This Task Group Instruction (TGI) details a naval maintenance project for the USS Blue Ridge (LCC-19) involving the replacement of Collecting, Holding, and Transfer (CHT) discharge piping. The work involves replacing approximately 60 feet of 4-inch CHT discharge piping, transitioning from existing Cu-Ni 90-10 material to Cu-Ni 70-30 material, located in crew washroom and decontamination stations between frames 99 and 100 on the port side. The project is classified as a Class P-2 piping replacement with Level III cleanliness requirements, with a planned contractor work period from July 21, 2026 to November 21, 2027. The U.S. Fleet Forces Command (SRF-JRMC) will provide government-furnished materials and supporting services including crane rigging, utility services, and quality assurance inspections.

The material list includes multiple copper-nickel tubes, elbows, sleeves, and backing components, with specific stock numbers and quantities specified for procurement. Special requirements note potential asbestos and lead hazards during the work. The project involves detailed technical specifications, including hydrostatic testing at 60 PSIG using clean fresh water, and will be executed under Job Control Number ER01-3539. The task is intended to clear a specific Depot Facility Submission (DFS No. LCC-19-0023-2024) and involves coordination between multiple departments and personnel, including a planner from Code 234 and a Work Integration Manager from Code 333.

View the file

Other files

File Type Posted
Exhibit (A) BLR_5C1_TYCOM5 CDRL_r.pdf PDF
N6264925RA0540003.pdf PDF
N6264925RA0540002.pdf PDF
TGI_3819P59301A01_c0v0.pdf PDF
BLR_5C1_TYCOM5 CDRL.pdf PDF
TGI_3819P51418T01_c0v0.pdf PDF
TGI_3819P52802A01_c0v0.pdf PDF
TGI_3819P52801_T01_c0v0.pdf PDF
TGI_3819P51418T02_c0v0.pdf PDF
TGI_3819P51418A04_c0v0.pdf PDF
TGI_3819P123AFA01_c0v0.pdf PDF
TGI_3819P59301T01_c0v0.pdf PDF
TGI_3819P52808A01_c0v0.pdf PDF
TGI_3819P51413A01_c0v0.pdf PDF
TGI_3819P51420A01_c0v0.pdf PDF
TGI_3819P52802T01_c0v0.pdf PDF
TGI_3819P51419A01_c0v0.pdf PDF
TGI_3819P123AAA01_c0v0.pdf PDF
TGI_3819P52801_A01_c0v0.pdf PDF
TGI_3819P52808T01_c0v0.pdf PDF
TGI_3819P51413T01_c0v0.pdf PDF
TGI_3819P123ADA01_c0v0.pdf PDF
TGI_3819P52806_T01_c0v0.pdf PDF
TGI_3819P14218A01_c0v0.pdf PDF
N6264925RA054 Amendment 0001.pdf PDF
Attachment VIII Source of Repair Instruction.pdf PDF
2.01 N6264925RA054 Solicitation.pdf PDF
Attachment VI Quality Assurance Surveillance Plan (QASP).pdf PDF
Attachment III GFP_List_V3 TYCOM5.xlsx XLSX spreadsheet
Attachment VII Warranty Tracking Information.pdf PDF
Attachment V Contract data.pdf PDF
Attachment II Proposal Sheet Generator v1.2.xlsx XLSX spreadsheet
Attachment IV-3 Request for Information Form (SAMPLE).docx DOCX document
Exhibit (A) CDRL BLR_5C1_TYCOM5.pdf PDF
Show all 34

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

FOUO

WebAIM Short Form TASK GROUP INSTRUCTION

21-DEC-2024 1020

20.14.15.2.9020 (September 2024) ICN: 3819P52806 KeyOp: A01

COMPONENT NAME: TYPE: PHASE: REPEAT: CHG/VER:TGI NO: CHT DISCH 5-100-2-L AY A 0 0/0

SHIP/HULL NO: SHIP/HULL NAME: PROJECT: SYSTEM: PLANT ID: CASREP CAT:

LCC-19 USS BLUE RIDGE 19P

CU PHASE TITLE: *F/O - REPLACE CHT DISCHARGE PIPING IN 5-100-2-L

WORK CERTIFICATION SIGNATURES: DLs

COMPLETION OF WORK REVIEW: BADGE NO: SHOP/CODE: PHONE: DATE:

