposed grading will divide the site into six drainage areas each served by an infiltration basin (See Figure 1).

Figure 1. Drainage Basins

All basins will be lined with bioretention soil media to promote the removal of stormwater contaminants.

Stormwater will percolate through the engineered soil media where pollutants will be removed via adsorption, absorption and ion exchange. The basin bottoms will consist of 760 mm (30 inches) of soil media for stormwater treatment, underlain by 50 mm (2 inches) of class 2 permeable and 100 mm (4 inches) of gravel to allow for equal distribution of infiltration into underlying bedrock.

Figure 2. Lined Basin Typical Section

Roadside swales will consist of v shape or trapezoidal shape and will also be lined with a surface layer of either grass/mulch or limestone coral rock depending on the slope and velocity. All swales sections will include a minimum of 760 mm (30 inches) of soil media to promote the removal of stormwater contaminants (see Figure 3&4). Check dams will be placed intermittently to promote retention and subsequent filtration through the engineered soil media. Two V shaped swales outside of the wellhead protection zone do not have treatment media (north side of Road 5 between Roads 2 and 6). The perimeter road swales are also not required to have treatment media.

Figure 3. Lined V Swale Typical Sections

This design approach will address runoff from the roadway, future lot developments and the proposed infrastructure buildings for wells, pump stations and water treatment. Bioretention within the roadside swales is sized to treat the 95% percentile runoff. Therefore it can be concluded that only 5% of average annual rain events will exceed the swale treatment capacity and spill to the basins. The 1 year 24 hour storm is completely retained within a combination of the swales and infiltration basins. The basins have also been sized to retain the difference between the pre and post construction runoff for the 25 year storm.

Figure 4. Lined Trapezoid Swale Typical Sections

CONCLUSION

The proposed integrated strategy outlined in this discussion, which includes bioretention/biofiltration for primary treatment of storm water within the wellhead zone and avoids incidental infiltration directly into bedrock will provide a highly effective treatment strategy for storm water pollutants while protecting groundwater quality. These treatment strategies comply with the CNMI/Guam Stormwater Management Manual and the UFC 3-210-10 N. Stormwater that has been treated will then infiltrate into underlying bedrock and allowed to percolate down to the groundwater zone. All Infiltration basins will be lined. Bioretention/biofiltration is a highly effective strategy for removing storm water pollutants and will ensure protection of groundwater quality.

This narrative has clearly presented the proposed conceptual treatment strategy within the wellhead zone and that stormwater will be treated with a highly effective strategy to preserve groundwater quality. Calculations for stormwater facilities is provided in the drainage report. An inspection and maintenance plan will also be developed to ensure the bioretention swales and basins are maintained to preserve functionality over the design life.

REFERENCES

2006 CNMI and Guam Stormwater Management Manual, October 2006

UFC 3�201�01 Civil Engineering, 01 June 2013

UFC 3�210�10N Low Impact Development, 6 April 2010

Best Management Practices for Wellhead Protection Northern Guam Lens Aquifer, December 2010

Conceptual Grading, Drainage, and Low Impact Development Guam and CNMI Military Relocation, August 2013

Soil Survey of Territory of Guam, May 1988

Site Characterization Study NCTS Finegayan, Guam, Mariana Islands, 31 July 2008

Hunt, William (2012, June) Why is Bioretention So Popular. The Stormwater Report

Davis, A.P., Shokouhian, M., Sharma, H. and Minami, C., “Laboratory Study of Biological Retention (Bioretention) for Urban Stormwater Management, “ Water Environ. Res., 73(1), 5-14 (2001).

Normal millerj Text Box

APPENDIX

A EXHIBIT A

Typewriter Basin 1 millerj Typewriter Basin millerj Typewriter Basin 2 millerj Typewriter millerj Typewriter Basin millerj Typewriter millerj Typewriter millerj Typewriter Basin millerj Typewriter Basin

Polygon Line

B EXHIBIT B

C EXHIBIT C

N A

V

FA

C P

A C

IF

IC

CR501

J-

1B F

IN

E

G A

Y A

N U

TI

LI

TI

E

S A

N D

S

IT

E

IM

P R

O V

E M

E N

TS

P

H A

S E

SECTION F-F

PLAN VIEW

F F

G G

SECTION G-G

POST CONSTRUCTION

CHECK DAM

GRASSY V-SWALE

SECTION

CONCRETE BROW DITCH

1M m m m m

1M

CORAL V-SWALE

SECTION

GRASS D TCH NO

TREATM NT

PLAN VIEW

GRASSY TRAP SWALE

SECTION

CORAL TRAP SWALE

SECTION

CURB & GUTTER

CURB RAMP - TYPE A CURB RAMP - TYPE C

WATER DEFLECTORA3

CR501

C2

CR501

C1

CR501

C4

CR501

C3

CR501

A1

CR501

B3

CR501

B4

CR501

B2

CR501

B1

CR501

A5

CR501

WELLHEAD PROTECTION PLAN
TABLE OF CONTENTS
1 PROJECT LOCATION
2 PROJECT DESCRIPTION
3 PURPOSE
4 STORM WATER DRAINAGE
4.1 STORMWATER REQUIREMENTS
4.2 DESIGN APPROACH
4.3 ADDITIONAL INFILTRATION BASINS
CONCLUSION
APPENDIX
Exhibit A
APPENDIX
Exhibit B
APPENDIX
Exhibit C
955 J001B-1147910-CR-5-01-DETAILS
A1
A2
A3
A4
A5
B1
B2
B3
B4
B5
C1
C2
C3
C4
C5
D1
D2
D3
D4
D5

File details come from the government source that posted it. Updated .