This Task Group Instruction (TGI) details a structural repair project for the USS Blue Ridge (LCC-19), focused on repairing structural members in multiple tank and machinery spaces. The work involves removing and replacing various structural components, including tank bottom plates, horizontal stiffeners, collar plates, and backing straps, primarily located in the Distillate Fuel Marine Tank (8-48-1-F) and Clean Salt Water Ballast (9-40-1-W) areas. The materials specified are OS steel plates and beams meeting MIL-S-22698 Grade A standards, with specific dimensions and weights outlined for each component.
The project is scheduled to start on 7/21/2026 and complete by 10/21/2027, with special requirements including working around a fire zone boundary and fabricating a non-flammable closure. The instruction mandates specific technical procedures such as magnetic particle inspection of new welds, removal of temporary sealing compound, and coating of new and disturbed surfaces. Additional considerations include potential lead hazards and the need for various inspections and quality assurance measures. The work will be supported by SRF-JRMC (Ship Repair Facility) providing services like crane operations, utility services, and quality inspections.
View the file
Other files
Show all 34
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
FOUO
FOUO: Public availability to be determined under 5 USC 552
TASK GROUP INSTRUCTION
AIM REV 20.11.4.0 (OCTOBER 2020)
TGI COMPONENT NAME: TYPE: PHASE: REPEAT: CHANGE:
NO.: STRL MBR 8-48-1-F AY A 0 0
SHIP/HULL NO.: SHIP/HULL NAME: SYSTEM: PROJ/WO NO: CASREP CAT:
LCC-19 USS BLUE RIDGE 19P
CU PHASE TITLE:
F/O - REPAIR STRUCTURAL MEMBER IN 8-48-1-F AND 9-40-1-W
PREPARING ACTIVITY:
PREPARED BY: CODE PHONE DATE
NAOKI KUROKAWA 231B. 315-243-0108 25-FEB-2025
APPROVED BY: CODE PHONE DATE
RYOUTA TAKAGI 231B. 315-243-4502 25-FEB-2025
CONCURRED BY: CODE PHONE DATE
CONCURRED BY: CODE PHONE DATE
CONCURRED BY: CODE PHONE DATE
CONCURRED BY: CODE PHONE DATE
REASON FOR WORK/NEED FOR CHANGE:
CHANGE INSTRUCTIONS:
SPECIAL REQUIREMENTS:
This work affects a fire zone boundary. Fabrication and/or staging of a non-flammable closure is required.
CLEANLINESS FOR PIPING SYSTEM/EQUIPMENT LEVEL III
WORK CERTIFICATION SIGNATURES
COMPLETION OF WORK REVIEW: BADGE NO.: SHOP/CODE: PHONE: DATE:
ACCEPTANCE OF COMPLETED WORK
PHYSICAL INSPECTION PHYSICAL INSPECTION COMPLETED: BADGE NO.: SHOP/CODE: PHONE: DATE:
REQUIRED:☐YES ☒NO
RECORDS REVIEW: BADGE NO.: SHOP/CODE: PHONE: DATE:
TGI NO.: STRL MBR 8-48-1-F AY A 0
FOUO
SHIP: LCC-19 CHG/VER: 0/0
LIST OF EFFECTIVE PAGES
SHT NO. CHG NO. SHT NO. CHG NO. SHT NO. CHG NO. SHT NO. CHG NO. SHT NO. CHG NO.
