N6247024R0001 Amendment 0003.pdf

PDF 1 MB Posted

Attached to
Base Operations Support (BOS) Services U. S. Naval Support Activity (NSA) Souda Bay, Crete Greece Federal contract opportunity
Solicitation number
N6247024R0001
Issued by
Department of the Navy Naval Facilities Engineering Command

About this file

This document is a solicitation amendment for the Base Operations Support (BOS) Services contract at U.S. Navy Support Activity (NSA) Souda Bay, Crete, Greece under solicitation number N6247024R0001. The amendment revises Sections B, C, J, and L of the solicitation. Key details include:

The contract is for a base period of 12 months with up to 7 one-year option periods and 1 six-month option period, for a total potential contract duration of 102 months. The contract will be awarded on a fixed-price basis with both recurring and non-recurring work. Recurring work will be priced using CLINs, while non-recurring work will use unit-priced tasks. The government intends to issue an initial task order to meet the minimum contract guarantee. The solicitation provides details on management, administration, safety, security, environmental, and other requirements. Contract performance will be at various locations within the NSA Souda Bay area of responsibility.

View the file

Other files for this federal contract opportunity

Other files attached to Base Operations Support (BOS) Services U. S. Naval Support Activity (NSA) Souda Bay, Crete Greece, newest first.
File Type Posted
J-0200000-15 ELINS (AMD 0006).xlsx XLSX spreadsheet
N6247024R0001 Amendment 0006.pdf PDF
SECTION F Deliverables (AMD 0006).pdf PDF
N6247024R0001 Amend 0005.pdf PDF
J-1502000-05 PM Services Matrix (AMD 0005).xlsx XLSX spreadsheet
1402000 J Unaccompanied Housing (AMD 0005).pdf PDF
J-1503060-03 Pavement Clearance Site Map (AMD 0005).pdf PDF
Attachment F SECTION F Deliverables (AMD 0005).pdf PDF
J-0200000-15 ELINS (AMD 0003).xlsx XLSX spreadsheet
J-1402000-07 Minor Repairs Historical Data (AMD 0002).xlsx XLSX spreadsheet
J-1800000 Environmental (AMD 0002).pdf PDF
J-0200000-15 ELINS (AMD 0002).xlsx XLSX spreadsheet
Attachment F - Section F Deliverables (AMD 0002).pdf PDF
N6247024R0001 Amendment 0002.pdf PDF
J-1502000 Facility Investment (AMD 0002).pdf PDF
J-1502000-23.a Irrigation System Layout (AMD 0002).pdf PDF
J-0600000 Port Operations (AMD 0002).pdf PDF
N6247024R0001 Amendment 0001.pdf PDF
N6247024R0001 RFP.pdf PDF
J-1 NAVFAC Past Performance Questionnaire.pdf PDF
J-0200000-11.a How to purchase PKI to Access Maximo.pdf PDF
J-0200000-11.b How to Request a Maximo Account.pdf PDF
J-0200000-11.c SAAR-N Sample Form for BOSC.pdf PDF
J-0200000-12 Final Governing Standards (FGS) Greece.pdf PDF
J-1002000 Supply Services.pdf PDF
J-1501000 Facility Management.pdf PDF
J-1502000-33.d Arresting Gear Preserved On Site Components.pdf PDF
J-1503010 Custodial.pdf PDF
J-1503020-13 Historical Unscheduled Pest Control Service Orders.xlsx XLSX spreadsheet
J-1503050-11 Running Track Boneyard Grounds Map.pdf PDF
F - Section F Deliverables.pdf PDF
J-2 Corporate Experience Project Data Sheet.pdf PDF
J-7 DBIDS SECNAV FORM 5512_1.pdf PDF
J-0200000 Management and Administration.pdf PDF
J-0200000-07 - NAVFAC Maximo Asset Information.xlsx XLSX spreadsheet
J-1002000-03 Personal Property Customer Service Survey.pdf PDF
1300000 J Galley.pdf PDF
J-1300000-13 Galley Floor Plan.pdf PDF
J-1402000.2 NHG-NAVY INN.pdf PDF
J-1402000.3 Contingency Lodging.pdf PDF
J-1501000-06 Equipment Standards List.xlsx XLSX spreadsheet
J-1502000-05 Preventative Maintenance (PM) Program Services Matrix.xlsx XLSX spreadsheet
J-1502000-17.a Weatherpak Quick Deploy Guide.pdf PDF
J-1502000-23 Irrigation System Layout.pdf PDF
J-1502000-33.a STW-07 Outdoor Painting Depainting and Corrosion Control.pdf PDF
J-1502000-33.f NAVAIR 17-1-125 CORROSION CONTROL.pdf PDF
J-1503020-15 Integrated Pest Management Plan (IPMP) NSA Souda Bay.pdf PDF
J-1503050-14 Marathi Port Ops Grounds Map.pdf PDF
J-1503050-15 Marathi Security RSM1 Grounds Map.pdf PDF
J-1606001 Water (Overseas).pdf PDF
Show all 50

Base Operations Support (BOS) Services U. S. Naval Support Activity (NSA) Souda Bay, Crete Greece has more files on GovTribe.

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

N6247024R0001

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

N6247024R0001 Base Operations Support (BOS) Services Contract at U.S. Navy Support Activity (NSA) Souda Bay, Crete, Greece.

This Amendment is issued to revise Sections B, C, J and L.

See Continuation Page.

1. CONTRACT ID CODE PAGE OF PAGES

J 1 191

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 15-Oct-2024

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X N6247024R0001

X 9B. DATED (SEE ITEM 11)

05-Sep-2024

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

15-Oct-2024

CODE

COMNAVFACSYSCOM ATLANTIC

6506 HAMPTON BLVD

NORFOLK VA 23508-1278

N62470 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION SF 30 - BLOCK 14 CONTINUATION PAGE

The following have been added by full text:

AMENDMENT 0003

This amendment is issued to provide further information to various sections and to disseminate the information as outlined below.

