J-1503010-06 Custodial Inventory (Amendment 0004).xlsx
XLSX spreadsheet 54 KB Posted
- Attached to
- Base Operations Support (BOS) Services at Naval Support Facility (NSF) Redzikowo, Poland
- Solicitation number
- N6247023R0010
About this file
This document contains a room inventory spreadsheet and solicitation notice for base operations support services. The spreadsheet lists over 200 rooms in various facilities located at Naval Support Facility Redzikowo in Poland, providing details on room dimensions, finishes, and amenities. The solicitation notice seeks proposals to provide base operations support services at the facility, including custodial, maintenance, transportation, and other services to support daily operations. Offerors must submit proposals by a specified due date, and the contract period of performance will be for one base year with four one-year options. The Department of the Navy Naval Facilities Engineering Command is the contracting agency.
View the file
Other files
Show 40 more
Latest 50 of 78 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Region Custodial
| ROOM FINISH INVENTORY | |||||||||||||||
| FLOORS | RESTROOM/BREAK ROOM | RECEPTACLES | |||||||||||||
| FACILITY No. | ROOM NO. | ROOM NAME | NET AREA (SF) | NET AREA (M2) | FLOOR | BASE | |||||||||
| FREQUENCY (Standard, Prestige, or A-D, as applicable) | MAT | FINISH | MAT | FINISH | SINK | TOILET | URINAL | SHOWER | RECYCLE BINS | TRASH REC. | |||||
| VISITORS' CENTER (ACF) (2034 SF) | |||||||||||||||
| 4200 | 100 | Vestibule | 64.3 | 6 | STANDARD | CONC | EM1/VNL1 | - | RB1 | ||||||
| 4200 | 101 | Waiting Room | 291.8 | 27.1 | STANDARD | CONC | EM1/VNL 1,2,3 | - | RB1 | X | |||||
| 4200 | 102 | Hallway | 164.2 | 15.3 | STANDARD | CONC | VNL 1,2,3 | - | RB1 | ||||||
| 4200 | 103 | Visitor Processing | 157.8 | 14.7 | STANDARD | CONC | CT3 | - | RB1 | X | |||||
| 4200 | 104 | Office | 108.4 | 10.1 | STANDARD | CONC | CT3 | - | RB1 | X | |||||
| 4200 | 105 | Mech/Elect Room | 192.9 | 17.9 | STANDARD | CONC | SC | - | RB1 | ||||||
| 4200 | 106 | POP/Comm | 155.9 | 14.5 | STANDARD | CONC | SDT1 | - | RB1 | ||||||
| 4200 | 107 | Host Teleco | 80.9 | 7.5 | STANDARD | CONC | SC | - | RB1 | ||||||
| 4200 | 108 | Host Mod | 60.6 | 5.6 | STANDARD | CONC | SC | - | RB1 | ||||||
| 4200 | 109 | Break Room | 141.8 | 13.2 | STANDARD | CONC | VNL 1,2,3 | - | RB1 | 1 | X | X | |||
| 4200 | 110 | Storage | 79 | 7.3 | STANDARD | CONC | VNL 1,2,3 | - | RB1 | ||||||
| 4200 | 111 | CGL | 32.7 | 3 | STANDARD | CONC | SC | - | RB1 | ||||||
| 4200 | 112 | Unisex Head | 58.1 | 5.4 | STANDARD | CONC | CFT1 | - | CB1 | 1 | 1 | X | |||
| 4200 | 113 | Unisex Head | 58.1 | 5.4 | STANDARD | CONC | CFT1 | - | CB1 | 1 | 1 | X | |||
| VEHICLE INSPECTION FACILITY (ACF) (1776 SF) | |||||||||||||||
| 4210 | 117 | Guard Room | 52 | 4.8 | STANDARD | CONC | SPF1 | - | RB1 | X | |||||
| 4210 | 118 | Vehicle Inspection | 1455 | 135.3 | STANDARD | CONC | - | - | - | ||||||
| 4210 | 119 | Waiting Room | 86 | 8 | STANDARD | CONC | SPF1 | - | RB1 | X | |||||
| GUARD SHACK #1 (40 SF) | |||||||||||||||
| 4221 | 114 | Guard Booth | 40 | 3.7 | STANDARD | SPR | SPF1 | - | RB1 | ||||||
| GUARD SHACK #2 (40 SF) | |||||||||||||||
| 4222 | 115 | Guard Booth | 40 | 3.7 | STANDARD | SPR | SPF1 | - | RB1 | ||||||
| OVERWATCH GUARD SHACK #1 (203 SF) | |||||||||||||||
| 4223 | 116 | Overwatch Guard Booth | 52 | 5 | STANDARD | SPR | SPF1 | - | RB1 | ||||||
| OVERWATCH GUARD SHACK #2 | |||||||||||||||
| 4225 | 116 | Overwatch Guard Booth | 52 | 5 | STANDARD | SPR | SPF1 | - | RB1 | ||||||