1-5 J-1 M1-2 Sketch (1)
1. SCOPE/PURPOSE
1.1 Title: Structural Member in 8-48-1-F and 9-40-1-W; repair
1.2 Location of Work:
1.2.1 Distillate Fuel Marine Tank (8-48-1-F)
1.2.2 Clean Salt Water Ballast (9-40-1-W)
1.2.3 CHT Tank No. One (8-48-0-W)
1.2.4 Distillate Fuel or Ballast (9-40-0-F)
1.2.5 Fresh Water Ballast (Locked in) (9-48-0-W)
1.2.6 Air Conditioning Machinery Room No. One and Refrigeration Machinery Room (7-40-0-E)
1.2.7 SD Storeroom (7-48-0-A)
1.3 Identification:
1.3.1 Quantity (One Lot), Structural Member in 8-48-1-F and 9-40-1-W
1.3.1.1 Quantity (One Lot), Tank Bottom Plate, Frames between 48 and 51, Starboard (Stbd) Material: OS, MIL-S-22698 GR-A, 17.85 LBs Plate Remarks: See Sketch Enclosure-01 and Sheet 4 Plan 4-A of 2.3 for detail
1.3.1.2 Quantity (One EA), Horizontal Stiffener on Longitudinal Bulkhead, 16 Feet 0 Inch Off from Ship’s Center Line, Frames between 47 and 50, Stbd
Material: OS, MIL-S-22698 GR-A, 16 Inches x 7 Inches x 40 LBs I-T Remarks: See Sheet 4 Elevation 4-B of 2.3 for detail
1.3.1.3 Quantity (One EA), Tight Collar Plate on Transverse Bulkhead, Frame 48, Stbd Material: OS, MIL-S-22698 GR-A, 17.85 LBs Plate Remarks: See Sheet 4 Detail 4-E of 2.3 for detail
1.3.1.4 Quantity (One EA), Tight Collar Plate on Horizontal Stiffener, Frame 50, Stbd Material: OS, MIL-S-22698 GR-A, 10.2 LBs Plate Remarks: See Sheet 4 Detail 4-D of 2.3 for detail
1.3.1.5 Quantity (One EA), Chock on Horizontal Stiffener, Frame 48, Stbd Material: OS, MIL-S-22698 GR-A, 15.3 LBs Plate Remarks: See Sheet 4 Detail 4-E of 2.3 for detail
1.3.1.6 Quantity (One EA), Flange Plate of Horizontal Stiffener, Frames between 50 and 51, Stbd Material: OS, MIL-S-22698 GR-A, 20.4 LBs Plate
FOUO
SHIP: LCC-19 CHG/VER: 0/0
Remarks: See Sheet 4 Elevation 4-B of 2.3 for detail
1.3.1.7 Quantity (2 EA), Lateral Stiffener on Tank Bottom Plate, Stbd Material: OS, MIL-S-22698 GR-A, 6 Inches x 4 Inches x 11 LBs T Remarks: See Sheet 4 Elevation 4-C of 2.3 for detail
1.3.1.8 Quantity (One EA), Closure Plate for Inaccessible Void, Frames between 49 and 50, Stbd Material: OS, MIL-S-22698 GR-A, 17.85 LBs Plate Remarks: See Sheet 4 Detail 4-B of 2.3 for detail
1.3.1.9 Quantity (One Lot), Backing Strap for Tank Bottom Plate listed in 1.3.1.1 Material: OS, MIL-S-22698 GR-A, 10.2 LBs Plate Remarks: See Sheet 4 Plan 4-A of 2.3 for detail
1.3.1.10 Quantity (One Lot), Backing Strap for Flange Plate of Horizontal Stiffener listed in 1.3.1.6 Material: OS, MIL-S-22698 GR-A, 10.2 LBs Plate Remarks: See Sheet 4 Plan 4-B of 2.3 for location detail
1.3.1.11 Quantity (One Lot), Backing Strap for Tight Collar Plate listed in 1.3.1.4 Material: OS, MIL-S-22698 GR-A, 7.65 LBs Plate Remarks: See Sheet 4 Detail 4-D of 2.3 for location detail
REF.
NO.
DOCUMENT
/DRAWING
NUMBER
DOCUMENT/DRAWING TITLE REV CHG
NO.