1. Section B – Section B has been revised. See note below.

2. Section C – Section C is Amended as outlined below

The following Annexes are Revised:

Annex 0100000 General Information Annex 0200000 Management and Administration Annex 1002000 Supply Services Annex 1300000 Galley Annex 1501000 Facility Management Annex 1502000 Facility Investment

3. Section J – Revisions are made to Section J Table of Contents. Amedment 0003 preaward inquiry responses are provided as well as the following attachments. See note below.

The following attachments have been revised:

Attachment F Section F Deliverables (PDF) J-0200000-15 Exhibit Line Item Numbers (ELINs) (Amendment 0003)

4. Section L – Section L has been revised. See note below.

NOTE: Revisions are provided by the use of red font; deletions are indicated by the use of red strikethrough font.

SECTION B - SUPPLIES OR SERVICES AND PRICES

The following have been modified:

SECTION B

B.1 MAXIMUM NOT TO EXCEED (NTE) AND MINIMUM GUARANTEE

The maximum NTE value of an ordering period is the total of all the CLINs in that ordering period. The maximum or NTE value of the contract is the total value of all CLINs in the Schedule. Orders shall not be made that exceed the maximum NTE value for any ordering period. The maximum NTE value of an ordering period and of the contract may be increased by written modification to the contract in conjunction with any modification that increases the value of an existing task order that is authorized by a contract clause. Orders in excess of the estimated quantity set forth for any particular CLIN shall not be exceeded without the Contractor’s agreement which shall be indicated by signing or beginning performance of the order.

Concurrently with the award of the basic contract, the Government intends to issue a task order to obligate the contract minimum guarantee for:

CLIN 0001 Base Period Recurring work;

Minimum guarantees do not apply to the option periods.

B.2. CONTRACT TERM

This contract contains provisions for one base period of twelve (12) months and includes up to seven (7) one-year option periods and one (1) six-month option period, for a proposed total contract term, if all options are exercised, not-to-exceed 102 months. As such, the contract includes FAR Clause 52.217-8—OPTION TO EXTEND SERVICES (NOV 1999). The Government has the option to extend the term of the contract in accordance with Section I, Contract Clauses, FAR Clause 52.217-9, OPTION TO EXTEND THE TERM OF THE CONTRACT

(MAR 2000).

B.3 CONTRACT LINE ITEMS, CONTRACT EXHIBIT LINE ITEMS AND SUBCLINS

a. Offerors shall enter unit prices and amounts for Contract Line Items (CLINs) and Exhibit line items (ELINs) as indicated in the schedules and any accompanying exhibits. ELIN unit prices must be rounded to two (2) decimal places only, and each ELIN extended total price must be calculated based on the rounded unit price. If an offeror does not round ELIN unit prices to two (2) decimal places, then the Government will round the prices to two (2) decimal places and the rounded prices will be used for evaluation purposes. All ELIN unit prices may not be less than $0.01. If an offeror proposes unit price less than $0.01 but higher than “$0.00,” then the Government will round the unit price to $0.01 and that rounded price and resultant extended total price will be used for evaluation purposes.

(It is highly recommended that Offerors use cell format “currency” in the electronic Microsoft Excel ELIN spreadsheet).

b. In the event there is a difference between the unit price and the extended total amount, the unit price will be held to be the intended offer and the extended total of the CLIN and ELIN will be recomputed to take into account the change in the contract CLIN/ELINS. If the offeror provides a total amount for an ELIN but fails to enter the unit price, the extended total amount divided by the ELIN quantity will be held to be the intended unit price; however, if this calculation results in a unit price requiring more than two decimal places, then the unit price will be rounded to two decimal places, and the extended total price will be recalculated in accordance with the preceding paragraph. If an Offeror does not have a value (i.e.: $-.--) or has $0.00 listed in both the unit price field and the extended total field for that ELIN(s) within the Attachment J-0200000-153, and a total evaluated price could not be determined by the Government for that ELIN(s) or CLIN(s) based on pricing submitted, then the Offeror’s price proposal will be determined to be unawardable. In the event there is a discrepancy between the hard copy Attachment J-0200000- 153and electronic copy of the J-0200000-153, the hard copy Attachment J-0200000-153 pricing will be held to be the intended offer.

c. The Schedule of Recurring work (CLINs 0001, 0003, 0005, 0007, 0009, 0011, 0013, 0015, and 0017), and the Schedule of Non-Recurring work (CLIN 0002, 0004, 0006, 0008, 0010, 0012, 0014, 0016, and 0018), will be used as the basis for deductions in accordance with the FAR Clause 52.246-4 INSPECTION OF SERVICES – FIXED- PRICE (AUG 1996), Section E.

d. Informational SubCLINs will be incorporated at the time of award with appropriate funding/lines of accounting by customer. These SubCLINS represent funding for each CLIN by customer. The contractor shall not submit totals for SubCLINs.

B.4 INDEFINITE QUANTITY INDIVIDUAL CONTRACT LINE ITEM QUANTITIES

Once the estimated quantities for individual line items shown in the Schedule and any accompanying exhibits have been ordered, additional quantities may be ordered at the same rates or unit prices as awarded, as long as the overall not-to-exceed (NTE) amount of the contract per year is not exceeded.

B.5 FULLY LOADED PRICING

Prices provided shall be fully loaded and no other allocations, fees, overheads, G&A, insurance, taxes, profits or any other markups shall be applied when an option is exercised or a Task Order is issued. Costs for technical specifications 0100000– General Information and 0200000– Management and Administration shall be considered overhead; therefore, those annexes’ shall be allocated and included throughout the prices proposed for all other annexes. Further, the Government will not compensate the Contractor for individual non-recurring work proposal preparation or estimating costs.

B.6 GOVERNMENT PURCHASE CARD

Non-Recurring work may be ordered at the prices offered by two ways:

1) By the issuing activity using a DD Form 1155 “Order for Supplies and Services”; or

2) By an authorized Government user via a Government Purchase Card (GPC).

