This document is a WebAIM Short Form Task Group Instruction (TGI) for the USS Blue Ridge, dated 15-APR-2025, focused on preserving a distillate fuel or ballast tank (Tank No. 9-40-0-F) with a 67,051-gallon capacity. The task involves commercial blast cleaning of the tank, visual inspection for structural integrity, and coating application, with work scheduled to start on 7/21/2026 and complete by 10/21/2027.
The instruction details specific procedures including commercial blast cleaning per SSPC-SP 6 specifications, comprehensive visual inspection for tank damage, and coating application. SRF-JRMC will provide supporting services including crane and rigging, utility services, safety inspections, and quality assurance inspections. The task is associated with Job Control Number (JCN) EM04-ZAE9 and meets the intent of LCC CSWT File No. 123-016, with a potential lead hazard noted and a critical coated area identified as CCNY-LCC19-081-25.
View the file
Other files
Show all 34
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
FOUO
WebAIM Short Form TASK GROUP INSTRUCTION
15-APR-2025 1723
20.14.15.2.9020 (September 2024) ICN: 3819P123AD KeyOp: A01
COMPONENT NAME: TYPE: PHASE: REPEAT: CHG/VER:TGI NO: FO/BLST 9-40-0-F AY A 0 0/0
SHIP/HULL NO: SHIP/HULL NAME: PROJECT: SYSTEM: PLANT ID: CASREP CAT:
LCC-19 USS BLUE RIDGE 19P
CU PHASE TITLE: F/O - PRESERVE DISTILLATE FUEL OR BALLAST (9-40-0-F)
WORK CERTIFICATION SIGNATURES: DLs
COMPLETION OF WORK REVIEW: BADGE NO: SHOP/CODE: PHONE: DATE:
RECORDS REVIEW: BADGE NO: SHOP/CODE: PHONE: DATE:
FOUO Pg 1 of 5
EM04ZAE9
PREPARING ACTIVITY: STATUS: APP WORKING STATUS:
PREPARED BY: CODE: PHONE: DATE:
HAGA, MASAMICHI 231B 3152432513 14-APR-2025
APPROVED BY: CODE: PHONE: DATE:
TAKAGI, RYOUTA 231B 3152434502 14-APR-2025
CONCURRED BY: CODE: PHONE: DATE:
REASON FOR WORK/NEED FOR CHANGE:
JCN:
EM04-ZAE9
SPECIAL REQUIREMENTS:
CU PHASE DESCRIPTION:
ZONE MANAGER: ZONE: COMPARTMENT: LEVEL: FRAME: SIDE:
YAGINUMA, TAKEHIDE
JOB SUMMARY ID: TOT MAN HR.: TOT DUR: TOT JML COST: PLANNING ACCEPTANCE:
123A11AD
1 SCOPE/PURPOSE:
1.1 Title: Distillate Fuel or Ballast (9-40-0-F); preserve
1.2 Location of Work:
1.2.1 Distillate Fuel or Ballast (9-40-0-F)
1.2.2 Air Conditioning Machinery Room No. One and Refrigeration Machinery Room (7-40-0-E)
1.3 Identification:
1.3.1 Quantity (One EA), Distillate Fuel or Ballast
Tank No.: 9-40-0-F Capacity: 67,051 Gallons
TGI Short Form
15-APR-2025 1723
20.14.15.2.9020 (September 2024) (Continued) ICN: 3819P123AD KeyOp: A01
COMPONENT NAME: TYPE: PHASE: REPEAT: CHG/VER:TGI NO: FO/BLST 9-40-0-F AY A 0 0/0
SHIP/HULL NO: SHIP/HULL NAME: PROJECT: SYSTEM: PLANT ID: CASREP CAT:
LCC-19 USS BLUE RIDGE 19P
CU PHASE TITLE: F/O - PRESERVE DISTILLATE FUEL OR BALLAST (9-40-0-F)
FOUO Pg 2 of 5
CU PHASE DESCRIPTION (Cont.)
1.3.2 Quantity (11,900 SF), Entire Interior Surface of Distillate Fuel or Ballast (9-40-0-F)
Remarks: The area includes tank side of manhole cover plate(s) and bolting ring
1.4 Security Classification: None.
1.5 Initial Condition:
1.5.1 Critical Coated Area: CCNY-LCC19-081-25 for the area listed in 1.3.2
1.5.2 Potential Lead Hazard.
1.6 Contractor work start date: 7/21/2026
1.7 Contractor work completion date: 10/21/2027
2. PROCEDURE:
2.1 Commercial blast clean each tank listed 1.3.1. Accomplish each requirement of Surface Preparation Specification SSPC-SP 6 of Ref. No. 3.
2.2 Accomplish a visual inspection of each tank listed in 1.3.1 for structural integrity, deterioration, pitting, each crack, and area of damage or distortion, using Ref. No. 4 through Ref. No. 10 for guidance.
2.2.1 Submit one legible copy, in hard copy or approved transferrable media, of a report listing results of the requirements of 2.2 to the SUPERVISOR.
2.3 Accomplish the requirements of 009-032 of Ref. No. One, including Table 4, Line(s) 11, for each area listed in 1.3.2.
2.3.1 Submit new coating data applied to the SUPERVISOR in accordance with Ref. No. 11 and Ref. No. 12.
2.4 Accomplish the requirements of 009-025 of Ref. No. One for a completion air test of each tank listed in 1.3.1. Test pressure must be 2 PSIG. Allowable drop in pressure: None.
