TGI_3819P51413A01_c0v0.pdf

PDF 102 KB Posted

Attached to
USS BLUE RIDGE 5C1 DSRA TYCOM 5
Solicitation number
N6264925RA054
Issued by

About this file

This document is a WebAIM Short Form Task Group Instruction (TGI) for the USS Blue Ridge, detailing the replacement of a spiral condenser in the ship's Air Conditioning (A/C) Plant. The specific work involves removing and replacing the existing spiral condenser for the Purge and Pump Out (PPO) Unit located in the Air Conditioning Machinery Room, with the work to be performed by a contractor between July 21, 2026, and October 21, 2027.

The task requires precise technical procedures, including removing lubricating oil, evacuating the refrigerant system, installing a new spiral condenser manufactured by York International Corp, performing leak checks, and charging the lubrication system with new Polyolester (POE) oil. SRF-JRMC will provide supporting services such as crane and rigging, utility services, safety inspections, and quality assurance inspections. The material list includes specific components like the spiral condenser, couplings, leak detectors, lubricants, and vacuum pump oil, with quantities and stock numbers specified for each item.

View the file

Other files

File Type Posted
Exhibit (A) BLR_5C1_TYCOM5 CDRL_r.pdf PDF
N6264925RA0540003.pdf PDF
N6264925RA0540002.pdf PDF
TGI_3819P59301A01_c0v0.pdf PDF
BLR_5C1_TYCOM5 CDRL.pdf PDF
TGI_3819P51418T01_c0v0.pdf PDF
TGI_3819P52802A01_c0v0.pdf PDF
TGI_3819P52801_T01_c0v0.pdf PDF
TGI_3819P51418T02_c0v0.pdf PDF
TGI_3819P51418A04_c0v0.pdf PDF
TGI_3819P123AFA01_c0v0.pdf PDF
TGI_3819P59301T01_c0v0.pdf PDF
TGI_3819P52808A01_c0v0.pdf PDF
TGI_3819P51420A01_c0v0.pdf PDF
TGI_3819P52802T01_c0v0.pdf PDF
TGI_3819P51419A01_c0v0.pdf PDF
TGI_3819P123AAA01_c0v0.pdf PDF
TGI_3819P52801_A01_c0v0.pdf PDF
TGI_3819P52808T01_c0v0.pdf PDF
TGI_3819P51413T01_c0v0.pdf PDF
TGI_3819P52806A01_c0v0.pdf PDF
TGI_3819P123ADA01_c0v0.pdf PDF
TGI_3819P52806_T01_c0v0.pdf PDF
TGI_3819P14218A01_c0v0.pdf PDF
N6264925RA054 Amendment 0001.pdf PDF
Attachment VIII Source of Repair Instruction.pdf PDF
2.01 N6264925RA054 Solicitation.pdf PDF
Attachment VI Quality Assurance Surveillance Plan (QASP).pdf PDF
Attachment III GFP_List_V3 TYCOM5.xlsx XLSX spreadsheet
Attachment VII Warranty Tracking Information.pdf PDF
Attachment V Contract data.pdf PDF
Attachment II Proposal Sheet Generator v1.2.xlsx XLSX spreadsheet
Attachment IV-3 Request for Information Form (SAMPLE).docx DOCX document
Exhibit (A) CDRL BLR_5C1_TYCOM5.pdf PDF
Show all 34

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

FOUO

WebAIM Short Form TASK GROUP INSTRUCTION

16-OCT-2024 1803

20.14.15.2.9020 (September 2024) ICN: 3819P51413 KeyOp: A01

COMPONENT NAME: TYPE: PHASE: REPEAT: CHG/VER:TGI NO: AC PLANT AY A 0 0/0

SHIP/HULL NO: SHIP/HULL NAME: PROJECT: SYSTEM: PLANT ID: CASREP CAT:

LCC-19 USS BLUE RIDGE 19P

CU PHASE TITLE: F/O - REPLACE SPIRAL CONDENSER OF PPO UNIT FOR A/C PLANT 7-40-0-E

WORK CERTIFICATION SIGNATURES: DLs

COMPLETION OF WORK REVIEW: BADGE NO: SHOP/CODE: PHONE: DATE:

RECORDS REVIEW: BADGE NO: SHOP/CODE: PHONE: DATE:

FOUO Pg 1 of 5

EA059997

PREPARING ACTIVITY: STATUS: APP WORKING STATUS:

PREPARED BY: CODE: PHONE: DATE:

KUBO, YUUJI 232 3152434528 04-OCT-2024

APPROVED BY: CODE: PHONE: DATE:

OIKAWA, KAZUYUKI 232 3152435615 08-OCT-2024

CONCURRED BY: CODE: PHONE: DATE:

REASON FOR WORK/NEED FOR CHANGE:

JCN:

EA05-9997

SPECIAL REQUIREMENTS:

CU PHASE DESCRIPTION:

ZONE MANAGER: ZONE: COMPARTMENT: LEVEL: FRAME: SIDE:

YAGINUMA, TAKEHIDE

JOB SUMMARY ID: TOT MAN HR.: TOT DUR: TOT JML COST: PLANNING ACCEPTANCE:

514A2113

1. SCOPE/PURPOSE:

1.1 Title: Spiral Condenser of Purge and Pump Out (PPO) Unit for Air Conditioning (A/C) Plant; replace

1.2 Location of Work:

1.2.1 Air Conditioning Machinery Room No.One & Refrigeration Machinery Room (7-40-0-E)

1.3.1 Quantity (One EA), Purge and Pump Out (PPO) Unit for Air Conditioning (A/C) Plant Mfr: York International Corp Mfr Id: 376-05362-000

APL: 01A010029

1.4 Security Classification: None.

1.5 Initial Condition: None.

TGI Short Form

16-OCT-2024 1803

20.14.15.2.9020 (September 2024) (Continued) ICN: 3819P51413 KeyOp: A01

COMPONENT NAME: TYPE: PHASE: REPEAT: CHG/VER:TGI NO: AC PLANT AY A 0 0/0

SHIP/HULL NO: SHIP/HULL NAME: PROJECT: SYSTEM: PLANT ID: CASREP CAT:

LCC-19 USS BLUE RIDGE 19P

CU PHASE TITLE: F/O - REPLACE SPIRAL CONDENSER OF PPO UNIT FOR A/C PLANT 7-40-0-E

FOUO Pg 2 of 5

CU PHASE DESCRIPTION (Cont.)

1.6 Contractor work start date: 7/21/2026

1.7 Contractor work completion date: 10/21/2027

2. PROCEDURE:

2.1 Remove each existing spiral condenser (Index No.19, Figure 7-34 of Ref. No.3) of each PPO unit in 1.3.1, using Ref. No.3 for guidance.

2.1.1 Remove and dispose of lubricating oil from the lubrication system, using Paragraph 4-6.7 of Ref. No.3 for guidance.

2.1.2 Evacuate the refrigerant system, using Paragraph 6-5.3 of Ref. No.3 for guidance.

2.1.2.1 Ensure the density of refrigerant is below 100 ppm at the leak detector. If not, vacuum the refrigerant system until the leak detector reads 100 ppm or below.

2.2 Install each new spiral condenser (Index No.19, Figure 7-34 of Ref. No.3) of each PPO listed in 1.3.1, using Ref. No.3 for guidance.

2.2.1 Accomplish the requirements of 009-12 of Ref. No.One, including Table One, Column(s) B, Lines One through 10.

2.2.2 Accomplish a leak check of the refrigerant system in accordance with Paragraph 6-5.3 of Ref. No.3.

2.2.3 Evacuate and dehydrate the refrigerant system in accordance with Paragraph 6-5.3 of Ref. No.3.

2.2.4 Accomplish a vacuum hold check of the refrigerant system in accordance with Paragraph 6-5.3 of Ref. No.3.

(V)(G) “VACUUM HOLD CHECK”

2.2.5 Charge the lubricating system with new Polyolester (POE) oil in accordance with Paragraph4.6.7 of Ref. No.3.

2.3 Accomplish the requirements of 009-32 of Ref. No.One for each new and disturbed surface.

2.4 Notes:

2.4.1 Planner: Code 232 Y. Kubo, 243-4228

2.4.2 Work Integration Manager (WIM): Code 333 T. Yaginuma, 080-5419-0598

2.4.3 This TGI will take place at the same period as the TGI 3819P14201A01.

2.4.4 JCN EA05-9997 is related to this TGI.

2.5 Government Furnished Material (GFM):

2.5.1 SRF-JRMC will provide GFM listed in the Material List.

2.6 SRF-JRMC will provide the following service work: (TGI No. 3819P51413S03)

16-OCT-2024 1803

20.14.15.2.9020 (September 2024) (Continued) ICN: 3819P51413 KeyOp: A01

COMPONENT NAME: TYPE: PHASE: REPEAT: CHG/VER:TGI NO: AC PLANT AY A 0 0/0

SHIP/HULL NO: SHIP/HULL NAME: PROJECT: SYSTEM: PLANT ID: CASREP CAT:

LCC-19 USS BLUE RIDGE 19P

CU PHASE TITLE: F/O - REPLACE SPIRAL CONDENSER OF PPO UNIT FOR A/C PLANT 7-40-0-E

FOUO Pg 3 of 5

CU PHASE DESCRIPTION (Cont.)

2.6.1 [C740] Crane and crane rigging service.

2.6.2 [C740] Rigging service without crane operation

2.6.3 [X99E] Utility service, electrical.