When receiving GPC orders against Section B/Exhibits, the contractor shall provide the supplies and services at the offered price without additional markup or handling fee.

B.7 UNIT PRICE ADJUSTMENTS IN OPTION PERIODS

In the event the Government elects to exercise an option period, the contract price proposed and accepted at time of award will be the contract price. No price adjustments will be made.

B.8 BIDDING UNIT PRICES FOR LABOR

a. A portion of the work included in the scope of this contract cannot be identified in advance in sufficient detail to be included in the Recurring Work Items portion or as a Unit Price Task in the Non-Recurring Work Items portion of the contract. Labor for this work will be ordered under the “NON-RECURRING WORK/UNIT PRICED LABOR (UPL) WORK (NEGOTIATED)” clause in Section C and paid for based on unit prices for labor bid by the Contractor listed in the Schedule of Non-Recurring work.

b. Estimated hours in the Schedule are a forecast of future requirements. These estimated hours are for performing "Non-Recurring Work” accomplished in the time period shown.

c. The Contractor shall enter, in the unit price bid space, the unit price for performing composite labor. The composite labor price shall include all direct and indirect costs associated with performing an hour of work. The composite labor price should be the Contractor's hourly craft wage adjusted to allow for the offerors work force productivity (i.e., the Contractor's estimate of how its’ work force will perform in relation to the Means Facilities Cost Data and/or the Engineered Performance Standards). The Composite Labor Rate shall include all costs for preparation of the cost proposal, job preparation, travel, pre-expended bin materials and supplies, ordering and stockpiling job material, additional material handling, items of equipment necessary to perform work (i.e. bucket truck, lifting equipment, staging, etc.), equipment set up time, lift time, craft delay allowance, profit, tools, equipment, field and home office overhead, clerical support, supervision, inspection, fees, taxes, licenses, bonds, permits, insurance, etc.

B.9 PHASE-IN AND PHASE-OUT

Pricing shall include applicable Phase-In and Phase-Out costs, Phase-In shall be for a period of up to but no more than 60 days and Phase-Out to be for a period of up to but no more than thirty (30) days. There is no separately priced CLIN for Phase-In and Phase-Out and such costs can be distributed however the offeror chooses. The Government recognizes that offerors may choose to front load these costs into the base year.

B.10 CONTRACT PRICE INFORMATION

For administrative purposes of the U.S. Government, the price of this contract and all subsequent task orders and modifications issued under this contract will be expressed in U.S. dollars. Payment will also be made in U.S.

dollars.

B.11 CONTRACTOR SUPPORT OF ELECTRONIC FACILITIES SUPPORT CONTRACTING (E-FSC)

This procurement allows for and the Government fully intends to use DoD E-Mall for issuing orders under the Non- Recurring Work portion of the contract. Refer to Section H, Special Contract Requirements.

B.13 PRIOR CONTRACT INFORMATION

This requirement is currently being satisfied under contract N62742-18-D-3000 Base Operations Support Services Contract at Souda Bay, Crete Greece, which was awarded to IAP Worldwide Services, Inc.

This information is provided for informational purposes only. Prospective offerors are cautioned that they should not rely on this information to determine workload as there is no assurance that workload and volume of future effort and costs will replicate past experience.

SECTION C - DESCRIPTIONS AND SPECIFICATIONS

The following have been modified:

ANNEX 0100000

0100000 – General Information Spec Item Title 1 General Information

1.1 Outline of Services

1.2 Project Location

1.3 Acquisition of Additional Work

1.4 Background Information

1.5 Navy PBSA Approach

1.6 Standard Template

1.7 Related Information

1.8 Verification of Workload and Conditions

1.9 Contractor's Knowledge

1.10 Technical Proposal Certification

1.11 References and Technical Documents

1.12 Non-Recurring Work ELINs

0100000 – General Information Spec Item Title Description 1 General Information

0100000 – General Information Spec Item Title Description

1.1 Outline of Services Except where otherwise stated, the Contractor shall furnish all labor, supervision, management, tools, materials, equipment, facilities, transportation, incidental engineering, and other items necessary to provide the services outlined below and described in this Performance Work Statement (PWS) at Naval Support Activity (NSA), Souda Bay, Crete, Greece, and its outlying support sites, by means of a performance-based contract that is comprised of both Recurring Work and Non-Recurring Work Items.

The PWS is organized into annexes. Annex 1 is "General Information".

Annex 2 contains the on-site project management and administration requirements. Annexes 3 through 18 contain the technical requirements.

The annex numbers are identified as 1 through 18 in the description column, but the fully expanded annex numbers include seven digits (e.g., Annex 1 expanded number is 0100000 as shown in the header row at the top of this page).

Annex 1 General Information Annex 2 Management and Administration Annex 3 Command and Staff Annex 4 Safety Annex 5 Air Operations Annex 6 Port Operations

• 0600000 Port Operations Annex 7 Ordnance Annex 8 Range Operations Annex 9 Health Care Support Annex 10 Supply

• 1002000 Supply Services Annex 11 Personnel Support Annex 12 Morale, Welfare and Recreation Support Annex 13 Galley

• 1300000 Galley Services Annex 14 Housing

• 1402000 Unaccompanied Housing

• 1402000.2 NHG-NAVY INN Lodging

• 1402000.3 Contingency Lodging

Annex 15 Facilities Support

• 1501000 Facility Management

• 1502000 Facilities Investment

• 1503010 Custodial Services

• 1503020 Pest Control

• 1503030 Integrated Solid Waste Management (ISWM)

• 1503050 Grounds Maintenance and Landscaping

• 1503060 Pavement Clearance

Annex 16 Utilities

• 1604000 Wastewater

• 1606001 Water (Overseas)

Annex 17 Base Support Vehicles and Equipment

• 1700000 Transportation (BSVE)

Annex 18 Environmental

• 1800000 Environmental

Spec Item Title Description

1.2 Project Location The work shall be performed at various locations within the Area of

Responsibility (AOR) of the Commander, Naval Support Activity (NSA) Souda Bay, which includes NATO Marathi Pier Complex (commonly known as “Marathi”) and Malaxa Site, Klapes, and Larissa. Marathi is located approx. 6 kilometers from NSA Souda Bay. NSA Souda Bay has NEX, NGIS, Medical, Gym, Admin, Base Galley, ID Card Lab and the Liberty Center. Marathi has piers, sports fields, self-service laundry and an a la carte dining facility (the Argonaut). Access codes are required through the Port Operations Officer for both installations. Malaxa Site is located approx. 33 kilometers from NSA Souda Bay. Klapes is located approx. 12 kilometers from NSA Souda Bay. Larissa is located on mainland Greece.

