SECTION F Deliverables (AMD 0006).pdf
PDF 225 KB Posted
- Attached to
- Base Operations Support (BOS) Services U. S. Naval Support Activity (NSA) Souda Bay, Crete Greece Federal contract opportunity
- Solicitation number
- N6247024R0001
About this file
This is Section F Deliverables document for a Base Operations Support Services contract at Naval Support Activity Souda Bay, Crete, Greece. The document provides a comprehensive matrix of all required deliverables across multiple service areas including Management and Administration, Port Operations, Supply, Galley Services, Unaccompanied Housing, Facility Management, Custodial Services, Transportation, Wastewater, Water, and Grounds Maintenance.
For each deliverable, the document specifies the attachment form number (if applicable), title, submission dates, distribution requirements (typically to KO, COR, and other relevant stakeholders), and frequency (ranging from daily to annually or as required). Key deliverables include various inspection reports, maintenance schedules, certification documentation, training plans, inventory records, quality control reports, safety documentation, and environmental compliance reports. Most deliverables have specific timing requirements, such as "within 15 calendar days prior to contract start" or "by the 5th day of each month," with distribution primarily to the Contracting Officer (KO) and Contracting Officer's Representative (COR).
View the file
Other files for this federal contract opportunity
Show all 50
Base Operations Support (BOS) Services U. S. Naval Support Activity (NSA) Souda Bay, Crete Greece has more files on GovTribe.
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SECTION F DELIVERABLES
Annex/ Spec Item
Form Attachment
Number Deliverable Title
Dates of Submission
Distribution Frequency
0200000 - Management and Administration 0200000/
2.2.1.4 N/A Request to Work
Outside Government’s
Regular Working Hours
At least seven calendar days prior to requested day.
KO and COR As Required
0200000/ 2.3.1
N/A Sign-in Sheets and Minutes for Review and Comments
Within two working days of all meetings
KO, COR and all attendees
As Required
0200000/ 2.3.1
N/A Sign-in Sheets and Minutes Final
Revision
Within two working days of comments received
KO, COR and all attendees
As Required
0200000/ 2.3.4
N/A Permits and Licenses Before work commences and as requested by the
KO.
KO and COR As Specified
0200000/ 2.3.5
N/A Certificate of Insurance
Within 15 calendar days prior to contract start.
KO and COR As Required
0200000/ 2.3.5.1
N/A Written Notice of Cancellation or material change in policy coverage
At least 30 calendar days prior to cancellation or material change in policy coverage
KO and COR As Required
0200000/ 2.3.10
N/A Translated Copy of the PWS and modifications
Within 30 calendar days after contract start and any contract modification
KO and COR As Required
0200000/ 2.7.1
N/A Plans of Action and Milestones (POA&Ms)
Within 15 calendar days prior to contract start and within seven calendar days of changes.
KO, COR, and Command Security Manager
As Required
0200000/ 2.7.1
N/A Safeguarding Information - Cybersecurity
Incident
Immediately upon discovery during regular working hours and by 0800 the following workday for discoveries after regular working hours
KO, COR, and Command Security Manager
As Required
0200000/ 2.7.3
N/A Work Reception POC and After Hours POC
Within 15 calendar days after contract start.
KO and COR As Required
0200000/ 2.7.4
N/A Work Control – Work Schedules for
Recurring Work and Work Status Updates
Within 15 calendar days prior to contract start, 10 days prior to the beginning of the month, and within two calendar days of changes to schedule.
KO and COR As Specified
Spec Item
Form Attachment
Number Deliverable Title
Dates of Submission
Distribution Frequency
0200000/ 2.7.4
N/A Work Control – Work Schedules for Non- Recurring Work and Work Status Updates
As specified in work order or task order
0200000/
N/A Work Schedule - Notification of any
Difficulty in Scheduling Work
By the end of each workday
KO and COR As Required
0200000/ 2.7.6
N/A Status of Deliverables Within 30 minutes of the inquiry during regular working hours, and by 0800 the following workday for inquiries after regular working hours
KO and COR As Required and Upon Request
0200000/ 2.7.7
N/A Service Interruptions Notifications
At least five working days in advance for scheduled outages and immediately for non-scheduled service interruptions
KO and COR As Specified and As Required
0200000/ 2.7.8.2
N/A NAVFAC Maximo Data Entry
By the end of each workday
KO or a representative designated by the KO
Daily
0200000/ 2.7.8.2
N/A NAVFAC Maximo Work Order and
Condition Assessment Data
Submittal
Weekly until NAVFAC Maximo access is established for direct entry
KO or a representative designated by the KO
Weekly
0200000/ 2.7.8.2
N/A Asset and Specification Data
When an asset is repaired, replaced, installed, or otherwise affected entry by the end of the workday
KO or a representative designated by the KO
As Required
0200000/ 2.7.8.3
N/A List of personnel requiring access to
Government’s Maximo
Within 30 calendar days prior to contract start
KO, COR and
FMD
As Specified
0200000/ 2.7.9.1
N/A Quality Management Plan
Within 15 calendar days prior to contract start.
KO and COR As Specified
0200000/ 2.7.9.1
N/A Revised Quality Management Plan
Within seven calendar days of implementation of any changes.
KO and COR As Specified
0200000/ 2.7.9.2
N/A Quality Inspection and Surveillance File
Within five calendar days of completion/ termination of the contract.
Spec Item
Form Attachment
Number Deliverable Title
Dates of Submission
Distribution Frequency
0200000/ 2.7.9.3
N/A Quality Inspection and Surveillance
Report
Fifth workday of each month.
