| Specification 0600000 - Port Ops | | | | | | | |
| A700 | | Port Ops Barrier Services (PSB) | The Contractor shall furnish all labor, supervision, management, tools, materials, equipment, facilities, transportation, incidental engineering, and other items necessary to provide Port Security Barrier Services at Piers K10/12 and Pier K14. The Contractor shall be required to operate (open, close and/or secure) the barrier at the direction of the Port Operations Officer, Port Operations Manager, or Installation Security Officer, following authorization by a Contracting Officer. Opening and closing the barrier on different occasions consists of two movements. The Contractor shall provide a written report describing services rendered, damages, issues, degradation and/or breaks, observed or witnessed, to the Port Operations Officer, Port Operations Manager and Contracting Officer within 12 hours of completing a PSB movement. All reports shall be in English. Response time within 1 working day or as specified in the order. | $0.00 | MOVE-MENTS | 5 | $0.00 |
| A701-A702 | | Reserved | | | | | |
| Specification 1300000 - Galley | | | | | | | |
| A703 | | Galley Services for additional meals in blocks of up to 75 meals per day | The Contractor shall furnish all labor, supervision, management to prepare and provide additional meals in blocks up to 75 meals per day (for example: 25 ppl eating 3 meals per day or 75 ppl eating 1 meal)within the same facilities and with the same equipment provided in Annex 13. The Government will provide the doof and subsistence items for these meals at no cost to the Contractor. Meals shall be served during Specified Meal Periods listed in J-1300000-04. Extensions of Specified Meal Periods may be required to serve all waiting customers. Complete all work within timeframe specified in the order. | $0.00 | BLOCKS of 75 MEALS | 1,500 | $0.00 |
| A704-A706 | | Reserved | | | | | $0.00 |
| Specification 1402000.3 - Contingency Lodging | | | | | | | |
| A707 | | Building 84 Services | In accordance with Technical Specification 1402000.3, Spec Item 4.1 | $0.00 | NIGHT | 12,000 | $0.00 |
| A708-A710 | | Reserved | | | | | |
| Specification 1501000 - Facility Management | | | | | | | |
| A711 | | Asset Inventory & Tagging | The Contractor shall furnish all labor, supervision, management, tools, materials, equipment, facilities, transportation, incidental engineering, and other items necessary to perform a base-wide asset inventory validation and update for all facilities and utilities. Update NAVFAC Maximo to add, remove, or modify assets and asset information to obtain 100% NAVFAC Maximo accuracy. The Contractor shall ensure each asset is properly labeled in accordance with Labeling requirements in NAVFAC P-503 Conditions Based Maintenance Management and NAVFAC P-603 Utilities Infrastructure Management. The Contractor shall provide a summary report of assets inventoried and any changes applied. The report shall also specify whether or not the asset is covered under the contract for maintenance and repair. The survey is subject to the interpretation of the COR and KO. For those items not under the contract, the Contractor shall provide a proposal for including the asset for maintenance within the contract. Each asset in the proposal shall be a separate, severable line item. The KO may issue a contract modification for assets identified in the report as not under contract. The inventory and applicable NAVFAC Maximo updates shall be completed within 120 days. The report and proposal shall be submitted for KO approval within 150 days. | $0.00 | EA | 1 | $0.00 |
| A712-A714 | | Reserved | | | | | |
| Specification 1502000 - Facility Investment | | | | | | | |
| Service Orders | | | | | | | |
| A715 | | Service Orders - Routine | The Contractor shall furnish all labor, supervision, management, tools, materials, equipment, facilities, transportation, incidental engineering, and other items necessary to perform Routine Service Orders (Spec Item 3.1.3) in blocks of five (5) service orders. | $0.00 | BLOCKS of 5 | 15 | $0.00 |
| Painting Services | | | | | | | |