The specific locations of the current requirements are identified in each annex, sub-annex, and in Section J. Task Orders for Non-Recurring Work for each annex may be issued for any location within the AOR of NSA Souda Bay.

The following is an example of the dispersion of work at the various locations.

(1) Port Ops: Marathi Pier

(2) Housing Services: Facilities Support

(3) Facilities Investment: NSA Souda Bay, Malaxa Site, Klapes, Larissa

1.3 Acquisition of

Additional Work The Government reserves the right to acquire additional services at additional locations, within the scope of the annexes and areas included in Spec Item 1.1 Outline of Services, in addition to the services and locations identified in the requirements of this contract. Additional services will be incorporated into the contract in accordance with the CHANGES clause, SECTION I or ordered under the non-recurring work provisions of the contract. Items of work not covered by this contract but within the general intent are considered in the scope of this contract.

1.4 Background Information The Naval Support Activity (NSA) Souda Bay is strategically located on the Akrotiri Peninsula, on the Northwest coast of the rugged Greek island of Crete. Its operational mission is to extend Joint and Fleet Warfighting capability through Operational Support to U.S. Allied and Coalition Forces deployed within the EUCOM/CENTCOM/AFRICOM AOR by providing, operating and sustaining superior facilities and services dedicated to combat readiness and security of ships, aircraft, detachments and personnel. Crete is located in the Eastern Mediterranean Sea approximately 225 kilometers southeast of Athens, Greece. Crete consists of semi-mountainous terrain in a subtropical climate. NSA Souda Bay is physically located on the large circular shaped Akrotiri Peninsula, which forms the northern face of the Souda harbor. It is located on the Hellenic Air Force Base, adjacent to the Chania airport, just beyond the village of Mouzouras and shares the runway with the Chania airport. The installation is approximately 500 acres with approximately 1,000 total military and civilian personnel.

1.5 Navy PBSA Approach The Navy’s approach to performance-based service acquisition (PBSA) includes four component parts, which are 1) performance outcomes, 2) measurable standards, 3) consideration of incentives, and 4) performance assessment plan.

Spec Item Title Description

1.6 Standard Template Key to implementing the PBSA approach is using a standard template that ensures Navy-wide consistency yet affords appropriate tailoring to meet local needs.

The standard template contains 18 standard annexes. Annex 1 will always contain General Information that is relevant to the entire scope of the contract. Annex 2 contains Management and Administration requirements that are relevant to the entire scope of the contract. Annexes 3 through 18 and their associated sub-annexes contain the General Information, Management and Administration requirements, Performance Objectives, Related Information, and Performance Standards that are relevant to that technical annex. Except where otherwise stated, Annexes 3 through 18 and their associated sub-annex requirements are not relevant to one another. Within each technical annex and sub-annex, the organization of information and requirements are also standardized. Specification Item 1 will always contain General Information. Specification Item 2 will always contain the Management and Administrative requirements. Specification Item 3 will always contain the Recurring Work requirements.

Specification Item 4 will always contain the Non-Recurring Work requirements. Requirements and standards for higher level specification items apply to all subordinate specification items, e.g., Specification Item 3 standards apply to all recurring work specification items. Specification Item 3.1 is applicable to all 3.1 subordinate specification items.

Specification Items 3.2 and 3.3 are not considered subordinate to 3.1 nor are they considered subordinate to one another. All costs associated with Annexes 1 and 2 and Specification Items 1 and 2 shall be priced, and their price shall be allocated to the Exhibit Line Items.

1.7 Related Information There are four types of Related Information that can be found in the Description and Related Information columns of the specification as follows:

Informational Notes as used throughout this PWS provides additional information to offerors, to be used in developing a thorough understanding of the work to be performed in this contract. Any block of text marked “Informational Notes” throughout Annexes 1 through 18 and their associated sub-annexes are subject to this disclaimer. Offerors may not rely upon the "Informational Notes" as material representations of the Government. Information provided in "Informational Notes" does not create a contractually binding requirement on either party.

Clarifying Information describes client expectations in a more detailed manner than the Performance Objective and Performance standard alone.

Constraining Information describes limitations to the work performed to meet the Performance Objective and Performance Standard.

Requirement Information further describes client requirements associated with each Performance Objective.

1.8 Verification of

Workload and Conditions

Throughout the PWS, the workload data is generally referred to as being located in Sections C and J. Section C provides data such as descriptions, specifications, and the statement of work. Section J provides data such as system descriptions, maps, floor plans, and tables to represent the type and location of services to be provided. All facilities, systems, and assets identified in this contract shall be accepted by the Contractor in "AS-IS"

Spec Item Title Description condition. The Contractor is fully responsible for all work up to and including the limits of liabilities specified.

As prescribed in FAR 52.237-1, offerors or quoters are urged and expected to inspect the site where services are to be performed and to satisfy themselves regarding all general and local conditions that may affect the cost of contract performance, to the extent that the information is reasonably obtainable. In no event shall failure to inspect the site constitute grounds for a claim after contract award.

1.9 Contractor's Knowledge The Navy expects to receive insightful management from its contractors.

This management will include the knowledge, skills, authority and willingness to use contractor resources to find better ways of serving Navy clients’ strategic and operational goals and objectives. The Navy's use of performance-based objectives evidences this principle. Although performance work statements will typically contain several levels of performance assessment, the Navy wants its contractors to exercise maximum discretion within bounds of prudent risk management to adjust processes and resources needed to reach specified objectives at the highest performance level.