2.5 Accomplish the requirements of 009-032 of Ref. No. One for each new and disturbed surface.
2.6 Notes:
2.6.1 Planner: Code 231B M. Haga, 243-2513
2.6.2 Work Integration Manager (WIM): Code 333 T. Yaginuma, 080-5419-0598
2.6.3 Opening, initial cleaning, and closing of each space listed in 1.2.1 will be covered by TGI No. 3819P12316A01 (KTR TGI).
2.6.4 Ref. No. 12 is available on P:\C200\C225\Enclosures\C231\Tank and Void Structural and Coating Condition Survey (MRC G1N5).
2.6.5 This TGI meets the intent of LCC CSWT File No. 123-016.
15-APR-2025 1723
20.14.15.2.9020 (September 2024) (Continued) ICN: 3819P123AD KeyOp: A01
COMPONENT NAME: TYPE: PHASE: REPEAT: CHG/VER:TGI NO: FO/BLST 9-40-0-F AY A 0 0/0
SHIP/HULL NO: SHIP/HULL NAME: PROJECT: SYSTEM: PLANT ID: CASREP CAT:
LCC-19 USS BLUE RIDGE 19P
CU PHASE TITLE: F/O - PRESERVE DISTILLATE FUEL OR BALLAST (9-40-0-F)
FOUO Pg 3 of 5
CU PHASE DESCRIPTION (Cont.)
2.6.6 JCN EM04-ZAE9 is related to this TGI.
2.7 Government Furnished Material (GFM): None.
2.8 SRF-JRMC will provide the following service work: (TGI No. 3819P123ADS02)
2.8.1 [C740] Crane and crane rigging service.
2.8.2 [X99E] Utility service, electrical.
2.8.3 [X99M] Utility service, including water supply, steam supply, and low pressure air supply except onboard blasting work.
2.8.4 [C106.1] Safety inspection for SRF-JRMC employees.
2.8.5 [C106.2] Gas free inspection for SRF-JRMC employees.
2.8.6 [C133] QA inspection for (G) symbol(s) and review of coating application data.
15-APR-2025 1723
20.14.15.2.9020 (September 2024) (Continued) ICN: 3819P123AD KeyOp: A01
COMPONENT NAME: TYPE: PHASE: REPEAT: CHG/VER:TGI NO: FO/BLST 9-40-0-F AY A 0 0/0
SHIP/HULL NO: SHIP/HULL NAME: PROJECT: SYSTEM: PLANT ID: CASREP CAT:
LCC-19 USS BLUE RIDGE 19P
CU PHASE TITLE: F/O - PRESERVE DISTILLATE FUEL OR BALLAST (9-40-0-F)
FOUO Pg 4 of 5
OTHER SPECIAL REQUIREMENTS:
CLEANLINESS FOR PIPING SYSTEM/EQUIPMENT LEVEL III
Ref.
No.
Document/Drawing Number DOCUMENT/DRAWING TITLE REV
CHG
NO.
CPY
REQ PARAGRAPH SECT PG CHPT
1 NSI FY-26 NAVSEA Standard Items - 1 N 2 LI FY-26 Local Standard Items - ORG N
3 TM SYSTEMS &
SPECIFICATIONS
SSPC Painting Manual Volume
- N
4 DWG 100-2491001 Shell Plating & Stringer - Fr51- 1/2 Ctr to 4th Dk
H Y ALL
5 DWG 101-2491011 CVK & SHELL LONG FR8-51-
1/2
E Y ALL
6 DWG 101-2491013 Floors FR 8-98 S Y 12, 13, 7 DWG 102-2491030 INNER BOTTOM PLTG FR8-
1/2 - 51-1/2
G Y ALL
8 DWG 103-2491032 2ND PLTF PLATING FR 8-52 G Y ALL
9 DWG 114-2491155 TRANSV BHD FR 40, Pump
RM BHD and Trunk BHD FR 44-45
K Y ALL
10 DWG 114-2491161 DEEP TANK BHD FR 24, 48,
56, & LONG BHD BEL 2ND
PLATF FR 30-76
F Y ALL
11 TM T-9630-AB-MMD-
Corrosion Control Assessment and Maintenance Manual
(CCAMM)
3 N
12 TM NAVSEA 4790/14 Tank and Void Structural and Coating Condition Survey (MRC G1N5)
- N
TASK NAME / TASK DESCRIPTION
SHOP/
TSD TS
SF
WC
CREW
# MHRS RWRK
22/KE PC N
22/KE PC N
22/KE PC N
22/KE PC N
22/KE PC N
22/MQ CS N
10/CT OM N
15-APR-2025 1723
20.14.15.2.9020 (September 2024) (Continued) ICN: 3819P123AD KeyOp: A01
COMPONENT NAME: TYPE: PHASE: REPEAT: CHG/VER:TGI NO: FO/BLST 9-40-0-F AY A 0 0/0
SHIP/HULL NO: SHIP/HULL NAME: PROJECT: SYSTEM: PLANT ID: CASREP CAT:
LCC-19 USS BLUE RIDGE 19P
CU PHASE TITLE: F/O - PRESERVE DISTILLATE FUEL OR BALLAST (9-40-0-F)
FOUO Pg 5 of 5
MATERIAL LIST
ITEM
NO.
PC
NO.
REF
NO.
M
C DESCRIPTION
STOCK
NUMBER
GENERIC
MATL
TYPE LVL QA
HAZ
MAT
DOC
NO.
QTY
REQD/
UNIT
QTY
USED/
UNIT
MATERIAL REFERENCES