| A716 | | Interior Painting | The Contractor shall furnish all labor, supervision, management, tools, materials, equipment (except lifts), facilities, transportation, incidental engineering, and other items necessary to paint interior surfaces of facilities using washable, low VOC, interior latex paint having a flat, semi-gloss or gloss finish and color as specified in the task order. Work includes removal of existing paint from surfaces, surface preparation, priming and application of 2 finish coats of paint. All products shall be lead-free and compatible with surfaces where being used. The Contractor shall collect and dispose off base all paint chips, dust, and other waste paint materials resulting from any part of the painting process. Complete all work within 3 working days or as specified in the order. (Appropriate lift to be procured under ELINs for Special Equipment Rentals, if required.) | $0.00 | SM | 2,000 | $0.00 |
| A717 | | Exterior Painting | The Contractor shall furnish all labor, supervision, management, tools, materials, equipment (except lifts), facilities, transportation, incidental engineering, and other items necessary to paint exterior surfaces of facilities using acrylic resin exterior type paint with and without quartz having a flat, semi-gloss or gloss finish and color as specified in the task order. Work includes removal of existing paint from surfaces, surface preparation, priming and application of 2 roller applied finish coats of paint. All products shall be lead-free, odorless, nontoxic, and compatible with surfaces where being used. The Contractor shall collect and dispose off base all paint chips, dust, and other waste paint materials resulting from any part of the painting process. Complete all work within 3 working days or as specified in the order. (Appropriate lift to be procured under ELINs for Special Equipment Rentals, if required.) | $0.00 | SM | 2,500 | $0.00 |
| A718 | | Interior Painting - Door and Frame | The Contractor shall furnish all labor, supervision, management, tools, materials, equipment, facilities, transportation, incidental engineering, and other items necessary to paint interior surfaces of door and frame using a low VOC, interior paint having a semi-gloss or gloss finish and color as specified in the task order. Work includes removal of existing paint from surfaces, surface preparation, priming and application of 2 finish coats of paint. All products shall be lead-free, odorless, nontoxic, and compatible with surfaces where being used. The Contractor shall collect and dispose off base all paint chips, dust, and other waste paint materials resulting from any part of the painting process. Complete all work within 3 working days or as specified in the order. | $0.00 | SM | 50 | $0.00 |
| A719 | | Exterior Painting - Door and Frame | The Contractor shall furnish all labor, supervision, management, tools, materials, equipment, facilities, transportation, incidental engineering, and other items necessary to paint exterior surfaces of door and frame using exterior grade paint having a semi-gloss or gloss finish and color as specified in the task order. Work includes removal of existing paint from surfaces, surface preparation, priming and application of 2 finish coats of paint. All products shall be lead-free, odorless, nontoxic, and compatible with surfaces where being used. The Contractor shall collect and dispose off base all paint chips, dust, and other waste paint materials resulting from any part of the painting process. Complete all work within 3 working days or as specified in the order. | $0.00 | SM | 50 | $0.00 |
| A720 | | Interior Painting - Railings | The Contractor shall furnish all labor, supervision, management, tools, materials, equipment, facilities, transportation, incidental engineering, and other items necessary to paint interior railings using a low VOC, semi-gloss or gloss finish and color, as specified in the task order. Work includes removal of existing paint from surfaces, surface preparation, priming and application of 2 finish coats of paint. All products shall be lead-free, odorless, nontoxic, and compatible with surfaces where being used. The Contractor shall collect and dispose off base all paint chips, dust, and other waste paint materials resulting from any part of the painting process. Complete all work within 3 working days or as specified in the order. | $0.00 | LM | 1,000 | $0.00 |
| A721 | | Exterior Painting - Railings | The Contractor shall furnish all labor, supervision, management, tools, materials, equipment, facilities, transportation, incidental engineering, and other items necessary to paint exterior railings using exterior-grade paint in a semi-gloss or gloss finish and color as specified in the task order. Work includes removal of existing paint from surfaces, surface preparation, priming and application of 2 roller applied finish coats of paint. All products shall be lead-free, odorless, nontoxic, and compatible with surfaces where being used. The Contractor shall collect and dispose off base all paint chips, dust, and other waste paint materials resulting from any part of the painting process. Complete all work within 3 working days or as specified in the order. (See Manlift Rental under Special Equipment Rentals.) | $0.00 | LM | 2,000 | $0.00 |