1.10 Technical Proposal

Certification

The Contractor warrants that its proposal incorporated herein by reference will meet or exceed the performance objectives set forth in this contract.

1.11 References and

Technical Documents

The Contractor shall adhere to the applicable portions of all referenced publications and directives, and those reference in Section J of each annex, in performing the services required under this contract. The References and Technical Documents lists shall not be considered all-inclusive and do not release the Contractor from all obligations that must be fulfilled in the observance and execution of this contract.

When U.S., European and/or Greek directives, instructions and industry standards are applicable to the work to be performed under this contract, the most stringent directives, instructions and industry standards shall govern.

1.12 Non-Recurring Work

ELINs

Non-Recurring Work Exhibit Line Item Numbers (ELINs) are provided in J-0200000-15.

ANNEX 0200000

0200000 – Management and Administration Spec Item Title

2 Management and Administration

2.1 Definitions and Acronyms

2.2 General Information

2.2.1 Government Regular Working Hours

2.2.1.1 Observed Federal Holidays

2.2.1.2 Greek Legal Holidays

2.2.1.3 Greek Administrative Holidays

2.2.1.4 Restriction to Contractor Working Hours

2.2.2 Wage Determinations

2.2.3 Requirements Hierarchy

2.2.4 Conflicts Between US Standards and Local Standards

2.3 General Administrative Requirements

2.3.1 Required Conferences and Meetings

2.3.2 Training for Maintenance and Operation of New and Replacement Systems and Equipment

Spec Item Title

2.3.3 Partnering

2.3.3.1 Formal and Informal Partnering

2.3.3.2 Contract Partnering Administration

2.3.3.3 Contract Partnering Session Attendees

2.3.4 Permits and Licenses

2.3.5 Insurance

2.3.5.1 Certificate of Insurance

2.3.5.2 Minimum Insurance Amounts

2.3.6 Protection of Government Property

2.3.7 Directives, Instructions, and References

2.3.7.1 Standard Operating Procedures (SOP)

2.3.8 Invoicing Procedures

2.3.9 Forms

2.3.10 Translation of Performance Work Statement (PWS)

2.4 Government-Furnished Items

2.4.1 Government-Furnished Property (GFP)

2.4.2 Government-Furnished Facilities

2.4.3 Government-Furnished Vehicles and Equipment

2.4.4 Government-Furnished Utilities

2.5 Contractor-Furnished Items

2.6 Expenses

2.7 Management

2.7.1 Safeguarding Information

2.7.2 Dissemination of Information

2.7.3 Work Reception

2.7.4 Work Control

2.7.5 Work Schedule

2.7.6 Deliverables

2.7.7 Service Interruptions

2.7.8 Government’s Computerized Maintenance Management System (CMMS) NAVFAC Maximo

2.7.8.1 NAVFAC Maximo Data

2.7.8.2 NAVFAC Maximo Method of Data Entry

2.7.8.3 NAVFAC Maximo Access

2.7.8.4 NAVFAC Maximo Training

2.7.9 Quality Management System (QMS)

2.7.9.1 Quality Management (QM) Plan

2.7.9.2 Quality Inspection and Surveillance

2.7.9.3 Quality Inspection and Surveillance Report

2.7.10 System and Equipment Replacement

2.8 Personnel Requirements

2.8.1 Key Personnel

2.8.1.1 Project Manager (PM)

2.8.1.2 Quality Manager

2.8.1.3 Quality Control Personnel

2.8.1.4 Site Safety and Health Officer (SSHO)

2.8.1.5 Environmental/Energy Manager

2.8.2 Employee Requirements

2.8.2.1 Employee Certification and Training

2.8.2.2 Employee Appearance

2.8.2.3 Employee Conduct

2.8.2.4 Identification as Contractor Employee

Spec Item Title

2.8.2.5 Removal of Employees

2.8.2.6 Proof of Legal Residency

2.8.2.7 English-Speaking Personnel

2.8.3 Service Contract Reporting (SCR)

2.9 Security Requirements

2.9.1 Employee Listing

2.9.2 Vehicles

2.9.3 Passes and Badges

2.9.4 Access to Installation

2.9.5 Access to Buildings

2.9.6 Access Arrangements

2.9.6.1 Escort Arrangement for Secured Areas

2.9.7 Security Clearances

2.9.8 Access to Controlled Unclassified Information

2.9.9 Access to Government Information Technology (IT), Operating Technology (OT), and Facility

Related Control Systems (FRCS)