KO and COR Monthly
0200000/ 2.8.1
N/A List of Key Personnel and Qualifications /
Resumes
Within 15 calendar days prior to contract start and within 15 days of a personnel change
KO and COR As Specified
0200000/ 2.8.1
N/A Key Personnel Replacements and
Qualifications / Resumes
Within 7 days of a personnel change
KO and COR As Specified
0200000/ 2.8.1
N/A Organizational Chart Within 15 calendar days prior to contract start
KO and COR As Specified
0200000/ 2.8.2.6
N/A Proof of Legal Residency
Prior to being admitted to site of work.
KO and COR As Specified
0200000/ 2.8.3
N/A Service Contract Reporting (SCR)
No later than 31 October
KO and COR Annually for each Gov’t fiscal year
(FY)
0200000/
2.9.1 N/A Employee List Within 15 calendar
days prior to contract start and within seven calendar days of personnel changes.
KO and COR As Required
0200000/ 2.9.3
N/A Passes and Badges – Confiscated and Returned with
Revised Employee List
Within 1 calendar days of personnel changes.
KO, COR, and Command Security Manager
As Required
0200000/ 2.9.8
N/A OF-306 Declaration for Federal
Employment and Digital Fingerprints
Prior to commencement of work
KO, COR, and Security Manager
As Required
0200000/ 2.9.9
N/A List of personnel requiring access to and the justification for access to Government IT, OT, and FRCS
Within 15 calendar days prior to contract start and within seven calendar days of personnel or access changes.
KO, COR, and Security Manager
As Required
0200000/ 2.10.1
N/A Accident Prevention Plan
Within 15 calendar days prior to contract start and within seven calendar days of changes.
KO and COR As Specified
0200000/ 2.10.2
N/A Activity Hazard Analysis for
Recurring Work
Together with the Accident
Prevention Plan and within seven calendar days of any changes or revisions.
Spec Item
Form Attachment
Number Deliverable Title
Dates of Submission
Distribution Frequency
0200000/ 2.10.2
N/A Activity Hazard Analysis for Non- Recurring Work
At least two working days prior to start of work.
KO and COR As Specified
0200000/ 2.10.3
N/A Compliance Plans, Programs, and
Procedures, included in APP
Together with the Accident
Prevention Plan and within seven calendar days of any changes.
KO and COR As Specified
0200000/ 2.10.3.7
N/A Control of Hazardous Energy
(lockout/tagout) Report
Within 30 calendar days after each inspection.
KO and COR Annually
0200000/ 2.10.4
N/A Weight Handling Equipment
Notification, Joint Testing and Weight Test Documentation
24 hours prior to bringing weight handling equipment on board installation.
KO and COR As Specified
0200000/ 2.10.5
J-0200000- 04.a
Contractor Crane Operating Checklist for Critical Lifts
At least two working days prior to start of work.
KO and COR As Required
0200000/ 2.10.5
J-0200000-05 N/A
Accident and Damage Reporting
Immediately or within four hours of a Recordable
Injury, High Visibility Accident or WHE accident.
KO and COR As Required
0200000/ 2.10.5
J-0200000- 04.b
Weight Handling Equipment Accident
Report
Within 15 working days of accident.
KO and COR As Required
0200000/ 2.10.6
J-0200000- 04.c
Crane and Rigging Gear Near Miss
Report
Within 15 working days of accident.
KO and COR As Required
0200000/ 2.10.7
J-0200000- 05.d and J-
0200000-05.e
Monthly On-Site Labor Reports for
Recurring and Non- Recurring Work
First workday of each month.
KO and COR Monthly
0200000/ 2.10.8
N/A OSHA Citations and Violations Corrective
Action Report
Within 48 hours after receiving a citation.
KO and COR As Required
0200000/ 2.10.9
N/A Safety Inspections and Monitoring
Report
Upon request. KO and COR As Required
0200000/ 2.10.10
N/A Safety Certifications Within 15 calendar days prior to contract start, as old certifications, expire and as required for all new work requiring certification.
KO and COR As Specified
0200000/ 2.11
N/A EMS Goals and Policy Monitoring and Measurement
Information
Upon request. KO and COR As Required
Spec Item
Form Attachment
Number Deliverable Title
Dates of Submission
Distribution Frequency
0200000/ 2.11.1.1
N/A Water Conservation Plan
Within 15 calendar days after award and for changes.
KO and COR As Specified
0200000/ 2.11.2
N/A Environmental Protection Plan
Within 15 calendar days prior to contract start and within seven calendar days of changes.
KO and COR As Specified
0200000/ 2.11.2.1
N/A Class I and II ODS Report
Within 24 hours following delivery of refrigerant to
DLA
KO and COR As Required
0200000/ 2.11.2.2
J-0200000- 05.f
Solid Waste Management and
Recycling Reports
First workday of each month.
KO and COR Monthly
0200000/ 2.11.2.2
J-0200000- 05.g
Summary Solid Waste Management and Recycling Report
By October 10th KO and COR Annually
0200000/ 2.11.2.4
N/A Waste Stream Determination
Within 30 calendar days prior to start of contract performance and within 14 days of identification of any new waste stream.