| A721-A724 | | Reserved | | | | | |
| Minor Construction Services | | | | | | | |
| A725 | | Gypsum Board - Patch & Repair | The Contractor shall furnish all labor, supervision, management, tools, materials, equipment, facilities, transportation, incidental engineering, and other items necessary to patch and repair interior gypsum wall board surfaces to a Level 4 finish per GA-214-10, Recommended Levels of Gypsum Board Finish. The Contractor shall collect and dispose off base all chips, dust, and other waste materials resulting from any part of the painting process. Complete all work within 3 working days or as specified in the order. | $0.00 | SM | 1,000 | $0.00 |
| A726 | | Concrete Wall - Patch & Repair | The Contractor shall furnish all labor, supervision, management, tools, materials, equipment, facilities, transportation, incidental engineering, and other items necessary to patch and repair concrete wall surfaces to the same finish level of surrounding wall surfaces. The Contractor shall collect and dispose off base all chips, dust, and other waste materials resulting from any part of the painting process. Complete all work within 3 working days or as specified in the order. | $0.00 | SM | 1,000 | $0.00 |
| A727 | | Ceramic Tile - Remove and Dispose | The Contractor shall furnish all labor, supervision, management, tools, materials, equipment, facilities, transportation, incidental engineering, and other items necessary to remove and dispose of existing ceramic tile, grout and setting bed material. The Contractor shall take care to prevent damage to all surrounding and adjacent surfaces, wall substrate and/or subfloor. All substrates shall be left in a smooth/flat condition as required for new tile installation. Contractor shall collect and dispose off base all debris, dust, and other waste materials resulting from any part of the removal process. All work must be completed as per UFGS 02 41 00 Demolition. Complete all work within 5 working days or as specified in the order. | $0.00 | SM | 2,000 | $0.00 |
| A728 | | Ceramic Tile - New Installation | The Contractor shall furnish all labor, supervision, management, tools, materials, equipment, facilities, transportation, incidental engineering, and other items necessary to provide and install new ceramic tile surfaces to match size, pattern, grade, quality and appearance of existing tile. The Contractor shall take care to prevent damage to all surrounding and adjacent surfaces. Subfloor and/or wall substrate shall be patched and prepared as required to receive new tile. Matching tile base at a height of 10-15 cm shall be provided with floor tile if wall tile is not installed. Samples and manufacturer's technical data for tile and grout shall be provided for KO approval. All work must be completed as per UFGS 09 30 10 Ceramic Quarry and Glass Tiling. Contractor shall collect and dispose off base all debris, dust, and other waste materials resulting from any part of the installation and finishing process. Complete all work within 5 working days or as specified in the order. | $0.00 | SM | 2,000 | $0.00 |
| A729 | | Porcelain Tile - Remove and Dispose | The Contractor shall furnish all labor, supervision, management, tools, materials, equipment, facilities, transportation, incidental engineering, and other items necessary to remove and dispose of existing ceramic tile, grout and setting bed material. The Contractor shall take care to prevent damage to all surrounding and adjacent surfaces, wall substrate and/or subfloor. All substrates shall be left in a smooth/flat condition as required for new tile installation. Contractor shall collect and dispose off base all debris, dust, and other waste materials resulting from any part of the removal process. All work must be completed as per UFGS 02 41 00 Demolition. Complete all work within 5 working days or as specified in the order. | $0.00 | SM | 2,000 | $0.00 |