2.9.10 Access to OneNet

2.9.11 Employee Status

2.10 Contractor Safety Program

2.10.1 Contractor Safety Requirements

2.10.2 Accident Prevention Plan (APP)

2.10.3 Activity Hazard Analysis (AHA)

2.10.4 Safety and Occupational Health (SOH) Risks and Compliance Plans

2.10.4.1 Alcohol and Drug Abuse Prevention Plan

2.10.4.2 Chemical Hazard Communication Program

2.10.4.3 Confined Space Program

2.10.4.4 Critical Lift Plan

2.10.4.5 Fall Prevention and Protection Plan

2.10.4.6 Pathogen Exposure

2.10.4.7 Control of Hazardous Energy (lockout/tagout)

2.10.5 Crane Operations

2.10.5.1 Crane Inspections

2.10.5.2 Rigging Gear

2.10.5.3 Crane Operators

2.10.6 Accident and Damage Reporting

2.10.6.1 Accident Reporting and Notification Criteria

2.10.7 Fire Protection

2.10.8 Monthly On-Site Labor Report

2.10.9 OSHA Citations and Violations

2.10.10 Safety Inspections and Monitoring

2.10.11 Safety Certification

2.10.12 Safety Apparel on Jobsites

2.10.13 Emergency Medical Treatment

2.10.14 Excavations

2.11 Environmental Management and Sustainability

2.11.1 Energy Management Program

2.11.1.1 Water Conservation Plan

2.11.1.2 Energy Efficient Products

2.11.2 Environmental Protection

2.11.2.1 ODS Requirements for Refrigerant Recycling

2.11.2.2 Solid Waste Management and Recycling

2.11.2.3 Non-Regulated Waste Disposal

Spec Item Title

2.11.2.4 Regulated Waste Disposal

2.11.2.5 Universal Waste

2.11.2.6 Spill Prevention, Containment, and Clean-up

2.11.2.7 Hazardous Material Management

2.11.2.8 Protection of Endangered and Threatened Species (Flora and Fauna)

2.11.2.9 Noise Control

2.11.2.10 Salvage

2.11.2.11 Asbestos Containing Material (ACM)

2.11.2.12 Clean Air Act (CAA)

2.11.3 Sustainable Procurement and Practices

2.11.3.1 Environmentally Preferable Products

2.11.3.2 Use of Recovered Materials

2.11.3.3 Use of Biobased Products

2.12 Disaster Preparedness

2.13 Technical Library

2.14 Warranty Management

2.15 Recurring Work Procedures

2.15.1 Recurring Work Preparation of Proposals

2.15.2 Notification to the Government for Work Above the Recurring Work Limitations

2.15.3 Inventory Data Quantity Variation

2.15.4 Recurring Work Exhibit Line Item Numbers (ELINs)

2.16 Non-Recurring Work

2.16.1 Unit Priced Task (UPT) Work (Non-Negotiated)

2.16.1.1 Acceptance and Performance

2.16.1.2 Invoicing and Receiving Payment

2.16.2 Unit Priced Labor (UPL)Work (Negotiated)

2.16.2.1 Non-Recurring Work Preparation of Proposals

2.16.2.1.1 Labor Requirements

2.16.2.1.2 Direct Material and Construction Equipment Requirements

2.16.2.2 Issuance of Final Task Order

2.16.3 Non-Recurring Work ELINS

2.17 Inventory Data Quantity Variation

2.18 Initial Inspection of Equipment Requested to be Added to the Contract

0200000 - Management and Administration

2 Management and

Administration

2.1 Definitions and

Acronyms

Definitions and Acronyms are listed in J-0200000-01.

2.2 General

Information

The Contractor shall be compliant with all U.S and Host Nation labor laws.

2.2.1 Government

Regular Working Hours

The Government's regular working hours are from 0730-1630, five days per week, Monday through Friday, except observed Federal holidays. Exceptions to the regular hours of operation are detailed in subsequent sections of this PWS. Work in certain annexes or sub-annexes require Contractor continuous operations, 24 hours a day, every day of the year, including holidays. The performance of other work requirements shall be accomplished within the Government’s regular working hours unless the specific work requirement specified herein necessitates otherwise. Any other work outside Government

Spec Item Title Description regular working hours that are not referenced in the specific annex work requirements must be authorized by the KO prior to commencement of work.

2.2.1.1 Observed Federal

Holidays

The US Government observes the following holidays:

New Year's Day 01 January * Martin Luther King, Jr.'s Day 3rd Monday in January President's Day 3rd Monday in February Memorial Day last Monday in May Juneteenth 19 June * Independence Day 04 July * Labor Day 1st Monday in September Columbus Day 2nd Monday in October Veteran's Day 11 November * Thanksgiving Day 4th Thursday in November Christmas Day 25 December *

* Holidays falling on Saturday are usually observed on the preceding Friday and holidays falling on Sunday are usually observed on the following Monday.

2.2.1.2 Greek Legal

Holidays

For information purposes, the following are the Greek legal holidays:

New Year’s Day – January 1 Epiphany Day – January 6 Independence Day – March 25 Easter Monday – Set each year Labor Day – May 1 Holy Virgin Day – August 15 OXI Day – October 28 Christmas Day – December 25 Second Day of Christmas – December 26

2.2.1.3 Greek

Administrative Holidays

For information purposes, the following are the Greek administrative holidays:

New Year’s Day – January 1 Epiphany Day – January 6 Clean Monday – Set each year Good Friday – Set each year Whit Monday – Set each year Hellenic Air Force Day – November 8 Second Day of Christmas – December 26

2.2.1.4 Restriction to

Contractor Working Hours

If the Contractor wishes to work outside of the Government's regular working hours for the Contractor’s convenience, the Contractor shall submit a written Request to Work Outside Government’s Regular Working Hours per Section F. Excludes work to be performed during specified hours.

2.2.2 Wage

Determinations

Not Applicable.

2.2.3 Requirements

Hierarchy

Requirements or definitions specified in each spec item of this contract apply to subordinate paragraphs. For example, requirements shown in spec item 3.1 would apply to spec items 3.1.1, 3.1.2, 3.1.2.1 and so on.

Likewise, Performance Standards specified at a lower digit level (i.e. spec item 3.1.1, 3.1.2, 3.1.2.1) apply when performance is assessed at a higher tier (i.e., spec item 3.1) based on the composite work requirements.

Spec Item Title Description

2.2.4 Conflicts Between

US Standards and Local Standards

All work under this contract shall be performed in accordance with US standards and local (Greek) standards. In case of conflicts between US standards and local standards, the most stringent standard shall apply.

2.3 General

Administrative Requirements

2.3.1 Required

Conferences and Meetings

The Contractor shall attend administrative and coordination meetings. The Contractor shall provide sign-in sheets, prepare minutes of all meetings and submit per Section F for review and comment. The Contractor shall incorporate comments received within two working days into the meeting minutes A copy of the final revision shall be submitted per Section F for concurrence.

2.3.2 Training for

Maintenance and Operation of New and Replacement Systems and Equipment

When construction, renovation, or repair work, is performed by means other than this contract, the Contractor shall attend Government provided training, as applicable, for maintenance and operation of new and replacement systems and equipment at no additional cost to the Government.