KO and COR As Required
0200000/ 2.11.2.6
N/A Fuel and hazardous substance spill notification
Within 15 minutes of discovery
Regional Environmental
POC
As Required
0200000/ 2.11.2.6
N/A Fuel and hazardous substance spill notification
As soon as possible but not more 24 hours of discovery
KO and COR As Required
0200000/ 2.11.2.6
N/A Fuel and hazardous substance spill report
Within 48 hours of discovery
KO and COR As Required
0200000/ 2.11.2.7
N/A Hazardous Material Management
Approval
10 working days prior to planned use of hazardous material
KO and COR As Specified
0200000/ 2.11.2.7
J-0200000-14 Contractor Hazardous Material Inventory
Log
Within 15 calendar days after the end of each calendar year and at termination of the contract
KO and COR Annually
0200000/ 2.11.2.11
N/A Asbestos Containing Material (ACM)
Verbally notify the KO and COR within one hour and follow-up with written Notification within
24 hours
Spec Item
Form Attachment
Number Deliverable Title
Dates of Submission
Distribution Frequency
0200000/ 2.11.2.12
N/A Air Quality - Hazardous Air
Pollutants Semi-annual Reports
At intervals of 160 to 200 calendar days
KO, COR,
Installation
Environmental Division, City, State, and EPA
Semi-annually
0200000/ 2.11.2.12
N/A Air Quality - Hazardous Air
Pollutants Monthly Data
First workday of each month.
KO, COR,
Installation
Environmental Division
Monthly
0200000/ 2.11.3
N/A Sustainable Procurement and
Practices Plan
Within 15 calendar days prior to contract start and within 15 calendar days after exercised option periods
KO and COR Annually
0200000/ 2.11.3
N/A Sustainable Delivery of Services Report
Within five calendar days after each contract period
KO and COR Annually
0200000/ 2.11.3.2
N/A Recovered Material Certification
When a product containing recovered materials is equal to or better than the original and could be used
KO and COR As Specified
0200000/ 2.13
N/A Technical Library Table of Contents
Within 15 calendar days after contract start and within seven calendar days of changes
KO and COR As Specified
0200000/ 2.14
N/A Warranty Management
Within five calendar days following asset replacement
KO and COR As Required
0200000/ 2.15.1
N/A Recurring Work Proposals
Within five calendar days following receipt of request
KO and COR As Required
0200000/ 2.15.2
N/A Notification to the Government for Work Above the Recurring Work Limitations and
Rough Order of Magnitude
Within two hours of identification
KO and COR As Required
0200000/ 2.16
N/A Notification of Uploaded of Non- Recurring Work catalog in FedMall
Within 30 calendar days after contract start with notification to KO/COR and within seven calendar days of changes
KO and COR As Required
Spec Item
Form Attachment
Number Deliverable Title
Dates of Submission
Distribution Frequency
0200000/ 2.16.1.1
DD1155 Non-Recurring Work Quantities Ordered via FedMall Report
By the fifth day of the following month
KO and COR Monthly
0200000/ 2.16.2.1
N/A Non-Recurring Work Proposals
Within two working days following receipt of request
KO As Required
0600000 - Port Operations 0600000/
2.2.1 N/A Certification, Training and Licenses At least 30
calendar days prior to contract start and upon request
KO, COR Once for initial submittal, then as requested
0600000/ 2.6.3
N/A Joint Inventories 1st week of each calendar year
KO, COR and Port Operations
Officer
Annually
0600000/
N/A Contractor-Caused Damages
Report shall be submitted the day of damage
KO, COR and Port Operations
Officer
As Required
0600000/ 3.2
N/A Port Security Barrier (PSB) Services
Within twelve (12) hours of completing a PSB movement
KO, COR, Port Operations
Manager and Port Operations
Officer
As Required
0600000/ 3.3
N/A Preventive Maintenance (PM) and Corrective Maintenance (CM)
Program
At least 15 calendar days prior to contract start, then annually or after any revisions
KO, COR, Port Operations
Officer
Once for initial submission, then annually
0600000/ 3.3.1 N/A Preventive Maintenance (PM) Monthly Schedule
At least 15 calendar days prior to contract start, at least 5 working days prior to the beginning of each month
KO, COR, Port Operations
Manager and Port Operations
Officer
Monthly
0600000/ 3.3.1
N/A Preventive Maintenance (PM) Annual Schedule
At least 15 calendar days prior to contract start, then annually
KO, COR, Port Operations
Manager and Port Operations
Officer
Annually
0600000/ 3.3.1
J-0600000-07 / J-0600000-
Preventive Maintenance (PM)
Weekly Reports with completed FMC and
PM Checklists
Every Friday by
COB
KO, COR, Port Operations Officer
Weekly
0600000/ 3.3.1
N/A Preventive Maintenance (PM) Monthly Report
At least 5 working days prior to the beginning of each month
KO, COR, Port Operations Officer
Monthly
0600000/ 3.3.2
N/A Corrective Maintenance (CM)
Report
As Required KO, COR, Port Operations
Officer
As Required
Spec Item
Form Attachment
Number Deliverable Title
Dates of Submission
Distribution Frequency
0600000/ 3.4
N/A Overhaul Work Packages
As Required KO, COR, Port Operations
Officer
As Required
1002000 - Supply 1002000/
2.2.1 N/A Certification, Training and Licenses
Two weeks prior to contract start date and as updated
