This document is a Task Group Instruction (TGI) for replacing Collecting, Holding, and Transfer (CHT) piping on the USS Blue Ridge (LCC-19). The work involves replacing CHT piping in multiple locations, including the Crew Living Space, Passage, Storeroom, and A/C Machinery Room, with copper-nickel 70-30 Class 200 piping in 4-inch and 5-inch sizes. The project is scheduled to begin on 7/21/2026 and complete by 11/21/2027, with a contractor (KTR) responsible for removing existing piping, fabricating and installing new piping, conducting hydrostatic tests, and applying insulation.
The detailed material list includes various pipe tubes, elbows, tees, flanges, sleeves, and insulation materials, primarily from K-Flex and specified to MIL standards. The instruction notes potential asbestos and lead hazards and requires compliance with specific testing and installation procedures. SRF-JRMC will provide government-furnished services including crane rigging, utility services, safety inspections, and quality assurance inspections. The project is categorized as a Class P-2 piping job with Cleanliness Level III for the piping system and equipment.
View the file
Other files
Show all 34
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
FOUO
WebAIM Short Form TASK GROUP INSTRUCTION
26-NOV-2024 1416
20.14.15.2.9020 (September 2024) ICN: 3819P59301 KeyOp: A01
COMPONENT NAME: TYPE: PHASE: REPEAT: CHG/VER:TGI NO: CHT PPG AY A 0 0/0
SHIP/HULL NO: SHIP/HULL NAME: PROJECT: SYSTEM: PLANT ID: CASREP CAT:
LCC-19 USS BLUE RIDGE 19P
CU PHASE TITLE: *F/O - REPLACE CHT PP IN 5-40-01-L AND 6-61-2-L
WORK CERTIFICATION SIGNATURES: DLs
COMPLETION OF WORK REVIEW: BADGE NO: SHOP/CODE: PHONE: DATE:
RECORDS REVIEW: BADGE NO: SHOP/CODE: PHONE: DATE:
FOUO Pg 1 of 8
ER013511 * ER013501
PREPARING ACTIVITY: STATUS: APP WORKING STATUS:
PREPARED BY: CODE: PHONE: DATE:
INOMATA, YOSHIYUKI 234 3152434536 21-NOV-2024
APPROVED BY: CODE: PHONE: DATE:
SHINMEI, HIDEKUNI 234 3152432371 21-NOV-2024
CONCURRED BY: CODE: PHONE: DATE:
REASON FOR WORK/NEED FOR CHANGE:
JCN:
ER01-3501 * ER01-3511
SPECIAL REQUIREMENTS:
CU PHASE DESCRIPTION:
ZONE MANAGER: ZONE: COMPARTMENT: LEVEL: FRAME: SIDE:
YAGINUMA, TAKEHIDE
JOB SUMMARY ID: TOT MAN HR.: TOT DUR: TOT JML COST: PLANNING ACCEPTANCE:
593A1101
1. SCOPE/PURPOSE:
1.1 Title: Replacement of Collecting, Holding, and Transfer (CHT) Piping; accomplish
1.2 Location of Work:
1.2.1 Crew Living Space (5-40-01-L)
1.2.2 Passage (6-61-2-L)
1.2.3 Storeroom (6-52-4-A)
1.2.4 A/C Machinery Room No. One (7-40-0-E)
1.3 Identification:
1.3.1 Quantity (One Lot), CHT Piping located in 1.2.1
TGI Short Form
26-NOV-2024 1416
20.14.15.2.9020 (September 2024) (Continued) ICN: 3819P59301 KeyOp: A01
COMPONENT NAME: TYPE: PHASE: REPEAT: CHG/VER:TGI NO: CHT PPG AY A 0 0/0
SHIP/HULL NO: SHIP/HULL NAME: PROJECT: SYSTEM: PLANT ID: CASREP CAT:
LCC-19 USS BLUE RIDGE 19P
CU PHASE TITLE: *F/O - REPLACE CHT PP IN 5-40-01-L AND 6-61-2-L
FOUO Pg 2 of 8
CU PHASE DESCRIPTION (Cont.)
Size: 4 Inch IPS (4.500 Inch OD x 0.109 Inch WT) Material: Cu-Ni 70-30, CL 200 Specification: MIL-T-16420 Remarks: See Sheet 5 of Ref. No. 3, Sheet 4 (PART PLAN 5th DK) of Ref. No. 4, Sheet 5 (Zone 42-F) of Ref. No. 5 and
Sketch Enclosure-01 for details.