| A730 | | Porcelain Tile - New Installation | The Contractor shall furnish all labor, supervision, management, tools, materials, equipment, facilities, transportation, incidental engineering, and other items necessary to provide and install new ceramic tile surfaces to match size, pattern, grade, quality and appearance of existing tile. The Contractor shall take care to prevent damage to all surrounding and adjacent surfaces. Subfloor and/or wall substrate shall be patched and prepared as required to receive new tile. Matching tile base at a height of 10-15 cm shall be provided with floor tile if wall tile is not installed. Samples and manufacturer's technical data for tile and grout shall be provided for KO approval. All work must be completed as per UFGS 09 30 10 Ceramic Quarry and Glass Tiling. Contractor shall collect and dispose off base all debris, dust, and other waste materials resulting from any part of the installation and finishing process. Complete all work within 5 working days or as specified in the order. | $0.00 | SM | 2,000 | $0.00 |
| A731-A739 | | Reserved | | | | | $0.00 |
| Air Conditioning Equipment Services | | | | | | | |
| A740 | | Existing A/C Unit - Remove and Dispose | The Contractor shall furnish all labor, supervision, management, tools, materials, equipment, facilities, transportation, incidental engineering, and other items necessary to remove existing Air Conditioning Unit (up to 24,000 BTU) and and properly dispose of HAZMAT and unit. | $0.00 | EA | 5 | $0.00 |
| A741 | | Air Conditioner Replacement/Installation, Split/Heat Pump-Type - 10,000 - 12,000 BTU/hr | The Contractor shall furnish all labor, tools, materials, new equipment, transportation, incidental engineering, and other items necessary to perform installation of new AC unit. Includes testing to ensure new unit is operational. The Contractor shall Provide/Install Air Conditioning Unit, Split/Heat Pump-type - 10,000 – 12,000 BTU/hr; Inverter type, A+ rating. All work must be completed as per UFC 3-410-01. Complete all work within 5 working days or as specified in the order. | $0.00 | EA | 2 | $0.00 |
| A742 | | Air Conditioner Replacement/Installation, Split/Heat Pump-Type -18,000 BTU/hr | The Contractor shall furnish all labor, tools, materials, new equipment, transportation, incidental engineering, and other items necessary to perform delivery and installation of new A/C unit. Includes testing to ensure new unit is operational. The Contractor shall provide and install Split/Heat Pump-type - 18,000 BTU/hr; Inverter type, with an A+ rating. All work must be completed as per UFC 3-410-01. Complete all work within 5 working days or as specified in the order. | $0.00 | EA | 2 | $0.00 |
| A743 | | Air Conditioner Replacement/Installation, Split/Heat Pump-Type -24,000 BTU/hr | The Contractor shall furnish all labor, tools, materials, new equipment, transportation, incidental engineering, and other items necessary to perform delivery and installation of new A/C unit. Includes testing to ensure new unit is operational. The Contractor shall provide and install Split/Heat Pump-type - 24,000 BTU/hr; Inverter type, with an A+ rating. All work must be completed as per UFC 3-410-01. Complete all work within 5 working days or as specified in the order. | $0.00 | EA | 2 | $0.00 |
| A744-A749 | | Reserved | | | | | |
| Generator Rentals | | | | | | | |
| A750 | TR | Mobile Generator Rental - 5K Light Plant (Mobile Generator) | The Contractor shall provide a 5K light plant; to include Generator for 24 Hours. Price per calendar day to include delivery, setup, removal, required cables (up to 25 meters in length) sized according to building load, distribution panels, all connections to the facility, fuel tank, operation, maintenance for a 5K light plant. The Contractor shall fully set up the plant and en sure it is fully operational. The Contractor is responsible for all fuel and refueling. The price shall include any related MHE costs such as cranes. Response time within 1 working day or as specified in the order. | $0.00 | DAY | 15 | $0.00 |
| A751 | | Generator Rental and Mobilization 250 kva @ 50hz 220/400v | The Contractor shall provide a 250 kva @ 50hz 220/400v Generator. Price per calendar day to include delivery, setup, removal, required cables (up to 25 meters in length) sized according to building load, distribution panels, all connections to the facility, fuel tank, operation, maintenance. The Contractor is responsible for all fuel and refueling. The Contractor shall complete electrical connections, unloading, and setting in-place within three (3) hours after delivery. Response time is 1 working day or as specified in the order. The price shall include all MHE costs such as cranes. | $0.00 | DAY | 30 | $0.00 |