KO, TO, COR Once for initial submittal, then as updated and requested
1002000/ 2.2.3
N/A Notification of Personnel Changes
Two weeks prior to contract start date and as updated
KO, TO, COR Once for initial submittal, then as updated 1002000/
2.3 N/A Government-
Furnished Vehicles and Equipment
Requests
One day prior to the work requirement
KO, TO, COR As Required
1002000/ 2.3
N/A Government- Furnished Vehicles and Equipment Contractor Incident
Report (CIR)
By COB the day of the incident
KO, TO, COR As Required
1002000/ 2.5.1
N/A System Access and Training - Personnel
List for system access and One Net accounts
Two weeks prior to contract start date and as updated
KO, TO, COR Once and Updated as Required
1002000/ 2.5.2
N/A Proof of Secret Security Clearance
Prior to contract start date
KO, NAVFAC
Security
Manager, COR
Once and Renewed as Required
2.5.3 N/A System Training
Requests Two weeks prior to contract start date and as needed for new personnel
KO, TO, COR As Required
1002000/ 2.5.5
N/A Key Control POC’s One day prior to the work requirement and as updated
KO, TO, COR As Required
1002000/ 3.1
J-1002000-
PPSS Customer Surveys
NLT the 5th workday of each month
DGR Monthly
3.1.1
N/A PPSO Shipment Summary
Spreadsheet
NLT the 5th workday of each
KO, TO, COR Monthly
3.1.1
J-1002000-
PPSO Monthly Metrics Excel Spreadsheet
NLT the 5th workday of each
KO, TO COR Monthly
3.1.5
N/A Inbound Personal Property Shipment
Request for Reweigh
As Required DGR As Required
1002000/ 3.2.1
NAVFAC
Fleet Logistic format
Cargo-On-Hand Report
NLT 0900 each workday
KO, TO, COR Daily
1002000/ 3.2.1
N/A Cargo Shipping and Receiving Services
SOP
Two weeks prior to contract start and as updated
KO, TO, COR Once Initially and as required
Spec Item
Form Attachment
Number Deliverable Title
Dates of Submission
Distribution Frequency
1002000/ 3.2.1
N/A Cargo Shipping and Receiving Reports and Records
NLT the 5th workday of each month
KO, TO, COR Monthly
1002000/ 3.2.3
N/A Cargo Shipment Invoice Coordination
NLT five days after receipt of invoice
KO, TO, COR As Required
1002000/ 3.3
N/A Container Services Spreadsheet
NLT the 5th workday of each month
KO, TO,
FSCM
Monthly
3.3
N/A Shipping Container Services SOP
Two weeks prior to contract start and as updated
KO, TO, COR Once Initially and as required
1002000/ 3.3
N/A Shipping Container Services
Packing/Crating Usage Report
NLT the 5th workday of each month
KO, TO, COR Monthly
1300000 - Galley 1300000/
2.3 N/A Certification Training
and Licenses Within 15 days after award or as requested by the
KO
KO/FSO/COR/
SECURITY
Once for initial submittal, then as requested
1300000/ 2.3.8
N/A Re-Occurring Short-and Long-range
Training Schedule
Within 15 days after award and quarterly
KO/FSO/COR As specified and quarterly
1300000/ 2.5.1
N/A Pre-Employment and Annual Medical Examination and
Records
Within 15 days after award and quarterly
KO/FSO/ COR As specified and quarterly
1300000/ 2.5.3
N/A Work Uniforms Within 15 days after award
KO/FSO As specified
1300000/ 2.5.6
NAVSUP P-
Appendices
Records and Reports Entry in Food Service
Management and Electronically
FSO As specified in P-
1300000/ 3.2
N/A Meal Contingency Plan
Within 30 days after contract award
KO/FSO/COR As Specified
1300000/ 3.2.1
N/A 21 Day Cycle Menu Within 15 days after contract award and by the last day of the month in May and January
KO/FSO/COR As Specified
1300000/ 3.2.1
N/A Menu Change Approval Request
Within seven working days prior to the day of the day of the menu change
FSO As Specified
1300000/ 3.2.2
J-1300000-05 and J-1300000-
Customer Survey Monthly Form
Summary
Within five days after the end of each month
FSO Monthly
Spec Item
Form Attachment
Number Deliverable Title
Dates of Submission
Distribution Frequency
1300000/ 3.2.3
N/A Logistic Mgmt.
Review Board
Meeting Minutes
Within 3 days of each meeting and after any comments/ corrections to the meeting minutes
FSO Monthly and Quarterly after meetings, as specified
1300000/ 3.2.3.4
N/A Consumable HAZMAT Supply
List
Within 15 days of contract award and as HAZMAT supplies are added or deleted
KO/FSO/ COR As Specified
1300000/ 3.2.3.5
N/A Food Service Equipment Damage or Loss Notification
Within 24 hours of discovery of damage or loss
KO/FSO As Required
1300000/ 3.2.3.5
J-1300000-16 Food Service Equipment Inventory
Within 30 days of contract award and within by Jan. 15 each year
KO/FSO/COR As Specified and Annually
1300000/ 3.3
NAVSUP
Form 1090
Food Preparation Worksheet
For each meal FSO As Required
1300000/ 3.4
NAVSUP
Form 1291
NAVSUP
Form 1292
Meal Services Summary of Sign-In
Sheets
Weekly FSO As Specified
1300000/ 3.4.1
NAVSUP
Form 1291
Cashier Meal Signature Record
End of each Workday
FSO As Specified
1300000/ 3.4.1
NAVSUP
Form 1292
Cashier Recapitulation of
Meal Record
End of each Meal Period
FSO As Specified
1300000/ 3.4.1
DoD Form
Cashier Cash Collection Voucher
For each deposit FSO As Required
1300000/ 3.4.1
NAVSUP
Form 1359
Cashier General Mess Summary Document
5th day of each Month
FSO Monthly
1300000 /3.4.5
NAVSUP
Form 1090
Food Preparation Worksheets
End of each workday
FSO Daily
1300000 /3.4.6, 3.4.7