RECORDS REVIEW: BADGE NO: SHOP/CODE: PHONE: DATE:

FOUO Pg 1 of 5

ER013539

PREPARING ACTIVITY: STATUS: APP WORKING STATUS:

PREPARED BY: CODE: PHONE: DATE:

KOMOTO, HIDEKI 234 3152430975 18-DEC-2024

APPROVED BY: CODE: PHONE: DATE:

INOMATA, YOSHIYUKI 234 3152434536 20-DEC-2024

CONCURRED BY: CODE: PHONE: DATE:

REASON FOR WORK/NEED FOR CHANGE:

JCN:

ER01-3539

SPECIAL REQUIREMENTS:

CU PHASE DESCRIPTION:

ZONE MANAGER: ZONE: COMPARTMENT: LEVEL: FRAME: SIDE:

YAGINUMA, TAKEHIDE

JOB SUMMARY ID: TOT MAN HR.: TOT DUR: TOT JML COST: PLANNING ACCEPTANCE:

528A0006

1. SCOPE/PURPOSE:

1.1 Title: Collecting, Holding, and Transfer (CHT) Piping; replace

1.2 Location of work:

1.2.1 Crew Washroom, Shower and Decontamination Station (5-98-2-L)

1.2.2 Crew W.R. WC, SH and Decontn Station (5-100-2-L)

1.3 Identification:

1.3.1 Quantity (Approx. 60 FT), CHT Discharge Piping, runs from located in frames between 99 and 100 at port side in 1.2.1 to deck sleeve for 4TH deck in 1.2.2

Size: 4 Inch IPS (4.500 OD X 0.109 WT) Material: Cu-Ni 90-10 (Existing) / Cu-Ni 70-30 (New) Specification: MIL-T-16420

TGI Short Form

21-DEC-2024 1020

20.14.15.2.9020 (September 2024) (Continued) ICN: 3819P52806 KeyOp: A01

COMPONENT NAME: TYPE: PHASE: REPEAT: CHG/VER:TGI NO: CHT DISCH 5-100-2-L AY A 0 0/0

SHIP/HULL NO: SHIP/HULL NAME: PROJECT: SYSTEM: PLANT ID: CASREP CAT:

LCC-19 USS BLUE RIDGE 19P

CU PHASE TITLE: *F/O - REPLACE CHT DISCHARGE PIPING IN 5-100-2-L

FOUO Pg 2 of 5

CU PHASE DESCRIPTION (Cont.)

Remarks: See followings for location detail.

Ref. No. 3: Sheet 4 (Zone 15-D of Part Plan 5TH Deck)

1.4 Security Classification: None.

1.5 Initial Condition:

1.5.1 Potential Asbestos Hazard.

1.5.2 Potential Lead Hazard.

1.6 Contractor work start date: 7/21/2026

1.7 Contractor work completion date: 11/21/2027

2. PROCEDURE:

2.1 Remove existing, fabricate and install each new CHT discharge piping listed in 1.3.1, using Ref. No. 3 for guidance.

2.1.1 Accomplish the requirements of 009-09 of Ref. No. One for the certification process.

2.1.2 Accomplish the requirements of 009-12 of Ref. No. One, including Table One, Column(s) A, Lines One through 10.

2.1.3 Accomplish the requirements of 009-71 of Ref. No. One for hydrostatic test, using clean, fresh water at 60 PSIG, for each new and disturbed CHT discharge piping systems.

2.1.3.1 Document shop hydrostatic test results on QA Form 28 Enclosure-01-1.

2.2 Accomplish the requirements of 009-32 of Ref. No. One for each new and disturbed surface.

2.3 Notes:

2.3.1 Planner: Code 234 H. Komoto, 070-7787-2047

2.3.2 Work Integration Manager (WIM): Code 333 T. Yaginuma, 080-5419-0598

2.3.3 This TGI is issued to clear DFS No. LCC-19-0023-2024

2.3.4 JCN ER01-3539 is related to this TGI.

2.4 Government Furnished Material (GFM):

2.4.1 SRF-JRMC will provide GFM listed in the Material List.

2.5 SRF-JRMC will provide the following service work: (TGI No. 3819P52806S02)

2.5.1 [C740] Crane and crane rigging service.