| A752 | | Generator Rental and Mobilization 500KVA @ 50hz 220/400v | The Contractor shall provide a 500 kva @ 50hz 220/400v Generator. Price per calendar day to include delivery, setup, removal, required cables (up to 25 meters in length) sized according to building load, distribution panels, all connections to the facility, fuel tank, operation, maintenance. The Contractor is responsible for all fuel and refueling. The Contractor shall complete electrical connections, unloading, and setting in-place within three (3) hours after delivery. Response time is 1 working day or as specified in the order. The price shall include all MHE costs such as cranes. | $0.00 | DAY | 30 | $0.00 |
| A753-A759 | | Reserved | | | | | |
| Special Equipment Rentals | | | | | | | |
| A760 | | Crane Rental - 4 to 25 Ton | The Contractor shall furnish all labor, supervision, management, fuel, tools, materials, equipment, facilities, transportation, incidental engineering, and other items necessary to provide a 4 to 25-Ton Crane and certified operator for up to 8 hrs. The Contractor shall submit a lift plan, which shall be accpeted by the FEAD prior to commencement of any work. All work must be completed in accordance with EM 385-1-1 section 16 and P-307. The Contractor shall be responsible for all maintenance and emergency servicing of the vehicle. Emergency down time shall not exceed one hour. Drivers shall meet all access requirements. Contractor shall provide daily safety and operational brief for personnel. Response time is 1 working day or as specified in the order. | $0.00 | EA | 30 | $0.00 |
| A761 | | Crane Rental -50 Ton | The Contractor shall furnish all labor, supervision, management, fuel, tools, materials, equipment, facilities, transportation, incidental engineering, and other items necessary to provide a 50-Ton Crane and certified operator for up to 8 hrs. The Contractor shall submit a lift plan, which shall be accpeted by the FEAD prior to commencement of any work. All work must be completed in accordance with EM 385-1-1 section 16 and P-307. The Contractor shall be responsible for all maintenance and emergency servicing of the vehicle. Emergency down time shall not exceed one hour. Drivers shall meet all access requirements. Contractor shall provide daily safety and operational brief for personnel. Response time is 1 working dys or as specified in the order. | $0.00 | EA | 5 | $0.00 |
| A762 | | Crane Rental -100 Ton | The Contractor shall furnish all labor, supervision, management, fuel, tools, materials, equipment, facilities, transportation, incidental engineering, and other items necessary to provide a 100-Ton Crane and certified operator for up to 8 hrs. The Contractor shall submit a lift plan, which shall be accpeted by the FEAD prior to commencement of any work. All work must be completed in accordance with EM 385-1-1 section 16 and P-307. The Contractor shall be responsible for all maintenance and emergency servicing of the vehicle. Emergency down time shall not exceed one hour. Drivers shall meet all access requirements. Contractor shall provide daily safety and operational brief for personnel. Response time is 1 working days or as specified in the order. | $0.00 | EA | 5 | $0.00 |
| A763 | | Motor Grader Rental | The Contractor shall furnish all labor, supervision, management, fuel, tools, materials, equipment, facilities, transportation, incidental engineering, and other items necessary to provide a Motor Grader and a certified operator for up to 8 hrs. The Contractor shall be responsible for all maintenance and emergency servicing of the vehicle. Emergency down time shall not exceed one hour. Drivers shall meet all access requirements. Contractor shall provide daily safety and operational brief for personnel. All work must be completed as per EM 385-1-1 section 16 and P-300. Response time is 1 working day or as specified in the order. Complete all work within 3 working days or as specified in the order. Power (HP / KW) - 165 to 215 / 123 to 160; Operating Weight (Ton) - 10.6 to 18.7; Mold Board Width (M) - 3.7 to 4.3. | $0.00 | EA | 2 | $0.00 |