N/A Special Event, Packaged and Picnic
Meal Quantities
5th Day of January each year
FSO/COR Annually
1300000/ 3.6
N/A Mess Gear Replacement Request for Damaged Items
By the 15th and 30th Day of Each
Month, after damage occurs and after each inventory
FSO Semi-Monthly and As specified
1300000/ 3.6
J-1300000-08 Mess Gear Inventory Bi-Weekly KO/FSO/COR Bi-Weekly
1300000/ 3.7.1
J-1300000-10 Galley Refrigeration and Food Service
Equipment Cleaning Schedule
5th day of each Month
KO/FSO/COR Monthly
1300000/ 3.7.2
J-1300000-11 Galley Area Cleaning Schedule
5th day of each Month
KO/FSO/COR Monthly
1300000/ 3.7.3
J-1300000-12 Galley Floor Care Cleaning Schedule
5th day of each Month
KO/FSO/COR Monthly
1402000 - Unaccompanied Housing
Spec Item
Form Attachment
Number Deliverable Title
Dates of Submission
Distribution Frequency
1402000/ 2.2.2
N/A Certification and Training
At least 30 calendar days prior to contract start and as requested by the KO
KO, COR,
Housing Officer
Once for initial submission then as requested
1402000/ 3.1
N/A Daily Housing Utilization and
Occupancy Report
5th calendar day of each month
KO, COR,
Housing Officer
Monthly
1402000/ 3.1.1.1
N/A UH Assignment and Occupancy Report
As required Command Master Chief, KO, COR, and
Housing Officer
Upon implementation of
THREATCON
BRAVO PLUS or higher
N/A FF&E, Bed Linen and Consumable Supplies Updated Inventory
1st week of the year
KO, COR,
Housing Officer
Annually
N/A Need for additional and replacement
FF&E, Bed Linen and consumable supplies
As required KO, COR, Housing Officer
45 days in advance of the requested delivery date
1402000/ 3.1.6.1
N/A Change of Occupancy (COS) Inspection
Report
At completion of each COS
COR, Housing Officer
At completion of each COS
1402000 3.2
N/A Service Orders Log for work performed outside MAXIMO
5th day of the following month maintenance is performed
KO, COR,
Housing Officer
Monthly
1402000 / 3.2
N/A Service Order Log for all Service Orders
5th day of the following month after service start
KO, COR,
Housing Officer
Monthly
1402000/ 3.3.1
N/A FA&E and FF&E Disposal Process
At least 30 calendar days prior to contract start
KO, COR,
Housing Officer
Once for initial submission, then
As Specified 1402000/
3.3.1 DD Form
FA&E and FF&E
Disposal Documentation
Monthly COR, Housing Officer
As Specified
1402000.2 - NHG / NAVY INN
1402000.2/
3.1.3 N/A Linen Inventory 1st day of the week
and 1st workday of the month
KO, COR,
NAVY INN
MGR
Weekly and Monthly
1402000.2/ 3.1.3.1
J-1402000.2-06 Room Inspection Checklist
Twice per year, each room
KO, NAVY
INN MGR
As Specified
1402000.2/ 3.1.3.2
N/A Power Wash Annual Schedule
Within 30 days from contract start then annually
KO, COR,
NAVY INN
MGR
As Specified
1402000.2/ 3.1.3.2
N/A Common Use and Perimeter Area
Cleaning Schedule
Within 30 days from contract start then annually
KO, NAVY
INN MGR
As Specified
1402000.2 / 3.1.4
N/A Service Order Log 5th day of the following month after service start
KO, COR,
NAVY INN
MGR
Monthly
1402000.2 - Contingency Lodging 1402000.3/
4.1.2 N/A Monthly Occupancy
and COS Report 5th day of the following month after contract start
KO, COR Monthly
Spec Item
Form Attachment
Number Deliverable Title
Dates of Submission
Distribution Frequency
1402000.3/ 4.1.5
N/A Key Personnel and Inventory
Within 30 days from contract start with updates as required when personnel leaves.
KO, COR Monthly and as updated
1402000.3/
4.1.7 4.1.6
N/A FA&E Inventory Within 30 days from contract start then annually.
KO, COR As Specified
1402000.3/
4.1.7 4.1.6
N/A FA&E Disposal Request and
Documentation
As Required KO, COR As Required
1402000.3/
4.1.8 4.1.7
N/A Cleaning Schedules for Daily Services and COS
Within 30 days from contract start
KO, COR Annually and as updated
1402000.3/
4.1.8 4.1.10
N/A Report of major Repairs and Maintenance
Required
Within one day of COS inspection when a repair or maintenance issue is found
KO, COR As Required
1402000.3/ 4.1.10
N/A Unscheduled Services Unresolved Report
Within one day of notification or after a repair or maintenance issue is found
KO, COR As Required
1402000.3/ 4.1.10
N/A Unscheduled Services Report
5th day of the following month after services were completed
KO, COR Monthly
1501000 - Facility Management 1501000/
3.2.1 N/A Summary of
NAVFAC MAXIMO
Asset Changes report
Within first 2 working day of each month
KO, COR As Specified
1502000 - Facility Investment 1502000/
2.2.1 N/A Certification, Training and Licensing
At least 30 calendar days prior to contract start and upon request
KO, COR Once for initial submission, then as requested
1502000/
N/A Monthly Maintenance Summary Report
The 5th day of each month
KO, COR Monthly
1502000/ 3.1
N/A Monthly Summary of Competed and
Unaccomplished Service Orders
The 5th day of each
KO, COR
1502000/ 3.2
N/A Preventive Maintenance Program
Plan
At least 15 calendar days prior to contract start, then annually
KO, COR Once for initial submission, then annually
1502000/ 3.2
N/A Monthly PM Program Work Schedule
At least 5 working days prior to the beginning of each month
KO, COR Monthly
1502000/ 3.2.1
N/A Copy of Complete PM Report for
Auxiliary Generators