1.3.1.1 Quantity (55 FT), Pipe Lagging
Pipe Size: 4 Inch IPS Insulation: EB-4013 Lagging: MIL-C-20079, Type I, Class 3
1.3.2 Quantity (One Lot), CHT Piping located in 1.2.2 and 1.2.3 Size: 5 Inch IPS (5.563 Inch OD x 0.125 Inch WT)
4 Inch IPS (4.500 Inch OD x 0.109 Inch WT) Material: Cu-Ni 70-30, CL 200 Specification: MIL-T-16420 Remarks: See Sheet 2 (Zone 6-D) and Sheet 3 (ELEVATION VIEW 10C) of Ref. No. 6, Sheet One (Zone 5-B) of Ref. No.
7, and Sketch Enclosure-02 for details.
1.4 Security Classification: None.
1.5 Initial Condition:
1.5.1 Potential Asbestos Hazard.
1.5.2 Potential Lead Hazard.
1.6 Contractor work start date: 7/21/2026
1.7 Contractor work completion date: 11/21/2027
2. PROCEDURE:
2.1 Remove existing, fabricate and install each new CHT piping listed in 1.3.1 and 1.3.2, using Ref. No. 3 through Ref. No. 7, Enclosure-01 and Enclosure-02 for guidance.
2.1.1 Accomplish the requirements of 009-09 of Ref. No. One for the certification process.
2.1.2 Accomplish the requirements of 009-12 of Ref. No. One, including Table One, Column(s) A, Lines One through 10.
2.1.3 Accomplish the requirements of 009-12 of Ref. No. One, including Table 2, Column(s) A, Lines One through 7.
2.1.4 Accomplish the requirements of 009-71 of Ref. No. One for hydrostatic test, using clean, fresh water at 60 PSIG, for each new and disturbed CHT piping systems listed in 1.3.1.
2.1.4.1 Document shop hydrostatic test results on QA Form 28 Enclosure-03-1.
2.1.5 Accomplish the requirements of 009-71 of Ref. No. One for hydrostatic test, using clean, fresh water at 50 PSIG, for each new and disturbed CHT piping systems listed in 1.3.2.
26-NOV-2024 1416
20.14.15.2.9020 (September 2024) (Continued) ICN: 3819P59301 KeyOp: A01
COMPONENT NAME: TYPE: PHASE: REPEAT: CHG/VER:TGI NO: CHT PPG AY A 0 0/0
SHIP/HULL NO: SHIP/HULL NAME: PROJECT: SYSTEM: PLANT ID: CASREP CAT:
LCC-19 USS BLUE RIDGE 19P
CU PHASE TITLE: *F/O - REPLACE CHT PP IN 5-40-01-L AND 6-61-2-L
FOUO Pg 3 of 8
CU PHASE DESCRIPTION (Cont.)
2.1.5.1 Document shop hydrostatic test results on QA Form 28 Enclosure-03-2.
2.2 Accomplish the requirements of 009-11 of Ref. No. One for installation each new insulation and lagging listed in 1.3.1.1, using Ref. No. 3 through Ref. No. 5 for guidance.
2.3 Accomplish the requirements of 009-32 of Ref. No. One for each new and disturbed surface.
2.4 Notes:
2.4.1 Planner: Code 234 Y. Inomata, 080-9350-1347
Planner: Code 234 O. Mitsui, 243-0976 Planner: Code 231B H. Tanaka, 243-4491
2.4.2 Work Integration Manager (WIM): Code 333 T. Yaginuma, 080-5419-0598
2.4.3 JCN ER01-3501 and ER01-3511 are related to this TGI.
2.5 Government Furnished Material (GFM):
2.5.1 SRF-JRMC will provide GFM listed in the Material List.
2.6 SRF-JRMC will provide the following service work: (TGI No. 3819P59301S02).
2.6.1 [C740] Crane and crane rigging service.
2.6.2 [X99E] Utility service, electrical.
2.6.3 [X99M] Utility service, including low pressure air supply, water supply, and steam supply.
2.6.4 [C106.1] Safety inspection for SRF-JRMC employees.
2.6.5 [C106.2] Gas free inspection for SRF-JRMC employees.