| Multi-Purpose Facility (MPF) - Main Level | |||||||||||||||
| 4300 | 1023 | Admin Area | 668 | 62 | STANDARD | CONC | CT1 | RB1 | - | X | |||||
| 4300 | 1024 | Conference Room | 250 | 23 | STANDARD | CONC | CT1 | RB1 | - | X | |||||
| 4300 | Corridor & Hallways | 1342 | 125 | STANDARD | CONC | CFT1 | CB1 | - | X | X | |||||
| 4300 | 1027 | Mini-Theatre | 223 | 21 | STANDARD | CONC | CT1 | RB1 | - | ||||||
| 4300 | 1028 | Chief's Mess | 323 | 30 | STANDARD | CONC | CT1 | RB1 | - | X | |||||
| 4300 | 1029 | Control | 35 | 3 | CONC | CT1 | RB1 | - | |||||||
| 4300 | 1031 | Dry Storage | 454 | 42 | CONC | RF1 | SKF1 | - | |||||||
| 4300 | 1032 | Electrical | 66 | 6 | CONC | SC | RB1 | - | |||||||
| 4300 | 1033 | Location Exchange | 732 | 68 | CONC | CFT1 | CB1 | - | X | ||||||
| 4300 | 1034 | Storage (NEX) | CONC | CFT1 | CB1 | - | X | ||||||||
| 4300 | 1036 | Barber Shop | 193 | 18 | CONC | VNL 1,2,3 | RB1 | - | 1 | X | |||||
| 4300 | 1036A | Sprinkler Room | CONC | VNL 1,2,3 | RB1 | - | 1 | X | |||||||
| 4300 | 1037 | Corridor | 174 | 16 | STANDARD | CONC | CFT1 | CB1 | - | X | |||||
| 4300 | 1038 | Vestibule | 62 | 6 | STANDARD | CONC | VNL1 | RB1 | - | ||||||
| 4300 | 1040 | Liberty Lounge | 116 | 11 | STANDARD | CONC | CT1 | RB1 | - | X | X | ||||
| 4300 | 1041 | Lobby | 116 | 11 | STANDARD | CONC | SPF1 | RB1 | - | ||||||
| 4300 | 1042 | Fitness Coordinator | 150 | 14 | STANDARD | CONC | CT1 | RB1 | - | X | |||||
| 4300 | 1043 | Fitness Area & Free Weights | 992 | 92 | STANDARD | CONC | SPF1 | RB1 | - | X | |||||
| 4300 | 1044 | Game Room | 1403 | 130 | STANDARD | CONC | CT1 | RB1 | - | X | |||||
| 4300 | 1045 | Storage | CONC | CT1 | RB1 | - | X | ||||||||
| 1046 | Closet | ||||||||||||||
| 4300 | 1048 | MWR Site Manager | 371 | 34 | STANDARD | CONC | CT1 | RB1 | - | X | |||||
| 4300 | 1049 | Mechanical | 1403 | 130 | CONC | SC | RB1 | - | |||||||
| 4300 | 1050 | Electrical | 167 | 15 | CONC | SC | RB1 | - | |||||||
| 4300 | 1051 | Multi-Purpose Room | 355 | 33 | STANDARD | CONC | VNL 1,2,3 | RB1 | - | X | |||||
| 4300 | 1052 | Storage | 101 | 9 | CONC | VNL 1,2,3 | RB1 | - | |||||||
| 4300 | 1053 | RFI | STANDARD | CONC | VNL 1,2,3 | RB1 | - | ||||||||
| 4300 | 1054 | Corridor | STANDARD | CONC | VNL 1,2,3 | RB1 | - | ||||||||
| 4300 | 1057 | Equipment Storage | CONC | VNL 1,2,3 | RB1 | - | |||||||||
| 4300 | 1058 | Exit to corridor & locker rooms | STANDARD | CONC | VNL 1,2,3 | RB1 | - | ||||||||
| 4300 | 1062 | Gym Men’s Head & Shower Locker | 452 | 42 | STANDARD | CONC | CFT1 | CB1 | - | 6 | 6 | 4 | 4 | X | |
| 4300 | Gym Women’s Head & Shower Locker | 452 | 42 | STANDARD | CONC | CFT1 | CB1 | X | |||||||
| 4300 | 1064 | CGL | 139 | 13 | CONC | SC | RB1 | - | |||||||
| MPF Dining - Main Level | |||||||||||||||
| 4300 | 1001 | Dining/Circulation | 1034 | 96 | J-1503010-05 | CONC | ST1 | RB1 | - | X | |||||
| 4300 | 1002 | Combination Line | 898 | 83 | J-1503010-05 | CONC | ST1 | RB1 | - | ||||||
| 4300 | 1003 | Laundry/Paper Goods Storage | 116 | 11 | J-1503010-05 | CONC | VNL 1,2,3 | RB1 | - | ||||||
| 4300 | 1004 | Dishwashing | 188 | 18 | J-1503010-05 | CONC | CFT1 | CB1 | - | X | |||||
| 4300 | 1005 | Sign In | 25 | 2 | J-1503010-05 | CONC | ST1 | CB1 | - | ||||||
| 4300 | 1006 | Queue | 230 | 21 | J-1503010-05 | CONC | ST1 | RB1 | - | X | |||||
| 4300 | 1006A | Hand Wash | 30 | 3 | J-1503010-05 | CONC | ST1 | CB1 | - | 2 | |||||
| 4300 | 1007 | Service Line | 258 | 24 | J-1503010-05 | CONC | RF1 | SKF1 | - | ||||||