2.5.2 [X99E] Utility service, electrical.

21-DEC-2024 1020

20.14.15.2.9020 (September 2024) (Continued) ICN: 3819P52806 KeyOp: A01

COMPONENT NAME: TYPE: PHASE: REPEAT: CHG/VER:TGI NO: CHT DISCH 5-100-2-L AY A 0 0/0

SHIP/HULL NO: SHIP/HULL NAME: PROJECT: SYSTEM: PLANT ID: CASREP CAT:

LCC-19 USS BLUE RIDGE 19P

CU PHASE TITLE: *F/O - REPLACE CHT DISCHARGE PIPING IN 5-100-2-L

FOUO Pg 3 of 5

CU PHASE DESCRIPTION (Cont.)

2.5.3 [X99M] Utility service, including low pressure air supply, water supply, and steam supply.

2.5.4 [C106.1] Safety inspection for SRF-JRMC employees.

2.5.5 [C106.2] Gas free inspection for SRF-JRMC employees.

2.5.6 [C133] QA inspection for (G) symbol(s).

21-DEC-2024 1020

20.14.15.2.9020 (September 2024) (Continued) ICN: 3819P52806 KeyOp: A01

COMPONENT NAME: TYPE: PHASE: REPEAT: CHG/VER:TGI NO: CHT DISCH 5-100-2-L AY A 0 0/0

SHIP/HULL NO: SHIP/HULL NAME: PROJECT: SYSTEM: PLANT ID: CASREP CAT:

LCC-19 USS BLUE RIDGE 19P

CU PHASE TITLE: *F/O - REPLACE CHT DISCHARGE PIPING IN 5-100-2-L

FOUO Pg 4 of 5

OTHER SPECIAL REQUIREMENTS:

CLASS P-2 PIPING.

CLEANLINESS FOR PIPING SYSTEM/EQUIPMENT LEVEL III.

Ref.

No.

Document/Drawing Number DOCUMENT/DRAWING TITLE REV

CHG

NO.

CPY

REQ PARAGRAPH SECT PG CHPT

1 NSI FY25 Standard Items - ORG N 2 LI FY25 Local Standard Items - ORG N

3 DWG 528-4346220 CHT PIPING SYSTEM

SUCTION & DISCHARGE TKS

#1,2,3 & 4

C Y 4

TASK NAME / TASK DESCRIPTION

SHOP/

TSD TS

SF

WC

CREW

# MHRS RWRK

N

N

N

N

MATERIAL LIST

ITEM

NO.

PC

NO.

REF

NO.

M

C DESCRIPTION

STOCK

NUMBER

GENERIC

MATL

TYPE LVL QA

HAZ

MAT

DOC

NO.

QTY

REQD/

UNIT

QTY

USED/

UNIT

001 M TUBE,METALLIC, 4 INCH IPS,

CU-NI 70-30

ORDERED FOR: KTR

ORIG: C234 H. KOMOTO 070-

7787-2047

9B 4710 006048328 NA 4 N 60/FT

002 M TUBE,METALLIC, 4 INCH IPS,

CU-NI 70-30

ORDERED FOR: KTR

ORIG: C234 H. KOMOTO 070-

7787-2047

9B 4710 006048328 NA 4 N 60/FT

003 M TUBE,METALLIC, 4 INCH IPS,

CU-NI 70-30

ORDERED FOR: KTR

ORIG: C234 H. KOMOTO 070-

7787-2047

9B 4710 006048328 NA 4 N 60/FT

MATERIAL REFERENCES

REF

NO.

DOCUMENT/DRAWING NUMBER DOCUMENT/DRAWING TITLE

REV

ICN: 3819P52806 KEY OP: A01

21-DEC-2024 1020

20.14.15.2.9020 (September 2024) (Continued) ICN: 3819P52806 KeyOp: A01

COMPONENT NAME: TYPE: PHASE: REPEAT: CHG/VER:TGI NO: CHT DISCH 5-100-2-L AY A 0 0/0

SHIP/HULL NO: SHIP/HULL NAME: PROJECT: SYSTEM: PLANT ID: CASREP CAT:

LCC-19 USS BLUE RIDGE 19P

CU PHASE TITLE: *F/O - REPLACE CHT DISCHARGE PIPING IN 5-100-2-L

FOUO Pg 5 of 5

MATERIAL LIST

ITEM

NO.