2.6.6 [C133] QA inspection for (G) symbol(s).
26-NOV-2024 1416
20.14.15.2.9020 (September 2024) (Continued) ICN: 3819P59301 KeyOp: A01
COMPONENT NAME: TYPE: PHASE: REPEAT: CHG/VER:TGI NO: CHT PPG AY A 0 0/0
SHIP/HULL NO: SHIP/HULL NAME: PROJECT: SYSTEM: PLANT ID: CASREP CAT:
LCC-19 USS BLUE RIDGE 19P
CU PHASE TITLE: *F/O - REPLACE CHT PP IN 5-40-01-L AND 6-61-2-L
FOUO Pg 4 of 8
OTHER SPECIAL REQUIREMENTS:
CLASS P-2 PIPING.
CLEANLINESS FOR PIPING SYSTEM/EQUIPMENT LEVEL III.
Ref.
No.
Document/Drawing Number DOCUMENT/DRAWING TITLE REV
CHG
NO.
CPY
REQ PARAGRAPH SECT PG CHPT
1 NSI FY-25 NAVSEA Standard Items - ORG N 2 LI FY-25 Local Standard Items - ORG N
3 PDD 505-ELM-
120250
REPLT OF CHT PUMP NO.1 &
2 SUCT & DISCH PP
- Y 1,3, 4 DWG 528-4346220 CHT PIPING SYSTEM
SUCTION & DISCHARGE TKS
#1,2,3 & 4
C Y 4
5 DWG 505-5341776 MODIFICATIONS TO
COLLECTING, HOLDING AND
TRANSFER SYS UPGARDE
G Y 5
6 DWG 528-4346215 COLLECTION HOLDING &
TRANSFER SYSTEM PIPING
ARRANGMENT FR 52-76 1ST
PLTF
B Y ALL
7 DWG 528-4346273 PLUMBING DRAINS $
COLLECTING, HOLDING &
TRANSFER SYSTEM DIAG-
PLANS 5TH DK & BL
- Y 1
TASK NAME / TASK DESCRIPTION
SHOP/
TSD TS
SF
WC
CREW
# MHRS RWRK
N
N
N
. N
N
MATERIAL LIST
ITEM
NO.
PC
NO.
REF
NO.
M
C DESCRIPTION
STOCK
NUMBER
GENERIC
MATL
TYPE LVL QA
HAZ
MAT
DOC
NO.
QTY
REQD/
UNIT
QTY
USED/
UNIT
MATERIAL REFERENCES
REF
NO.
DOCUMENT/DRAWING NUMBER DOCUMENT/DRAWING TITLE
REV
ICN: 3819P59301 KEY OP: A01
26-NOV-2024 1416
20.14.15.2.9020 (September 2024) (Continued) ICN: 3819P59301 KeyOp: A01
COMPONENT NAME: TYPE: PHASE: REPEAT: CHG/VER:TGI NO: CHT PPG AY A 0 0/0
SHIP/HULL NO: SHIP/HULL NAME: PROJECT: SYSTEM: PLANT ID: CASREP CAT:
LCC-19 USS BLUE RIDGE 19P
CU PHASE TITLE: *F/O - REPLACE CHT PP IN 5-40-01-L AND 6-61-2-L
FOUO Pg 5 of 8
MATERIAL LIST
ITEM
NO.
PC
NO.
REF
NO.
M
C DESCRIPTION
STOCK
NUMBER
GENERIC
MATL
TYPE LVL QA
HAZ
MAT
DOC
NO.