COPY
REQ’D
(Y/N)
SOURCE
DOC
(Y/N)
PARA SEC PG CHP
1 NSI FY-25 NAVSEA Standard Items - ORG N 2 LI FY-25 Local Standard Items - ORG N
3 PDD 123-
ELM-250196
REPIR PLAN OF BOTTOM PL IN
DFM TANK (8-48-1-F)
- Y AL
L
4 NSI T-9630-
AB-MMD-
Corrosion Control Assessment and Maintenance Manual (CCAMM)
3 N
5 TM NAVSEA
4790/14
Tank and Void Structural and Coating Condition Survey (MRC G1N5)
- N
1.3.2 Quantity (35 SF), Interior Surface of 8-48-1-F, where new material is installed and disturbed by the hot work
Remarks: See Sheet 4 of 2.3 for detail
1.3.3 Quantity (35 SF), Interior Surface of 9-40-1-W, where new material is installed and disturbed by the hot work
Remarks: See Sheet 4 of 2.3 for detail
1.4 Security Classification: None.
1.5 Initial Condition:
1.5.1 Critical Coated Area: CCNY-LCC19-076-25 for the area listed in 1.3.2 and 1.3.3.
1.5.2 Potential Lead Hazard
1.6 Contractor Work start date: 7/21/026
1.7 Contractor Work completion date: 10/21/2027
2. REFERENCES:
FOUO
SHIP: LCC-19 CHG/VER: 0/0
3. APPENDICES:
3.1. Appendix “J” TGI Job Summary Information Sheet
3.2. Appendix "M" TGI Material List
3.3. Appendix “D” Deficiency Form
4. GENERAL REQUIREMENTS:
4.1 Not Applicable.
5. PROCEDURE:
5.1 Remove existing, fabricate and install new each structural member listed in 1.3.1 in accordance with 2.3.
5.1.1 Fabricate each new closure plate and backing strap listed in 1.3.1.8 through 1.3.1.11.
5.1.2 Remove temporary searing compound Belzona 1161, using Enclosure-01 for guidance.
5.1.3 Accomplish the requirements of 009-12 of 2.1, including Table 2, Column(s) A, Lines One through 7.
5.1.4 Accomplish the requirements of 009-25 of 2.1 for a local air hose test of each new weld of the tank bottom plate, horizontal stiffener, and tight collar plate listed in 1.3.1.1 through 1.3.1.4. Allowable leakage: None.
5.1.5 Accomplish magnetic particle (MT) inspection of each new weld of the tank bottom plate and closure plate listed 1.3.1.1 and 1.3.1.8 as substitute method of compartment tightness test in accordance with Test Note 2 of 2.3.
The accept or reject criteria must be in accordance with Test Note 2 of 2.3.
(I)(G) “MT INSPECTION”
5.2 Accomplish the requirements of 009-32 of 2.1, including Table 4, Line(s) 11, for each area listed in 1.3.2 and Table 4, Line(s) 17, for each area listed in 1.3.3.
5.2.1 Submit new coating data applied to the SUPERVISOR in accordance with 2.4 and 2.5.
5.3 Accomplish the requirements of 009-32 of 2.1 for each new and disturbed surface. See 5.4.5
5.4 Notes:
5.4.1 Planner: Code 231B N. Kurokawa, 243-0108
Engineer: Code 250 I. Hayasaka, 243-4334
5.4.2 Work Integration Manager (WIM): Code 333 T. Yaginuma, 080-5419-0598
5.4.3 2.5 is available on P:\C200\C225\Enclosures\C231\Tank and Void Structural and Coating Condition Survey
(MRC G1N5).
5.4.4 This TGI clears DFS LCC-19-1000-2021 in its entirety.
5.4.5 Preservation work for disturbed inside surface of new inaccessible void is not required after installation of closure plate listed in 1.3.1.8 in accordance with Note 6 of 2.3.
5.4.6 Opening, initial cleaning, closing, and installation/removal of FMEs of each space listed in 1.2.1 will be covered by TGI No 3819P12304A01 (KTR TGI).