Within 5 working days of completion
KO, COR,
Customer POC
As Specified
Spec Item
Form Attachment
Number Deliverable Title
Dates of Submission
Distribution Frequency
1502000/ 3.2.2.4
N/A Boiler Water Treatment Test Result
Report
Within 5 working days of completion of testing
KO, COR As Specified
1502000/ 3.2.3
N/A Copy of Complete PM Report for Fire Protection Systems
Within 5 working days of completion
KO, COR As Specified
3.2.3.1
N/A Fire Suppression Kitchen Hood Annual
Testing and Certification
Within 5 calendar days of completion of annual certification
KO, COR Annual
1502000/ 3.2.3.3
N/A Fire Alarm, Suppression System and FM200 Annual
Testing and Certification Report
Within 10 calendar days of completion of annual certification
KO, COR,
FMD
Annual
1502000/ 3.2.4
N/A Galley Refrigeration System Unavailability Weekly Status Update
The 1st day of each week
KO, COR Weekly
1502000/ 3.2.4
N/A Copy of Complete Galley Refrigeration
PM Report
The 5th day of each month
KO, COR, FSO As Specified
1502000/ 3.2.5.1
N/A Vertical Transportation
Equipment Inspection and Test Report
The 5th day of each month
KO, COR Monthly
1502000/ 3.2.6
N/A Out-of-Service Kitchen Equipment
Report
Immediately Upon Discovery
KO, COR As Specified
1502000/ 3.2.6
N/A Copy of Complete Monthly PM of
Galley Equipment
The 5th day of each month
KO, COR, FSO As Specified
1502000/ 3.2.7
N/A UPS PM Report and Testing Report
The 5th day of each month
KO, COR,
Customer POC
As Specified
1502000/ 3.2.8
N/A Copy of Complete SWR PM Report
Within 1 working day of completion
KO, COR,
GEMD LCPO
As Specified
1502000/ 3.2.9
N/A EHSS Equipment Monthly Report
Received (Inbound), Returned (Outbound) and On-Hand (Storage/Not Deployed)
The 5th day of each month
KO, COR,
NIWC Pacific
As Specified
1502000/ 3.2.11
N/A Small Arm Firing Ranges (SAFR) Spare
Parts Inventory
At least 30 calendar days prior to contract start, then annually
KO, COR Annually
1502000/3.2.11 N/A Small Arm Firing Ranges (SAFR) Waste Disposal
Report
The 5th day of each month
KO, COR As Required
1502000/ 3.2.11
N/A Small Arm Firing Ranges (SAFR)
Monthly PM Checklist
The 5th day of each month
KO, COR,
Security POC
As Specified
Spec Item
Form Attachment
Number Deliverable Title
Dates of Submission
Distribution Frequency
1502000/ 3.2.13.1
N/A Swimming Pool Water Treatment
Quality Test Analysis Report
The 1st day of each week
KO, COR As Specified
1502000/ 3.3.1
N/A Exhaust Hoods and Ducts Cleaning
Report
Within two (2) days after cleaning occurrence
KO, COR As Specified
1502000/ 3.3.3
N/A Grease Disposal Ticket from
Accepting Agency
The 5th workday of each month
KO, COR,
Environmental
Division
3.3.4
N/A Oil Water Separator Sludge Disposal
Ticket from Accepting Agency
5th day of each month
KO, COR,
Environmental
Division
As Required
1502000/ 3.3.6
Provided in Attachment J-1502000
Fuel Tank Inspection Checklist
The 5th day of each month
KO, COR,
Environmental
Division
As Specified
1502000/ 3.3.6
N/A
Notification of Issue/Problem during
Inspection
Immediately, no more than 1 hour after discovery
KO, COR,
Environmental
Division
As Specified
1502000/ 3.3.7
N/A Copy of Complete Test Analysis Report
Within 10 working days of completion
KO, COR,
UEM
As Specified
1502000/ 3.3.9
N/A Calibration Technician
Certification
Upon Request KO, COR As Specified
1502000/ 3.3.9
N/A Copy of Certificate of Calibration
Within 10 working days of completion
KO, COR,
UEM
As Specified
1502000/ 3.3.11
N/A Swimming Pool Patron Count
The 5th workday of each month
KO, COR As Specified
1503010 - Custodial 1503010/
2.2.1 N/A Pathogen Training
Certificates Upon request KO/COR Upon request
1503010/ 3.1
N/A Annual Work Schedule
Within 15 calendar days prior to contract start, Annually and five (5) calendar days prior to implementing any changes to the schedule
KO/COR Annually and As required
1503010/ 3.1
N/A Monthly Work Plan Five workdays prior to the beginning of each month and two (2) workdays prior to implementing any changes to the schedule
KO/COR Monthly and As required
1503010/ 3.5
N/A Unscheduled Services Five days after the beginning of each month
KO/COR Monthly
1503010 - Custodial 1503020/
2.2.1
N/A Copy of Certification for Contractor
Personnel
15 calendar days prior to start of work
KO, COR, EV As Required
Spec Item
Form Attachment
Number Deliverable Title
Dates of Submission
Distribution Frequency
1503020/ 2.3.1
N/A Business Licensing 5 days prior to the start of work requiring permits
KO, COR, EV As Required
1503020/ 2.3.2
N/A Permits 5 days prior to the start of work requiring permits
KO, COR, EV As Required
1503020/ 2.3.4
N/A Ultra-Low Volume (ULV) Equipment
Calibration and Droplet Analysis
Report
15 days prior to the start of work and after every 50 hours of ULV equipment use
KO, COR, EV As Required
1503020/
N/A Contractor's Work Plan
30 calendar days prior to start of work
KO, COR, EV As Required
1503020/
N/A Planned Pesticide Use Sheets including
Pesticide Labels and Safety Data Sheets
(SDS)
30 calendar days prior to start of work. Any proposed changes in pesticide usage shall be submitted for approval at least 5 business days in advance of pesticide use.