QTY
REQD/
UNIT
QTY
USED/
UNIT
001 M TUBE,MET, 4"IPS, 70-30, #200
ORDERED FOR KTR
ORIG:C234 Y.INOMATA, 243-
9B 4710 006048328 NA 4 N 42955264 20/FT
002 M TUBE,MET, 4"IPS, 70-30, #200
ORDERED FOR KTR
ORIG:C234 Y.INOMATA, 243-
9B 4710 006048328 NA 4 N 42955263 20/FT
003 M TUBE,MET, 4"IPS, 70-30, #200
ORDERED FOR KTR
ORIG:C234 Y.INOMATA, 243-
9B 4710 006048328 NA 4 N 42955262 20/FT
004 M TUBE,MET, 4"IPS, 70-30, #200
ORDERED FOR KTR
ORIG:C234 Y.INOMATA, 243-
9B 4710 006048328 NA 4 N 42955261 20/FT
005 M ELBOW,PI, 4"IPS, 70-30,
90DEG, BW, LR
ORDERED FOR KTR
ORIG:C234 Y.INOMATA, 243-
9B 4730 014283175 NA 4 N 42955258 4/EA
006 M ELBOW,TU, 4"IPS, 70-30,
45DEG, BW
ORDERED FOR KTR
ORIG:C234 Y.INOMATA, 243-
9B 4730 007254005 NA 4 N 42955256 8/EA
007 M TEE,PIPE, 4"IPS, 70-30, BW
ORDERED FOR KTR
ORIG:C234 Y.INOMATA, 243-
9B 4730 014397295 NA 4 N 42955255 1/EA
008 M ELBOW 90, 4"IPS, BW,, ELBOW
90, 4"IPS, BW, SR, 70/30,
200PSI
ORDERED FOR KTR
ORIG:C234 Y.INOMATA, 243-
9B 4730 LL4462310 NA 4 N 42957580 2/EA
009 M BACKING RING. 4"IPS,
BACKING RING. 4"IPS, CNA
70/30, 200PSIG
ORDERED FOR KTR
ORIG:C234 Y.INOMATA, 243-
9B 4730 LL4358122 NA 4 N 42957578 32/EA
010 M SLEEVE, 4"IPS, BW, SLEEVE,
4"IPS, BUTT WELD, CU-NI 70-
30, 200PSI, DWG: 810-1385880
ORDERED FOR KTR
ORIG:C234 Y.INOMATA, 243-
9B 4730 LL4462305 NA 4 N 42957579 10/EA
011 M TUBE,METALLIC, 5" IPS, CU-NI
70-30, CL200
ORDERED FOR KTR
ORIG:C234 O.MITSUI 243-0976
9B 4710 006048366 NA 4 N 43035063 15/FT
012 M TUBE,METALLIC, 4" IPS, CU-NI
70-30, CL200
ORDERED FOR KTR
ORIG:C234 O.MITSUI 243-0976
9B 4710 006048328 NA 4 N 43035066 5/FT
26-NOV-2024 1416
20.14.15.2.9020 (September 2024) (Continued) ICN: 3819P59301 KeyOp: A01
COMPONENT NAME: TYPE: PHASE: REPEAT: CHG/VER:TGI NO: CHT PPG AY A 0 0/0
SHIP/HULL NO: SHIP/HULL NAME: PROJECT: SYSTEM: PLANT ID: CASREP CAT:
LCC-19 USS BLUE RIDGE 19P
CU PHASE TITLE: *F/O - REPLACE CHT PP IN 5-40-01-L AND 6-61-2-L
FOUO Pg 6 of 8
MATERIAL LIST
ITEM
NO.
PC
NO.
REF
NO.
M
C DESCRIPTION
STOCK
NUMBER
GENERIC
MATL
TYPE LVL QA
HAZ
MAT
DOC
NO.
QTY
REQD/
UNIT
QTY
USED/
UNIT
013 M LATERAL, LATERAL. BUTT
WELD, SIZE: 5" X 5" X 4"IPS,
MATL: CU-NI 70/30,
PRESSURE: 200 PIS, DWG:
810-1385880, SPEC: MIL-C-
15726.
ORDERED FOR KTR
ORIG:C234 O.MITSUI 243-0976
9B 4730 LL9311056 NA 4 N 43247477 1/EA
014 M FLANGE,PIPE, 5" IPS, CU-NI
70-30, SW, 150PSI
ORDERED FOR KTR
ORIG:C234 O.MITSUI 243-0976
9B 4730 014635647 NA 4 N 43035064 1/EA
015 M ELBOW 45DEG, ELBOW
45DEG, BUTT WELD, SIZE:
5"IPS, MATL: CU-NI 70/30,
PRESSURE: 200PSI, DWG: 810-
1385880, PREMIER COPPER P/N:
87104650.