PC

NO.

REF

NO.

M

C DESCRIPTION

STOCK

NUMBER

GENERIC

MATL

TYPE LVL QA

HAZ

MAT

DOC

NO.

QTY

REQD/

UNIT

QTY

USED/

UNIT

004 M ELBOW,TUBE, 4 INCH IPS, CU-

NI 70-30, 45, BW, CL200

ORDERED FOR: KTR

ORIG: C234 H. KOMOTO 070-

7787-2047

9B 4730 007254005 NA 4 N 8/EA

005 M ELBOW,PIPE, 4 INCH IPS, CU-

NI 70-30, 90, BW, CL200

ORDERED FOR: KTR

ORIG: C234 H. KOMOTO 070-

7787-2047

9B 4730 014283175 NA 4 N 8/EA

006 M SLEEVE,, 4 INCH IPS, CU-NI 70-

30, BW, CL200

ORDERED FOR: KTR

ORIG: C234 H. KOMOTO 070-

7787-2047

9C 4730 LL4462305 NA 4 N 10/EA

007 M BACKING, 4 INCH IPS, CU-NI

70-30, BW, 200 PSI

ORDERED FOR: KTR

ORIG: C234 H. KOMOTO 070-

7787-2047

9C 4730 LL4358122 NA 4 N 30/EA

ATTACHMENT LIST

TITLE FILE NAME SAVED DATE

ENCLOSURE-01 3819P52806A01-QA28.docx 18-DEC-2024 0000

COMUSFLTFORCOMINST 4790.3 REV D CHG 3

07 Nov 2023

SHOP TEST RECORD Page 1 of 1

QA FORM 28 Planning must fill in blocks identified by a prior to issuing

1. SHIP HULL NO. 2. JCN 3. LWC/SHOP 4. CWP/REC SER NO. 5. SYSTEM/COMPONENT/ROTATABLE POOL SER NO.

USS BLUE RIDGE LCC19 ER01-3539 KTR N/A CHT DISCHARGE SYSTEM PIPING

6. REFERENCES: TEST REF (E.G., MS, TECH MAN) & OTHER REFS (E.G., VLV DWG) 7. TEST GAGE RANGE /INSTRUMENT USED SERIAL NO. CAL DUE DATE 8. RELIEF VLV SET POINT

A. S9086-RK-STM-010/CH-505 Rev. 6

B. LAR-XXXXX/LCC19/12L056

C. .

D. .

9. TEST REQUIREMENTS & RESULTS

TEST TYPE KEY H = STRENGTH AND POROSITY/ELEVATED PRESSURE TEST J = MECHANICAL JOINT TIGHTNESS ST = SEAT TIGHTNESS OP = OPERATIONAL O = OTHER

(SPECIFY): ______________________

TE

ST

T Y

PE

(S

EE

K

EY

) PARAGRAPH

DESCRIBING

VALVE POSITION

AND POINT OF

ENTRY

REF

LTR

GAGE

USED

(LTR

FROM

BLK 7)

REQUIRED

MEDIUM

MEDIUM

USED

REQUIRED

PRESSURE

ACTUAL

PRESSURE

MINIMUM

DURATION

ACTUAL

DURATION

ALLOWED

LEAKAGE

ACTUAL

LEAKAGE SAT/UNSAT SIGNATURE, BADGE NO. & DATE

H 2.1.3 A, B Clean Fresh Water 60 PSIG 30 minutes None

10. REMARKS. (CRAFTSMAN/QAI SUBMIT A DF TO RESOLVE UNSAT DATA)

11. QA INSPECTOR/SHOP SUPERVISOR SIGNATURE/BADGE NO. (RECORD

REVIEWED FOR FINAL ACCEPTANCE)

DATE 12. QAS SIGNATURE/BADGE NO. (RECORD HAS BEEN REVIEWED FOR

COMPLETENESS)

DATE

3819P52806A01 ENCLOSURE-01-1 TOTAL 1

File details come from the government source that posted it. Updated .