| A764 | | Bulldozer Rental with Angled or Standard Blade | The Contractor shall furnish all labor, supervision, management, fuel, tools, materials, equipment, facilities, transportation, incidental engineering, and other items necessary to provide a Bulldozer with a minimum weight capacity of 9,000 kg, and Angled or Standard Blade as requested, with a certified operator for up to 8 hrs. All work must be completed as per EM 385-1-1 section 16 and P-300. The Contractor shall be responsible for all maintenance and emergency servicing of the vehicle. Emergency down time shall not exceed one hour. Drivers shall meet all access requirements. Contractor shall provide daily safety and operational brief for personnel. Response time is 1 working days or as specified in the order. Response time is 1 working day or as specified in the order. Weight Capacity shall be a minimum of 9,000 kg (20,000 lbs). | $0.00 | EA | 2 | $0.00 |
| A765 | | Bucket Truck Rental | The Contractor shall furnish all labor, supervision, management, fuel, tools, materials, equipment, facilities, transportation, incidental engineering, and other items necessary to provide a Bucket Truck with a certified operator for up to 8 hrs. All work must be completed as per EM 385-1-1 section 16 and P-300. The Contractor shall be responsible for all maintenance and emergency servicing of the vehicle. Emergency down time shall not exceed one hour. Drivers shall meet all access requirements. Contractor shall provide daily safety and operational brief for personnel. Response time is 1 working days or as specified in the order. Bucket Truck working height shall be no less than 15 meters. | $0.00 | EA | 2 | $0.00 |
| A766 | | Trench Digger Rental | The Contractor shall furnish all labor, supervision, management, fuel, tools, materials, equipment, facilities, transportation, incidental engineering, and other items necessary to provide a Trench Digger with a certified operator for up to 8 hrs. All work must be completed as per EM 385-1-1 section 16 and P-300. The Contractor shall be responsible for all maintenance and emergency servicing of the vehicle. Emergency down time shall not exceed one hour. Drivers shall meet all access requirements. Contractor shall provide daily safety and operational brief for personnel. Response time is 1 working days or as specified in the order. Trench width capability shall be a minimum of 1.2 meters wide. | $0.00 | EA | 2 | $0.00 |
| A767 | | Backhoe Rental | The Contractor shall furnish all labor, supervision, management, fuel, tools, materials, equipment, facilities, transportation, incidental engineering, and other items necessary to provide a Backhoe with a certified operator for up to 8 hrs. All work must be completed as per EM 385-1-1 section 16 and P-300. The Contractor shall be responsible for all maintenance and emergency servicing of the vehicle. Emergency down time shall not exceed one hour. Drivers shall meet all access requirements. Contractor shall provide daily safety and operational brief for personnel. Response time is 1 working days or as specified in the order. Depth requirement for back hoe shall be a minimum of 5 meters (15 feet) | $0.00 | EA | 2 | $0.00 |
| A768 | | Wheel Skid Steer Loader Rental | The Contractor shall furnish all labor, supervision, management, tools, fuel, materials, equipment, facilities, transportation, incidental engineering, and other items necessary to provide a Wheel Skid Steer Loader with a certified operator for up to 8 hrs. All work must be completed as per EM 385-1-1 Section 16 and P-300. The Contractor shall be responsible for all maintenance and emergency servicing of the vehicle. Emergency down time shall not exceed one hour. Drivers shall meet all access requirements. Contractor shall provide daily safety and operational brief for personnel. Response time is 1 working day or s specified in the order. Complete all work within 3 working days or as specified in the order. Max Lift capacity - 1360 kg, max lift height: 40 meters, 91.2 HP Diesel Engine. | $0.00 | EA | 2 | $0.00 |
| A769 | | Truck Rental - 2 Ton | The Contractor shall furnish all labor, supervision, management, fuel, tools, materials, equipment, facilities, transportation, incidental engineering, and other items necessary to provide a Five (5) ton Truck with a certified operator for up to 8 hrs. All work must be completed as per EM 385-1-1 section 16 and P-300. Emergency down time shall not exceed one hour. Drivers shall meet all access requirements. Response time is 1 working day or as specified in the order. | $0.00 | EA | 2 | $0.00 |
| A770 | | Truck Rental - 5 Ton | The Contractor shall furnish all labor, supervision, management, fuel, tools, materials, equipment, facilities, transportation, incidental engineering, and other items necessary to provide a Five (5) ton Truck with a certified operator for up to 8 hrs. All work must be completed as per EM 385-1-1 section 16 and P-300. Emergency down time shall not exceed one hour. Drivers shall meet all access requirements. Response time is 1 working day or as specified in the order. | $0.00 | EA | 2 | $0.00 |