5.4.7 Opening, initial cleaning, and closing of each space listed in 1.2.2 through 1.2.5 will be covered by the following TGI No(s).
FOUO
SHIP: LCC-19 CHG/VER: 0/0
Clean Salt Water Ballast (9-40-1-W): 3819P12316A01 (KTR TGI) CHT Tank No. One (8-48-0-W): 3819P12355 (KTR TGI) Distillate Fuel or Ballast (9-40-0-F): 3819P12316A01 (KTR TGI) Fresh Water Ballast (Locked in) (9-48-0-W): 3819P12338 (KTR TGI)
5.4.8 Preservation work for disturbed surfaces of each space listed 1.2.3 will be covered by TGI No.
3819P12355A01 (KTR TGI).
5.4.9 Work per this instruction involves cutting an access (or removal of a door) through a fire zone bulkhead, through the hull of the ship above the turn of the bilge, through ventilation components (ducting, plenums, etc.), or through any air-tight, fume-tight or watertight bulkheads normally used to control air flow in the event of a shipboard fire. A nonflammable closure is required in accordance with COMNAVSEASYSCOM MSG R 261400Z JUL 12. The closure, if not continuously in use, shall be staged near the access, readily visible and accessible, so that any emergency responder can install the closure to affect proper air flow onboard the ship.
5.4.10 JCN ER01-L034 is related to this TGI.
5.5 Government Furnished Material (GFM):
5.5.1 SRF-JRMC will provide GFM listed in Appendix “M”.
5.6 SRF-JRMC will provide following service work: (TGI No. 3819P123AAS02).
5.6.1 [C740] Crane and crane rigging service.
5.6.2 [X99E] Utility service, electrical.
5.6.3 [X99M] Utilities service, including water supply, steam supply, and low pressure air supply except onboard blasting work.
5.6.4 [C106.1] Safety inspection for SRF-JRMC employees.
5.6.5 [C106.2] Gas free inspection for SRF-JRMC employees.
5.6.6 [C133] QA inspection for (G) symbol(s) and review of coating application data.
5.6.7 [C135] QA inspection for (G) symbol(s).
FOUO
J-1
SHIP: LCC-19 CHG/VER: 0/0
APPENDIX "J"
TGI JOB SUMMARY INFORMATION SHEET
SYSTEM: PLANT NO.: COMPONENT NAME: TYPE: PHASE: REPEAT: CU PH
VERSION:
CASREP
CAT:
STRL MBR 8-48-1-F AY A 0 0
CU PHASE TITLE:
F/O - REPAIR STRUCTURAL MEMBER IN 8-48-1-F AND 9-40-1-W
PRIMARY COMPONENT:
COMPONENT UNIT LIST (FOR ASSEMBLIES):
BLST 9-40-1-W TK FO STOR 8-48-1-F TK
ATTACHMENT LIST:
1. ENCLOSURE-01 (3819P123AAA01-Sketch.pdf) saved on 25-FEB-2025 0000.
ZONE MANAGER: ZONE: COMPARTMENT: LEVEL: FRAME: SIDE:
YAGINUMA ,TAKEHIDE
JO: KO: TOTAL MAN HRS: PLANNING ACCEPTANCE:
3819P123AA A01
TOTAL MAT’L COST TOTAL DURATION:
CU PHASE DESCRIPTION:
The purpose of this TGI is to repair structural member in 8-48-1-F and 9-40-1-W.
Location of Work:
Distillate Fuel Marine Tank (8-48-1-F) Clean Salt Water Ballast (9-40-1-W) CHT Tank No. One (8-48-0-W) Distillate Fuel or Ballast (9-40-0-F) Fresh Water Ballast (Locked in) (9-48-0-W) Air Conditioning Machinery Room No. One and Refrigeration Machinery Room (7-40-0-E) SD Storeroom (7-48-0-A)
TASK NAME
SHOP TSD/WC TS CREW# MHRS
HIGH RAD
HOURS
RC
GRID#
5.1 SFTR, WELD, PNTR, RGRS, CARP, QA
5.2 PNTR, QA
5.3 PNTR, QA
Structural Work CFM: fire watch cost, confined space watch cost, marine chemist, MT inspection cost, sampler/analyze lead, air compressor rental cost and fuel oil cost for air hose test, fastener, and MISC such as gases, electrode, temporary closure, covering material and other consumable.