2.3.3 Partnering The Government requires cohesive partnerships with its Contractors and subcontractors. Key stakeholders, including the supported commands who may receive services, principal individuals from NAVFAC, the performance assessment team, and representative(s) of the installation(s) will be invited to participate in the partnering process. Key members of the prime and sub-contractor teams, including senior management personnel must participate.

The partnership will draw on the strength of each organization in an effort to achieve quality contract services done right the first time, within the contract price, as scheduled, and without any safety mishaps.

The goal of Partnering is to develop a cohesive team with common purpose, commitment and established communication processes.

2.3.3.1 Formal and

Informal Partnering

The Contracting Officer shall organize an in-person initial Formal Partnering Meeting with key personnel of the project team, including Contractor's personnel and Government personnel. The initial session will be one day in duration, will be scheduled concurrently with the Pre-Performance Conference, and held no later than 30 days after award at a Government-provided facility, as designated by the KO.

Follow-on Informal Partnering Sessions will be conducted on a semi-annual basis and as requested by the KO and will typically last a half day or less.

Key Contractor’s personnel are required to attend. The senior Government stakeholder present will lead the meeting; however, the Contractor’s PM or senior representative is encouraged to participate as co-lead.

The Partners will determine the frequency of the follow-on sessions.

2.3.3.2 Contract Partnering

Administration

Upon award, the ACO will contact the Contractor, supported command(s), Region, and Installation(s) stakeholders, and the performance assessment team to discuss implementation of partnering. A partnership agreement, The Charter, should be in place as early as possible so issues arising, even before work begins, can be resolved using the issues resolution process.

Replacement of Core Management Team members (stakeholders who attended the initial session and manage the contract work day-to-day) is discouraged since it will disrupt the synergy that has been developed. If replacement of a team member proves to be unavoidable, a follow-on

Spec Item Title Description partnering session must be held to officially turn the responsibilities of the position over to the new member.

The Core Management Team consisting of the attendees below must be present during the initial and all follow-on partnering sessions. These are the core mandatory attendees. Other stakeholders may attend if they desire or as recommended by the partners.

2.3.3.3 Contract Partnering

Session Attendees

The Contractor shall bring the necessary personnel to successfully partner on this contract. (Asterisks indicate mandatory personnel.)

President/Vice President

* Project Manager

* Quality Manager

* Site Safety and Health Officer

2.3.4 Permits and

Licenses

The Contractor shall obtain all required permits, licenses, and authorizations to perform work under this contract and comply with all the applicable Federal, Host Nation and Final Governing Standards (FGS) Greece regulations. The Contractor shall submit copies of Permits and Licenses per Section F.

The FGS Greece is provided in J

2.3.5 Insurance The Contractor shall submit a Certificate of Insurance per Section F as evidence of the existence of the following insurance coverage in amounts not less than the amounts specified below in accordance with the FAR Clause

52.228-5, INSURANCE – WORK ON A GOVERNMENT

INSTALLATION. This insurance must be maintained during the performance period.

2.3.5.1 Certificate of

Insurance

The Certificate of Insurance shall provide for at least 30 calendar days written notice to the KO by the insurance company prior to cancellation or material change in policy coverage. Other requirements and information are contained in the aforementioned insurance clause. The Contractor shall provide written notice of cancellation or change in coverage per Section F.

2.3.5.2 Minimum

Insurance Amounts

The Contractor shall procure and maintain, during the entire period of performance under this contract, the following minimum insurance coverage:

• Comprehensive General Liability: $500,000 per occurrence

• Automobile Liability: $200,000 per person, $500,000 per occurrence, $20,000 per occurrence for property damage

• Workmen's Compensation: As required by Federal and

Greek worker's compensation and occupational disease statutes

• Employer's Liability coverage: $100,000, except in states where worker's compensation may not be written by private carriers

• Other as required by Greek law

2.3.6 Protection of

Government Property

During execution of the work, the Contractor shall protect Government property. The Contractor shall return areas damaged as a result of Contractor negligence under this contract to their original condition at no cost to the Government.

2.3.7 Directives, Instructions, and References

Department of Defense (DoD), Secretary of the Navy (SECNAV), Chief of Naval Operations (OPNAV), and other applicable Directives, Instructions, and References are listed in J-0200000-02. The Contractor shall comply with the most current version of directives, instructions, and references including versions published during the term of the contract.

Spec Item Title Description

2.3.7.1 Standard Operating

Procedures (SOP) The Contractor shall comply with all Government provided SOPs. The Contractor shall comply and implement SOP updates as they are provided by the Government.

2.3.8 Invoicing

Procedures

Refer to Section G for invoicing instructions. Refer to Invoice Form in J- 0200000-03 for sample.

Invoices shall be submitted in a format compatible with the most recent Government installed Microsoft Office Version (currently 2010). Invoice data shall be capable of being sorted by CLIN, annex/sub-annex, spec item, spec item title, and ELIN/Sub-ELIN.

2.3.9 Forms It is the intent of Government that all forms required for accomplishment of work in this PWS be accessed electronically. The Department of Defense Forms Management Program site at:

http://www.dtic.mil/whs/directives/forms/index.htm provides access to an inventory of DOD, Navy, GAO and GSA forms, frequently asked questions, and downloading instructions. The Contractor shall duplicate the required forms as necessary for accomplishment of the work. In the event that a form is unavailable electronically, the Contractor shall develop and provide a form sample to the KO for approval.

Forms referenced in this Annex, e.g. accident reporting, and damage reporting are included among the Forms in J-0200000-04.

2.3.10 Translation of

Performance Work Statement (PWS)

The Contractor shall obtain the services of a certified translator to provide a translated copy of the PWS, to include all modifications, from English into Greek, and provide translated copies to all contractor and subcontractor personnel for use in performing services on the contract. A translated copy shall also be provided per Section F.

2.4 Government-

Furnished Items

Except for items identified below as Government-Furnished, the Contractor shall furnish all labor, supervision, management, tools, materials, equipment, facilities, transportation, incidental engineering, and other items necessary to provide the services described in this Performance Work Statement (PWS).