ORDERED FOR KTR
ORIG:C234 O.MITSUI 243-0976
9B 4730 LL4462316 NA 4 N 43247466 2/EA
016 M ELBOW,TUBE, ELBOW 45, 4"
IPS, CU-NI 70-30, BW
ORDERED FOR KTR
ORIG:C234 O.MITSUI 243-0976
9B 4730 007254005 NA 4 N 43035067 1/EA
017 M BACKING, BACKING RING,
5"IPS, CU-NI 70/30, 200PSIG,
MIL-STD-22
ORDERED FOR KTR
ORIG:C234 O.MITSUI 243-0976
9B 4730 LL4480106 NA 4 N 43037407 7/EA
018 M BACKING, 4" IPS, CU-NI 70-30,
200PSIG
ORDERED FOR KTR
ORIG:C234 O.MITSUI 243-0976
9B 4730 LL4358122 NA 4 N 43037404 4/EA
019 M SLEEVE,, 4" IPS, CU-NI 70-30,
BW
ORDERED FOR KTR
ORIG:C234 O.MITSUI 243-0976
9B 4730 LL4462305 NA 4 N 43037405 1/EA
020 M SLEEVE,, 5" IPS, CU-NI 70-30,
BW
ORDERED FOR KTR
ORIG:C234 O.MITSUI 243-0976
9B 4730 LL4462306 NA 4 N 43037406 1/EA
400 M ADHESIVE, ORDERED FOR
KTR
ORIG:C234 Y.INOMATA, 243-
9B 8040 008419773 NA 4 Y 42955265 7/PT
401 M ADHESIVE, ORDERED FOR
KTR
ORIG:C234 Y.INOMATA, 243-
9B 8040 002738708 NA 4 Y 42955266 7/GL
26-NOV-2024 1416
20.14.15.2.9020 (September 2024) (Continued) ICN: 3819P59301 KeyOp: A01
COMPONENT NAME: TYPE: PHASE: REPEAT: CHG/VER:TGI NO: CHT PPG AY A 0 0/0
SHIP/HULL NO: SHIP/HULL NAME: PROJECT: SYSTEM: PLANT ID: CASREP CAT:
LCC-19 USS BLUE RIDGE 19P
CU PHASE TITLE: *F/O - REPLACE CHT PP IN 5-40-01-L AND 6-61-2-L
FOUO Pg 7 of 8
MATERIAL LIST
ITEM
NO.
PC
NO.
REF
NO.
M
C DESCRIPTION
STOCK
NUMBER
GENERIC
MATL
TYPE LVL QA
HAZ
MAT
DOC
NO.
QTY
REQD/
UNIT
QTY
USED/
UNIT
402 M INSULATION, PIPE,
INSULATION, PIPE,BRAND: K-
FLEX ECO,SPECIFICATION
COMPLIANCE: EB 4013,FOR
SIZE: 4" IPS,SIZE: 4-1/2" ID X
3/4" THK X 6 FT LG,UI: EA/6
FT(ONE CONTINUOUS
LENGTH REQUIRED),MATL:
NON-HALOGEN,
ORDERED FOR KTR
ORIG:C234 Y.INOMATA, 243-
9B 5970 LL9607848 NA 4 N 42957583 12/EA
403 M INSULATION, FLAT SHT,
INSULATION, FLAT
SHEET,BRAND: K-FLEX
ECO,SPECIFICATION
COMPLIANCE: EB 4013,SIZE:
36" W X 48" L X 3/4" THK,MATL:
NON-HALOGEN,
ORDERED FOR KTR
ORIG:C234 Y.INOMATA, 243-
9B 5640 LL9607854 NA 4 N 42957584 1/SH
404 M ADHESIVE, ADHESIVE FOR
INSULATION SLEEVING
ORDERED FOR KTR
ORIG:C234 O.MITSUI 243-0976
9B 8040 008419773 NA 4 Y 43035069 4/PT
405 M ADHESIVE, ADHESIVE FOR
CLOTH
ORDERED FOR KTR
ORIG:C234 O.MITSUI 243-0976
9B 8040 002738708 NA 4 Y 43035070 2/GL
406 M INSULATI, INSULATION, PIPE,
BRAND: K-FLEX ECO,
SPECIFICATION COMPLIANCE:
EB 4013,
FOR SIZE: 4" IPS,
SIZE: 4-1/2" ID X 3/4" THK X 6
FT LG,
UI: EA/6 FT(ONE CONTINUOUS
LENGTH REQUIRED),
MATL: NON-HALOGEN,
**GSA ADVANTAGE
AVAILABLE**
3EA/BOX. *MUST BE ORDERED
IN MULTIPLES OF 3EA*
*MSM AVAILABLE*
9B 5970 LL9607848 NA 4 N 43037408 3/EA
26-NOV-2024 1416
20.14.15.2.9020 (September 2024) (Continued) ICN: 3819P59301 KeyOp: A01
COMPONENT NAME: TYPE: PHASE: REPEAT: CHG/VER:TGI NO: CHT PPG AY A 0 0/0
SHIP/HULL NO: SHIP/HULL NAME: PROJECT: SYSTEM: PLANT ID: CASREP CAT:
LCC-19 USS BLUE RIDGE 19P
CU PHASE TITLE: *F/O - REPLACE CHT PP IN 5-40-01-L AND 6-61-2-L
FOUO Pg 8 of 8
MATERIAL LIST
ITEM
NO.