Preservation Work CFM: all paints, thinner, grits, disposal cost, confined space watch cost, air compressor, dryer, fuel oil, air conditioning, and MISC such as covering material and other consumable.
Process Funding Document.
FOUO
M-1
SHIP: LCC-19 CHG/VER: 0/0
APPENDIX “M”
TGI MATERIAL LIST
SYSTEM: PLANT NO.: COMPONENT NAME: TYPE: PHASE: REPEAT: CU PH
VERSION:
CASREP
CAT:
STRL MBR 8-48-1-F AY A 0 0
CU PHASE TITLE:
F/O - REPAIR STRUCTURAL MEMBER IN 8-48-1-F AND 9-40-1-W
MATERIAL REFERENCES
REF
NO.
DOCUMENT/DRAWING
NUMBER
DOCUMENT/DRAWING TITLE REV
JOB ORDER: KEY OP:
3819P123AA A01
MATERIAL LIST
ITEM
NO.
PC
NO.
REF
NO.
M
C DESCRIPTION
STOCK
NUMBER
GENERIC
MATL
TYPE LVL QA
HAZ
MAT
DOC
NO.
QTY
REQD/
UNIT
QTY
USED/
UNIT
001 M PLATE,ME, 1F X 9F
ORIGINATOR: C231B N.
KUROKAWA 243-0108
ORDER FOR KTR
9B 9515 001533184 NA 4 N 50525224 9/SF
002 M PLATE,ME, 1F X 2F
ORIGINATOR: C231B N.
KUROKAWA 243-0108
ORDER FOR KTR
9B 9515 001533223 NA 4 N 50525223 2/SF
003 M PLATE,ME, 5F X 5F
ORIGINATOR: C231B N.
KUROKAWA 243-0108
ORDER FOR KTR
9B 9515 001533230 NA 4 N 50525225 25/SF
004 M PLATE,ME, 1F X 2F
ORIGINATOR: C231B N.
KUROKAWA 243-0108
ORDER FOR KTR
9B 9515 001533236 NA 4 N 50525222 2/SF
005 M PLATE,ME, 1F X 2F
ORIGINATOR: C231B N.
KUROKAWA 243-0108
ORDER FOR KTR
9B 9515 002375333 NA 4 N 50525221 2/SF
006 M BEAM,STRUCTURAL,
ORIGINATOR: C231B N.
KUROKAWA 243-0108
ORDER FOR KTR
9B 9520 002780359 NA 4 N 50525226 3/FT
NOTES:
FOUO
M-2
SHIP: LCC-19 CHG/VER: 0/0
MATERIAL LIST
ITEM
NO.
PC
NO.
REF
NO.
M
C DESCRIPTION
STOCK
NUMBER
GENERIC
MATL
TYPE LVL QA
HAZ
MAT
DOC
NO.
QTY
REQD/
UNIT
QTY
USED/
UNIT
007 M BEAM, I-T SHAPE, 1 EA X 10FT
CONTINUOUS LENGTH
BEAM, I-T SHAPE, SIZE: 16" X
7" X 40#, MATL: STEEL OS,
I-T BEAM, 40#,
CUT FROM 16" X 7" X 40#, I-
BEAM,
MIL-S-22698 ABS GRADE A,
ASTM A36,
TWO SIDES OF ONE FLANGE
REMOVED
ORIGINATOR: C231B N.