| A771 | | Articulating Boom Lift Rental | The Contractor shall furnish all labor, supervision, management, fuel, tools, materials, equipment, facilities, transportation, incidental engineering, and other items necessary to provide an Articulating Boom Lift with a certified operator for up to 8 hrs. All work must be completed as per EM 385-1-1 section 16 and P-300. The Contractor shall be responsible for all maintenance and emergency servicing of the vehicle. Emergency down time shall not exceed one hour. Drivers shall meet all access requirements.Contractor shall submit site-specific fall protection plan and provide daily safety and operational brief for personnel. Response time is 1 working days or as specified in the order. Minimum platform height shall be 14 meters (45 ft). | $0.00 | EA | 2 | $0.00 |
| A772 | | Mobile Hydraulic Manlift Rental | The Contractor shall furnish all labor, supervision, management, fuel, tools, materials, equipment, facilities, transportation, incidental engineering, and other items necessary to rent manlift including operator for 8 hours. The Contractor shall be responsible for all maintenance and emergency servicing of the vehicle. Emergency down time shall not exceed one hour. Drivers shall meet all access requirements.Contractor shall submit site-specific fall protection plan and provide daily safety and operational brief for personnel. Response time is 1 working days or as specified in the order. Complete all work within 2 working days or as specified in the order. Manlift minimum boom length shall be a minimum of 35 meters. | $0.00 | DAY | 5 | $0.00 |
| A773 | | Hydraulic Scissor Lift Rental | The Contractor shall furnish all labor, supervision, management, fuel, tools, materials, equipment, facilities, transportation, incidental engineering, and other items necessary to provide a Hydraulic Scissor Lift Rental with a certified operator for up to 8 hrs. All work must be completed as per EM 385-1-1 section 16 and P-300. The Contractor shall be responsible for all maintenance and emergency servicing of the vehicle. Emergency down time shall not exceed one hour. Drivers shall meet all access requirements.Contractor shall submit site-specific fall protection plan and provide daily safety and operational brief for personnel. Response time is 1 working days or as specified in the order. Platform minimum height of 8 meters (26 ft). | $0.00 | EA | 2 | $0.00 |
| A774 | | Dump Truck Rental - 4.6 cubic yards (7 Ton) minimum capacity | The Contractor shall furnish all labor, supervision, management, fuel, tools, materials, equipment, facilities, transportation, incidental engineering, and other items necessary to provide a Dump Truck Rental with a 4.6 cubic yard minimum capacity and a certified operator for up to 8 hrs. All work must be completed as per EM 385-1-1 section 16 and P-300. The Contractor shall be responsible for all maintenance and emergency servicing of the vehicle. Emergency down time shall not exceed one hour. Drivers shall meet all access requirements. Response time is 1 working days or as specified in the order. | $0.00 | EA | 2 | $0.00 |
| A775-A779 | | Reserved | | | | | |
| Fencing Services | | | | | | | |
| A780 | | Chain Link Fencing - Provide and Install Fence Fabric and Tension Wires | The Contractor shall furnish all labor, supervision, management, fuel, tools, materials, equipment, facilities, transportation, incidental engineering, and other items necessary to provide and install Fence Fabric and Tension Wires only on existing chain link fence. All work must be completed as per UFC 4-022-03 Security Fences and Gates. Complete all work within 5 working days or as specified in the order. | $0.00 | LM | 500 | $0.00 |
| A781 | | Chain Link Fencing - Removal and Disposal of Fence Fabric and Tension Wires | The Contractor shall furnish all labor, supervision, management, fuel, tools, materials, equipment, facilities, transportation, incidental engineering, and other items necessary to remove and dispose of Fence Fabric and Tension Wires on existing chain link fence. All work must be completed as per UFC 4-022-03 Security Fences and Gates. Complete all work within 5 working days or as specified in the order. | $0.00 | LM | 500 | $0.00 |
| A782-A784 | | Reserved | | | | | |
| Fire Alarm Devices | | | | | | | |