TGI_3819P14218A01_c0v0.pdf

PDF 190 KB Posted

Attached to
USS BLUE RIDGE 5C1 DSRA TYCOM 5
Solicitation number
N6264925RA054
Issued by

About this file

This document is a Task Group Instruction (TGI) for preservation work on deck plating for the USS Blue Ridge (LCC-19), scheduled for contractor work from 7/21/2026 to 10/21/2027. The preservation work involves 17 square feet of deck plating in two specific areas: the Medical Storeroom (7-98-2-A) and Passage (7-102-2-L) on the ship's 2nd Platform. The work includes deck plating preservation between frames 98-101, 101-102, and 102-103, with specific attention to areas underneath metal joiner doors.

The instruction specifies potential asbestos and lead hazards and outlines service work to be provided by SRF-JRMC, including crane and rigging services, utility services (electrical, low pressure air, water, and steam), and safety and quality assurance inspections. The task involves multiple craft hours including sheet metal, insulation, carpentry, painting, and quality assurance personnel. An enclosed sketch provides detailed location mapping for the preservation work areas on the ship's 2nd Platform.

View the file

Other files

File Type Posted
Exhibit (A) BLR_5C1_TYCOM5 CDRL_r.pdf PDF
N6264925RA0540003.pdf PDF
N6264925RA0540002.pdf PDF
TGI_3819P59301A01_c0v0.pdf PDF
BLR_5C1_TYCOM5 CDRL.pdf PDF
TGI_3819P51418T01_c0v0.pdf PDF
TGI_3819P52802A01_c0v0.pdf PDF
TGI_3819P52801_T01_c0v0.pdf PDF
TGI_3819P51418T02_c0v0.pdf PDF
TGI_3819P51418A04_c0v0.pdf PDF
TGI_3819P123AFA01_c0v0.pdf PDF
TGI_3819P59301T01_c0v0.pdf PDF
TGI_3819P52808A01_c0v0.pdf PDF
TGI_3819P51413A01_c0v0.pdf PDF
TGI_3819P51420A01_c0v0.pdf PDF
TGI_3819P52802T01_c0v0.pdf PDF
TGI_3819P51419A01_c0v0.pdf PDF
TGI_3819P123AAA01_c0v0.pdf PDF
TGI_3819P52801_A01_c0v0.pdf PDF
TGI_3819P52808T01_c0v0.pdf PDF
TGI_3819P51413T01_c0v0.pdf PDF
TGI_3819P52806A01_c0v0.pdf PDF
TGI_3819P123ADA01_c0v0.pdf PDF
TGI_3819P52806_T01_c0v0.pdf PDF
N6264925RA054 Amendment 0001.pdf PDF
Attachment VIII Source of Repair Instruction.pdf PDF
2.01 N6264925RA054 Solicitation.pdf PDF
Attachment VI Quality Assurance Surveillance Plan (QASP).pdf PDF
Attachment III GFP_List_V3 TYCOM5.xlsx XLSX spreadsheet
Attachment VII Warranty Tracking Information.pdf PDF
Attachment V Contract data.pdf PDF
Attachment II Proposal Sheet Generator v1.2.xlsx XLSX spreadsheet
Attachment IV-3 Request for Information Form (SAMPLE).docx DOCX document
Exhibit (A) CDRL BLR_5C1_TYCOM5.pdf PDF
Show all 34

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

FOUO

WebAIM Short Form TASK GROUP INSTRUCTION

08-NOV-2024 0912

20.14.15.2.9020 (September 2024) ICN: 3819P14218 KeyOp: A01

COMPONENT NAME: TYPE: PHASE: REPEAT: CHG/VER:TGI NO: 2ND PLTF DK PLTING AY A 0 0/0

SHIP/HULL NO: SHIP/HULL NAME: PROJECT: SYSTEM: PLANT ID: CASREP CAT:

LCC-19 USS BLUE RIDGE 19P

CU PHASE TITLE: *F/O - PRESERVE DECK PLATING IN 7-98-2-A AND 7-102-2-L

WORK CERTIFICATION SIGNATURES: DLs

COMPLETION OF WORK REVIEW: BADGE NO: SHOP/CODE: PHONE: DATE:

RECORDS REVIEW: BADGE NO: SHOP/CODE: PHONE: DATE:

FOUO Pg 1 of 3

MH014749

PREPARING ACTIVITY: STATUS: APP WORKING STATUS:

PREPARED BY: CODE: PHONE: DATE:

ANDO, TOMOHIKO 231B 3152434372 05-NOV-2024

APPROVED BY: CODE: PHONE: DATE:

NAKANO, SEIICHI 231B 3152434519 05-NOV-2024

CONCURRED BY: CODE: PHONE: DATE:

REASON FOR WORK/NEED FOR CHANGE:

JCN:

MH01-4749

SPECIAL REQUIREMENTS:

CU PHASE DESCRIPTION:

ZONE MANAGER: ZONE: COMPARTMENT: LEVEL: FRAME: SIDE:

YAGINUMA, TAKEHIDE

JOB SUMMARY ID: TOT MAN HR.: TOT DUR: TOT JML COST: PLANNING ACCEPTANCE:

142A0018

1. SCOPE/PURPOSE:

1.1 Title: Deck Plating in 7-98-2-A and 7-102-2-L; preserve

1.2 Location of Work:

1.2.1 Passage (7-102-2-L)

1.2.2 Madical Storeroom (7-98-2-A)

1.3 Identification:

1.3.1 Quantity (9 SF), Deck Plating, Frames between 98 and 101 in 7-98-2-A

Remarks: See Sketch Enclosure-01 for location detail

1.3.2 Quantity (4 SF), Deck Plating, Frames between 101 and 102 in 7-98-2-A, including underneath sill of metal joiner door 7-

TGI Short Form

08-NOV-2024 0912

20.14.15.2.9020 (September 2024) (Continued) ICN: 3819P14218 KeyOp: A01

COMPONENT NAME: TYPE: PHASE: REPEAT: CHG/VER:TGI NO: 2ND PLTF DK PLTING AY A 0 0/0

SHIP/HULL NO: SHIP/HULL NAME: PROJECT: SYSTEM: PLANT ID: CASREP CAT:

LCC-19 USS BLUE RIDGE 19P

CU PHASE TITLE: *F/O - PRESERVE DECK PLATING IN 7-98-2-A AND 7-102-2-L

FOUO Pg 2 of 3

CU PHASE DESCRIPTION (Cont.)

Ref.

No.

Document/Drawing Number DOCUMENT/DRAWING TITLE REV

CHG

NO.

CPY

REQ PARAGRAPH SECT PG CHPT

102-2

Remarks: See Sketch Enclosure-01 for location detail

1.3.3 Quantity (4 SF), Deck Plating, Frames between 102 and 103 in 7-102-2-L, including underneath sill of metal joiner door 7-

102-2

Remarks: See Sketch Enclosure-01 for location detail

1.4 Security Classification: None.

1.5 Initial Condition:

1.5.1 Potential Asbestos Hazard

1.5.2 Potential Lead Hazard

1.6 Contractor work start date: 7/21/2026

1.7 Contractor work completion date: 10/21/2027

2. PROCEDURE:

2.1 Accomplish the requirements of 009-32 of Ref. No. One, including Table 3, Line(s) 6, for each area listed in 1.3.1 through 1.3.3.

2.2 Notes:

2.2.1 Planner: Code 231B T. Ando, 243-4372

Engineer: Code 250 K, Matsunari, 243-5816

2.2.2 Work Integration Manager (WIM): Code 333 T. Yaginuma, 080-5419-0598

2.2.3 JCN MH01-4749 is related to this TGI.

2.3 Government Furnished Material (GFM): None.

2.4 SRF-JRMC will provide the following service work: (TGI No. 3819P14218S02).

2.4.1 [C740] Crane and crane rigging service.

2.4.2 [X99E] Utility service, electrical.

2.4.3 [X99M] Utility service, including low pressure air supply, water supply, and steam supply.

2.4.4 [C106.1] Safety inspection for SRF-JRMC employees.

2.4.5 [C106.2] Gas free inspection for SRF-JRMC employees.

2.4.6 [C133] QA inspection for (G) symbol(s).

08-NOV-2024 0912

20.14.15.2.9020 (September 2024) (Continued) ICN: 3819P14218 KeyOp: A01

COMPONENT NAME: TYPE: PHASE: REPEAT: CHG/VER:TGI NO: 2ND PLTF DK PLTING AY A 0 0/0

SHIP/HULL NO: SHIP/HULL NAME: PROJECT: SYSTEM: PLANT ID: CASREP CAT:

LCC-19 USS BLUE RIDGE 19P

CU PHASE TITLE: *F/O - PRESERVE DECK PLATING IN 7-98-2-A AND 7-102-2-L

FOUO Pg 3 of 3

Ref.

No.

Document/Drawing Number DOCUMENT/DRAWING TITLE REV

CHG

NO.

CPY

REQ PARAGRAPH SECT PG CHPT

1 NSI FY-25 NAVSEA Standard Items - ORG N 2 LI FY-25 Local Standard Items - ORG N

TASK NAME / TASK DESCRIPTION

SHOP/

TSD TS

SF

WC

CREW

# MHRS RWRK

2.1 SFTR HRs, SMTL HRs, INSL HRs, CARP HRs, PNTR HRs, QA

HRs

22/KE PC N

Preservation Work CFM for all paints, thinner, deck covering material cost, fastener, insulation, tape, cap, adhesive, lead sampling/analysis cost, asbestos sampler cost and analysis cost for compartment insulation, and MISC such as covering material, and other consumable.

22/MQ CS N

Process Funding Document. 10/CT OM N

MATERIAL LIST

ITEM

NO.

PC

NO.

REF

NO.

M

C DESCRIPTION

STOCK

NUMBER

GENERIC

MATL

TYPE LVL QA

HAZ

MAT

DOC

NO.

QTY

REQD/

UNIT

QTY

USED/

UNIT

ATTACHMENT LIST

TITLE FILE NAME SAVED DATE

ENCLOSURE-01 3819P14218A01-Sketch.pdf 01-NOV-2024 0000

MATERIAL REFERENCES

REF

NO.

DOCUMENT/DRAWING NUMBER DOCUMENT/DRAWING TITLE

REV

ICN: 3819P14218 KEY OP: A01

3819P14218A01 Sheet 1 of 1

SKETCH

ENCLOSURE-01

LOCATION OF WORK

2ND PLATFORM

12” 12”

12”