TGI_3819P51418T01_c0v0.pdf

PDF 97 KB Posted

Attached to
USS BLUE RIDGE 5C1 DSRA TYCOM 5
Solicitation number
N6264925RA054
Issued by

About this file

This document is a WebAIM Short Form Task Group Instruction (TGI) for an operational test of Air Conditioning Plant #2 on the USS Blue Ridge, scheduled for 03-APR-2025 at 0900. The TGI (number 51422-3-301KTR) covers work to be performed by contractors, quality assurance (QA) personnel, and shop/support personnel, with specific tasks including accomplishing and documenting the operational test and conducting vibration analysis in accordance with the referenced test procedure (TP 51422-3-301KTR). The document is marked FOUO (For Official Use Only) and involves personnel from code 246.2, including Yuuhei Ishii (preparer) and Sean F. Irei (approver), with Yasuhiko Takahashi listed as the zone manager.

View the file

Other files

File Type Posted
Exhibit (A) BLR_5C1_TYCOM5 CDRL_r.pdf PDF
N6264925RA0540003.pdf PDF
N6264925RA0540002.pdf PDF
TGI_3819P59301A01_c0v0.pdf PDF
BLR_5C1_TYCOM5 CDRL.pdf PDF
TGI_3819P52802A01_c0v0.pdf PDF
TGI_3819P52801_T01_c0v0.pdf PDF
TGI_3819P51418T02_c0v0.pdf PDF
TGI_3819P51418A04_c0v0.pdf PDF
TGI_3819P123AFA01_c0v0.pdf PDF
TGI_3819P59301T01_c0v0.pdf PDF
TGI_3819P52808A01_c0v0.pdf PDF
TGI_3819P51413A01_c0v0.pdf PDF
TGI_3819P51420A01_c0v0.pdf PDF
TGI_3819P52802T01_c0v0.pdf PDF
TGI_3819P51419A01_c0v0.pdf PDF
TGI_3819P123AAA01_c0v0.pdf PDF
TGI_3819P52801_A01_c0v0.pdf PDF
TGI_3819P52808T01_c0v0.pdf PDF
TGI_3819P51413T01_c0v0.pdf PDF
TGI_3819P52806A01_c0v0.pdf PDF
TGI_3819P123ADA01_c0v0.pdf PDF
TGI_3819P52806_T01_c0v0.pdf PDF
TGI_3819P14218A01_c0v0.pdf PDF
N6264925RA054 Amendment 0001.pdf PDF
Attachment VIII Source of Repair Instruction.pdf PDF
2.01 N6264925RA054 Solicitation.pdf PDF
Attachment VI Quality Assurance Surveillance Plan (QASP).pdf PDF
Attachment III GFP_List_V3 TYCOM5.xlsx XLSX spreadsheet
Attachment VII Warranty Tracking Information.pdf PDF
Attachment V Contract data.pdf PDF
Attachment II Proposal Sheet Generator v1.2.xlsx XLSX spreadsheet
Attachment IV-3 Request for Information Form (SAMPLE).docx DOCX document
Exhibit (A) CDRL BLR_5C1_TYCOM5.pdf PDF
Show all 34

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

FOUO

WebAIM Short Form TASK GROUP INSTRUCTION

03-APR-2025 0900

20.14.15.2.9020 (September 2024) ICN: 3819P51418 KeyOp: T01

COMPONENT NAME: TYPE: PHASE: REPEAT: CHG/VER:TGI NO: 51422-3-301KTR TT T 2 0/0

SHIP/HULL NO: SHIP/HULL NAME: PROJECT: SYSTEM: PLANT ID: CASREP CAT:

LCC-19 USS BLUE RIDGE 19P 51422

CU PHASE TITLE: A/C PLANT #2 (T & OP) - KTR

WORK CERTIFICATION SIGNATURES: DLs

COMPLETION OF WORK REVIEW: BADGE NO: SHOP/CODE: PHONE: DATE:

RECORDS REVIEW: BADGE NO: SHOP/CODE: PHONE: DATE:

FOUO Pg 1 of 2

EA050149

PREPARING ACTIVITY: STATUS: APP WORKING STATUS:

PREPARED BY: CODE: PHONE: DATE:

ISHII, YUUHEI 246.2 3152434302 18-MAR-2025

APPROVED BY: CODE: PHONE: DATE:

IREI, SEAN F. 246.2 3152437427 31-MAR-2025

CONCURRED BY: CODE: PHONE: DATE:

REASON FOR WORK/NEED FOR CHANGE:

JCN:

EA05-0149

SPECIAL REQUIREMENTS:

CU PHASE DESCRIPTION:

ZONE MANAGER: ZONE: COMPARTMENT: LEVEL: FRAME: SIDE:

TAKAHASHI, YASUHIKO U

JOB SUMMARY ID: TOT MAN HR.: TOT DUR: TOT JML COST: PLANNING ACCEPTANCE:

514A2218

Operational Test for A/C Plant #2 - KTR.

TGI Short Form

FOUO

WebAIM Short Form TASK GROUP INSTRUCTION

03-APR-2025 0900

20.14.15.2.9020 (September 2024) (Continued) ICN: 3819P51418 KeyOp: T01

COMPONENT NAME: TYPE: PHASE: REPEAT: CHG/VER:TGI NO: 51422-3-301KTR TT T 2 0/0

SHIP/HULL NO: SHIP/HULL NAME: PROJECT: SYSTEM: PLANT ID: CASREP CAT:

LCC-19 USS BLUE RIDGE 19P 51422

CU PHASE TITLE: A/C PLANT #2 (T & OP) - KTR

FOUO Pg 2 of 2

Ref.

No.

Document/Drawing Number DOCUMENT/DRAWING TITLE REV

CHG

NO.

CPY

REQ PARAGRAPH SECT PG CHPT

1 TP 51422-3-301KTR A/C PLANT #2 (T & OP) - KTR LAT Y

TASK NAME / TASK DESCRIPTION

SHOP/

TSD TS

SF

WC

CREW

# MHRS RWRK

(V) Contractor work:

Accomplish/document the operational test in accordance with reference, TP 51422-3-301KTR.

(G) QA work:

Accomplish/document the operational test in accordance with reference, TP 51422-3-301KTR.

Conduct vibration analysis in accordance with reference, TP 51422-3-

301KTR.

(S) S/F work:

Accomplish/document the operational test in accordance with reference, TP 51422-3-301KTR.

MATERIAL LIST

ITEM

NO.

PC

NO.

REF

NO.

M

C DESCRIPTION

STOCK

NUMBER

GENERIC

MATL

TYPE LVL QA

HAZ

MAT

DOC

NO.

QTY

REQD/

UNIT

QTY

USED/

UNIT

MATERIAL REFERENCES

REF

NO.

DOCUMENT/DRAWING NUMBER DOCUMENT/DRAWING TITLE

REV

ICN: 3819P51418 KEY OP: T01

File details come from the government source that posted it. Updated .