KUROKAWA 243-0108
ORDER FOR KTR
9B 9520 LL4944351 NA 4 N 10/FT
FOUO: Public availability to be determined under 5 USC 552 SHEET_____OF_____
☐ NUCLEAR APPENDIX "D"
DEFICIENCY FORM
☐ NON-NUCLEAR
1. SHIP/HULL NO.: 2a. DL or DR No.
(Circle One)
2b. REVISION: 3a. COMPONENT NAME: 3b. TYPE: 3c. PHASE: 3d. REPEAT:
LCC-19 STRL MBR 8-48-1-F AY A 0
4a. ICN: 4b. KEY OP: 5. LOC SPACE/LVL: FRAME: P/S/C: 6. CAUSED BY:
3819P123AA A01
7. DESCRIPTION:
8. ORIGINATOR: NAME: BADGE: SHOP/CODE: DATE: PHONE NO.:
9. CORRECTIVE ACTION:
10. EVALUATOR: NAME: BADGE: SHOP/CODE: DATE: PHONE NO.:
FOR NON-NUCLEAR USE ONLY
11. RFD/RFW REQ’D ☐ LAR REQ'D ☐
ILS MOD REQ’D ☐
SRD/PLAN REV REQ'D ☐
DWG NO.: _____________________ S/A NO.: ___________________
12. ISOLATION SIGN: BADGE: SHOP/CODE: DATE: PHONE NO.:
SATISFACTORY:
13. SUBSAFE OQE RECORD? SIGN: BADGE: SHOP/CODE: DATE: PHONE NO.
YES ☐ NO ☐
14. CORRECTIVE ACTION SIGN: BADGE: SHOP/CODE: DATE: PHONE NO.
COMPLETE:
15. INSPECTION REQ’D? INSPECTION COMPLETE/SIGN: BADGE: SHOP/CODE: DATE: PHONE NO.
_________:YES ☐ NO ☐
16. RECORDS REVIEW SIGN: BADGE: SHOP/CODE: DATE: PHONE NO.
COMPLETE (DR ONLY)
DL’s ISSUED
(DR ONLY)
FOUO: Public availability to be determined under 5 USC 552 SHEET_____OF_____
☐ NUCLEAR Deficiency Form Continuation Sheet ☐ NON-NUCLEAR
1. SHIP/HULL NO.: 2a. DL or DR No.
(Circle One) 2b. REVISION: 3a. COMPONENT NAME: 3b. TYPE: 3c. PHASE: 3d. REPEAT:
LCC-19 STRL MBR 8-48-1-F AY A 0
3819P123AA A01 ENCLOSURE-01 Sheet 1 of 1
AutoCAD SHX Text
FR 49
AutoCAD SHX Text_1
TRANSV BHD FR 48
AutoCAD SHX Text_2
OT LONG BHD (16'-0 OFF CL STBD)
AutoCAD SHX Text_3
FWD
AutoCAD SHX Text_4
SHELL (S)
AutoCAD SHX Text_5
DFM TANK 8-48-1-F
AutoCAD SHX Text_6
CLEAN SW BLST 9-40-1-W
AutoCAD SHX Text_7
AutoCAD SHX Text_8
CLEAN SW BLST 9-52-1-W
AutoCAD SHX Text_9 49 9
AutoCAD SHX Text_10
AutoCAD SHX Text_11
AutoCAD SHX Text_12
AutoCAD SHX Text_13
REF LINE
AutoCAD SHX Text_14
SEE FIGURE-1 FIGURE-1
AutoCAD SHX Text_15
HOLD
AutoCAD SHX Text_16
KEY PLAN
AutoCAD SHX Text_17 EXST TEMP SEALING COMPOUND (BELZONA 1161) AREA; ABT 32 x 17
AutoCAD SHX Text_18
STBD, LKG INBD
AutoCAD SHX Text_19
FIGURE-11
AutoCAD SHX Text_20
FWD
AutoCAD SHX Text_21
DFM TANK BOT 17.85#
AutoCAD SHX Text_22
SKETCH
File details come from the government source that posted it. Updated .