2.6.4 [X99M] Utility service, including low pressure air supply, water supply, and steam supply.

2.6.5 [C106.1] Safety inspection for SRF-JRMC employees.

2.6.6 [C106.2] Gas free inspection for SRF-JRMC employees.

2.6.7 [C133] QA inspection for (G) Symbol(s).

16-OCT-2024 1803

20.14.15.2.9020 (September 2024) (Continued) ICN: 3819P51413 KeyOp: A01

COMPONENT NAME: TYPE: PHASE: REPEAT: CHG/VER:TGI NO: AC PLANT AY A 0 0/0

SHIP/HULL NO: SHIP/HULL NAME: PROJECT: SYSTEM: PLANT ID: CASREP CAT:

LCC-19 USS BLUE RIDGE 19P

CU PHASE TITLE: F/O - REPLACE SPIRAL CONDENSER OF PPO UNIT FOR A/C PLANT 7-40-0-E

FOUO Pg 4 of 5

OTHER SPECIAL REQUIREMENTS:

CLEANLINESS FOR PIPING SYSTEM/EQUIPMENT LEVEL II

CLASS P-3b PIPING

Ref.

No.

Document/Drawing Number DOCUMENT/DRAWING TITLE REV

CHG

NO.

CPY

REQ PARAGRAPH SECT PG CHPT

1 NSI FY25 Standard Items ORG ORG N 2 LI FY-25 Local Standard Items ORG ORG N

3 TM S9514-EL-MMA-

AIR CONDITIONING PLANT,

HFC-236fa, 250-TON

CAPACITY, LCC-19 CLASS

5 N

TASK NAME / TASK DESCRIPTION

SHOP/

TSD TS

SF

WC

CREW

# MHRS RWRK

2.1 OMCH HRs 22/KE PC N

2.2 OMCH HRs, WELD HRs, QA HRs 22/KE PC N

2.3 PNTR HRs 22/KE PC N

Outside Machinist Work CFM for marine chemist, fire watch cost, brazing rod, tubing, Nitrogen, BC-8, Lubricating oil, Vacuum pump oil, plastic bag/sheet, paint and misc.

22/MQ CS N

Process Funding Document. 10/CT OM N

MATERIAL LIST

ITEM

NO.

PC

NO.

REF

NO.

M

C DESCRIPTION

STOCK

NUMBER

GENERIC

MATL

TYPE LVL QA

HAZ

MAT

DOC

NO.

QTY

REQD/

UNIT

QTY

USED/

UNIT

500 M CONDENSER,SPIRAL, S9514-

EL-MMA-010 FIGURE 7-34-19

ORDERED FOR X37R

C232 Y. KUBO 243-4228

9B 4130 011847391 NA 4 N 33365131 1/EA

501 M COUPLING, ORDERED FOR

X37R

C232 Y. KUBO 243-4228

9B 4730 002649156 NA 4 N 33365132 2/PG

502 M COUPLING, ORDERED FOR

X37R

C232 Y. KUBO 243-4228

9B 4730 002649153 NA 4 N 33365133 4/EA

503 M LEAK DET, ORDERED FOR

X37R

C232 Y. KUBO 243-4228

9B 6850 001862963 NA 4 Y 33365134 5/BT

504 M LUBRICAT, ORDERED FOR

X37R

C232 Y. KUBO 243-4228

9B 9150 014439390 NA 4 Y 33365135 1/GL

MATERIAL REFERENCES

REF

NO.

DOCUMENT/DRAWING NUMBER DOCUMENT/DRAWING TITLE

REV

ICN: 3819P51413 KEY OP: A01

16-OCT-2024 1803

20.14.15.2.9020 (September 2024) (Continued) ICN: 3819P51413 KeyOp: A01

COMPONENT NAME: TYPE: PHASE: REPEAT: CHG/VER:TGI NO: AC PLANT AY A 0 0/0

SHIP/HULL NO: SHIP/HULL NAME: PROJECT: SYSTEM: PLANT ID: CASREP CAT:

LCC-19 USS BLUE RIDGE 19P

CU PHASE TITLE: F/O - REPLACE SPIRAL CONDENSER OF PPO UNIT FOR A/C PLANT 7-40-0-E

FOUO Pg 5 of 5

MATERIAL LIST

ITEM

NO.

PC

NO.

REF

NO.

M

C DESCRIPTION

STOCK

NUMBER

GENERIC

MATL

TYPE LVL QA

HAZ

MAT

DOC

NO.

QTY

REQD/

UNIT

QTY

USED/

UNIT

505 M OIL, VAC, ULVAC VACUUM

PUMP OIL, SMR-100 (PART#:

1001879) 1GL(4L)/CN.

ORDERED FOR X37R

C232 Y. KUBO 243-4228

9G 9150 LHA000722 NA 4 Y 33387400 3/CN

File details come from the government source that posted it. Updated .