Electronically via
NOPRS
KO, COR, EV 1 for each pesticide per pest
1503020/
N/A Report of Conditions Conducive to Pest
Infestation
1 working day after citing conditions
KO, COR, EV As Required
1503020/ 3.1
N/A Weekly, Monthly and Quarterly Services
Schedule
25 calendar days prior to start of work
KO, COR, EV As Required
1503020 3.2
N/A Monthly Summary of Completed Pest Control Services
Orders
Last work day of the month
KO, COR, EV As Required
1503020/ 3.3
J-1503020-14 Report of Pest Management Operations
By the 15th of the following month.
Electronically via
NOPRS
KO, COR, EV Monthly
1503020 - Pest Control 1503020/
2.2.1
N/A Copy of Certification for Contractor
Personnel
15 calendar days prior to start of work
KO, COR, EV As Required
1503020/ 2.3.1
N/A Business Licensing 5 days prior to the start of work requiring permits
KO, COR, EV As Required
1503020/ 2.3.2
N/A Permits 5 days prior to the start of work requiring permits
KO, COR, EV As Required
1503020/ 2.3.4
N/A Ultra-Low Volume (ULV) Equipment
Calibration and Droplet Analysis
Report
15 days prior to the start of work and after every 50 hours of ULV equipment use
KO, COR, EV As Required
Spec Item
Form Attachment
Number Deliverable Title
Dates of Submission
Distribution Frequency
1503020/
N/A Contractor's Work Plan
30 calendar days prior to start of work
KO, COR, EV As Required
1503020/
N/A Planned Pesticide Use Sheets including
Pesticide Labels and Safety Data Sheets
(SDS)
30 calendar days prior to start of work. Any proposed changes in pesticide usage shall be submitted for approval at least 5 business days in advance of pesticide use.
Electronically via
NOPRS
KO, COR, EV 1 for each pesticide per pest.
1503020/
N/A Report of Conditions Conducive to Pest
Infestation
1 working day after citing conditions
KO, COR, EV As Required
1503020/ 3.1
N/A Weekly, Monthly and Quarterly Services
Schedule
25 calendar days prior to start of work
KO, COR, EV As Required
1503020/ 3.2
N/A Monthly Summary of Completed Pest Control Services
Orders
Last work day of the month
KO, COR, EV As Required
1503020/ 3.3
J-1503020-14 Report of Pest Management Operations
By the 15th of the following month.
Electronically via
NOPRS
KO, COR, EV Monthly
1503030 - Integrated Solid Waste Management (ISWM) 1503030/
2.2.1 N/A Certification, Training and Licensing
Within 15 calendar days after contract award
KO, COR, EV With invoice/ Monthly
1503030/ 2.3.2
N/A Weight Tickets (Non- Recyclable)
As specified KO, COR Monthly
1503030/ 2.3.3
N/A Permits and Licenses Within 15 calendar days after contract award
KO, COR As Required
1503030/ 3.1
N/A Solid Waste Collection Schedule
15 calendar days prior to contract start
KO, COR Annually and as required
1503030/ 3.1
J-1503030-07 Refuse Collection / Disposal and
Recycling Services Tracking Report
On the 5th day of every month
KO, COR, EV Monthly
1503030/ 3.2.3
N/A Medical Waste Receipts
As specified KO, COR, EV, Medical
Monthly
1503030/ 3.2.4
N/A Grease Collection Disposal Tickets
5th day of every month
KO, COR, EV Monthly
1503030/ 3.4
N/A Container Cleaning Schedule
5 days before the start of each month.
KO, COR Monthly
1503050 - Grounds Maintenance and Landscaping
Spec Item
Form Attachment
Number Deliverable Title
Dates of Submission
Distribution Frequency
1503050/ 2.2.1
N/A Certification, Training, and
Licensing
Within 15 calendar days prior to start of work. Copies of renewed certifications shall also be submitted
KO/COR Annually and as required by Section H –
Special Contract Requirements, FAC 5252.237-
9301 Substitutions of Key Personnel
1503050/ 2.3.1.1
N/A Business Licensing Within 15 calendar days prior to contract start.
Copies of renewed licenses shall also be submitted
KO/COR As Required
1503050/ 2.3.1.4
N/A Planned Pesticide/ Herbicide Use Sheets including Pesticide/
Herbicide Labels and Safety Data Sheets
(SDS)
Within 15 calendar days prior to contract start and at least 10 business days for any proposed changes
KO, COR,
PPMC
Annually for each pesticide/herbicide, as required.