PC
NO.
REF
NO.
M
C DESCRIPTION
STOCK
NUMBER
GENERIC
MATL
TYPE LVL QA
HAZ
MAT
DOC
NO.
QTY
REQD/
UNIT
QTY
USED/
UNIT
407 M INSULATI, INSULATION, PIPE,
BRAND: K-FLEX ECO,
SPECIFICATION COMPLIANCE:
EB 4013,
FOR 5" IPS,
SIZE: 5-1/2" ID X 3/4" THK X 6
FT LG,
UI: EA/6 FT(ONE CONTINUOUS
LENGTH REQUIRED),
MATL: NON-HALOGEN,
2EA/BOX. *MUST BE ORDERED
IN MULTIPLES OF 2EA*
*MSM AVAILABLE*
9B 5640 LL9607849 NA 4 N 43037409 4/EA
408 M INSULATI, INSULATION, PIPE,
BRAND: K-FLEX ECO,
SPECIFICATION COMPLIANCE:
EB 4013,
FOR SIZE: 8" IPS,
SIZE: 8-5/8" ID X 3/4" THK X 6
FT LG,
UI: EA/6 FT(ONE CONTINUOUS
LENGTH REQUIRED),
MATL: NON-HALOGEN,
1EA/BOX.
*MSM AVAILABLE*
9B 5640 LL9607851 NA 4 N 43037410 2/EA
ATTACHMENT LIST
TITLE FILE NAME SAVED DATE
ENCLOSURE-01 3819P59301A01-Sketch-1.pdf 06-NOV-2024 0000 ENCLOSURE-02 3819P59301A01-Sketch-2.pdf 06-NOV-2024 0000 ENCLOSURE-03 3819P59301A01-QA28.docx 20-NOV-2024 0000
Yoshiyuki.Inomata.ja Text Box
SKETCH
3819P59301A01 ENCLOSURE-01 SHEET 1 OF 2
Yoshiyuki.Inomata.ja_1 Polygonal Line
Yoshiyuki.Inomata.ja_2 Polygonal Line
Yoshiyuki.Inomata.ja_3 Text Box
Yoshiyuki.Inomata.ja_4 Text Box
CREW LIVING SPACE (5-40-01-L)
Yoshiyuki.Inomata.ja_5 Text Box
REPLACE RED MARKED AREA OF CHT PP
Yoshiyuki.Inomata.ja_6 Callout
CONTINUED FROM SHEET 2
Yoshiyuki.Inomata.ja_7
SKETCH
3819P59301A01 ENCLOSURE-01 SHEET 2 OF 2
Yoshiyuki.Inomata.ja_8 Line
Yoshiyuki.Inomata.ja_9 Line
Yoshiyuki.Inomata.ja_10 Line
Yoshiyuki.Inomata.ja_11 Line
Yoshiyuki.Inomata.ja_12 Callout
CONTINUED TO SHEET ONE
Yoshiyuki.Inomata.ja_13
REPLACE RED MARKED AREA OF CHT PP
3819P59301A01
SKETCH
ENCLOSURE-02 Sheet 1 of 1
REPLACE RED MARKED CHT PIPING
Location: Passage (6-61-2-L)
Valve 6-62-2
Location: Storeroom (6-52-4-A)
