1503060 J Pavement Clearance (AMD 0005).pdf

PDF 112 KB Posted

Attached to
Base Operations Support (BOS) Services U. S. Naval Support Activity (NSA) Souda Bay, Crete Greece Federal contract opportunity
Solicitation number
N6247024R0001
Issued by
Department of the Navy Naval Facilities Engineering Command

About this file

This is Section J (Attachments) of a solicitation for Base Operations Support Services at Naval Support Activity Souda Bay, Crete, Greece. The document contains five attachments: definitions and acronyms (J-1503060-01), references and technical documents (J-1503060-02), airfield pavement clearance site map (J-1503060-03), airfield pavement sweeping schedule (J-1503060-04), and NAVSUPPACTSOUDABAYINST 3750.7F (J-1503060-05).

The document details requirements for airfield pavement sweeping of a 216,500 square meter area that must be maintained daily from 7:30 AM to 2:30 PM, seven days per week. It includes extensive definitions related to airfield operations, snow/ice removal, and Foreign Object Debris (FOD) prevention. The document also contains 33 "Best Practices" for airfield safety, including requirements for vehicle operations, communications protocols, and safety procedures. References include FAA Advisory Circulars on ground vehicle operations, airport winter safety, and snow/ice control equipment.

View the file

Other files for this federal contract opportunity

Other files attached to Base Operations Support (BOS) Services U. S. Naval Support Activity (NSA) Souda Bay, Crete Greece, newest first.
File Type Posted
J-0200000-15 ELINS (AMD 0006).xlsx XLSX spreadsheet
N6247024R0001 Amendment 0006.pdf PDF
N6247024R0001 Amend 0005.pdf PDF
J-1502000-05 PM Services Matrix (AMD 0005).xlsx XLSX spreadsheet
1402000 J Unaccompanied Housing (AMD 0005).pdf PDF
J-1503060-03 Pavement Clearance Site Map (AMD 0005).pdf PDF
Attachment F SECTION F Deliverables (AMD 0005).pdf PDF
J-0200000-15 ELINS (AMD 0003).xlsx XLSX spreadsheet
N6247024R0001 Amendment 0003.pdf PDF
J-1402000-07 Minor Repairs Historical Data (AMD 0002).xlsx XLSX spreadsheet
J-1800000 Environmental (AMD 0002).pdf PDF
J-0200000-15 ELINS (AMD 0002).xlsx XLSX spreadsheet
Attachment F - Section F Deliverables (AMD 0002).pdf PDF
N6247024R0001 Amendment 0002.pdf PDF
J-1502000 Facility Investment (AMD 0002).pdf PDF
J-1502000-23.a Irrigation System Layout (AMD 0002).pdf PDF
J-0600000 Port Operations (AMD 0002).pdf PDF
N6247024R0001 Amendment 0001.pdf PDF
N6247024R0001 RFP.pdf PDF
J-1 NAVFAC Past Performance Questionnaire.pdf PDF
J-0200000-11.a How to purchase PKI to Access Maximo.pdf PDF
J-0200000-11.b How to Request a Maximo Account.pdf PDF
J-0200000-11.c SAAR-N Sample Form for BOSC.pdf PDF
J-0200000-12 Final Governing Standards (FGS) Greece.pdf PDF
J-1002000 Supply Services.pdf PDF
J-1501000 Facility Management.pdf PDF
J-1502000-33.d Arresting Gear Preserved On Site Components.pdf PDF
J-1503010 Custodial.pdf PDF
J-1503020-13 Historical Unscheduled Pest Control Service Orders.xlsx XLSX spreadsheet
J-1503050-11 Running Track Boneyard Grounds Map.pdf PDF
F - Section F Deliverables.pdf PDF
J-2 Corporate Experience Project Data Sheet.pdf PDF
J-7 DBIDS SECNAV FORM 5512_1.pdf PDF
J-0200000 Management and Administration.pdf PDF
J-0200000-07 - NAVFAC Maximo Asset Information.xlsx XLSX spreadsheet
J-1002000-03 Personal Property Customer Service Survey.pdf PDF
1300000 J Galley.pdf PDF
J-1300000-13 Galley Floor Plan.pdf PDF
J-1402000.2 NHG-NAVY INN.pdf PDF
J-1402000.3 Contingency Lodging.pdf PDF
J-1501000-06 Equipment Standards List.xlsx XLSX spreadsheet
J-1502000-05 Preventative Maintenance (PM) Program Services Matrix.xlsx XLSX spreadsheet
J-1502000-17.a Weatherpak Quick Deploy Guide.pdf PDF
J-1502000-23 Irrigation System Layout.pdf PDF
J-1502000-33.a STW-07 Outdoor Painting Depainting and Corrosion Control.pdf PDF
J-1502000-33.f NAVAIR 17-1-125 CORROSION CONTROL.pdf PDF
J-1503020-15 Integrated Pest Management Plan (IPMP) NSA Souda Bay.pdf PDF
J-1503050-14 Marathi Port Ops Grounds Map.pdf PDF
J-1503050-15 Marathi Security RSM1 Grounds Map.pdf PDF
J-1606001 Water (Overseas).pdf PDF
Show all 50

Base Operations Support (BOS) Services U. S. Naval Support Activity (NSA) Souda Bay, Crete Greece has more files on GovTribe.

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SECTION J

DOCUMENTS, EXHIBITS, AND OTHER ATTACHMENTS

TABLE OF CONTENTS

ATTACHMENT NUMBER ATTACHMENT TITLE

J-1503060-01 Definitions and Acronyms

J-1503060-02 References and Technical Documents

J-1503060-03 Airfield Pavement Clearance Site Map

J-1503060-04 Airfield Pavement Sweeping Schedule

J-1503060-05 NAVSUPPACTSOUDABAYINST 3750.7F

J-1503060-01

DEFINITIONS AND ACRONYMS

DEFINITION/ACRONYM DESCRIPTION

Air Operations (Air Ops) The department responsible for all ground and air traffic on the airfield side of

Naval Air Station.

Air Snow King Person or persons designated by the Government to act as the overall responsible party for all airfield snow and ice operations. The Air Snow King has no authority to change, alter, or modify the contract.

Bare Pavement Free of frozen precipitation down to the surface of the pavement. Bare pavement does not mean completely dry and may still have frozen and/or liquid precipitation in the holes, pores, divots, seams and cracks.

Clear Free of debris, as defined below.

DOT U.S. Department of Transportation Debris Includes, but is not limited to, paper, cans, bottles, limbs and branches, pine straw and pinecones, leaves, sand, soil, aggregates, grass, metals, and other similar items.

End of Cleanup Defined as when the Contractor has met all performance objectives.

End of Precipitation The end of the hour during which the Contractor and the KO or designated representative mutually agree the precipitation has ended EPA Environmental Protection Agency FAA Federal Aviation Administration Finished Street, Road, or Parking Lot

A paved or improved area in which the following conditions are met:

Clear, Dry Area – The entire area of responsibility is as close as possible to clear and dry. Not more than one inch of snow shall remain on the area, including hard packed snow.

Full Width – Snow is from the full width of the paved and improved area of the streets, roads, or parking lots. The snow is removed to at least the outer edge of the entire area of responsibility, so that the outer edge is exposed, unless otherwise specified.

Obstructions – Where obstructions such as utility poles, sign posts, fire hydrants, and trees exist between or in the midst of the streets, roads or parking area: snow shall be cleared around these objects down to the required finished depth (by hand if necessary) so that streets, roads, or parking areas are blocked with snow.

Foreign Object Debris

(FOD)

Any foreign object external to an aircraft that can cause damage. Examples include nuts, bolts, safety wire, baggage tags, misplaced tools, sand, rocks, asphalt chunks, birds, snakes and, rodents. Any item(s) on a runway that may be picked up by any aircraft and potentially cause damage to any part of the aircraft.

Ice (Taken from FAA AC 150/5200-30C)

The solid form of water consisting of a characteristic hexagonal symmetry of water molecules. The density of pure ice is 57 lb/ft3 (913 kg/m3), which is 9 percent less dense than water. Compacted snow becomes ice when the air passages become discontinuous at a density of about 50 lb/ft3 (800 kg/m3).

Initiation of Work The Contractor shall initiate work as required to maintain streets, roads, and parking lots within the performance standard for snow removal and sanding.

NAS Naval Air Station New Storm Any precipitation occurring after the “End of Precipitation” defined above.

Passage The movement of persons or vehicles across paved surfaces.

Primary Runway (Taken from FAA AC 150/5200-30C)

A runway expected to be used under the existing atmospheric and storm event conditions where most of the takeoff and landing operations will take place.

J-1503060-01

DEFINITIONS AND ACRONYMS

Secondary Runway (Taken from FAA AC 150/5200-30C)

A runway that supports a primary runway. Takeoff and landing operations on such a runway are generally less frequent than on a primary runway.

Snow (on the ground).

(Taken from FAA AC 150/5200-30C)

A porous, permeable aggregate of ice grains, which can be predominately single crystals or close groupings of several crystals.

Snow Event Any occurrence of frozen precipitation that results in visible accumulation of snow or ice on paved surfaces.

Snow King Person or persons designated by the Government to act as the overall responsible party for all snow and ice operations. The Snow King has no authority to change, alter, or modify the contract.

Twenty-Four (24) Hour Lot

Parking Lots that have to be cleared during designated shift changes or maintained during the course of an intense storm.

ATTACHMENT J-1503060-02

REFERENCES AND TECHNICAL DOCUMENTS

The Contractor shall adhere to the applicable portions of the following publications and directives in performing the services required under this contract. This list shall not be considered all-inclusive and does not release the Contractor from all obligations that must be fulfilled in the observance and execution of this contract.

When U.S., European and/or Greek directives, instructions and industry standards are applicable to the work to be performed under this contract, the most stringent directives, instructions and industry standards shall govern.

Title Reference Source Personnel and Equipment in the Runway Safety Area Certalert NO 03-07 Airport Safety and

Operations Division AAS-300

GROUND VEHICLE OPERATIONS ON

AIRPORTS

Advisory Circular 150/5210-20 Chg 1 and No. 150/5210-23

DOT / FAA

AIRPORT WINTER SAFETY AND OPERATIONS Advisory Circular 150/5200-30C

DOT / FAA

AIRPORT SNOW AND ICE CONTROL

EQUIPMENT

Advisory Circular 150/5220-20 DOT / FAA

NAVSUPPACTSOUDABAYINST 3750.7F (Includes Foreign Object Damage Prevention Program)

Attachment

Known 'Best Practices' for AIRFIELD SAFETY - Airport Personnel (Published by FAA)

1. Eliminate distractions in the operational area.

2. Eliminate confusing call signs for vehicles operating in the airport operations area.

3. Use two vehicles for runway inspections to reduce “Time-on-Runway”.

4. Use high visibility vehicles to increase conspicuity for pilots, controllers and other drivers operating on the

AOA (airport operations area).

5. All vehicle lights (high beams, flashers, beacons, and strobes) should be turned on when crossing or operating on runways, taxiways or the AOA.

6. Vehicle flashers and beacons help ATC, aircrews and other vehicle operators see vehicles in the AOA – especially during periods of reduced visibility and at night.

7. Use current diagrams in all AOA access vehicles.

8. Carry a current airport diagram with all AOA personnel badges.

9. Obtain and use airport diagrams. Use the FAA runway safety website to find airport diagrams for all airports.

10. The airport authority is encouraged to share its driver’s training program. (Even FAA employees are required to take training if they are on the airfield.)

11. Utilize CD-based pilot and driver’s education training materials and electronic programs.

12. All AOA access authorized personnel, including taxi-qualified mechanics, should complete a driver’s training program – to include recurrent training.

13. Require and schedule FAA employee driver’s training and recurrent training/testing.

14. Offer training and awareness education to local contractors working on the airport, and monitor them.

15. Ensure drivers know where to look for traffic when a pilot isn’t talking to the tower or broadcasting on

CTAF.

16. AOA access authorized personnel should have an awareness and understanding of the “uniqueness of helicopter operations”.

17. Conduct “Clearing Turns” prior to entering ANY runway.

18. Place signs and marking placards in all AOA access vehicles.

19. Know who has access to the airfield.

20. Enforce a “No Tailgating” policy to ensure vehicles remain within proximity until gate is closed and secure to prevent unauthorized “Tailgating”.

21. Keep the runway a runway, no racing.

22. Enforce maximum use of existing service roads; stay off of the runway as much as possible.

23. Use tunable radios.

24. Enforce a policy of “No Cell Phone” use for personnel while operating on the airfield.

25. Prevent potential obstructions.

26. Issue NOTAMS for snow removal operations and mowing operations.

27. Attend and conduct safety seminars and programs on RUNWAY SAFETY.

28. Improve safety by teaching, advocating, stressing and understanding situational awareness.

29. Cite specific airport RUNWAY SAFETY web pages.

30. Realize that every airport is unique and presents its own set of RUNWAY SAFETY challenges.

31. Stay alert; stay alive.

32. Declare war on errors; make it everyone’s responsibility.

33. Always think SAFETY FIRST.

ATTACHMENT J-1503060-03

PAVEMENT CLEARANCE SITE MAP

Please see separate attachment

ATTACHMENT J-1503060-04

AIRFIELD PAVEMENT SWEEPING SCHEDULE

AREA and

FREQUENCY SUN MON TUES WED THUR FRI SAT

Airfield Area * (216,500 sq m), Daily, 7 days per week for the specified hours

7:30 AM

to

2:30 PM

7:30 AM

to

2:30 PM

7:30 AM

to

2:30 PM

7:30 AM

to

2:30 PM

7:30 AM

to

2:30 PM

7:30 AM

to

2:30 PM

7:30 AM

to

2:30 PM

* Refer to Pavement Clearance Site Map, J-1503060-03

ATTACHMENT J-1503060-05

NAVSUPPACTSOUDABAYINST 3750.7F

Please see separate attachment

File details come from the government source that posted it. Updated .