1503050/ 2.3.1.5
N/A Pest Management Operations Report
Electronically by the 15th of the following month (Example: July data must be submitted by
August 15) on the format approved by PMC
KO, COR,
PPMC
Monthly
1503050/ 2.3.2
N/A Permits Within 15 calendar days prior to start of work
KO/COR As Required
1503050/ 2.3.9.1
N/A Water Conservation Plan
Within 15 calendar days prior to contract start
KO/COR Annually and five calendar days prior to implementing changes to the schedule 1503050/
N/A SDS sheets, catalog cut sheets, samples of all proposed fertilizers, and mulch
Prior to bringing on-board installation and prior to use
KO/COR As Required
1503050/
N/A Contractor Work Schedules
5 days prior to the beginning of each month
KO/COR Monthly
1503050/ 3.1.1.3
N/A Soil Analysis Within 15 days after receipt of the test results by the
Contractor
KO/COR As Required
1503050/ 3.1.1.3
N/A Top Dressing and Over Seeding Seed
Type
Within 15 calendar days prior to contract start
KO/COR As Required
1503060 - Pavement Clearance
Spec Item
Form Attachment
Number Deliverable Title
Dates of Submission
Distribution Frequency
1503060/ 3.2
N/A Unscheduled Services 5th day of each month
KO/COR Monthly
1604000 - Wastewater 1604000/
3.1 N/A Certificate of
Wastewater Analysis and the Wastewater
Report
As specified KO/COR Monthly
1604000/ 3.2
N/A Sewage Removal Services Sewage
Disposal Ticket from Accepting Agency
5th day of each month
KO, COR, EV Monthly
1604000/ 3.3
N/A Sewer Line Cleaning Report
As specified KO, COR, EV End of cleaning of the entire system
1606000 - Water 1606000/
3.1 N/A Weekly Drinking
Water Quality Sampling and Testing
Report
4 workdays after sample has been retrieved
KO, COR,
Drinking Water
Program Manager
Weekly
1606000/ 3.2
N/A Quarterly Drinking Water Quality
Sampling and Testing Report
As specified KO, COR, Drinking Water
Program Manager
Quarterly
1606000/ 3.3
N/A Sampling and Testing of Drinking Water
Treatment Chemicals
NSF60
As specified KO, Environmental, Utilities Services
Branch Head, Drinking Water
Program Manager
Every 12 months
1700000 - Transportation
2.2.1 N/A Certification, Training, and Licensing
Within 30 days of contract start
KO, TO As Required
2.3.4.2 N/A Monthly Downtime
Report
By the 25th day of the preceding month
KO, TO As Required
2.3.4.4 N/A Temporary
Suspension of
Downtime Request and Temporary Suspension of
Downtime Accumulation
Within two hours of notice to the
Contractor that the material delays will cause the downtime standard to be missed and upon approval
KO, TO As Required
2.3.4.5 N/A Excessive Repair
Estimates
Upon receipt of estimate exceeding one-time repair limits
KO.TO As Required
3.1 N/A Unscheduled Services
Tracking
By the 5th day of each month to each customer
KO, TO Monthly
Spec Item
Form Attachment
Number Deliverable Title
Dates of Submission
Distribution Frequency
3.4.1 N/A PM Plan and Annual
and Monthly Schedules for Maintenance
(CNRE/PW, AMC,
and AF schedules)
Annual schedule prior to Contract Start and 5 days prior to the beginning of the month
KO, COR, TO Annually and Monthly
3.4.1 J-1700000-07 Maintenance and
Repair Reports – Air Mobility Command
(AMC)
No later than 3 days after completion of work
Emailed per Section C
As Required
3.4.1 N/A Vehicle Accident
Reports
By the fifth working day of each month
KO, TO, COR Monthly
3.4.1 N/A Preventive
Maintenance BSVE
Repair Tracker
By the fifth working day of
KO, TO, COR
3.4.3 N/A Credentials for
Contractor Personnel performing Inspections, Load
Testing and Certification
Prior to start of contract and prior to a new employee starting work
KO, TO, COR As Required
3.4.3 N/A Vehicle Accident, abuse and Damage
Reports
By the fifth working day of each month
KO, TO Monthly
3.4.3.1 N/A
Schedule for Inspecting, Testing, and Certification of
MEWPs
Prior to start of contract and annually
3.4.3.2 N/A Schedule for
Inspection, Load Test, and Certification of MHE and HLG
Prior to start of contract and annually
3.4.3.3 N/A Schedule for EVT
Inspections and
Certification
Prior to start of contract and annually
KO, TO, COR,
FMD
3.4.4 N/A Towing Services
Report
By the fifth working day of each month
KO, COR, TO Monthly
3.4.5 N/A Service Orders for
Accidents and Vehicle Abuse Monthly BSVE
Tracker
By the fifth working day of
KO, COR, TO
3.4.6 N/A Maintenance for
Safety Motorcycles
Schedule
Within 30 days of contract start, after repairs and as updated
Annually and as Required
3.4.6 N/A Maintenance Report
for Safety
Motorcycles
By the fifth working day of
3.5.1 J-1700000-09 GSA Accountability
Form
Within 2 days of vehicle shipping
KO, COR, TO As Required
Spec Item
Form Attachment
Number Deliverable Title
Dates of Submission
Distribution Frequency
3.5.2 J-1700000-10 Air Force
Transportation Office
(AFTO) Limited Technical Inspection
Form 91
Within 2 days of vehicle shipping
KO, COR, TO As Required
1800000 - Management and Administration
2.2.1 N/A Training Plan 15 days after
award/ Annually
KO, EV As Required
2.3.1 N/A Health and Safety
Plan
15 days after award
KO, EV, FSCM As Required
2.3.2 N/A Spill Response and
Preparedness
Implementation Plan
15 days after award
KO, EV, FSCM As Required
4.1 N/A Oil and Hazardous
Substance Spill Response and
Cleanup Ashore Contact Info
15 days after award/Updates as required
KO, EV, FSCM As Required
4.1.1 N/A Oil and Hazardous
Substance Spill
Containment Assessment
Within 30 minutes of arrival on-site
OHS Spill Response
Coordinator
As Required
4.1.3 N/A Oil and Hazardous
Substance Spill Reporting and Documentation
Within (5) five working days after cleanup is complete.
OHS Spill Response
Coordinator, KO, EV, FSCM
File details come from the government source that posted it. Updated .