Remove yellow marked branch piping due to not shown on DWG: 528-4346215 Rev. B
COMUSFLTFORCOMINST 4790.3 REV D CHG 3
07 Nov 2023
3819P59301A01 ENCLOSURE-03-1 TOTAL 2
SHOP TEST RECORD Page 1 of 1
QA FORM 28 Planning must fill in blocks identified by a prior to issuing
1. SHIP HULL NO. 2. JCN 3. LWC/SHOP 4. CWP/REC SER NO. 5. SYSTEM/COMPONENT/ROTATABLE POOL SER NO.
USS BLUE RIDGE LCC19 ER01-3501 KTR N/A CHT PIPING
6. REFERENCES: TEST REF (E.G., MS, TECH MAN) & OTHER REFS (E.G., VLV DWG) 7. TEST GAGE RANGE /INSTRUMENT USED SERIAL NO. CAL DUE DATE 8. RELIEF VLV SET POINT
A. S9086-RK-STM-010/CH-505 Rev. 6
B. LAR-XXXXX/LCC19/12L056
C.
D.
9. TEST REQUIREMENTS & RESULTS
TEST TYPE KEY H = STRENGTH AND POROSITY/ELEVATED PRESSURE TEST J = MECHANICAL JOINT TIGHTNESS ST = SEAT TIGHTNESS OP = OPERATIONAL O = OTHER
(SPECIFY): ______________________
TE
ST
T Y
PE
(S
EE
K
EY
) PARAGRAPH
DESCRIBING
VALVE POSITION
AND POINT OF
ENTRY
REF
LTR
GAGE
USED
(LTR
FROM
BLK 7)
REQUIRED
MEDIUM
USED
PRESSURE
ACTUAL
MINIMUM
DURATION
ALLOWED
LEAKAGE
ACTUAL
LEAKAGE SAT/UNSAT SIGNATURE, BADGE NO. & DATE
H 2.1.4 for 1.3.1 A,B Clean Fresh Water 60 PSIG 30 minutes None
10. REMARKS. (CRAFTSMAN/QAI SUBMIT A DF TO RESOLVE UNSAT DATA)
11. QA INSPECTOR/SHOP SUPERVISOR SIGNATURE/BADGE NO. (RECORD
REVIEWED FOR FINAL ACCEPTANCE)
DATE 12. QAS SIGNATURE/BADGE NO. (RECORD HAS BEEN REVIEWED FOR
COMPLETENESS)
DATE
COMUSFLTFORCOMINST 4790.3 REV D CHG 3
07 Nov 2023
3819P59301A01 ENCLOSURE-03-2 TOTAL 2
SHOP TEST RECORD Page 1 of 1
QA FORM 28 Planning must fill in blocks identified by a prior to issuing
1. SHIP HULL NO. 2. JCN 3. LWC/SHOP 4. CWP/REC SER NO. 5. SYSTEM/COMPONENT/ROTATABLE POOL SER NO.
USS BLUE RIDGE LCC19 ER01-3511 KTR N/A CHT PIPING
6. REFERENCES: TEST REF (E.G., MS, TECH MAN) & OTHER REFS (E.G., VLV DWG) 7. TEST GAGE RANGE /INSTRUMENT USED SERIAL NO. CAL DUE DATE 8. RELIEF VLV SET POINT
A. S9086-RK-STM-010/CH-505 Rev. 6
B. DWG 505-4610903 Rev. D
C.
D.
9. TEST REQUIREMENTS & RESULTS
TEST TYPE KEY H = STRENGTH AND POROSITY/ELEVATED PRESSURE TEST J = MECHANICAL JOINT TIGHTNESS ST = SEAT TIGHTNESS OP = OPERATIONAL O = OTHER
(SPECIFY): ______________________
TE
ST
T Y
PE
(S
EE
K
EY
) PARAGRAPH
DESCRIBING
VALVE POSITION
AND POINT OF
ENTRY
REF
LTR
GAGE
USED
(LTR
FROM
BLK 7)
USED
MINIMUM
ALLOWED
LEAKAGE
ACTUAL
LEAKAGE SAT/UNSAT SIGNATURE, BADGE NO. & DATE
H 2.1.5 for 1.3.2 A,B Clean Fresh Water 50 PSIG 30 minutes None
10. REMARKS. (CRAFTSMAN/QAI SUBMIT A DF TO RESOLVE UNSAT DATA)
11. QA INSPECTOR/SHOP SUPERVISOR SIGNATURE/BADGE NO. (RECORD
REVIEWED FOR FINAL ACCEPTANCE)
DATE 12. QAS SIGNATURE/BADGE NO. (RECORD HAS BEEN REVIEWED FOR
COMPLETENESS)
DATE