This document is a WebAIM Short Form Task Group Instruction (TGI) for the USS Blue Ridge (LCC-19), dated 08-JAN-2025, focused on a sewage system tightness and operational test. The task involves contractor, quality assurance (QA), and shore/facilities (S/F) work to accomplish and document the test in accordance with technical procedure TP 59311-3-300KTR. The instruction covers a system with project number 19P and system number 59311, prepared by Nagashima Hisao and approved by Blewitt John, with Yaginuma Takehide listed as the zone manager. The document is marked FOUO (For Official Use Only) and provides detailed instructions for conducting a comprehensive test of the ship's sewage system.
View the file
Other files
Show all 34
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
FOUO
WebAIM Short Form TASK GROUP INSTRUCTION
08-JAN-2025 1404
20.14.15.2.9020 (September 2024) ICN: 3819P52801 KeyOp: T01
COMPONENT NAME: TYPE: PHASE: REPEAT: CHG/VER:TGI NO: 59311-3-300KTR TT T 6 0/0
SHIP/HULL NO: SHIP/HULL NAME: PROJECT: SYSTEM: PLANT ID: CASREP CAT:
LCC-19 USS BLUE RIDGE 19P 59311
CU PHASE TITLE: SEWAGE SYS (T & OP) - KTR
WORK CERTIFICATION SIGNATURES: DLs
COMPLETION OF WORK REVIEW: BADGE NO: SHOP/CODE: PHONE: DATE:
RECORDS REVIEW: BADGE NO: SHOP/CODE: PHONE: DATE:
FOUO Pg 1 of 2
ER01L024
PREPARING ACTIVITY: STATUS: APP WORKING STATUS:
PREPARED BY: CODE: PHONE: DATE:
NAGASHIMA, HISAO 246.2 3152439944 13-DEC-2024
APPROVED BY: CODE: PHONE: DATE:
BLEWITT, JOHN 246.2 3152438280 26-DEC-2024
CONCURRED BY: CODE: PHONE: DATE:
REASON FOR WORK/NEED FOR CHANGE:
JCN:
ER01-L024
SPECIAL REQUIREMENTS:
CU PHASE DESCRIPTION:
ZONE MANAGER: ZONE: COMPARTMENT: LEVEL: FRAME: SIDE:
YAGINUMA, TAKEHIDE U
JOB SUMMARY ID: TOT MAN HR.: TOT DUR: TOT JML COST: PLANNING ACCEPTANCE:
528A1101
Tightness & Operational Test for Sewage System - KTR.
TGI Short Form
FOUO
WebAIM Short Form TASK GROUP INSTRUCTION
08-JAN-2025 1404
20.14.15.2.9020 (September 2024) (Continued) ICN: 3819P52801 KeyOp: T01
COMPONENT NAME: TYPE: PHASE: REPEAT: CHG/VER:TGI NO: 59311-3-300KTR TT T 6 0/0
SHIP/HULL NO: SHIP/HULL NAME: PROJECT: SYSTEM: PLANT ID: CASREP CAT:
LCC-19 USS BLUE RIDGE 19P 59311
CU PHASE TITLE: SEWAGE SYS (T & OP) - KTR
FOUO Pg 2 of 2
Ref.
No.
Document/Drawing Number DOCUMENT/DRAWING TITLE REV
CHG
NO.
CPY
REQ PARAGRAPH SECT PG CHPT
1 TP 59311-3-300KTR SEWAGE SYS (T & OP) - KTR LAT Y
TASK NAME / TASK DESCRIPTION
SHOP/
TSD TS
SF
WC
CREW
# MHRS RWRK
(V) Contractor work:
Accomplish/document the tightness & operational test in accordance with reference, TP 59311-3-300KTR.
(G) QA work:
Accomplish/document the tightness & operational test in accordance with reference, TP 59311-3-300KTR.
(S) S/F work:
Accomplish/document the tightness & operational test in accordance with reference, TP 59311-3-300KTR.
MATERIAL LIST
ITEM
NO.
PC
NO.
REF
NO.
M
C DESCRIPTION
STOCK
NUMBER
GENERIC
MATL
TYPE LVL QA
HAZ
MAT
DOC
NO.
QTY
REQD/
UNIT
QTY
USED/
UNIT
MATERIAL REFERENCES
REF
NO.
DOCUMENT/DRAWING NUMBER DOCUMENT/DRAWING TITLE
REV
ICN: 3819P52801 KEY OP: T01