| 4300 | 1008 | Kitchen | 1559 | 145 | J-1503010-05 | CONC | RF1 | SKF1 | - | ||||||
| 4300 | 1009 | Utensil Wash/Pot Pan Shack | 152 | 14 | J-1503010-05 | CONC | RF1 | SKF1 | - | X | |||||
| 4300 | 1010 | CGL | 46 | 4 | J-1503010-05 | CONC | SC | RB1 | - | ||||||
| 4300 | 1011 | Head | 46 | 4 | STANDARD | CONC | CFT1 | CB1 | - | 1 | 1 | ||||
| 4300 | 1012 | Head | 46 | 4 | STANDARD | CONC | CFT1 | CB1 | - | 1 | 1 | X | |||
| 4300 | 1013 | Locker Room | 69 | 6 | STANDARD | CONC | RF1 | SKF1 | - | X | |||||
| 4300 | 1014 | Office | 76 | 7 | STANDARD | CONC | RF1 | SKF1 | - | X | |||||
| 4300 | 1016 | Can Wash | 32 | 3 | J-1503010-05 | CONC | SC | RB1 | - | X | |||||
| MPF MEDICAL CLINIC | |||||||||||||||
| 4300 | 1111 | Vestibule | 62 | 6 | STANDARD | CONC | VNL1 | RB1 | - | ||||||
| 4300 | 1112 | Treatment Room | 211 | 20 | J-1503010-05 | CONC | VNL 4 | VNL 4 | - | 1 | X | ||||
| 4300 | 1113 | Soiled Utility | 91 | 8 | J-1503010-05 | CONC | VNL 4 | VNL 4 | - | 1 | X | ||||
| 4300 | 1114 | Central Sterilization | 105 | 10 | J-1503010-05 | CONC | VNL 4 | VNL 4 | - | 1 | X | ||||
| 4300 | 1115 | Hallway | 281 | 26 | STANDARD | CONC | VNL 1,2,3 | RB1 | - | ||||||
| 4300 | 1116 | Exam Room | 110 | 10 | J-1503010-05 | CONC | VNL 4 | VNL 4 | - | 1 | X | ||||
| 4300 | 1117 | Clean Utility | 78 | 7 | J-1503010-05 | CONC | VNL 4 | VNL 4 | - | X | |||||
| 4300 | 1118 | Exam Room | 110 | 10 | J-1503010-05 | CONC | VNL 4 | VNL 4 | - | 1 | X | ||||
| 4300 | 1119 | Water Lab | 92 | 9 | STANDARD | CONC | VNL 4 | VNL 4 | - | 1 | X | ||||
| 4300 | 1121 | Satellite Lab | 92 | 9 | STANDARD | CONC | VNL 4 | VNL 4 | - | 1 | X | ||||
| 4300 | 1122 | Provider Office | 108 | 10 | STANDARD | CONC | CT2 | RB1 | - | X | |||||
| 4300 | 1123 | CGL | 30 | 3 | J-1503010-05 | CONC | SC | RB1 | - | 1 | |||||
| 4300 | 1124 | Unisex Head | 84 | 8 | J-1503010-05 | CONC | CFT1 | CB1 | - | 1 | 1 | X | |||
| 4300 | 1126 | Communication | 89 | 8 | J-1503010-05 | CONC | SC | RB1 | - | ||||||
| 4300 | 1127 | Receptionist & Waiting Area | 258 | 24 | J-1503010-05 | CONC | VNL 1,2,3 | RB1 | - | X | |||||
| 4300 | 1128 | Storage Dispensing | 111 | 10 | STANDARD | CONC | VNL 4 | VNL 4 | - | 1 | X | ||||
| 4300 | 1129 | Vestibule | 62 | 6 | STANDARD | CONC | VNL1 | RB1 | - | ||||||
| 4300 | 1131 | Electrical | 58 | 5 | CONC | SC | RB1 | - | |||||||
| 4300 | 1132 | Mechanical | 247 | 23 | CONC | SC | RB1 | - | |||||||
| MPF Unaccompanied Housing - Main Level | |||||||||||||||
| 4300 | 1065 | Barracks Admin | 286 | 27 | STANDARD | CONC | CT1 | RB1 | - | X | |||||
| 4300 | 1066 | Stair | 250 | 23 | STANDARD | CONC | VNL 1,2,3 | RB1 | - | ||||||
| 4300 | 1067 | Soiled Linen Storage | 159 | 15 | STANDARD | CONC | SC | RB1 | - | X | |||||
| 4300 | 1068 | Clean Linen | 83 | 8 | STANDARD | CONC | SC | RB1 | X | ||||||
| 4300 | 1069 | Laundry Linen | 527 | 49 | STANDARD | CONC | SC | RB1 | X | ||||||
| 4300 | 1070 | Corridor | 1517 | 141 | STANDARD | CONC | SC | RB1 | - | X | |||||
| 4300 | 1071 | MWR COMMS | 159 | 15 | CONC | SDT1 | RB1 | ||||||||
| 4300 | 1072 | DOD COMMS | 159 | 15 | CONC | SDT1 | RB1 | ||||||||
| 4300 | 1073 | Storage General Supply | 570 | 53 | CONC | SC | RB1 | X | |||||||
| 4300 | 1074 | Laundry Resident | 538 | 50 | STANDARD | CONC | SC | RB1 | 1 | X | |||||
| 4300 | 1085 | Mens Head/Shower | 544 | 50 | STANDARD | CONC | CFT1 | CB1/RB1 | - | 4 | 5 | 2 | 6 | X | |
| 4300 | 1091 | Womens Head/Shower | 305 | 28 | STANDARD | CONC | CFT1 | CB1/RB1 | - | 2 | 2 | 3 | X | ||
| 4300 | 1100 | VIP Head/Shower | 100 | 9 | STANDARD | CONC | CFT1 | CB1/RB1 | 2 | 1 | 1 | X | |||
| 4300 | 1110 | VIP Head/Shower | 100 | 9 | STANDARD | CONC | CFT1 | CB1/RB1 | 2 | 1 | 1 | X | |||
| 4300 | 1120 | VIP Head/Shower | 100 | 9 | STANDARD | CONC | CFT1 | CB1/RB1 | 2 | 1 | 1 | X | |||
| 4300 | 1109 | Stair | 179 | 16 | STANDARD | CONC | VNL 1,2,3 | RB1 | - | ||||||
| MPF Unaccompanied Housing - Upper Level | |||||||||||||||
| 4300 | 2001 | Stair | 250 | 23 | STANDARD | CONC | VNL 1,2,3/ STR1 | RB1 | - | ||||||
| 4300 | 2002 | Corridor | 1507 | 140 | STANDARD | CONC | SC | RB1 | - | ||||||
| 4300 | 2019 | Mens Head | 544 | 50 | STANDARD | CONC | CFT1 | CB1/RB1 | - | 4 | 5 | 2 | 6 | X | |
| 4300 | 2022 | Mens Shower | STANDARD | CONC | CFT1 | CB1/RB1 | - | 4 | 5 | 2 | 6 | X | |||
| 4300 | 2025 | Womens Head | 305 | 28 | STANDARD | CONC | CFT1 | CB1/RB1 | - | 2 | 2 | 3 | X | ||
| 4300 | 2027 | Womens Shower | STANDARD | CONC | CFT1 | CB1/RB1 | - | 2 | 2 | 3 | X | ||||
| 4300 | 2029 | CGL | C | CONC | CFT1 | CB1/RB1 | - | 2 | 2 | 3 | X | ||||
| 4300 | 2045 | Stair | 179 | 16 | STANDARD | CONC | VNL 1,2,3/ STR1 | RB1 | - | ||||||
| 4300 | 2046 | Closet | CONC | CFT1 | CB1/RB1 | - | 2 | 2 | 3 | X | |||||
| GENERAL PURPOSE WAREHOUSE #2 (9860 SF) | |||||||||||||||
| 4400 | 100 | Vestibule | 86 | 8 | STANDARD | CONC | EM1/VNL1 | RB1 | - | ||||||
| 4400 | 101 | BOS Contractor Storage | 2435 | 226 | STANDARD | CONC | EM1/SC | - | - | ||||||
| 4400 | 102 | Head | 51 | 5 | STANDARD | CONC | CFT1 | CB1 | - | 1 | 1 | X | |||
| 4400 | 103 | Office (Hazmat, Customs & HHG) | 338 | 31 | STANDARD | CONC | SC | RB1 | - | X | |||||
| 4400 | 104 | Electrical | 87 | 8 | CONC | SC | RB1 | - | |||||||
| 4400 | 105 | Comm Room | 85 | 8 | CONC | SC | RB1 | - | |||||||
| 4400 | 106 | Battery Charging Station | 100 | 9 | CONC | SC | RB1 | - | |||||||
| 4400 | 107 | Mechanical | 101 | 9 | CONC | SC | RB1 | - | |||||||
| 4400 | 108 | Acct Mail Storage | 54 | 5 | STANDARD | CONC | AP | RB1 | - | X | |||||
| 4400 | 109 | Office | 211 | 20 | STANDARD | CONC | AP | RB1 | - | X | |||||
| 4400 | 110 | Mail Room | 299 | 28 | STANDARD | CONC | AP | RB1 | - | X | |||||
| 4400 | 111 | Vestibule | 86 | 8 | STANDARD | CONC | EM1/VNL1 | RB1 | - | ||||||
| 4400 | 112 | Lobby | 179 | 17 | STANDARD | CONC | EM1/VNL1 | RB1 | - | X | X | ||||
| 4400 | 113 | MRE Storage | 385 | 36 | STANDARD | CONC | SC | RB1 | - | ||||||
| 4400 | 114 | Gear Storage | 338 | 31 | CONC | SC | RB1 | - | |||||||
| 4400 | 115 | Head | 51 | 5 | STANDARD | CONC | CFT1 | CB1 | - | 1 | 1 | X | |||
| 4400 | 116 | Vestibule | 75 | 7 | STANDARD | CONC | EM1/VNL1 | RB1 | - | ||||||
| 4400 | 117 | Navy Supply Dept Storage | 3271 | 304 | STANDARD | CONC | EM1/SC | - | - | X | |||||
| 4400 | 118 | Household Goods | 448 | 42 | STANDARD | CONC | SC | - | - | X | |||||
| 4400 | 119 | Hazmat Storage | 448 | 42 | STANDARD | CONC | RF1/MG | CONC | - | X | |||||
| PUBLIC WORKS FACILITY (8795 SF) | |||||||||||||||
| 4500 | 100 | Vestibule | 43 | 4 | STANDARD | CONC | EM1/VNL1 | RB1 | - | ||||||
| 4500 | 101 | Hallway | 97 | 9 | STANDARD | CONC | EM1/VNL1 | RB1 | - | ||||||
| 4500 | 102 | Men’s Head w/ Lockers | 226 | 21 | STANDARD | CONC | CFT1 | CB1 | - | 2 | 2 | 2 | 1 | X | |
| 4500 | 103 | Women’s Head w/ Lockers | 140 | 13 | STANDARD | CONC | CFT1 | RB1 | - | 2 | 2 | 1 | X | ||
| 4500 | 104 | CGL | 31 | 3 | CONC | SC | RB1 | - | 1 | ||||||
| 4500 | 105 | Break Room | 280 | 26 | STANDARD | CONC | VNL 1,2,3 | RB1 | - | 1 | X | X | |||
| 4500 | 106 | Communication Room | 86 | 8 | CONC | SC | RB1 | - | |||||||
| 4500 | 107 | Admin Area | 1001 | 93 | STANDARD | CONC | EM1/CT1 | RB1 | - | X | |||||
| 4500 | 108 | Vestibule | 43 | 4 | STANDARD | CONC | EM1/VNL1 | RB1 | - | ||||||
| 4500 | 109 | Office PWO | 142 | 13 | STANDARD | CONC | CT1 | RB1 | - | X | |||||
| 4500 | 110 | Office FEAD | 118 | 11 | STANDARD | CONC | CT1 | RB1 | - | X | |||||
| 4500 | 111 | Conference Room/Office | 196 | 18 | STANDARD | CONC | CT1 | RB1 | - | X | |||||
| 4500 | 112 | Vehicle Maintenance Bay | 2970 | 276 | STANDARD | CONC | SC | - | - | X | |||||
| 4500 | 113 | Storage | 97 | 9 | CONC | SC | RB1 | - | |||||||
| 4500 | 114 | Storage/Shop | 398 | 37 | CONC | SC | - | - | X | ||||||
| 4500 | 115 | Tools | 194 | 18 | CONC | SC | - | - | X | ||||||
| 4500 | 116 | Hazmat Storage/Office Space | 194 | 18 | STANDARD | CONC | SC | - | - | X | |||||
| 4500 | 117 | Electrical | 108 | 10 | CONC | SC | RB1 | - | |||||||
| 4500 | 118 | Mechanical | 129 | 12 | CONC | SC | RB1 | - | |||||||
| SECURITY CONTROL FACILITY (7072 SF) | |||||||||||||||
| 4800 | 100 | Vestibule | 86 | 8 | STANDARD | CONC | EM1/VNL 1 | - | RB1 | ||||||
| 4800 | 101 | Hallway | 452 | 42 | STANDARD | CONC | EM/VNL 1,2,3 | - | RB1 | ||||||
| 4800 | 102 | Break Room | 180 | 17 | STANDARD | CONC | VNL 1,2,3 | - | RB1 | 1 | X | X | |||
| 4800 | 103 | IESS | 168 | 16 | STANDARD | RAF | SDT1 | - | RB1 | X | |||||
| 4800 | 104 | Comms I.T. | 54 | 5 | STANDARD | CONC | SDT1 | - | RB1 | ||||||
| 4800 | 104A | Hallway | 75 | 7 | STANDARD | CONC | VNL 1,2,3 | - | RB1 | ||||||
| 4800 | 105 | POP #2 Comms/Computer Room | 345 | 32 | STANDARD | CONC | SDT1 | - | RB1 | X | |||||
| 4800 | 106 | Comms SEC | 108 | 10 | STANDARD | CONC | SDT1 | - | RB1 | X | |||||
| 4800 | 107 | H. N. POP | 108 | 10 | STANDARD | CONC | SC | - | RB1 | ||||||
| 4800 | 108 | Men’s Head | 166 | 15 | STANDARD | CONC | CFT1 | - | CB1 | 2 | 2 | 2 | X | ||
| 4800 | 109 | Women’s Head | 54 | 5 | STANDARD | CONC | CFT2 | - | CB2 | 1 | 1 | X | |||
| 4800 | 110 | CGL | 48 | 4 | CONC | SC | - | RB1 | |||||||
| 4800 | 111 | Safety Chiefs | 146 | 14 | STANDARD | CONC | CT2 | - | RB1 | X | |||||
| 4800 | 112 | XO Office | 134 | 13 | STANDARD | CONC | CT1 | - | RB1 | X | |||||
| 4800 | 113 | Command Executive Officer | 133 | 12 | STANDARD | CONC | CT2 | - | RB1 | X | |||||
| 4800 | 114 | CO Office | 168 | 16 | STANDARD | CONC | CT1 | - | RB1 | X | |||||
| 4800 | 115 | CMDCS Office | 126 | 12 | STANDARD | CONC | CT2 | - | RB1 | X | |||||
| 4800 | 116 | SECO Office | 126 | 12 | STANDARD | CONC | CT2 | - | RB1 | X | |||||
| 4800 | 117 | Evidence Room | 22 | 2 | STANDARD | CONC | SC | - | RB1 | X | |||||
| 4800 | 118 | Admin Room | 273 | 26 | STANDARD | CONC | CT2 | - | RB1 | X | |||||
| 4800 | 119 | Armory Room | 226 | 21 | STANDARD | CONC | BARP | - | BARP | X | |||||
| 4800 | 120 | Armory Vestibule | 43 | 4 | STANDARD | CONC | BARP | - | BARP | ||||||
| 4800 | 121 | AA&E/Supply | 116 | 11 | STANDARD | CONC | BARP | - | BARP | X | |||||
| 4800 | 122 | Training/Guardmount | 496 | 46 | STANDARD | CONC | VNL 1,2,3 | - | RB1 | X | |||||
| 4800 | 123 | Guard Mount Classroom | 516 | 48 | STANDARD | CONC | VNL 1,2,3 | - | RB1 | X | |||||
| 4800 | 124 | Local Dispatch Center | 326 | 30 | STANDARD | RAF1 | SDT1 | - | RB1 | X | |||||
| 4800 | 125 | EOC | 310 | 29 | STANDARD | RAF1 | SDT1 | - | RB1 | X | |||||
| 4800 | 126 | Mechanical Room | 345 | 32 | CONC | SC | - | RB1 | |||||||
| 4800 | 127 | Electrical Room | 193 | 18 | CONC | SC | - | RB1 | |||||||
| 4800 | 128 | Vestibule | 65 | 6 | STANDARD | CONC | EM1/VNL1 | - | RB1 | ||||||
| FIRE STATION (7933 SF) | |||||||||||||||
| 4900 | 100 | Vestibule | 52 | 4.9 | STANDARD | CONC | EM/VNL1 | RB1 | - | ||||||
| 4900 | 101 | Hallway | 326 | 30.3 | STANDARD | CONC | VNL 1,2,3 | RB1 | - | ||||||
| 4900 | 102 | Public Head | 57 | 5.3 | STANDARD | CONC | CFT1 | CB1 | - | 1 | 1 | X | |||
| 4900 | 103 | SCBA Clean Room | 122 | 11.3 | STANDARD | CONC | SC | RB1 | - | X | |||||
| 4900 | 104 | NIPR Comm/IT Room | 110 | 10.2 | STANDARD | CONC | SDT1 | RB1 | - | X | |||||
| 4900 | 105 | Chief's Office | 115 | 10.7 | STANDARD | CONC | VNL 1,2,3 | RB1 | - | ||||||
| 4900 | 106 | Electrical Room | 77 | 7.2 | CONC | SC | RB1 | - | |||||||
| 4900 | 107 | Mechanical Room | 138 | 12.8 | CONC | SC | RB1 | - | |||||||
| 4900 | 108 | Office / Dorm | 87 | 8.1 | STANDARD | CONC | SPF1 | RB2 | - | X | |||||
| 4900 | 109 | Kitchen | 256 | 23.8 | STANDARD | CONC | VNL 1,2,3 | CB1 | - | 1 | X | X | |||
| 4900 | 110 | Dining/Day Room | 374 | 34.7 | STANDARD | CONC | VNL 1,2,3 | RB1 | - | X | |||||
| 4900 | 111 | Dorm Room | 110 | 10.2 | STANDARD | CONC | CT3 | RB1 | - | X | |||||
| 4900 | 112 | Dorm Room | 109 | 10.1 | STANDARD | CONC | CT3 | RB1 | - | X | |||||
| 4900 | 113 | Head | 71.4 | 6.6 | STANDARD | CONC | CFT1 | CB1 | - | 1 | 1 | 1 | X | ||
| 4900 | 114 | Dorm Room | 110 | 10.2 | STANDARD | CONC | CT3 | RB1 | - | X | |||||
| 4900 | 115 | Head | 71.4 | 6.6 | STANDARD | CONC | CFT1 | CB2 | - | 1 | 1 | 1 | X | ||
| 4900 | 116 | Dorm Room | 110 | 10.2 | STANDARD | CONC | CT3 | RB1 | - | X | |||||
| 4900 | 117 | Head | 73.7 | 6.8 | STANDARD | CONC | CFT1 | CB1 | - | 1 | 1 | 1 | X | ||
| 4900 | 118 | Dorm Room | 110 | 10.2 | STANDARD | CONC | CT3 | RB1 | - | X | |||||
| 4900 | 119 | Protective Clothing Laundry | 81 | 7.5 | STANDARD | CONC | VNL 1,2,3 | RB1 | - | X | |||||
| 4900 | 120 | Equipment Wash/Disinfecting | 206 | 19.2 | STANDARD | CONC | SC | RB1 | - | 1 | X | ||||
| 4900 | 121 | PPE Gear Storage | 136 | 12.66 | STANDARD | CONC | VNL 1,2,3 | RB1 | - | X | |||||
| 4900 | 122 | Spare PPE Storage | 136 | 12.66 | STANDARD | CONC | SC | RB1 | - | X | |||||
| 4900 | 123 | Work Room Equipt Maint | 143 | 13.2 | STANDARD | CONC | VNL1 | RB1 | - | 1 | X | ||||
| 4900 | 124 | EMT Storage | 136 | 12.66 | STANDARD | CONC | VNL1 | RB1 | - | 1 | X | ||||
| 4900 | 125 | Station Officer’s Office/Watch Desk | 126 | 11.7 | STANDARD | CONC | CT2 | RB2 | - | X | |||||
| 4900 | 126 | Vehicle Bay | 1896 | 176.2 | STANDARD | CONC | RF1 | - | - | X | |||||
| 4900 | 127 | Admin Supplies | 33.5 | 3.12 | STANDARD | CONC | VNL1 | RB1 | - | X |
| ROOM FINISH LEGEND | |
| ACT | Acoustical Ceiling Tile |
| BARP | Ballistic Anit-Ricochet Panel |
| CB | Ceramic Wall Base |
| CFT | Ceramic Floor Tile |
| CONC | Concrete |
| CT | Carpet Tile |
| CWT | Ceramic Wall Tile |
| EM | Entrance Mat Recessed |
| EXP | Exposed Structure |
| GLASS | Glass Door Assembly |
| GWB | Gypsum Wall Board |
| MG | Metal Grating |
| N | None |
| PT | Paint Color |
| RAF | Raised Access Floor |
| RB | Rubber Wall Base |
| SC | Sealed Concrete |
| SPF | Sports Flooring |
| SPR | Steel Plate W/Sports Flooring |
| AP | Acrylic Based Paint |
| SDT | Static Disapative Tile |
| SF | Square Foot |
| ST | Stained Concrete |
| WC | Wall Covering |
| VNL | Vinyl Floor Sheeting |
SURFLANT Custodial
| ROOM FINISH INVENTORY | |||||||||||||||
| FLOORS | RESTROOM/BREAK ROOM | RECEPTACLES | |||||||||||||
| Facility No. | ROOM NO. | ROOM NAME | NET AREA (SF) | NET AREA (M2) | FLOOR | BASE | |||||||||
| FREQUENCY (Standard, Prestige, or A-D, as applicable) | MAT | FINISH | MAT | FINISH | SINK | TOILET | URINAL | SHOWER | RECYCLE BINS | TRASH REC. | |||||
| DECKHOUSE SUPPORT BUILDING (29,100 SF) | |||||||||||||||
| 2200 | M06 | C4I | 895 | 83 | STANDARD | RAF | - | - | RB1 | X | |||||
| 2200 | M07 | Log Room | 185 | 17 | STANDARD | CONC | SC | - | RB1 | X | |||||
| 2200 | M08 | C4I | 1423 | 132 | STANDARD | RAF | - | -- | RB1 | X | |||||
| 2200 | M09 | C4I | 293 | 27 | STANDARD | RAF | - | - | RB1 | X | |||||
| 2200 | M10 | Men’s Head | 229 | 21 | STANDARD | CONC | CFT1 | - | CB1 | 3 | 2 | 1 | X | ||
| 2200 | M11 | Women’s Head | 71 | 7 | STANDARD | CONC | CFT2 | - | CB2 | 1 | 1 | X | |||
| 2200 | M12 | TFA Airblock B | 95 | 9 | STANDARD | CONC | EM/RES2 | RESB2 | |||||||
| 2200 | M13 | Vest B | 72 | 7 | STANDARD | CONC | VNL3 | - | RB1 | ||||||
| 2200 | M14 | Hemp/EMI Vest B | 96 | 9 | STANDARD | CONC | SC | - | RB1 | ||||||
| 2200 | M15 | CGL | 98 | 9 | STANDARD | CONC | SC | - | RB1 | ||||||
| 2200 | M16 | Rest Area | 167 | 16 | STANDARD | CONC | VNL 1,2,3 | - | RB1 | 2 | X | ||||
| 2200 | M17 | CMD MSTR Chief | 198 | 18 | STANDARD | CONC | CT2 | - | RB2 | X | |||||
| 2200 | M18 | CO/OIC Office | 199 | 18 | STANDARD | CONC | CT2 | - | RB2 | X | |||||
| 2200 | M19 | XO Office | 185 | 17 | STANDARD | CONC | CT2 | - | RB2 | X | |||||
| 2200 | M20 | Admin Office | 425 | 40 | STANDARD | CONC | CT3 | - | RB1 | X | |||||
| 2200 | M21 | Survival Gear Office | 294 | 27 | STANDARD | CONC | SC | - | RB1 | X | |||||
| 2200 | M22 | Conference | 455 | 42 | STANDARD | CONC | CT3 | - | RB1 | X | |||||
| 2200 | M23 | Equipment Storage | 487 | 45 | STANDARD | CONC | SC | - | RB1 | ||||||
| 2200 | M24 | Emp/EMI Vest D | 392 | 36 | STANDARD | CONC | SC | - | RB1 | ||||||
| 2200 | M25A | Corridor | 1134 | 105 | STANDARD | CONC | SC | - | RB1 | ||||||
| 2200 | M25B | Hallway | 1632 | 152 | STANDARD | CONC | SC | RB1 | |||||||
| 2200 | M25C | Hallway | 619 | 57 | STANDARD | CONC | SC | RB1 | |||||||
| 2200 | M26 | EKMS | 152 | 14 | STANDARD | RAF | - | - | RB1 | ||||||
| 2200 | M27 | CSMC/CCS | 1049 | 97 | STANDARD | RAF | - | - | RB1 | X | |||||
| 2200 | M28 | Elect Wkshp | 256 | 24 | STANDARD | CONC | SC | - | RB1 | X | |||||
| 2200 | M29 | Mopp Gear Storage | 457 | 42 | STANDARD | CONC | SC | - | RB1 | X | |||||
| 2200 | M30 | COMSEC | 161 | 15 | STANDARD | CONC | SC | - | RB1 | ||||||
| 2200 | M31 | COMM A | 522 | 49 | STANDARD | CONC | SC | - | RB1 | ||||||
| 2200 | M32 | Damage Control Locker | 50 | 5 | STANDARD | CONC | SC | - | RB1 | X | |||||
| 2200 | M33 | Hazwaste Storage | 40 | 4 | STANDARD | CONC | SC | - | RB1 | ||||||
| 2200 | M34 | Hazmat Storage | 40 | 4 | STANDARD | CONC | SC | - | RB1 | ||||||
| 2200 | M35 | UPS B | 879 | 82 | STANDARD | CONC | SC | - | RB1 | ||||||
| 2200 | M36 | Elect B | 729 | 68 | STANDARD | CONC | SC | - | RB1 | ||||||
| 2200 | M37 | Elect A | 723 | 67 | STANDARD | CONC | SC | - | RB1 | ||||||
| 2200 | M38 | UPS A | 869 | 81 | STANDARD | CONC | SC | - | RB1 | ||||||
| 2200 | M39 | Mech Equipment & Fire Riser Room | 8300 | 771 | STANDARD | CONC | SC | - | RB1 | ||||||
| 2200 | M40 | Hemp/EMI Vest A | 132 | 12 | STANDARD | CONC | SC | - | RB1 | ||||||
| 2200 | M41 | TFA Airlock A | 84 | 8 | STANDARD | CONC | RES2 | - | RESB2 | ||||||
| 2200 | M42 | Vest A | 226 | 21 | STANDARD | CONC | SC | - | RB1 | ||||||
| 2200 | M43 | CCA Stage 4 | 25 | 2 | STANDARD | CONC | RS2 | - | RESB2 | ||||||
| 2200 | M44 | CCA Stage 3 | 42 | 4 | STANDARD | CONC | RS1 | - | RESB2 | ||||||
| 2200 | M45 | CCA Stage 2 | 71 | 7 | STANDARD | CONC | RS2 | - | RESB1 | ||||||
| 2200 | M46 | CCA Stage 1 | 93 | 9 | STANDARD | CONC | RS2 | - | RESB2 | ||||||
| 2200 | M47 | Hemp/EMI Vest C | 96 | 9 | STANDARD | CONC | SC | - | RB1 | ||||||
| 2200 | M48 | Vest C1 | 73 | 7 | STANDARD | CONC | SC | - | RB1 | ||||||
| 2200 | M49 | Vest D | 55 | 5 | STANDARD | CONC | - | RB1 | |||||||
| 2200 | M50 | TFA Airlock D | 72 | 7 | STANDARD | CONC | RS2 | - | RESB2 | ||||||
| 2200 | M51 | TFA Airlock D | 67 | 6 | STANDARD | CONC | RS2 | - | RESB2 | ||||||
| 2200 | M52 | Vest C2 | 63 | 6 | STANDARD | CONC | SC | - | RB1 | ||||||
| 2200 | M53 | Mech Equipment B | 2665 | 248 | STANDARD | CONC | SC | - | RB1 | ||||||
| GENERAL PURPOSE WAREHOUSE #1 (2,500 SF) | |||||||||||||||
| 2500 | M01 | Vestibule | 54 | 5 | STANDARD | CONC | EM/VNL1 | - | RB1 | ||||||
| 2500 | M02 | Hallway | 291 | 27 | STANDARD | CONC | VNL 1,2,3/EM | - | RB1 | ||||||
| 2500 | M03 | Break Room | 97 | 9 | STANDARD | CONC | VNL 1,2,3 | - | RB1 | 1 | X | X | |||
| 2500 | M04 | Head | 54 | 5 | STANDARD | CONC | CFT1 | - | CB1 | 1 | 1 | X | |||
| 2500 | M05 | Supervisor Office | 75 | 7 | STANDARD | CONC | CT3 | - | RB1 | X | |||||
| 2500 | M06 | Storage Room | 97 | 9 | STANDARD | CONC | SC | - | RB1 | ||||||
| 2500 | M07 | Comm Room | 75 | 7 | STANDARD | CONC | SC | - | RB1 | ||||||
| 2500 | M08 | Warehouse | 1206 | 112 | STANDARD | CONC | SC | - | RB1 | X | |||||
| 2500 | M09 | Mechanical Room | 162 | 15 | STANDARD | CONC | SC | - | RB1 | ||||||
| 2500 | M10 | Electrical room | 65 | 6 | STANDARD | CONC | SC | - | RB1 | ||||||
| ENTRY CONTROL FACILITY (ECF) (2,800 SF) | |||||||||||||||
| 2700 | M01 | Vestibule | 86 | 8 | STANDARD | CONC | EM1/VNL1 | - | RB1 | ||||||
| 2700 | M02 | Waiting Area | 463 | 43 | STANDARD | CONC | VNL 1,2,3 | - | RB1 | X | |||||
| 2700 | M03 | Head | 65 | 6 | STANDARD | CONC | CFT1 | - | CB1 | 1 | 1 | X | |||
| 2700 | M04 | CGL | 43 | 4 | STANDARD | CONC | SC | - | RB1 | ||||||
| 2700 | M05 | Break Room | 258 | 24 | STANDARD | CONC | VNL 1,2,3 | - | RB1 | 1 | X | X | |||
| 2700 | M06 | Electrical Room | 122 | 11 | STANDARD | CONC | SC | - | RB1 | ||||||
| 2700 | M07 | COMM Room | 122 | 11 | STANDARD | CONC | SC | - | RB1 | ||||||
| 2700 | M08 | Mechanical Room | 241 | 22 | STANDARD | CONC | SC | - | RB1 | ||||||
| 2700 | M09 | Hallway | 226 | 21 | STANDARD | CONC | VNL 1,2,3 | - | RB1 | ||||||
| 2700 | M10 | ALT Security Control Center | 226 | 21 | STANDARD | RAF1 | RAF1 | - | RB1 | X | |||||
| 2700 | M11 | Control Center | 215 | 20 | STANDARD | CONC | VNL 1,2,3 | - | RB1 | X | |||||
| 2700 | M12 | Vestibule | 86 | 8 | STANDARD | CONC | EM1/VNL1 | - | RB1 | ||||||
| 2700 | M13 | Prefab Overwatch Guardboth | 22 | 2 | STANDARD | SP | SPF | - | RB1 | ||||||
| 2700 | M14 | Controlled Access Area | 172 | 16 | STANDARD | CONC | VNL 1,2,3 | - | RB1 | ||||||
| 2700 | M15 | Restricted Area Veh. Entrapment (Sally Port) | - | - | STANDARD | CONC | - | - | - |
| ROOM FINISH LEGEND | |
| ACT | Acoustical Ceiling Tile |
| CB | Ceramic Wall Base |
| CFT | Ceramic Floor Tile |
| CONC | Concrete |
| CT | Carpet Tile |
| CWT | Ceramic Wall Tile |
| EM | Entrance Mat |
| EXP | Exposed Structure |
| GLASS | Glass Door Assembly |
| GWB | Gypsum Wall Board |
| N | None |
| PT | Paint Color |
| RB | Rubber Wall Base |
| RAS | Raised Access Floor |
| RES | Resinous Flooring |
| SC | Sealed Concrete |
| SDT | Static Dissipative Tile |
| SPF | Sports Flooring |
| SF | Square Foot |
| ST | Stained Concrete |
| WC | Wall Covering |
| VNL | Vinyl Floor Sheeting |
File details come from the government source that posted it. Updated .