This document is a WebAIM Short Form Task Group Instruction (TGI) for the USS Blue Ridge, dated 03-APR-2025, with the Task Group Instruction (TGI) Number 51422-3-301KTR. The document focuses on a rotation check for A/C Plant #2 (KTR) during Phase 3 of the project. The primary task involves contractors, QA work, and S/F work accomplishing and documenting an operational test in accordance with the referenced technical procedure (TP 51422-3-301KTR). The instruction includes administrative details such as preparation by Ishii, Yuuhei and approval by Irei, Sean F. on 31-MAR-2025, with the job summary ID 514A2218. The document is marked FOUO (For Official Use Only) and pertains to the LCC-19 USS Blue Ridge, with a system number of 51422 and project number 19P.
View the file
Other files
Show all 34
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
FOUO
WebAIM Short Form TASK GROUP INSTRUCTION
03-APR-2025 0903
20.14.15.2.9020 (September 2024) ICN: 3819P51418 KeyOp: T02
COMPONENT NAME: TYPE: PHASE: REPEAT: CHG/VER:TGI NO: 51422-3-301KTR TT T 3 0/0
SHIP/HULL NO: SHIP/HULL NAME: PROJECT: SYSTEM: PLANT ID: CASREP CAT:
LCC-19 USS BLUE RIDGE 19P 51422
CU PHASE TITLE: A/C PLANT #2 (OP), ROTATION - KTR
WORK CERTIFICATION SIGNATURES: DLs
COMPLETION OF WORK REVIEW: BADGE NO: SHOP/CODE: PHONE: DATE:
RECORDS REVIEW: BADGE NO: SHOP/CODE: PHONE: DATE:
FOUO Pg 1 of 2
EA050149
PREPARING ACTIVITY: STATUS: APP WORKING STATUS:
PREPARED BY: CODE: PHONE: DATE:
ISHII, YUUHEI 246.2 3152434302 18-MAR-2025
APPROVED BY: CODE: PHONE: DATE:
IREI, SEAN F. 246.2 3152437427 31-MAR-2025
CONCURRED BY: CODE: PHONE: DATE:
REASON FOR WORK/NEED FOR CHANGE:
JCN:
EA05-0149
SPECIAL REQUIREMENTS:
CU PHASE DESCRIPTION:
ZONE MANAGER: ZONE: COMPARTMENT: LEVEL: FRAME: SIDE:
TAKAHASHI, YASUHIKO U
JOB SUMMARY ID: TOT MAN HR.: TOT DUR: TOT JML COST: PLANNING ACCEPTANCE:
514A2218
Rotation Check for A/C Plant #2 - KTR.
TGI Short Form
FOUO
WebAIM Short Form TASK GROUP INSTRUCTION
03-APR-2025 0903
20.14.15.2.9020 (September 2024) (Continued) ICN: 3819P51418 KeyOp: T02
COMPONENT NAME: TYPE: PHASE: REPEAT: CHG/VER:TGI NO: 51422-3-301KTR TT T 3 0/0
SHIP/HULL NO: SHIP/HULL NAME: PROJECT: SYSTEM: PLANT ID: CASREP CAT:
LCC-19 USS BLUE RIDGE 19P 51422
CU PHASE TITLE: A/C PLANT #2 (OP), ROTATION - KTR
FOUO Pg 2 of 2
Ref.
No.
Document/Drawing Number DOCUMENT/DRAWING TITLE REV
CHG
NO.
CPY
REQ PARAGRAPH SECT PG CHPT
1 TP 51422-3-301KTR A/C PLANT #2 (T & OP) - KTR LAT Y
TASK NAME / TASK DESCRIPTION
SHOP/
TSD TS
SF
WC
CREW
# MHRS RWRK
(V) Contractor work:
Accomplish/document the operational test in accordance with reference, TP 51422-3-301KTR.
(G) QA work:
Accomplish/document the operational test in accordance with reference, TP 51422-3-301KTR.
(S) S/F work:
Accomplish/document the operational test in accordance with reference, TP 51422-3-301KTR.
MATERIAL LIST
ITEM
NO.
PC
NO.
REF
NO.
M
C DESCRIPTION
STOCK
NUMBER
GENERIC
MATL
TYPE LVL QA
HAZ
MAT
DOC
NO.
QTY
REQD/
UNIT
QTY
USED/
UNIT
MATERIAL REFERENCES
REF
NO.
DOCUMENT/DRAWING NUMBER DOCUMENT/DRAWING TITLE
REV
ICN: 3819P51418 KEY OP: T02