Government-Furnished Items will be provided in "AS-IS" condition and their use is at the option of the Contractor. The total or partial breakdown or failure of Government-Furnished Items shall not relieve the Contractor of the responsibility to perform the requirements of this contract.

The Contractor shall provide periodic servicing, maintenance, and repair of the Government-Furnished Items accepted for use at no additional cost to the Government. Servicing, maintenance, and repair shall be provided in accordance with the manufacturer’s recommendations. The Contractor shall generate work orders in NAVFAC Maximo per Spec Item 2.7.8 for all servicing, maintenance, and repair activities performed on Government- Furnished Items.

At the completion of the contract, all Government-Furnished Items shall be returned to the Government in the same condition as received, except for reasonable wear and tear. Government-Furnished Items, which become worn out due to normal wear and tear, shall be returned to the Government and its replacement shall be the responsibility of the Contractor at no additional cost to the Government. The Contractor shall be responsible for the cost of any repairs or replacement caused by Contractor negligence or abuse.

Spec Item Title Description

The Government may inspect Government-Furnished Items at any time and without notice.

2.4.1 Government-

Furnished Property

(GFP)

The Government will furnish or make available to the Contractor certain Government Property for use in connection with this contract. The use of GFP for any other purposes is prohibited. GFP is provided and shall be managed by the Contractor in accordance with Section H; paragraph H.XX Government-Furnished Property.

A list of Government Furnished Property that will be made available to the Contractor is provided in J-0200000-05.

GFP may require credentials in the form of CAC or Alt Tokens for the purpose of accessing referenced systems for Contractor performance in each annex.

The Contractor shall support initial, periodic, and final inventories of GFP.

2.4.2 Government-

Furnished Facilities

The Government will make the following areas available to the Contractor:

• Areas in Building 2 (Galley)

• Building 6 (Cargo Shipping & Receiving Area)

• Building 15 (Transportation),

• Building 49 (Front Desk),

• Building 87 and

• Building 240 (Supply)

• Marathi Boat Maintenance Building

Areas in individual buildings for custodial services and recycling storage will be identified after award. The use of these facilities for any other purposes is prohibited.

The Contractor shall be responsible and accountable for the facilities accepted for use and shall take adequate precautions to prevent fire hazards, odors, and vermin. Custodial and refuse collection services for the facilities shall be provided by the Contractor. The Contractor shall obtain written approval from the KO prior to making any modifications or alterations to the facilities.

Government owned facilities are considered incidental to performance and are not considered GFP.

2.4.3 Government-

Furnished Vehicles and Equipment

Government owned vehicles and equipment used only on the installation are considered incidental to performance and are not considered GFP. The Government will make available to the Contractor certain vehicles and equipment for use in connection with this contract. The use of these vehicles and equipment for any other purposes is prohibited.

2.4.4 Government-

Furnished Utilities

The Government will make available water and electricity at existing outlets required for the work to be performed under the contract. Services required by the Contractor, for which there are no available Government outlets, shall be provided by the Contractor at no cost to the Government.

2.5 Contractor-

Furnished Items

Except for items identified as Government Furnished, the Contractor shall provide all equipment, materials, parts, supplies, components, and facilities to perform the requirements of this contract. The KO may inspect Contractor-furnished items for adequacy and compliance with contract requirements.

Inadequate or unsafe items shall be removed and replaced by the Contractor at no cost to the Government. Materials containing asbestos, lead, and polychlorinated biphenyls (PCBs) shall not be brought onsite. Energy

Spec Item Title Description efficient tools and equipment shall be used when available. The KO may at any time require Samples, Safety Data Sheets (SDS) or Manufacturer’s Data Cut Sheets of Materials used in this contract.

2.6 Expenses The Contractor is responsible for all operating and living expenses associated with performing work in Greece. Contractor costs include but are not limited to: Host Nation entry/work/residency visas, passports, customs, immigration, housing, living expenses, wages, transportation, insurance, taxes, training and overhead expenses.

2.7 Management The Contractor shall manage the total work effort associated with the services required herein to meet the performance objectives and standards. Such management includes but is not limited to planning, scheduling, cost accounting, report preparation, establishing and maintaining records, and quality assurance. The Contractor shall provide a staff with the necessary management expertise to ensure performance objectives and standards are met.

2.7.1 Safeguarding

Information

The Contractor shall safeguard controlled unclassified information and information associated with Government property in accordance with the latest revision of CNSSI 1253, DoDI 8582.01, NIST SP 800-53, NIST SP 800-171, SECNAV Defense Industrial Base (DIB) Memo, and applicable contract clauses. At a minimum, this information shall be protected at the moderate confidentiality level as defined in NIST SP 800-171.

Contractor information and data systems that contain information associated with Government property shall comply with DoD Risk Management Framework (RMF).

The Contractor shall develop Plans of Action and Milestones (POA&Ms) per NIST SP 800-171, track accomplishments, and submit to the Government per Section F.

If a cybersecurity incident is encountered or suspected related to any (Contractor or Government) Information Technology (IT) or Operating Technology (OT) systems, including Monitoring and Control Systems, the Contractor shall notify the Government per Section F.

2.7.2 Dissemination of

Information

If certain information cannot be provided to the public, state what information cannot be provided, when it will be provided, and to whom, e.g., DoD policy limits the dissemination of certain information. Instructions, Directives, and References not releasable to the public, e.g., Floor Plans, Maps, Post Orders, and Standard Operating Procedures, will be made available after contract award to the successful offeror with appropriate credentials and a need to know.

2.7.3 Work Reception The Contractor shall provide the capability to receive, prioritize, correspond, and respond to service orders and task orders during Government regular working hours and provide a point of contact at a local or toll-free number who can perform the above function during other than Government regular working hours. The Contractor shall submit this information per Section F.

2.7.4 Work Control The Contractor shall implement all necessary work control procedures to ensure timely accomplishment of work requirements, as well as to permit tracking and reporting of work in progress.

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .