N6247023R0010 Poland BOS Amend 0004.pdf
PDF 1 MB Posted
- Attached to
- Base Operations Support (BOS) Services at Naval Support Facility (NSF) Redzikowo, Poland
- Solicitation number
- N6247023R0010
About this file
This is a solicitation for base operations support services at the U.S. Navy Support Facility in Redzikowo, Poland. The solicitation seeks management and administration of installation operations including fire and emergency services, emergency management, facilities management, utilities management, environmental services, and transportation. Key requirements include quality management, safety programs, security compliance, and data reporting in NAVFAC Maximo. The period of performance is one base year with four one-year options. The solicitation was issued on December 5, 2023 with proposals due on January 5, 2024 and award anticipated by February 1, 2024. The incumbent contractor may apply. The total contract value will depend on task orders issued under both recurring and non-recurring work provisions. The Naval Facilities Engineering Command Europe Africa Central is the contracting agency.
View the file
Other files
Show 40 more
Latest 50 of 78 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
N6247023R0010: BASE OPERATIONS SUPPORT (BOS) SERVICES AT U.S. NAVY SUPPORT FACILITY (NSF) REDZIKOWO, POLAND.
This amendment is issued to provide revisions to Sections C, I, J, and L. (SEE CONTINUATION PAGE)
CS: Barkley Brow n, barkley.k.brow n.civ@us.navy.mil]
1. CONTRACT ID CODE PAGE OF PAGES
J 1 217
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 01-Feb-2024
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X N6247023R0010
X 9B. DATED (SEE ITEM 11)
05-Dec-2023
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
01-Feb-2024
CODE
COMNAVFACSYSCOM ATLANTIC
6506 HAMPTON BLVD
NORFOLK VA 23508-1278
N62470 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
N6247023R0010
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION SF 30 - BLOCK 14 CONTINUATION PAGE
The following have been added by full text:
AMENDMENT 0004
The purpose of this amendment is to disseminate the below information.
1. Section C – Various revisions throughout the following annexes are provided.
0200000 - Management and Administration (Amendment 0004) 0402000 - Fire and Emergency Services (Amendment 0004) 0403000 - Emergency Management (Amendment 0004) 1300000 - Galley (Amendment 0004) 1402000 - Unaccompanied Housing (Amendment 0004) 1501000 - Facility Management (Amendment 0004) 1502000 - Facility Investment (Amendment 0004) 1502001 - Facility Investment - AA MCSS Facilities (Amendment 0004) 1602000 - Electrical (Amendment 0004) 1700000 – Transportation (Amendment 0004) 1800000 - Environmental (Amendment 0004)
2. Section I – The following Clauses have been removed from Section I – CONTRACT CLAUSES
REMOVED BY REFERENCE.
52.216-24 Limitation Of Government Liability (APR 1984) 252.216-7003 Economic Price Adjustment - Wage Rates or Material Prices Controlled by a Foreign Government (MAR 2012)
3. Section J – Revisions are made to Section J Table of Contents. Amendment 0004 preaward inquiry responses are provided and the following attachments. See note below.
a. List of attachments has been Revised:
Attachment F - Section F Deliverables (Excel) (Amendment 0004) J-0200000 Management and Administration (PDF) (Amendment 0004) J-0200000-13 Exhibit Line Item Numbers (ELINs) (Amendment 0004) J-0403000 Emergency Management (PDF) (Amendment 0004) J-1002000 Supply Services (PDF) (Amendment 0004) J-1402000 Unaccompanied Housing (PDF) (Amendment 0004) J-1501000-08 FRCS Inventory (Excel) (Amendment 0004) J-1502000 Facilities Investment (PDF) (Amendment 0004) J-1502001-03 AA MCSS Facility Investment Equipment and Systems Inventory (Excel) (Amendment 0004) J-1503010 Custodial (PDF) (Amendment 0004) J-1503010-06 Custodial Inventory (Excel) (Amendment 0004) J-1601000 Utility Management (PDF) (Amendment 00004) J-1700000 Transportation (PDF) (Amendment 0004) J-1800000 Environmental (PDF) (Amendment 0004)
b. List of attachments has been Added:
J-0200000-04 Government Furnished Property Materials Services (Excel) (Amendment 0004)
4. Section L – Revisions are made to item L.2, see note below.
NOTE: Revisions are provided by the use of red font; deletions are indicated by the use of red strikethrough font.
SECTION C - DESCRIPTIONS AND SPECIFICATIONS
The following have been modified:
ANNEX 0200000
0200000 – Management and Administration
Table of Contents Spec Item Title 2 Management and Administration
2.1 Definitions and Acronyms
2.2 General Information
2.2.1 Government Regular Working Hours
2.2.1.1 Observed Federal Holidays
2.2.1.2 Restriction to Contractor Working Hours
2.2.2 Requirements Hierarchy
2.2.3 Conflicts Between US Standards and Local Standards
2.3 General Administrative Requirements
2.3.1 Required Conferences and Meetings
2.3.2 Training for Maintenance and Operation of New and Replacement Systems and Equipment
2.3.3 Partnering
2.3.3.1 Formal Partnering
2.3.3.2 Contract Partnering Administration
2.3.3.3 Contract Partnering Session Attendees
2.3.4 Permits and Licenses
2.3.4.1 Dig Permits
2.3.5 Insurance
2.3.5.1 Certificate of Insurance
2.3.5.2 Minimum Insurance Amounts
2.3.6 Protection of Government Property
2.3.7 Directives, Instructions, and References
2.3.8 Invoicing Procedures
2.3.9 Forms
2.4 Government-Furnished Items
2.4.1 Government-Furnished Property (GFP)
2.4.2 Government-Furnished Facilities
2.4.3 Government-Furnished Vehicles and Equipment
2.4.4 Government-Furnished Utilities
2.4.5 Government Furnished Services
2.4.5.1 Medical Services
2.4.5.2 Galley Access
0200000 – Management and Administration Table of Contents
Spec Item Title
2.5 Contractor-Furnished Items
2.5.1 Contractor Furnished Non-Consumables
2.6 Management
2.6.1 Safeguarding Information
2.6.2 Dissemination of Information
2.6.3 Work Reception
2.6.4 Work Control
2.6.5 Work Schedule
2.6.5.1 Annual Work Schedule
2.6.5.2 Monthly Work Schedule
2.6.5.3 Changes by the Government
2.6.6 Deliverables
2.6.7 Service Interruptions
2.6.8 NAVFAC Maximo
2.6.8.1 NAVFAC Maximo Data
2.6.8.2 NAVFAC Maximo Method of Data Entry
2.6.8.3 NAVFAC Maximo Access
2.6.8.4 NAVFAC Maximo Training
2.6.9 Quality Management System (QMS)
2.6.9.1 Quality Management (QM) Plan
2.6.9.2 Quality Inspection and Surveillance
2.6.9.3 Quality Inspection and Surveillance Report
2.6.10 Property Management Plan
2.6.11 System and Equipment Replacement
2.7 Personnel Requirements
2.7.1 Key Personnel
2.7.1.1 Project Manager (PM)
2.7.1.2 Quality Manager
2.7.1.2.1 Quality Control Personnel
2.7.1.3 Site Safety and Health Officer (SSHO)
2.7.1.4 Environmental/Energy Manager
2.7.2 Employee Requirements
2.7.2.1 Employee Certification and Training
2.7.2.2 Employee Appearance
2.7.2.3 Employee Conduct
2.7.2.4 Identification as Contractor Employee
2.7.2.5 Removal of Employees
2.7.2.5.1 Replacement of MCSS Maintenance personnel
2.7.2.6 Medical Screening
2.7.3 US Citizenship and Security Clearance Requirements
2.7.3.1 Project Manager
2.7.3.2 Alarm Installation and Maintenance Personnel
2.7.3.3 Mission Critical Support Systems (MCSS) Maintenance Personnel
2.7.3.4 Dispatcher Personnel
2.7.3.5 High- Altitude Electromagnetic Pulse (HEMP) Door Maintenance Personnel
2.7.3.6 Galley Manager
2.7.3.7 Locksmith Personnel
2.7.3.8 Fire & Emergency Services Personnel
2.7.3.9 Technical Librarian
2.7.4 Local Employee and Subcontractor Clearances
Spec Item Title
2.7.5 Service Contract Reporting (SCR)
2.7.6 Monthly On-Site Labor Report
2.8 Security Requirements
2.8.1 Employee Listing
2.8.2 Vehicles
2.8.3 Passes and Badges
2.8.4 Access to Installation
2.8.4.1 DBIDS Program
2.8.4.2 DBIDS Credentials
2.8.5 Access to Buildings
2.8.6 Access Arrangements
2.8.6.1 Access To Restricted Areas
2.8.6.2 Contingency Plan
2.8.7 Security Clearances
2.8.8 Access to Controlled Unclassified Information
2.8.8.1 International Traffic in Arms Regulations (ITAR)
2.8.8.2 Access to Government Information Technology (IT), Operating Technology (OT), and Facility
Related Control Systems (FRCS)
2.8.8.3 Classified Material
2.8.9 Access to Navy ONE-Net
2.8.10 Employee Status
2.9 Contractor Safety Program
2.9.1 Accident Prevention Plan (APP)
2.9.2 Activity Hazard Analysis (AHA)
2.9.3 Safety and Occupational Health (SOH) Risks and Compliance Plans
2.9.3.1 Alcohol and Drug Abuse Prevention Plan
2.9.3.2 Chemical Hazard Communication Program
2.9.3.3 Confined Space Program
2.9.3.4 Critical Lift Plan
2.9.3.5 Fall Prevention and Protection Plan
2.9.3.6 Pathogen Exposure
2.9.3.7 Control of Hazardous Energy (lockout/tagout)
2.9.4 Crane Operations
2.9.4.1 Crane Inspections
2.9.4.2 Rigging Gear
2.9.4.3 Crane Operators
2.9.5 Accident and Damage Reporting
2.9.5.1 Accident Reporting and Notification Criteria
2.9.6 Fire Protection
2.9.7 OSHA Citations and Violations
2.9.8 Safety Inspections and Monitoring
2.9.9 Safety Certification
2.9.10 Safety Apparel on Jobsites
2.9.11 Excavations
2.10 Environmental Management and Sustainability
2.10.1 Energy Management Program
2.10.1.1 Water Conservation Plan
2.10.1.2 Energy Efficient Products
2.10.2 Environmental Protection
2.10.2.1 Sampling, Testing and Laboratory Services
Spec Item Title
2.10.2.2 ODS Requirements for Refrigerant Recycling
2.10.2.3 Solid Waste Management and Recycling
2.10.2.4 Non-Regulated Waste Disposal
2.10.2.5 Regulated Waste Disposal
2.10.2.6 Universal Waste
2.10.2.7 Spill Prevention, Containment, and Clean-up
2.10.2.8 Hazardous Material Management
2.10.2.9 Protection of Endangered and Threatened Species (Flora and Fauna)
2.10.2.10 Noise Control
2.10.2.11 Salvage
2.10.2.12 Asbestos Containing Material (ACM)
2.10.3 Sustainable Procurement and Practices
2.10.3.1 Environmentally Preferable Products
2.10.3.2 Use of Recovered Materials
2.10.3.3 Use of Bio-based Products
2.11 Disaster Preparedness
2.12 Technical Library
2.13 Warranty Management
2.14 Recurring Work Procedures
2.14.1 Recurring Work Preparation of Proposals
2.14.2 Notification to the Government for Work Above the Recurring Work Limitations
2.14.3 Recurring Work Exhibit Line Item Numbers (ELINs)
2.15 Non-recurring Work
2.15.1 Unit Priced Task (UPT) Work (Non-Negotiated)
2.15.1.1 Acceptance and Performance
2.15.1.2 Invoicing and Receiving Payment
2.15.2 Unit Priced Labor (UPL)Work (Negotiated)
2.15.2.1 Non-recurring Preparation of Proposals
2.15.2.1.1 Labor Requirements
2.15.2.1.2 Direct Material and Construction Equipment Requirements
2.15.2.2 Issuance of Final Task Order
2.15.3 Non-recurring ELINS
2.16 Mobilization
2.16.1 Mobilization Plan
2.17 Demobilization
2.17.1 Demobilization Plan
2.18 Inventory Data Quantity Variation
0200000 - Management and Administration Spec Item Title Description 2 Management and
Administration
2.1 Definitions and
Acronyms
Definitions and Acronyms are listed in J-0200000-01.
2.2 General
Information
2.2.1 Government
Regular Working Hours
The Government's regular working hours are from 0730-1600, five days per week, Monday through Friday, including official Polish holidays, except observed Federal holidays. Exceptions to the regular hours of operation are detailed in subsequent sections of this PWS. Work in certain annexes or sub-annexes require Contractor continuous operations, 24 hours a day, every day of the year including holidays. The performance of other work requirements shall be accomplished within the Government’s regular working hours unless the specific work requirement specified herein necessitates otherwise. Any other work outside Government regular working hours must be authorized by the KO and coordinated with the COR prior to commencement of work.
2.2.1.1 Observed Federal
Holidays
The Government observes the following holidays:
New Year's Day 01 January * Martin Luther King, Jr.'s Day 3rd Monday in January President's Day 3rd Monday in February Memorial Day last Monday in May Juneteenth 19 June * Independence Day 04 July * Labor Day 1st Monday in September Columbus Day 2nd Monday in October Veteran's Day 11 November * Thanksgiving Day 4th Thursday in November Christmas Day 25 December *
* Holidays falling on Saturday are usually observed on preceding Friday.
Holidays falling on Sunday are usually observed on following Monday.
2.2.1.2 Restriction to
Contractor Working Hours
If the Contractor wishes to work outside of the Government's regular working hours for the Contractor’s convenience, the Contractor shall submit a written Request to Work Outside Government’s Regular Working Hours per Section F. Excludes work to be performed during specified hours.
2.2.2 Requirements
Hierarchy
Requirements or definitions specified in each spec item of this contract apply to subordinate paragraphs. For example, requirements shown in spec item 3.1 would apply to spec items 3.1.1, 3.1.2, 3.1.2.1 and so on.
Likewise, Performance Standards specified at a lower digit level (i.e. spec item 3.1.1, 3.1.2, 3.1.2.1) apply when performance is assessed at a higher tier (i.e., spec item 3.1) based on the composite work requirements.
2.2.3 Conflicts Between
US Standards and Local Standards
All work under this contract shall be performed in accordance with US standards and local (Polish) standards. In case of conflicts between US standards and local standards, the most stringent standard shall apply.
2.3 General
Administrative Requirements
2.3.1 Required
Conferences and Meetings
The Contractor shall attend administrative and coordination meetings at the discretion of the KO or COR. The Contractor shall attend inspections, site investigations, and other facility on-site meetings as often as necessary at the discretion of the KO, COR, or designated representative.
2.3.2 Training for
Maintenance and Operation of New and Replacement Systems and Equipment
When construction, renovation, or repair work is performed by means other than this contract, the Contractor shall attend Government provided training, as applicable, for maintenance and operation of new and replacement systems and equipment.
The Contractor is advised that the Construction Contractor will provide one-time familiarization training for each newly built structure and its installed systems approximately 120 days prior to that building being turned over to the Government. Training is typically conducted in conjunction with the demobilization of the particular sub-contractor responsible at time of the Construction Contractors’ choosing. The Contractor shall make video recordings of all new equipment training sessions; the recordings shall be placed into the Technical Library and become part of it.
The Contractor shall provide new equipment training for any new Contractor/personnel 30 days prior to the end of the contract.
2.3.3 Partnering The Government requires cohesive partnerships with its Contractors and subcontractors. Key stakeholders, including the supported commands who may receive services, principal individuals from NAVFAC, the performance assessment team, and representative(s) of the installation(s) will be invited to participate in the partnering process. Key members of the prime and sub-contractor teams, including senior management personnel must participate.
The partnership will draw on the strength of each organization in an effort to achieve quality contract services done right the first time, within the contract price, as scheduled, and without any safety mishaps.
The goal of Partnering is to develop a cohesive team with common purpose, commitment and established communication processes.
Partnering meeting minutes shall be recorded by the Contractor and distributed to all stakeholders per Section F.
2.3.3.1 Formal Partnering The initial session should be scheduled concurrent with the Pre-Performance Conference and held no later than 30 days after award. The initial Partnering Meeting will be at least one day in duration and held at a facility as designated by the KO. Follow-on sessions should be scheduled every three to six months and may be held via teleconference. The frequency, duration, and locations of follow-on sessions should be agreed to by both parties during the initial Partnering Meeting. The Contractor shall pay all costs associated with the partnering effort including facilitator, meeting room, and other incidental items. Before the partnering session, the Contractor shall coordinate with the facilitator the requirements for incidental items (audio-visual equipment, computer(s), two easels, flipchart paper, colored markers, note paper, pens/pencils, colored flash cards, etc.) and have these items available at the partnering session. The Contractor will provide copies of any documents used for the Partnering Meeting for distribution to all attendees. The facilitator must be acceptable to both the Contractor and the Government. The participants shall pay their own costs for meals, lodging, and transportation associated with partnering.
2.3.3.2 Contract Partnering
Administration
Upon award, the ACO will contact the Contractor, supported command(s), Region, and Installation(s) stakeholders, and the performance assessment team to discuss implementation of partnering. Commence discussions with the Contractor to select a facilitator and location that are acceptable to both partners. A partnership agreement, The Charter, should be in place as early as possible so issues arising, even before work begins, can be resolved using the issues resolution process. Replacement of Core Management Team members (stakeholders who attended the initial session and manage the contract work day-to-day) is discouraged since it will disrupt the synergy that has been developed. If replacement of a team member proves to be unavoidable, a follow-on partnering session must be held to officially turn the responsibilities of the position over to the new member.
The Core Management Team consisting of the attendees below must be present during the initial and all follow-on partnering sessions. These are the core mandatory attendees. Other stakeholders may attend if they desire or as recommended by the partners.
2.3.3.3 Contract Partnering
Session Attendees
The Contractor shall bring the necessary personnel to successfully partner on this contract. Asterisk indicates mandatory personnel.
President/Vice President
* Project Manager
* Supervisor/Superintendent
* Quality Manager Site Safety and Health Officer Sub-contractor Reps
2.3.4 Permits and
Licenses
The Contractor shall obtain all required permits, licenses, and authorizations to perform work under this contract and comply with all the applicable Federal, Polish and local laws and regulations. The Contractor shall submit copies of Permits and Licenses per Section F.
2.3.4.1 Dig Permits The Contractor shall institute and administer a dig permitting system for the base. The Contractor is responsible for investigating, resolving conflicts, and approving of all digs. The Contractor shall submit dig permit requests per Section F. The Contractor shall serve as the final permitting authority, subject to the oversight, guidance and decision making authority of the KO.
2.3.5 Insurance The Contractor shall submit a Certificate of Insurance per Section F as evidence of the existence of the following insurance coverage in amounts not less than the amounts specified below in accordance with the FAR Clause
52.228-5, INSURANCE – WORK ON A GOVERNMENT
INSTALLATION. This insurance must be maintained during the performance period.
2.3.5.1 Certificate of
Insurance
The Certificate of Insurance shall provide for at least 30 calendar days written notice to the KO by the insurance company prior to cancellation or material change in policy coverage. Other requirements and information are contained in the aforementioned insurance clause.
In addition the policies shall contain a provision worded as follows:
“The insurance company waives any right of subrogation against the United States of America which may arise by reason of any payment under the policy.”
2.3.5.2 Minimum
Insurance Amounts
The Contractor shall procure and maintain, during the entire period of performance under this contract, the following minimum insurance coverage:
Comprehensive General Liability: $2,000,000 per occurrence
Automobile Liability: $500,000 per person, $1,000,000 per occurrence, $100,000 per occurrence for property damage
Workmen's Compensation: As required by local law.
Other as required by local law.
2.3.6 Protection of
Government Property
During execution of the work, the Contractor shall protect Government property. The Contractor shall return areas damaged as a result of Contractor negligence under this contract to their original condition at no cost to the Government. The Contractor shall submit to the KO and COR a full report of damage to Government property and/or equipment by Contractor employees per Section F.
2.3.7 Directives, Instructions, and References
Department of Defense (DoD), Secretary of the Navy (SECNAV), Chief of Naval Operations (OPNAV), and other applicable Directives, Instructions, and References are listed in J-0200000-02. The Contractor shall comply with the most current version of directives, instructions, and references including versions published during the term of the contract.
2.3.8 Invoicing
Procedures
Refer to Section G for invoicing instructions.
Invoices shall be submitted in a format compatible with the most recent Government installed Microsoft Office Version (currently 2010). Invoice data shall be capable of being sorted by CLIN, annex/sub-annex, spec item, spec item title, and ELIN/Sub-ELIN.
2.3.9 Forms It is the intent of Government that all forms required for accomplishment of work in this PWS be accessed electronically. The Department of Defense Forms Program site at: www.dior.whs.mil provides access to an inventory of DoD, Navy, GAO and GSA forms, frequently asked questions, and downloading instructions. It shall be the Contractor’s responsibility to duplicate the required forms as necessary for accomplishment of the work. In the event that a form is unavailable electronically, the Contractor shall develop and provide a form sample to the KO and COR for approval. Forms referenced in this Annex, e.g. accident reporting, and damage reporting are included among the Forms in J-0200000-03.
2.4 Government-
Furnished Items
Except for items identified below as Government-Furnished, the Contractor shall furnish all labor, supervision, management, tools, materials, equipment, facilities, transportation, incidental engineering, and other items necessary to provide the services described in this Performance Work Statement (PWS).
Government-Furnished Items will be provided in "AS-IS" condition and their use is at the option of the Contractor. The total or partial breakdown or failure of Government-Furnished Items shall not relieve the Contractor of the responsibility to perform the requirements of this contract.
The Contractor shall provide periodic servicing, maintenance, and repair of the Government-Furnished Items accepted for use. Servicing, maintenance, and repair shall be provided in accordance with the manufacturer’s recommendations. The Contractor shall generate work orders in NAVFAC Maximo per Spec Item 2.6.8 for all servicing, maintenance, and repair activities performed on Government-Furnished Items.
At the completion of the contract, all Government-Furnished Items shall be returned to the Government in the same condition as received, except for reasonable wear and tear. Government-Furnished Items, which becomes worn out due to normal wear and tear, shall be returned to the Government and its replacement shall be the responsibility of the Contractor. The Contractor shall be responsible for the cost of any repairs or replacement caused by Contractor negligence or abuse.
The Government may inspect Government-Furnished Items at any time and without notice.
2.4.1 Government-
Furnished Property
(GFP)
The Government will furnish or make available to the Contractor certain Government Property for use in connection with this contract. The use of GFP for any other purposes is prohibited. GFP is provided and shall be managed by the Contractor in accordance with Section H; paragraph H.10 Government-Furnished Property.
A list of Government Furnished Property that will be made available to the Contractor is provided in J-0200000-04.
The Contractor shall support initial, periodic, and final inventories of GFP.
2.4.2 Government-
Furnished Facilities
The Government will make available to the Contractor certain facilities for use in connection with this contract. The use of these facilities for any other purposes is prohibited.
The Contractor shall be responsible and accountable for the facilities accepted for use and shall take adequate precautions to prevent fire hazards, odors, and vermin. Custodial and refuse collection services for the facilities shall be provided by the Contractor. The Contractor shall obtain written approval from the KO prior to making any modifications or alterations to the facilities. Any modifications to Government Furnished Facilities shall be at Contractor expense.
A list of the facilities that will be made available to the Contractor is provided in J-0200000-04.
2.4.3 Government-
Furnished Vehicles and Equipment
The Government will make available to the Contractor certain vehicles and equipment for use in connection with this contract. The use of these vehicles and equipment for any other purposes is prohibited.
A list of vehicles and equipment that will be made available to the Contractor is provided in J-0200000-04.
2.4.4 Government-
Furnished Utilities
The Government will make available water and electricity at existing outlets required for the work to be performed under the contract. The Contractor shall provide and maintain, at its expense, the necessary service lines from the existing Government outlets to the work site. Provide and maintain backflow prevention devices on connections to domestic water lines and electrical transformer provisions on connections to electric lines. The Contractor shall meet all FGS Poland, local, and installation codes and regulations for backflow prevention devices and electrical transformer provisions. Services required by the Contractor, for which there are no available Government outlets, shall be provided by the Contractor at no cost to the Government.
Installation of Contractor-provided devices is subject to inspection and approval by the Government.
2.4.5 Government Furnished Services
2.4.5.1 Medical Services
There will be no Government-Furnished Medical Services. The Contractor shall provide first aid for minor and emergency treatment at worksites. The Contractor should advise prospective employees about their health insurance coverage and its limitations while in Poland.
2.4.5.2 Galley Access
Contractor personnel may eat at the galley, subject to payment of the applicable rates.
The Contractor shall pay the DOD food service standard Meal rate for employees eating in the Galley. The total monthly meal charge amount will be calculated based upon NAVSUP 1291 Signature Record. Meal rates are updated annually by NAVSUP.
The Contractor shall provide a check or EFT payment to the Food Services Officer no later than the fifth calendar day after the end of each month. The
Check/EFT will be issued in US dollars, drawn on a US financial institution and made payable to the Treasurer of the United States.
2.5 Contractor-
Furnished Items
Except for items identified as Government Furnished, the Contractor shall provide all equipment, materials, parts, supplies, components, and facilities to perform the requirements of this contract. The KO or COR may inspect Contractor-furnished items for adequacy and compliance with contract requirements. Inadequate or unsafe items shall be removed and replaced by the Contractor at no cost to the Government. Materials containing asbestos, lead, and polychlorinated biphenyls (PCBs) shall not be brought onsite.
Energy efficient tools and equipment shall be used when available. The KO or COR may at any time require Samples, Safety Data Sheets (SDS) or Manufacturer’s Data Cut Sheets of Materials used in this contract.
2.5.1 Contractor
Furnished Non- Consumables
The Contractor shall observe generally accepted lifespans of non-consumable items (computers, printers, etc.) used to support performance of services under this contract prior to replacement of such items.
2.6 Management The Contractor shall manage the total work effort associated with the services required herein to meet the performance objectives and standards. Such management includes but is not limited to planning, scheduling, cost accounting, report preparation, establishing and maintaining records, and quality assurance. The Contractor shall provide a staff with the necessary management expertise to ensure performance objectives and standards are met.
2.6.1 Safeguarding
Information
The Contractor shall safeguard controlled unclassified information and information associated with Government property in accordance with the latest revision of CNSSI 1253, DoDI 8582.01, NIST SP 800-53, NIST SP 800-171, SECNAV Defense Industrial Base (DIB) Memo, and applicable contract clauses. At a minimum, this information shall be protected at the moderate confidentiality level as defined in NIST SP 800-171.
Contractor information and data systems that contain information associated with Government property shall comply with DoD Risk Management Framework (RMF). Contractor information and data systems shall not contain any information associated with Government property beyond that included in any attachments.
The Contractor shall develop Plans of Action and Milestones (POA&Ms) per NIST SP 800-171, track accomplishment, and submit to the Government per Section F.
If a cybersecurity incident is encountered or suspected related to any (Contractor or Government) Information Technology (IT) or Operating Technology (OT) systems, including Monitoring and Control Systems, the Contractor shall notify the Government per Section F.
2.6.2 Dissemination of
Information
DoD policy limits the dissemination of certain information. Instructions, Directives, and References not releasable to the public, e.g., Floor Plans, Maps, Post Orders, and Standard Operating Procedures, will be made available after contract award to the successful offeror with appropriate credentials and a need to know.
2.6.3 Work Reception The Contractor shall provide the capability to receive, classify, issue, prioritize, correspond, and respond to trouble/service calls and task orders during Government regular working hours and provide a point of contact at a local or toll free number who can perform the above function during other than Government regular working hours.
2.6.4 Work Control The Contractor shall implement all necessary work control procedures to ensure timely accomplishment of work requirements, as well as to permit tracking and reporting of work in progress. The Contractor shall plan and schedule work to assure material, labor, and equipment are available to complete work requirements within the specified time limits and in conformance with the quality standards established herein. Verbal scheduling and work status updates shall be provided when requested by the Government. A status update of any item of work must be provided within two hours of the inquiry during regular working hours, and by 0800 the following work day for inquiries after regular working hours.
2.6.5 Work Schedule The Contractor's work shall not interfere with normal Government business.
In those cases where some interference is unavoidable, the Contractor shall minimize the impact and effects of the interference. The Contractor shall provide advance access of all of its work schedules to the Government. The Contractor shall provide written notification of any difficulty in scheduling work due to Government controls, per Section F. At a minimum, the notification shall include the following:
• The date and time the work was initially coordinated.
• The name and phone number of the Government person with whom the work was initially coordinated.
• The name and phone number of the Government person who prevented the work from being performed as previously coordinated.
• The alternative date and time, the Government person requested the work be accomplished.
2.6.5.1 Annual Work
Schedule The Contractor shall submit an annual schedule of planned performance of work per Section F. This schedule shall be developed in conjunction with the "Frequency Schedules" given in the Technical Annexes or Attachments, and shall identify the following:
(1) Days of the week on which the Contractor will perform services with a frequency ranging from "daily" to "monthly".
(2) Month of the year in which the Contractor will perform services with a frequency ranging from "quarterly" to "annually".
The first annual work schedule shall be accompanied by a detailed monthly schedule, as defined below, for the first two (2) months of the contract. In case of any circumstance that results in a potential change in the annual schedule, the Contractor shall promptly submit a revised schedule to the KO and COR.
2.6.5.2 Monthly Work
Schedule
The Contractor shall develop a monthly work schedule identifying location, date, and time of performance for all services included in the approved annual work schedule for that month. Recurring services shall be identified by a daily work schedule organized by building/area and indicating the type and location of work to be performed, complete with the hour of the day and the estimated time to complete the work. When other than daily services fall on a holiday, alternate dates shall be specified. The schedule shall also identify all work ordered under the non-recurring work portion of the contract, if any, complete with task order number and title, and scheduled start and completion dates. The Contractor shall submit the monthly work schedule for approval per Section F.
2.6.5.3 Changes by the
Government
The Contractor is advised that in some cases such as, but not limited to, special events, the Government reserves the right to unilaterally direct the
Contractor to either anticipate or postpone scheduled performance dates.
When possible, the Contractor will be notified of the requested change at least 48 hours in advance.
2.6.6 Deliverables Except where otherwise stated, deliverable requirements are specified in Sections C, F, H, I, J, and within the Directives, Instructions, and References.
The Contractor shall submit accurate and complete documents within the specified timeframes. The Contractor shall revise/modify deliverables, as directed by the KO or COR.
Except where otherwise specified, all deliverables shall be submitted electronically in a Microsoft Office Version compatible format. Deliverables shall include the company name, contract number, contract title, date, and shall be unprotected and capable of being sorted by CLIN, work order number, asset number, section, annex/sub-annex, spec item and ELIN/Sub- ELIN or clause. All formulas shall be traceable.
Government acceptance of deliverables shall not relieve the Contractor of the responsibility for any error or omission which may exist in the deliverable, as the Contractor is responsible for all requirements of this contract.
The Contractor shall establish and maintain a secure website for posting an electronic copy of all deliverables listed in Section F. The Contractor shall allow only authorized Government and Contractor personnel to access the website. Government personnel access shall be limited to viewing and downloading of deliverables, but restricted from posting to the website. The Contractor shall notify the Government by email whenever there are new or updated deliverables posted to the website. Each deliverable posting on the website and each email notification shall include the title of the deliverable, the spec item requiring the deliverable, and the date and time the deliverable was posted. All deliverables shall be available to authorized Government personnel 24 hours/day and 365 days/year for the duration of the contract.
Website failure does not relieve the Contractor from providing deliverable on time by e-mail or other means.
2.6.7 Service
Interruptions
If any utilities or other services must be discontinued (even temporarily) due to scheduled contract work, the Contractor shall notify the KO, COR, affected tenants, and customers at least five (5) working days in advance. If the discontinued service is due to an emergency breakdown the Contractor shall notify the KO, COR, affected tenants, and customers as soon as practicable and provide the status of repairs, as directed by the KO, until normal operation is restored.
Scheduled utility outages and interruptions to equipment, system(s) operation, or other services shall be scheduled after hours of operation.
The Contractor shall shutdown, restart, and perform operational checks on all equipment affected by both scheduled and unscheduled utility outages and service interruptions.
2.6.8 NAVFAC Maximo NAVFAC Maximo is the Computerized Maintenance Management System (CMMS) used by the Government for work order history, asset management, and condition assessment. The Contractor shall provide all required data for NAVFAC MAXIMO as identified below:
2.6.8.1 NAVFAC Maximo
Data
Required data fields for work orders are indicated in the Service Provider Information provided in J-0200000-05. Asset inventory data requirements are indicated in the Asset Information provided in J-0200000-06, including additional data for Utilities assets listed in Specification Information in J- 0200000-07. Required data for documenting condition assessments is indicated in the Characteristic Meter Reading Information provided in J- 0200000-08.
Specified data shall be provided for all work performed in 1501000 Facility Management, 1502000 Facility Investment, 1502001 Facility Investment AA MCSS Facilities, 1601000 Utilities Management, 1602000 Electrical, 1606000 Water, and 1700000 Transportation. Further instructional information detailing the process for submitting the specified information for NAVFAC Maximo Data Reporting is provided in J-0200000-09.
The Service Provider, Asset, Specification, and Characteristic Meter Reading Interfaces are used in multiple processes for loading data into Maximo by the Government and the format may be updated periodically.
As part of the update the Contractor may be asked to modify the file to add/move columns in their submission. The Contractor shall provide up to 10 extra data elements or columns with as many as 150 characters per element for the Government to define during contract performance. The Government will provide the Contractor 60 calendar days’ notice of modifications to the Service Provider, Asset, Specification, or Characteristic Meter Reading Interfaces file format.
2.6.8.2 NAVFAC Maximo
Method of Data Entry
The Contractor shall provide data for NAVFAC Maximo using the methods detailed below:
DIRECT ENTRY: The Contractor shall manually enter required work order and condition assessment data directly into NAVFAC Maximo. The Contractor shall ensure all information is updated by the end of each workday for all work performed.
If the Contractor does not have access to NAVFAC Maximo at contract start, work order and condition assessment data shall be submitted in a pipe delimited flat-file following the NAVFAC Maximo Data Reporting process described in J-0200000-09 per Section F. Any failures in processing of the flat-file shall be corrected and resubmitted by the Contractor. In order to demonstrate the ability to properly format the flat-file, the Contractor shall provide a Sample Pipe Delimited Flat-file prior to contract performance per Section F. Flat file submission of work order and condition assessment data will be allowed for a period not to exceed six months unless an extension is authorized in writing by the KO.
The Contractor shall electronically record and report compiled service performance data for exportation of asset and specification data to NAVFAC Maximo. The Contractor shall submit asset and specification data in a spreadsheet flat-file following the NAVFAC Maximo Data Reporting process per Section F.
2.6.8.3 NAVFAC Maximo
Access
The process for obtaining access and establishing NAVFAC Maximo accounts are detailed in the NAVFAC Maximo System Access Procedures provided in J-0200000-10.
Once accounts have been established, NAVFAC Maximo can be accessed at https://maximo.navfac.navy.mil.
The Contractor shall provide all necessary computer equipment and Internet Service Provider (ISP) accounts to access Maximo for direct entry of required data. The Contractor shall provide a list of personnel requiring MAXIMO accounts.
The Contractor shall submit a list of personnel requiring NAVFAC Maximo accounts per Section F.
2.6.8.4 NAVFAC Maximo
Training
The Government will provide or make available initial training on NAVFAC Maximo to Contractor personnel responsible for direct entry of work order, asset, specification, and condition assessment data. Additional training will be provided by the Government when there are significant changes to the NAVFAC Maximo software or data entry requirements. Training due to changeover of personnel will be the responsibility for the Contractor. The Contractor will be provided a general user guide, local instructions, and other materials by the Government as reference material for the use of NAVFAC Maximo.
2.6.9 Quality
Management System (QMS)
The Contractor shall establish and maintain a complete QMS program in accordance with the provisions specified herein. The Contractor’s QMS program shall provide an effective and efficient means of identifying and correcting problems throughout the entire scope of operations. The Contractor's QMS program shall address:
• Accurate documentation of work processes, procedures, and output measures.
• A systematic procedure for assessing compliance with performance objectives and standards.
• Accurate documentation of quality inspections and surveillance conducted throughout the execution of work.
• Assessment-driven corrective actions and process adjustments as appropriate in a timely manner.
2.6.9.1 Quality
Management (QM) Plan
The Contractor shall develop and submit a QM Plan per Section F. The QM Plan shall describe the QMS methodology and approaches used under this contract. If any changes are made during the period of performance, the Contractor shall submit the revised QM Plan for acceptance, per Section F.
The Contractor’s QM Plan shall include, at a minimum, the following:
• Policy and objectives of Quality Management System (QMS)
• Quality organization o List of personnel o Responsibilities & lines of authority o Training and qualifications
• Approach to assuring quality of services provided and conformance with performance objectives and standards
• Methods and procedures for effective planning, operation and control of processes and performance of work
• Procedures for inspection and surveillance of services to include all contractual requirements.
o Scheduling and performance of inspection and surveillance o Measurement, data collection and analysis o Corrective action, preventive action, and continuous improvement o Oversight of subcontracted work
• Documentation and records management
• Communication with government (customers)
2.6.9.2 Quality Inspection
and Surveillance
The Contractor shall establish and maintain an inspection and surveillance system in accordance with the FAR Clause 52.246-4 INSPECTION OF SERVICES - FIXED-PRICE, to ensure that the work performed conforms to the contract requirements. The Contractor shall document and maintain a file of all scheduled and performed inspections and surveillances, inspection and surveillance results, and dates and details of corrective and preventive actions. The quality inspection and surveillance file shall be the property of the Government and made available during the Government’s regular working hours. The file shall be submitted to the COR after completion/termination of the contract per Section F.
2.6.9.3 Quality Inspection
and Surveillance Report
The Contractor shall submit a copy of the Contractor Quality Inspection and Surveillance Report per Section F. The Contractor Quality Inspection and Surveillance Report shall include a narrative of events, a tabulated summary and results of the quality inspection and surveillance events performed, inspection-driven corrective actions taken and the results attained, and management process adjustments during the previous month. The Government may adjust the frequency of the submittal based on the Contractor’s quality of performance.
2.6.10 Property
Management Plan
The Contractor shall establish and maintain a plan that meets the contract clause requirements of Specification Item 2.4, Government-Furnished Items, of this Annex. This plan shall identify the Contractor’s policies, procedures, and practices in receiving and performing physical inventories, key control, repairing and maintaining, preserving and protecting, and reporting the disposition of accepted government property in its possession. The Property Management Plan shall be submitted per Section F.
2.6.11 System and
Equipment Replacement
The Contractor shall maintain the integrity and performance of existing energy saving, water conservation or other sustainability design features of systems and equipment in the performance of repair and replacement work.
Except where otherwise specified, replacement components shall be of the same model/style or equivalent as the component being replaced. Substitutes for replacement components must be accepted by the KO or NAVFAC Subject Matter Expert (SME) prior to use. The KO or NAVFAC SME will furnish available information for the existing systems and equipment.
2.7 Personnel
Requirements
Except where specifically stated U.S. citizenship is required, the Contractor shall utilize local labor and suppliers to the fullest extent practicable in providing services during the performance of this contract. The Contractor shall comply with the personnel requirements stated below:
2.7.1 Key Personnel The Contractor shall submit a List of Key Personnel and Qualifications per Section F. The Contractor shall provide any additional information requested by the KO or COR necessary to validate their qualifications.
The Contractor shall submit an Organizational Chart per Section F showing lines of authority of the key personnel and on-site supervisor(s) for this contract. The chart shall include names of personnel and their position title in this contract. As a minimum, include the PM, Quality Manager, SSHO, and on-site supervisor(s) and who they will report directly to for this contract. The key personnel shall be revised as applicable for the contract.
The Contractor shall provide complete resumes for proposed substitutes and any additional information requested by the KO or COR. Proposed substitutes shall have comparable qualifications to those of the persons being replaced.
The KO or COR will notify the Contractor within 15 calendar days after receipt of all required information of the consent on substitutions. No change in fixed unit prices may occur as a result of key personnel substitutions.
2.7.1.1 Project Manager
(PM)
The Contractor shall provide a PM and designated alternate, as applicable, who shall have full authority to act for the Contractor on all contract matters relating to this contract. The PM or alternate shall be on-site during the Government's regular working hours and shall be available on-site within one hour after the Government's regular working hours.
The PM or designated alternate shall have at least three years of experience in managing a workforce providing services on contracts of similar size, scope and complexity.
2.7.1.2 Quality Manager The Contractor shall provide a Quality Manager or designated alternate who shall be on-site at all times when the Contractor is performing work during the Government's regular working hours and shall be available on-site within one hour after the Government’s regular working hours. The Quality Manager or designated alternate shall report directly to a senior corporate official and shall not report directly to the Project Manager.
The Quality Manager or designated alternate shall have fulfilled the following pre-requisite training and experiences before being hired as the Quality Manager under this contract:
The Quality Manager or designated alternate shall have at least three years of experience in preparing and enforcing QMS programs on contracts of similar size, scope and complexity. The Quality Manager or designated alternate shall not be the same person as the SSHO.
2.7.1.2.1 Quality Control
Personnel
The…