J-1502000 Facility Investment v2.3 revised Amendment 0003.pdf

PDF 2 MB Posted

Attached to
Base Operations Support (BOS) Services at U. S. Naval Support Activity (NSA) Naples, Italy and Outlying Areas
Solicitation number
N6247022R0008
Issued by

View the file

Other files

File Type Posted
J-0200000-10.c SAAR-N Sample Form for BOSC Amendment 0004.pdf PDF
J-1502000-39.a - HVAC Duct Cleaning Annual Scheduleb Amendment 0004.xlsx XLSX spreadsheet
Attachment F - Section F Deliverables Amendment 0004.pdf PDF
J-0200000 Management and Administration v2.7 Amendment 0004.pdf PDF
J-0200000-10.b. How to Request a Maximo Account Amendment 0004.pptx PPTX presentation
J-1501000-04.b Assets Inventory - DHA Amendment 0004.xlsx XLSX spreadsheet
J-0200000-10.a How to Purchase PKI to Access Maximo Amendment 0004.pptx PPTX presentation
J-1502000 Facility Investment v2.3 - Naples BOSC Amendment 0004.pdf PDF
J-0200000-13 ELINS 05.30.2023 Amendment 0004.xlsx XLSX spreadsheet
N6247022R0008 Amendment 0004.pdf PDF
J-1503030 Integrated Solid Waste Management v2.2 Amendment 0004.pdf PDF
J-3 Section B Supplies or Services and Prices.docx DOCX document
J-9 Pre-Proposal Conference and Site Visit Sign-In Sheets (Amendment 0003).pdf PDF
N6247022R0008 Amendment 0003.pdf PDF
J-0200000-13 ELINS revised Amendment 0003.xlsx XLSX spreadsheet
J-1 Past Performance Questionnaire (PPQ).doc DOC document
J-10 Pre-Proposal Conference Presentation (Amendment 0003).pdf PDF
J-2 Corporate Experience Project Data Sheet.docx DOCX document
J-1800000 J Environmental v2.1 revised Amendment 0003.pdf PDF
J-1503010 Custodial v2.5 revised Amendment 0003.pdf PDF
N6247022R0008 Amendment 0002.pdf PDF
J-7 Base Access Information Spreadsheet.xlsx XLSX spreadsheet
J-8 Site Visit Map.pdf PDF
N6247022R0008 Amendment 0001.pdf PDF
J-1503010-07.c Custodial Inventory - REGION and Other Commands.xlsx XLSX spreadsheet
J-1501000-04.a Assets Inventory - Region.xlsx XLSX spreadsheet
J-1800000 Environmental v2.1.pdf PDF
J-1606001 Water (Overseas).pdf PDF
J-4 Pre-Award Inquiry Form.xlsx XLSX spreadsheet
J-1503010-14 Non-Recurring Port Call Custodial Services.xlsx XLSX spreadsheet
J-1604000 Wastewater Ver 2.1.pdf PDF
J-0200000-04.a Hazardous Material Spill Report (Code Orange).pdf PDF
J-1502000-39.a HVAC Duct Cleaning Annual Schedule.xlsx XLSX spreadsheet
J-2 Corporate Experience Project Data Sheet.pdf PDF
J-1502000 Facility Investment v2.3.pdf PDF
J-0200000-04.b ICRA Template USNHNAPINST 6220.1.pdf PDF
J-1700000 Transportation v2.1.pdf PDF
J-1501000-03 Site Maps Naples BOS.pdf PDF
J-1503010-07.b Custodial Inventory - DoDEA.xlsx XLSX spreadsheet
J-0200000-05 SERVICE PROVIDER INFORMATION v1 - 2013-07-07.xlsx XLSX spreadsheet
J-1601000 Utility Management v2.0.pdf PDF
J-6 Antimafia Screening Attachment 2.pdf PDF
Attachment F - Section F Deliverables.pdf PDF
J-1601000-05 Utility Assets Inventory.pdf PDF
J-1502000-38.a Sample As Built Anchor Points (Bldg 402).pdf PDF
J-1502000-04 PM and IMP Services Matrix.xlsx XLSX spreadsheet
J-1503030 Integrated Solid Waste Management v2.2.pdf PDF
J-1503050 Grounds Maint and Landscaping v2.6.pdf PDF
J-0200000-06 ASSET INFORMATION v2 - 2017-04-26.xlsx XLSX spreadsheet
J-3 Section B Supplies or Services and Prices.pdf PDF
Show 40 more

Latest 50 of 72 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SECTION J – 1502000

FACILITY INVESTMENT

DOCUMENTS, EXHIBITS, AND OTHER ATTACHMENTS

TABLE OF CONTENTS

ATTACHMENT

NUMBER

ATTACHMENT TITLE

J-1502000-01 DEFINITIONS AND ACRONYMS

J-1502000-02 REFERENCES AND TECHNICAL DOCUMENTS

J-1502000-03 FACILITIES DESCRIPTION

J-1502000-04 PREVENTIVE MAINTENANCE (PM) PROGRAM AND INTEGRATED MAINTENANCE

PROGRAM (IMP) SERVICES MATRIX

J-1502000-05 ANTICIPATED SERVICE ORDERS

J-1502000-06 SAMPLE OF PROJECT WORK ORDERS

J-1502000-07 DIRECT DIGITAL CONTROL (DDC) SYSTEMS DESCRIPTION

J-1502000-07.a DIRECT DIGITAL CONTROL (DDC) SYSTEM CHECKLIST

J-1502000-08 EXHAUST HOODS AND DUCTS

J-1502000-09 GROUNDING SYSTEMS FOR INCOMING ELECTRICAL SUBSTATIONS

J-1502000-10 LIGHTNING ARRESTORS AND GROUNDING SYSTEMS

J-1502000-11 MEDIUM VOLTAGE (MV) BREAKERS

J-1502000-11.a MV BREAKERS LOCATION MAPS AND SINGLE-LINE DIAGRAMS

J-1502000-11.b SAMPLE POWER OUTAGE SCHEDULE

J-1502000-12 AIR EXHAUST SYSTEMS

J-1502000-13 AUTOMATED DOORS

J-1502000-14 EMERGENCY HOSPITAL AUXILIARY GENERATOR SYSTEMS

J-1502000-15 BOILERS AND UNFIRED PRESSURE VESSELS (UPVS) EQUIPMENT AND SYSTEMS

J-1502000-16 CARBON MONOXIDE (CO) DETECTION SYSTEMS

J-1502000-17 COMPRESSED AND MEDICAL AIR, GAS AND VACUUM SYSTEMS

J-1502000-18 EMERGENCY AND EXIT LIGHTING SYSTEMS

J-1502000-19 EMERGENCY EYEWASH AND SHOWER STATIONS

J-1502000-20 ELECTRICAL SYSTEMS

J-1502000-21 ELECTRONIC SECURITY SYSTEMS

J-1502000-22 FIRE PROTECTION SYSTEMS

J-1502000-23 FOOD SERVICE EQUIPMENT

J-1502000-24 GATES AND OVERHEAD AND ROLL-UP DOORS

J-1502000-25 INTERNAL WATER TREATMENT SYSTEMS

J-1502000-25.a SAMPLE OF WATER TESTS FORM

J-1502000-26 ISOLATION ROOMS

J-1502000-27 HVAC AND REFRIGERATION SYSTEMS

J-1502000-27.a OPERATING LOG SAMPLE FORM FOR CHILLERS

J-1502000-28 MOISTURE DETECTION SYSTEMS

J-1502000-29 PUBLIC ADDRESS (PA), NURSE CALL AND CODE BLUE SYSTEMS

J-1502000-30 REFRIGERATION SYSTEMS

J-1502000-31 SUMP PUMPS

J-1502000-32 UNINTERRUPTED POWER SYSTEMS (UPS)

J-1502000-33 VERTICAL TRANSPORTATION EQUIPMENT (VTE) AND SYSTEMS

J-1502000-34 KITCHEN EXHAUST HOODS AND DUCTS (CLEANING)

J-1502000-35 ELECTRICAL RECEPTACLES

J-1502000-36 FIRE DOORS AND FIRE WALLS

J-1502000-37 UNDER GROUND (UG) FUEL OIL STORAGE TANKS

J-1502000-38 FALL PROTECTION SYSTEMS FOR FACILITIES AND STRUCTURES

J-1502000-38.a SAMPLE AS BUILT ANCHOR POINTS (BLDG 402)

J-1502000-39 HVAC DUCT SYSTEMS

J-1502000-39.a HVAC DUCT SYSTEMS ANNUAL INSPECTING, CLEANING AND DISINFECTING

SCHEDULE

J-1502000-40 GUTTERS AND DOWNSPOUTS

ATTACHMENT J-1502000-01

DEFINITIONS AND ACRONYMS

DEFINITION DESCRIPTION

Crane, Category 1 Portal cranes, Hammerhead cranes, Locomotive cranes, Derricks, Floating cranes

(YD), Tower cranes, Container cranes, Mobile cranes (except those indicated as category 4), including truck, cruiser, crawler, warehouse/industrial cranes, and cranes used for dragline, pile driving, clamshell, magnet, bucket work, and Aircraft crash cranes.

Crane, Category 2 & 3 Cranes with rated capacities of 20,000 pounds or greater are category 2. Examples are

Overhead traveling cranes, Gantry cranes (rail mounted), Wall cranes, Jib cranes, Pillar cranes, Pillar jib cranes, Monorails and associated hoists, Fixed hoists including chain falls. Pedestal mounted commercial boom assemblies (fixed length, telescoping, and articulating types) attached to stake trucks, trailers, flatbeds, or railcars, or stationary mounted to piers, etc., with OEM rated capacities less than 2,000 pounds.

Crane, Category 4 Commercial truck mounted cranes, Truck mounted articulating boom cranes, Pedestal mounted commercial boom assemblies (fixed length, telescoping, and articulating types) attached to stake trucks, trailers, flatbeds, or railcars, or stationary mounted to piers, etc., with OEM rated capacities of 2,000 pounds and greater. Commercial truck mounted cranes and truck mounted articulating boom cranes with OEM capacities of

2,000 pounds and greater require a licensed operator even if the cranes are down rated below 2,000 pounds capacity for administrative purposes.

Equipment, Collateral Encompasses built-in and large substantially affixed equipment/property that is normally acquired and installed as part of a facility project.

Equipment, Installed Encompasses building-type equipment, built-in equipment, and large, substantially affixed equipment/property, and is normally acquired and installed as part of a facility project. Installed equipment is normally required to make a facility useful and operable. Removing such equipment would impair the usefulness, safety, or environment of the facility or the facility restoration work required after its removal, is substantial.

Equipment, Personal

Property

Personal property equipment includes all equipment other than collateral equipment.

Such equipment, when acquired and used in a facility or a test apparatus, can be severed and removed aster erection or installation without substantial loss of value or damage thereto or to the premises where installed.

Facilities Life Cycle A facilities life cycle is divided into four stages, requirements (planning and design), acquisition (construction and acceptance), stewardship (operations, maintenance and repair), and disposal.

Facilities Maintenance

Management

The planning, prioritizing, organizing, controlling, reporting, evaluating, and adjusting of facilities maintenance operations to support the CNO/NAVFAC facilities policy and objectives and satisfy customers’ facility needs. Defined by the International Facility

Management Association as “the practice of coordinating the physical workplace with the people and work of the organization.”

Integrated Maintenance

Program (IMP)

IMP is a recurring state-of-the-art, reliability-centered inspection, testing, maintenance and repair program that determines best practices for managing the functions and consequences of failures of facilities equipment and system components. IMP encompasses accepted commercial practices, including reactive, preventive, predictive and proactive maintenance, into one optimal program. The IMP approach gives the

Contractor full responsibility to maintain systems and equipment and perform repairs whenever necessary to ensure equipment and systems are operational and remain in a constant state of readiness. Service Orders will not be issued for accomplishment of repairs on systems and equipment maintained under IMP.

Life-Cycle Costs A form of economic analysis that considers the total cost of owning, operating, and maintaining a building or system over its useful life.

DEFINITION DESCRIPTION

Maintenance, Preventive

Maintenance designed to increase the availability of the facilities/equipment by reducing the number of unexpected breakdowns or service interruptions. It is any planned maintenance activity that improves equipment life and avoid any unplanned maintenance requirements.

Management

Information Systems-

Maintenance

A computerized system that will provide sufficient information for management to evaluate differences between budgets and actual costs and evaluate performance.

Repair Repair is the restoration of facilities or equipment to such a condition that it may be effectively utilized for its designated purposes by overhaul, reconstruction, or replacement of constituent parts or materials which have deteriorated by action of the elements or usage, and which have not been corrected through maintenance. This term also applies to replacement of the entire unit or system if beyond economical repair.

The intent of repair is to have the equipment at normal working condition.

Replacement Replacement, as a distinct work element, is confined to a program of planned replacement of a facility or its components. It may be further limited to major components such as air conditioning compressors, furnaces or hot water heaters.

Replacement is performed when the equipment has reached the end of its useful life;

when it no longer can perform due to degradation of its internal components and repair is no longer cost effective. Included under the replacement would be the major rebuilding of any component, since rebuilding also restores performance.

Restoration Restoration of real property to such a condition that it can be used for its intended purpose. Includes repair or replacement work to restore facilities damaged by inadequate sustainment, excessive age, natural disaster, fire, accident or other causes.

Sustainment Maintenance and repair activities necessary to keep a typical inventory of facilities in

“normal working condition”. Sustainment includes regularly scheduled maintenance as well as cyclical major repairs or replacement of components that occur periodically over the expected service life of the facilities.

Weight Handling

Equipment (WHE)

Weight handling equipment consists of cranes (e.g., portal cranes, jib cranes), rigging gear (e.g., slings, shackles), and associated equipment (e.g., portable hoists, dynamometers).

ACRONYM TITLE

ACO Administrative Contracting Officer

BPVC Boiler and Pressure Vessel Code

BW Biweekly

CDR Contract Discrepancy Report

CIA Controlled Industrial Area

CMMS Computerized Maintenance Management System

COR Condition of Readiness

DBH Diameter at Breast Height

DoD Department of Defense

DoN Department of Navy

DRMO Defense Reutilization Management Office

EPA Environmental Protection Agency

EPCRA Emergency Planning and Community Right-to-Know Act

FAR Federal Acquisition Regulation

FFP Firm Fixed Price

FIFRA Federal Insecticide, Fungicide, and Rodenticide Act

FSC Facility Support Contract

GFE Government-furnished Equipment

GFF Government-furnished Facilities

GFM Government-furnished Materials

GPWS Guide Performance Work Statements

HCA Head Contracting Agency

HVAC Heating, Ventilation, and Air Conditioning

ICAP Infrastructure Condition Assessment Program

ICP Integrated Contingency Plan

IDIQ Indefinite Delivery Indefinite Quantity

IFLOLS Improved Fresnel Lens Optical Landing System

IPM Integrated Pest Management

IPMIS Integrated Pest Management Information System

IPMP Integrated Pest Management Plan

KO Contracting Officer

LAN Local Area Network

M Monthly

MSDS Material Safety Data Sheets

NFPA National Fire Protection Association

NAVFAC Naval Facilities Engineering Command

NMCI Navy Marine Corps Intranet

NOSC Navy-On-Scene Coordinator

PAP Performance Assessment Plan

PAR Performance Assessment Representative

PAW Performance Assessment Worksheet

PEO Program Executive Officer

PM Project Manager

PRCSP Permit Required Confined Space Program

PWS Performance Work Statement

Q Quarterly

QC Quality Control

RPIE Real Property Inventory Equipment

SC Security Clearances

SCADA Supervisory Control And Data Acquisition

ACRONYM TITLE

SM Semimonthly

SOP Standard Operating Procedures

SPAR Senior Performance Assessment Representative

SRM Sustainment, Restoration and Modernization

TE Technical Evaluation

UFC Unified Facilities Criteria

UPV Unfired Pressure Vessel

VIQ Variation in Quantity

WBS Work Breakdown Structure

ATTACHMENT J-1502000-02

REFERENCES AND TECHNICAL DOCUMENTS

The Contractor shall adhere to the applicable portions of the following publications and directives in performing the services required under this contract. This list shall not be considered all-inclusive and does not release the

Contractor from all obligations that must be fulfilled in the observance and execution of this contract.

When U.S., European and/or Italian directives, instructions and industry standards are applicable to the work to be performed under this contract, the most stringent directives, instructions and industry standards shall govern.

REFERENCE TITLE

DM 1 March 1974 Norme per l'Abilitazione alla Conduzione di Generatori di Vapore

DPR 162/99 Norme per l’attuazione delle direttive 95/16/CE e 2006/42/CE (Ascensori e

Montacarichi)

CEI EN 50110-1 Operation of Electrical Installations

CEI 11-27 Lavori su Impianti Elettrici

UFC 3-410-01 Heating, Ventilating, and Air Conditioning Systems

UFC 3-410-06 Operation and Maintenance: Central Heating Plants

UFC 3-430-07 Operations and Maintenance: Inspection and Certification of Boilers and Unfired

Pressure Vessels

UFC 3-550-01 Exterior Electrical Power Distribution

UFC 3-560-01 Electrical Safety O&M

UFC 3-570-06 Cathodic Protection

UFC 3-600-02 Operations and Maintenance: Inspection, Testing, and Maintenance of Fire

Protection Systems

NAVMED P-5010-4 Manual of Naval Preventive Medicine

OSHA Occupational Safety and Health – Laws and Regulations

Technical Manual (OTM)

OSHA Instruction TED 01-00-015, Section III: Chapter 7, Legionnaires’ Disease

UNI EN 81-1 Safety rules for the construction and installation of lifts – Part 1 : Electric lifts

UNI EN 81-2 Safety rules for the construction and installation of lifts – Part 2 : Hydraulic lifts

SIEMENS O&M Operation and Maintenance of Telemetry Alarm System Manual

NAVFAC P-717 Preventive/Recurring Maintenance Handbook

NAVFAC MO-114 Building Maintenance

NAVFAC MO-115 Systems Maintenance Refrigeration

NAVFAC MO-118 Inspection of Vertical Transportation Equipment

NAVFAC MO-119 Building Maintenance; Galley Equipment

NAVFAC MO-200 Facilities Engineering Electrical Exterior Facilities

NAVFAC MO-206 Operation and Maintenance of Air Compressor Plants

NAVFAC MO-209 Maintenance of Steam, Hot Water and Compressed Air Distribution Systems

NAVFAC MO-210 Maintenance & Operation of Water Supply System, Treatment & Distribution

Systems

NAVFAC MO-220 Maintenance and Operation of Gas Systems

NAVFAC MO-225 Industrial Water Treatment

NAVFAC MO-324 Inspection and Certification of Boilers and Unfired Pressure Vessels

NAVFAC MO-912 Standard for Ventilation Control and Fire Protection of Commercial Cooking

Operations

NAVFACINST 11300.37 Energy and Utilities Policy Manual

NEC National Electrical Code

NESC National Electrical Safety Code

NFPA National Fire Protection Agency Standards

NFPA Standard 25 Standard for the Inspection, Testing, and Maintenance of Water-Based Fire

Protection Systems

REFERENCE TITLE

NFPA Standard 96 Standard for Ventilation Control and Fire Protection of Commercial Cooking

Operations

NFPA Standard 99 Standards for Health Care Facilities

ASME BPVC VI 1998 American Society of Mechanical Engineers, Boiler & Pressure Vessel Code

MIL-HDBK-1152 Inspection & Certification of Boilers & Unfired Pressure Vessels

OPNAVINST 5090.1 Environmental Readiness Program Manual

ASHRAE American Society of Heating, Refrigerating and Air Conditioning Engineers

ATTACHMENT J-1502000-03

FACILITIES DESCRIPTION

The Facilities Description file is provided as a separate attachment. Refer to Excel file “J-1502000-03 Facilities

Description”.

ATTACHMENT J-1502000-04

PREVENTIVE MAINTENANCE (PM) PROGRAM AND INTEGRATED MAINTENANCE PROGRAM (IMP)

SERVICES MATRIX

The Preventive Maintenance (PM) Program and Integrated Maintenance Program (IMP) Services Matrix is provided as a separate attachment. Refer to Excel file “J-1502000-04 PM and IMP Services Matrix”.

ATTACHMENT J-1502000-05

ANTICIPATED SERVICE ORDERS

Service Order

Classification

Service Order

Type

Estimated

Annual

Quantity

Limit of Liability

(Labor & Material)

FUNDING ACTIVITY: REGION

Emergency I 40 $ 350

II 45 $ 800

III 12 $ 1,500

IV 6 $ 2,500

V 6 $ 3,500

Urgent I 15 $ 350

II 45 $ 800

III 12 $ 1,500

IV 6 $ 2,500

V 6 $ 3,500

Routine I N/A N/A

II 15 $ 800

III 12 $ 1,500

IV 6 $ 2,500

V 6 $ 3,500

FUNDING ACTIVITY: Defense Health Agency

Emergency I N/A N/A

II

Urgent I 10 $ 350

II 5 $ 1,000

Routine I N/A N/A

II

ATTACHMENT J-1502000-06

ANTICIPATED PROJECT WORK ORDERS

Project Work

Orders Level

Estimated

Annual

Quantity

Limit of Liability

(Labor & Material)

FUNDING ACTIVITY: REGION

1 4 $ 10,000

2 2 $ 25,000

FUNDING ACTIVITY: Defense Health Agency

1 1 $ 30,000

2 N/A N/A

ATTACHMENT J-1502000-07

DIRECT DIGITAL CONTROL (DDC) SYSTEMS

The Contractor shall develop a PM program (Region funded) for the Direct Digital Control (DDC) Systems software and firmware only. Region funded DDC System is a Honeywell proprietary system, model EBI System (R500.1).

It includes approximately 156 CPUs, 60 CPU Expansions and 2 Servers. Only CPU expansion in the panelboard are part of the contract. Those in the false ceiling are not included. See J-1502000-07.a for required checklist and deliverable details.

The Contractor shall develop and implement an IMP (Defense Health Agency funded) for the Direct Digital Control

(DDC) Systems and all mechanically and electrically interlocked ancillary parts, equipment, and components of the

DDC Systems, such as: Control Units, CPU, UPS, LON Interface, Thermostats, Temperature Probes, Control Air

Compressors, etc.

Defense Health Agency funded DDC System provides ventilation and conditioned air to critical hospital and patient treatment rooms, monitors critical laboratory exhaust and isolation rooms and is considered critical to life and health of patients. System shall be monitored 24 hours a day. This is an ICS partner of Schenider Electric proprietary system - Satchewell has been delegated in support for the territory of Italy. It includes approximately 73 DDC units complete with UPS - 7 Temperature Probes and 9 Thermostats in Bldg. 2086, and 308 Temperature Probes and 12

Thermostats in Bldg. 2082. Network Maps will be provided after contract award.

ATTACHMENT J-1502000-07.a

DIRECT DIGITAL CONTROL (DDC) SYSTEM CHECKLIST

Checkpoints Check Box

Initial Honeywell EBI Upgrade patches Six: ___ ___ ___ ___ ___ ___

Back-up Honeywell EBI Databases on DVD and provide to Contracting Officer's Representative Six: ___ ___ ___ ___ ___ ___

Check Honeywell C-Bus communication (HVAC) Three: ___ ___ ___

Check Client Honeywell EBI Three: ___ ___ ___

Install Honeywell EBI standard patches/upgrades Six: ___ ___ ___ ___ ___ ___

Ghost of Honeywell EBI system Three: ___ ___ ___

Control of the Honeywell EBI Server energy Six: ___ ___ ___ ___ ___ ___

Check of the Honeywell C-BUS data traffic Three: ___ ___ ___

Technical support third party interfaces Six: ___ ___ ___ ___ ___ ___

Check database sol Honeywell IRC controls Three: ___ ___ ___

Diary of Maintenance Six: ___ ___ ___ ___ ___ ___

Update Documentation Six: ___ ___ ___ ___ ___ ___

Check Communication of OPC (Modbus/Protocols) Three: ___ ___ ___

A copy of the required above Checklist is due to the Contracting Officer upon completion of the maintenance cycle and included with the Diary of Maintenance performed at each visit.

Update of Documentation is due within 10 calendar days of the performed maintenance cycle and included with the Diary of Maintenance and Checklist

ATTACHMENT J-1502000-08

EXHAUST HOODS AND DUCTS

The Contractor shall develop and implement a PM program for the exhaust hoods and ducts and all mechanically and electrically interlocked ancillary parts, equipment, and components such as: filters, fans, fan housing, plenums, grease removal devices, waterproof covers, access panels, motors, cable, retainers, ducts, baffles, full length of ventilation ducts, etc. The below list is provided to give a general sense of the magnitude of work but may not include all assets required to be maintained.

FUNDING ACTIVITY: Defense Health Agency

BLDG NO. /

LOCATION

DESCRIPTION

QTY

(ea.)

GRICIGNANO SUPPORT SITE

2082 / Hospital /

Room 1168

Exhaust Hood, Kitchen / Brand: Rosenberg; Model A26-71040 D14.12)VW710-

6D (EF

2082 / Hospital /

Room 1177

ATTACHMENT J-1502000-09

GROUNDING SYSTEMS FOR INCOMING ELECTRICAL SUBSTATIONS

Grounding systems for incoming electrical substation commence at, and includes the utility isolation point of connection and terminate at foundation. The Contractor shall develop and implement an Inspection, Testing and

Certification program for grounding systems and all mechanically and electrically interlocked ancillary parts, equipment, and components such as: brakes, cables, circuit breakers, frequency drives, hoist, hooks, inverters, latches, surge suppressors, trackage, transformers, motors, wiring, monitoring and controls systems, conductors, bonding, ground rods, air terminals, etc. The below list is provided to give a general sense of the magnitude of work but may not include all assets required to be maintained.

TYPE OF SYSTEM LOCATION

UTILITIES

LOCATION

Grounding System for Utilities

Electrical Distribution, Capodichino

Bldg. 409, Capodichino Main Substation and downstream Substations (see layout below – 16 ea.

SS Substations + 409/411 = 18 Total

Capodichino:

CAPODI-ED00

Grounding System for Utilities

Electrical Distribution, Carney Park

Bldg. SS-560, Carney Park Main Substation and downstream Substation, Golf Course (see layout below)

Carney Park:

CARPAR-ED02

Grounding System for Utilities

Electrical Distribution, Lago Patria

Bldg. ED-05, Lago Patria Main Substation and downstream Substations, SS-1, SS-2 (see layout below)

Lago Patria: N/A

GROUNDING SYSTEMS FOR INCOMING ELECTRICAL SUBSTATIONS - Cont.

ATTACHMENT J-1502000-10

LIGHTNING ARRESTORS AND GROUNDING SYSTEMS

Lightning arresting and grounding systems commence at, and includes the utility isolation point of connection and terminate at foundation. The Contractor shall develop and implement an Inspection, Testing and

Certification program for the lighting arrestors and grounding systems and all mechanically and electrically interlocked ancillary parts, equipment, and components such as: brakes, cables, circuit breakers, frequency drives, hoist, hooks, inverters, latches, surge suppressors, trackage, transformers, motors, wiring, monitoring and controls systems, conductors, bonding, ground rods, air terminals, etc. The below schematics of the grounding system is provided to give a general sense of the magnitude of work but may not include all assets required to be maintained.

LOCATION: BLDG 2082 - HOSPITAL - GRICIGNANO SUPPORT SITE

LOCATION: BLDG 2086 - ENERGY BUILDLING - GRICIGNANO SUPPORT SITE

Schematics of grounding system for Bldg 2086 will be made available after contractor award.

ATTACHMENT J-1502000-11

MEDIUM VOLTAGE (MV) BREAKERS

The Contractor shall develop and implement a PM for the MV Breakers and all mechanically and electrically interlocked ancillary parts, equipment, and components, such as: main disconnects, secondary disconnects, medium-voltage circuit breaker contact assemblies, auxiliary contact assemblies, arc chutes, overcurrent protective devices, circuit breakers, etc. The below list is provided to give a general sense of the magnitude of work but may not

BLDG NO. NOTES MANUFACTURER

QTY

(ea.)

EQUIPMENT MODEL

1 SF6 circuit breaker Sepam S41

1 Protection relay 800A SF1 SM6

7 Venus circuit breaker 1250A 24GL31 Venus

2 Venus circuit breaker 1250A 24GL31 Venus

2 Circuit breaker (spare) Sepam S62

4 Circuit breaker (spare) Sepam S42

2 Merlin Gerin circuit breaker 630A SF1 type1 SF6

2 Protection relay Sepam S42

2 Load break switch SM6 Type IM

1 F6 circuit breaker 400A SF set

1 protection relay VIP 17

2 Merlin Gerin circuit breaker 630A SF1 type1 SF6

2 protection relay Sepam S20E

2 load break switch SM6 Type IM

1 SF6 circuit breaker SF set

1 protection relay VIP 17

1 Merlin Gerin circuit breaker 630A SF1 type1 SF6

1 Potection relay Sepam S20E

2 Merlin Gerin circuit breaker 630A SF1 type1 SF6

2 Protection relay Sepam S20E

2 Load break switch SM6 Type IM

3 Circuit breaker HD4

3 Protection relay PR 512

2 Merlin Gerin circuit breaker 630A SF1 type1 SF6

2 Protection relay Sepam S20E

2 Load break switch SM6-24 DM1-A

1 Circuit breaker HAD

1 Protection relay PR 512

2 Merlin Gerin circuit breaker 630A SF1 type1 SF6

2 Protection relay Sepam S20E

2 Load break switch SM6-24 DM1-A

1 Merlin Gerin circuit breaker 630A SF1 type1 SF6

1 Protection relay Sepam S20E

1 Merlin Gerin circuit breaker 630A SF1 type1 SF6

1 Protection relay VIP 17

1 Circuit breaker 630A SF1 type1 SF6

1 Protection relay SF6 Sepam S41

1 Disconnect breaker SM6

2 Merlin Gerin circuit breaker 630A SF1 type1 SF6

2 Protection relay Sepam S20E

2 load break switch SM6-24 DM1-A

1 VOR circuit breaker MG500

1 Load break switch UNICAM R

1 load break switch SM6-24 DM1-A

SS-5 Loop Schneider Electric

443-ES 443 ITI/NGM

415-ES 415 Magrini Galileo

430-PVES 430-Fot. Schneider Electric

SS-4 Loop Schneider Electric

403-ES 403 Schneider Electric

SS-3 Loop Schneider Electric

407-ES 407 ABB

SS-2 Loop Schneider Electric

406-ES

Serving Bldg #'s 405 and

ABB

412-ES 412 Merlin Gerin

404-ES 404 Schneider Electric

401-ES

Serving Bldg #'s 467, 468, 401, and 430 Merlin Gerin

SS-1 Loop Schneider Electric

411 Main Distribution Schneider Electric

SS-1A Loop Schneider Electric

FUNDING ACTIVITY: REGION

CAPODICHINO

409 Main Substation Schneider Electric

(ea.)

EQUIPMENT MODEL

1 Merlin Gerin circuit breaker 630A SF1 type1 SF6

1 Protection relay Sepam S20E

1 load break switch SM6-24 DM1-A

440-SS-6 loop Schneider Electric 2 Load break switch SM6 Type IM

1 circuit breaker 630A SF1 type1 SF6

1 load break switch SM6-24 DM1-P

1 Protection relay Sepam S40

1 Merlin Gerin circuit breaker 630A SF1 type1 SF6

1 load break switch SM6-24 DM1-P

1 Protection relay Sepam S40

1 Merlin Gerin circuit breaker 630A SF1 type1 SF6

1 load break switch SM6-24 DM1-P

1 Drotection relay Sepam S40

3 Load break switch SM6 Type IM

1 Protection relay Sepam S20 CEI 0.16

1 Load break switch SM6 type DM1C

2 Circuit breaker 630A SF1 type1 SF6

2 load break switch SM6-24 DM1-A

2 Protection relay Vip 37

2 Circuit breaker HD4

2 Protection relay PR 521

2 Merlin Gerin circuit breaker 630A SF1 type1 SF6

2 Protection relay Sepam S20E

2 load break switch SM6-24 DM1-A

2 SF6 circuit breaker SF set

2 Protection relay VIP 13

2 Merlin Gerin circuit breaker 630A SF1 type1 SF6

2 Schneider protection relay Sepam S20E

2 load break switch SM6-24 DM1-A

1 Merlin Gerin circuit breaker 630A SF1 type1 SF6

1 Protection relay Sepam S20E

3 Load break switch SM6 Type IM

2 Protection relay Sepam S20. CEI 0.16

2 Load break switch SM6 type DM1C

1 Circuit breaker SF6 set

1 Protection relay VIP 17

1 Circuit breaker SF6

1 Protection relay VIP 17

1 Load break switch UNICAM R

2 Merlin Gerin circuit breaker 630A SF1 type1 SF6

2 Protection relay Sepam S20E

2 Load break switch SM6-24 DM1-A

1 SF6 circuit breaker SF set

1 Protection relay VIP 13

1 Circuit breaker HAD

1 Protection relay PR 512

1 Merlin Gerin circuit breaker 630A SF1 type1 SF6

1 Protection relay Sepam S20E

1 load break switch SM6-24 DM1-A

1 Merlin Gerin circuit breaker 630A SF1 type1 SF6

1 Protection relay Vip 37

2 Load break switch SM6-24 DM1-A

2 Merlin Gerin circuit breaker 630A SF1 type1 SF6

2 Protection relay Sepam S20E

2 Load break switch SM6-24 DM1-A

1 Circuit breaker HAD-DX

1 Protection relay PR 512

2 Merlin Gerin circuit breaker 630A SF1 type1 SF6

2 Protection relay Sepam S20E

2 Load break switch SM6-24 DM1-A

1 Merlin Gerin circuit breaker 630A SF1 type1 SF6

1 protection relay Sepam S20E

FUNDING ACTIVITY: REGION

CAPODICHINO

433-ES 433 Schneider Electric

446 ES 446 ABB

SS-16 Loop Schneider Electric

449 ES 449 Schneider Electric

SS-15 Loop Schneider Electric

457 ES 457 ABB

SS-14 Loop Schneider Electric

SS-13 Loop Schneider Electric

448 ES

Serving Bldg #'s 448 and

Schneider Electric

459 ES 459 Schneider Electric

461 ES 461 Messina/NMG

463-ES 463 Schneider Electric

SS-12 Loop Schneider Electric

450-ES

Serving Bldg #'s 450, 451, 452, and 453 Schneider Electric

SS-10 Loop Schneider Electric

442B-ES 442B TrA, TrB ABB

SS-9 Loop Schneider Electric

440-SS-7 loop Schneider Electric

SS-8 loop Schneider Electric

440-USS-2 440 Schneider Electric

440-USS-3 440 Schneider Electric

447-ES 447 Schneider Electric

440-USS-1 440 Schneider Electric

(ea.)

EQUIPMENT MODEL

4 Circuit breaker 630A SF1 type1 SF6

1 Protection relay Sepam S41

3 Protection relay Sepam S20E

Golf course electrical substation

Golf course Messina/NMG 1 Load break switch UNICAM R - SVT-R

3 Merlin Gerin circuit breaker 630A SF1 type1 SF6

3 Protection relay Sepam S41E

3 Load break switch + fuse SM6-24 DM1-A

1 Merlin Gerin circuit breaker 630A SF1 type1 SF6

1 Protection relay Sepam S40

2 Load break switch 630 A IMS

1 Merlin Gerin circuit breaker 630A SF1 type1 SF6

1 Protection relay Sepam S40

2 Load break switch 630 A IMS

SS-2 Loop+tr Schneider Electric

FUNDING ACTIVITY: REGION

LAGO PATRIA (SATCOM)

ED05

Enel incoming main distribution Schneider Electric

SS-1 Loop+tr Schneider Electric

CARNEY PARK

SS-560

Enel incoming main distribution Schneider Electric

ATTACHMENT J-1502000-11.a

MEDIUM VOLTAGE (MV) BREAKERS Cont.

The MV Breakers location maps and single-line diagrams are provided as a separate attachment. Refer to PDF file

“J-1502000-11.a MV Breakers Location Maps and Single-Line Diagrams”.

ATTACHMENT J-1502000-11.c

MEDIUM VOLTAGE (MV) BREAKERS Cont.

A sample of power outage schedule is provided as a separate attachment. Refer to Excel file “J-1502000-11.b

Sample Power Outage Schedule”.

ATTACHMENT J-1502000-12

AIR EXHAUST SYSTEMS

The Contractor shall develop and implement an IMP for the air exhaust systems and all mechanically and electrically interlocked ancillary parts, equipment, such as: fans, ductwork, air filters, plenums, and air outlets, etc.

The below list is provided to give a general sense of the magnitude of work but may not include all assets required to be maintained.

Bldg No. System Description Manufacturer/

Model Technical Specification

Qty

(ea.)

719 Air Exhaust Fan, Roof-Type 1

752 Air Exhaust Fan 1 HP 2

Air Exhaust Fan Q=100cum/h - Pa 60 - 18w - with timer 1

Air Exhaust Fan DYNAIR Tower-type, duct work system, 400 cu mt/hr, 0.15kW, 350x150 mm joints 1

Exhaust Fan w/Speed Regulator VORTICE Q=300cum/h - Pa 80 - 0.15kw 1

Ductwork System 250X150mm sect. w/ 3ea 200X100mm grid 1

757 Air Exhaust System ASPIRA 10/4", IPX4, 230V 50hz, 21W, 80 cu mt/hr 4

Exhaust Fan Unit ASPIRA 15LT/220V 2

Exhaust Tower VORTICE 15LT/220V 1

FUNDING ACTIVITY: REGION

GAETA (Fleet Landing)

GAETA (Old Mill Inn)

Not Identified

752A

ATTACHMENT J-1502000-13

AUTOMATED DOORS

The Contractor shall develop and implement an IMP for automated doors and all mechanically and electrically interlocked ancillary parts, equipment, and components, such as: sensors, switches, weather-stripping, pulleys, belts, controllers, engines, motors, controllers, hangers, stoppers, locks, and adapters There are approximately 30 automated doors, single and double sliding, and single and double swing. The below floor plans are provided to give a general sense of the magnitude of work but may not include all assets required to be maintained.

AUTOMATED DOORS - Cont.

AUTOMATED DOORS - Cont.

ATTACHMENT J-1502000-14

EMERGENCY HOSPITAL AUXILIARY GENERATOR SYSTEMS

Emergency hospital auxiliary generator systems commence at and include the utility isolation point of connection. The Contractor shall develop and implement an IMP for emergency hospital auxiliary generator systems and all mechanically and electrically interlocked ancillary parts, equipment, and components, such as:

batteries, fuel tanks, generator, inverters, rectifiers, regulators, prime mover, pumps, piping, automatic transfer switches (ATS), switchgear, meters, monitoring and control systems, uninterruptible power supply, wiring, programing logic control (PLC), redundant gen-set control panel (RGCP) etc. The below list is provided to give a general sense of the magnitude of work but may not include all assets required to be maintained.

LOCATION

DESCRIPTION

QTY

(ea.)

GRICIGNANO SUPPORT SITE

2082 / Hospital Generator Set / Caterpillar, 3500b, 800kw / 100v / 1500a 3

Chillers Battery Charger / SICES Automazione 3/400 24 VCC 20A

ATTACHMENT J-1502000-15

BOILERS AND UNFIRED PRESSURE VESSELS (UPVS) EQUIPMENT AND SYSTEMS

Boiler and Unfired Pressure Vessels (UPVs) equipment and systems commence at and include the utility isolation point of connection and terminate at the steam/hot water point of delivery. The Contractor shall develop and implement an IMP for the Boiler and Unfired Pressure Vessels (UPVs) equipment and systems and all mechanically and electrically interlocked ancillary parts, equipment, and components, such as: burners, heat exchangers, flash tanks, meters, pressure vessel, pumps, piping, valves, steam regulating valves, steam traps, distribution lines, insulation, chemical feed system, condensation return lines, condensate meters, monitoring and controls systems, etc. The IMP shall include Seasonal Start-Up and Shutdown, Testing and Treatment Services, Inspection, Testing, and Certification and Boiler Air Emission Testing. The below list is provided to give a general sense of the magnitude of work but may not include all assets required to be maintained.

FUNDING ACTIVITY: REGION

LOCATION: GAETA (Old Mill Inn)

Bldg No.

Main Tenant /

Facility

Description

Location Equipment

Description Manufacturer

Model No./

Type

Technical

Specification

Qty

(ea.)

707 MWR Recreational

Bldg - Open Mess

External BOILER (Gas

Burned)

RBL 456400 BTU/hr 100 P/4 1

External WATER HEATER

(Gas Burned)

VAILLANT TurboMAG 16 ltrs per min.

LOCATION: GRICIGNANO SUPPORT SITE

BLDG NO. /

LOCATION

DESCRIPTION

QTY

(ea.)

2086 / Energy

Building

Boiler (Steam) - Thermal / THE/Q 1300 3S / 1300 Kw / 3

Boiler Feed Pump / Grundfos NK80-160/175A 3

Boiler Circulating Pump / Grundfos TP-80-90/4 2

Boiler Hot Water Tank / Junker, Temp 90° press 8 bar HW 4000 2

ATTACHMENT J-1502000-16

CARBON MONOXIDE (CO) DETECTION SYSTEMS

The Contractor shall develop and implement an IMP for Carbon Monoxide (CO) detection equipment and systems and all mechanically and electrically interlocked ancillary parts, equipment, and components, such as: notifiers, control panels, annunciators, alarms, detectors, switches, circuits, transmitters, relays, wiring, etc.

CO detectors located in Bldgs 430 and 461 are 24V hard wired.

The below list is provided to give a general sense of the magnitude of work but may not include all assets required

Bldg No.

Main Tenant / Facility

Description Manufacturer/Model

No. of CO

Sensors Additional Information

1 ea. panel CERBERUS CP 132 +

1 ea. panel NOTIFIER G-500S

461 East Parking NOTIFIER G-500S 56 1 ea. Control unit with 2 ea. modules separating the two lower levels

FUNDING ACTIVITY: REGION

430 West Parking 60 2 ea. Control units

ATTACHMENT J-1502000-17

COMPRESSED AND MEDICAL AIR, GAS AND VACUUM SYSTEMS

Compressed air systems commence at and includes the utility isolation point of connection and terminate at the compressed air point of delivery. The Contractor shall develop and implement an IMP for the compressed air systems and all mechanically and electrically interlocked ancillary parts, equipment, and components, such as:

compressors, regulators, unfired pressure vessels, air drying systems, distribution systems, air supply connectors, monitoring and control systems, electrical disconnects, alarm panels, piping, outlets, alarms, medical air, medical oxygen, medical nitrogen, medical nitrous oxide, medical vacuum, medical anesthesia vacuum, medical LP/natural gas, medical gas manifolds, etc. In Bldg 2082, Hospital, Gricignano Support Site, there are approximately 33 medical gas alarm panels, 26 Zone Valves, 43 Pressure Gauges and 571 Med Gas Outlets. In Bldg 2086, Energy

Building, Gricignano Support Site, there are approximately 1 Dental and 3 Medical Compressed Air, 2 pump service panels, 6 Alarm panel Anesthetic GAS, 1 Medical Gas Control Unit. For detailed current systems locations refer to attachment J-1501000-04.b.

ATTACHMENT J-1502000-18

EMERGENCY AND EXIT LIGHTING SYSTEMS

Emergency and exit lighting systems commence at, and includes the utility isolation point of connection. The

Contractor shall develop and implement an IMP to clean, re-lamp, and make all necessary repairs to the emergency and exit lighting systems and all mechanically and electrically interlocked ancillary parts, equipment, and components, such as: replacement of defective bulbs, batteries, lamps, tubes, ballasts, fuses, starters, switches, diffusers, covers, reflectors, photocells, controls, etc. In Bldg 2082, Hospital, Gricignano Support Site, there are approximately 400-500 emergency lights and 100-150 exit lights. At Gaeta (Fleet Landing), there are approximately

30-35 emergency lights and 12-16 exit lights. At Gaeta (Old Mill Inn), there are approximately 10-15 emergency/exit lights.

ATTACHMENT J-1502000-19

EMERGENCY EYEWASH AND SHOWER STATIONS

Emergency eyewash and shower station systems commence at, and includes the utility isolation point of connection.

The Contractor shall develop and implement an IMP for the emergency eyewash and shower stations and all mechanically and electrically interlocked ancillary parts, equipment, and components, such as: outlets, valves, activators, actuators, inlets, signage, showerheads, restrictors, bowls, filters, flanges, piping, etc. The below list is provided to give a general sense of the magnitude of work but may not include all assets required to be maintained.

EYE WASH /

SHOWER

STATION NO.

LOCATION ADDITIONAL INFO

1 Gricignano Support Site - Bldg 2082

- Hospital - Central Sterilization

Sink Type Eye Wash

2 Gricignano Support Site - Bldg 2082

- Hospital - Dental Laboratory

Regular Type Eye Wash

3 Gricignano Support Site - Bldg 2082

- Hospital - Pharmacy

Sink Type Eye Wash

4 Gricignano Support Site - Bldg 2082

- Hospital - Laboratory

Regular Type Eye Wash

5 Gricignano Support Site - Bldg 2082

- Hospital - Kitchen

Regular Type Eye Wash

6 Gricignano Support Site - Bldg 2082

- Hospital - Main Operating Room

Flexible Type Eye Wash

7 Gricignano Support Site - Bldg 2082

- Hospital - Spoiled Utility Room

Flexible Type Eye Wash

8 Gricignano Support Site - Bldg 2086

- Central Energy Bldg - Ground

Floor East Side

Shower Type Eye Wash

9 Gricignano Support Site - Bldg 2086

- Central Energy Bldg - Ground

Floor West Side

Shower Type Eye Wash with electrical water heater 25

Liters

10 Gricignano Support Site - Bldg 2086

- Central Energy Bldg - First Floor

Shower Type Eye Wash

11 Gricignano Support Site - Water

Storage Tanks

Shower Type Eye Wash with electrical water heater 25

Liters

12 Gricignano Support Site - Facilities

Maintenance Workshop

Regular Type Eye Wash

13 Gricignano Support Site - Bldg 2082

- Hospital - Hazardous Storage Area

Shower Type Eye Wash with electrical water heater 25

Liters

14 Gricignano Support Site - Bldg 2082

- Hospital - Morgue

Shower Type Eye Wash

15 Gricignano Support Site - Bldg 2088

- NSA Veterinary Clinic

Eye Wash

16 Capodichino - Bldg 457 -

Medical/Dental Clinic

Eye Wash

17 Capodichino - Bldg 457 -

Medical/Dental Clinic

Eye Wash

ATTACHMENT J-1502000-20

ELECTRICAL SYSTEMS

The Contractor shall develop and implement an IMP for the electrical systems and all mechanically and electrically interlocked ancillary parts, equipment and components of the electrical systems; such as: motor starters, variable frequency drives, panel boards, main distribution panels, transformers, automatic transfer switches, fuel transfer pumps, switchgears, power factor correction units, auxiliary generators, generator control systems, quick panels, batteries, battery chargers, breakers, buss work, cables, capacitors, circuit interrupters, control panels, disconnects, duct banks, hand holes, hardware, insulators, inverters, manholes, meters and metering systems, meter bases, overcurrent protection devices (including fiber optics), overhead and undergrounds lines, poles, rectifiers, regulators, relays, secondary service drops, switchboards, substations, supervisory control and data acquisition (SCADA) systems, switchgear, switches, towers, transformers, wiring, monitoring and controls systems, electric water heaters, etc. The below list is provided to give a general sense of the magnitude of work but may not include all assets required to be maintained.

ATTACHMENT J-1502000-21

ELECTRONIC SECURITY SYSTEMS

The Contractor shall develop and implement an IMP for the electronic security systems (Intrusion Alarm and Closed

Circuit Television systems) and all mechanically and electrically interlocked ancillary parts, equipment and components such as: controllers, switches, sensors, detectors, rectifiers, notifiers, alarms, power supplies, wiring, recorders, etc. The below list is provided to give a general sense of the magnitude of work but may not include all assets required to be maintained.

Bldg

No.

Main Tenant / Facility

Description

Manufacturer/

Model

No. of

Motion

Detectors

No. of

Magnetic

Contacts

No. of

Alarm

Sirens

No. of

Zones

Approx. Area

Covered (m

No. of

Floors Other Information

450 Community Bank Office DIGIPLEX / EVO 21 N/A 1 21 360 sqm 1 3 ea. Keypads

458 Child Development Center

(CDC)

ARITECH

ADVISOR

1 on exit back door

(balanced polarized)

1 (with flashing light)

1 -- 1 2 ea. Keypads (1 by main panel and 1 by exit back door)

498 ATM Space G.E. ARITECH

MASTER ATS2010

3 3 (duress-type push buttons)

2 (AS632) 8 10 1 3 ea. Keypads

752 NSA (Various) ARITECH ATS1010 9 4 2 up to 8 -- -- Serving NEX, Post

Office, Supply, and NSA

Conf. Room

GAETA (Fleet Landing)

FUNDING ACTIVITY: REGION

INTRUSION ALARM SYSTEMS

ATTACHMENT J-1502000-22

FIRE PROTECTION SYSTEMS

Fire protection systems commence at and include the utility isolation point of connection and includes the fire alarm and fire suppression/extinguishing systems. The Contractor shall develop and implement an IMP for the fire protection systems and all mechanically and electrically interlocked ancillary parts, equipment and components;

such as: fire alarm control panels, remote annunciator panels, audio alarms, audio visual alarms, duct smoke detectors, heat detectors, manual pull/push stations, tamper switches, fire department connections, visual alarms, waterflow switches, rises, standpipe systems, wet chemical extinguishing systems, fire pumps, water storage tanks, fire-smoke dampers, telephone dialers, panel notifiers, manual push stations, AFFF Foam, air compressors, alarm devices, alarm valves, annunciators, antennas, backflow prevention devices (does not include drinking water backflows), Dry Chemicals, batteries, connections, control panels, detectors, diesel engines, electric motors, fuses, gauges, initiating devices, meters, notification appliances, nozzles, piping, pumps, receivers, sensors, sprinkler heads, tanks, transmitters, voice communication devices, valves (including post indicator valves), monitoring and controls systems, etc.

***Informational Notes:

AFFF drainage trenches shall be maintained clear and automatic valves, which close the sanitary drain and divert

AFFF to a storage tank in event of activation.

Smoke Detectors at Bldg 401 are located at a height over 4 meters; the use scaffoldings or other appropriate equipment is required.

Sprinkler Heads marked at Bldgs 401, 402, 406, 415, 448 and 451 are located at a height over 4 meters; the use scaffoldings or other appropriate equipment is required.

Approximately 2,270 sprinkler heads are located at a height over 4 meters; the use scaffoldings or other appropriate equipment is required.

ATTACHMENT J-1502000-23

FOOD SERVICE EQUIPMENT

Food service equipment commences at and include the utility isolation point of connection. The Contractor shall develop and implement an IMP for food service equipment and all mechanically and electrically interlocked ancillary parts, equipment and components of the systems. Food service equipment includes dishwashing machines, ice machines, ovens, and gas kettles.

ATTACHMENT J-1502000-24

GATES AND OVERHEAD AND ROLL-UP DOORS

The Contractor shall develop and implement an IMP for gates and overhead and roll-up doors systems both manual and motorized, and all mechanically and electrically interlocked ancillary parts, equipment, and components of systems such as pulleys, rails, springs, rollers, hinges, hoists, motors, etc. The below list is provided to give a general sense of the magnitude of work but may not include all assets required to be maintained.

LOCATION

DESCRIPTION

QTY

(ea.)

GAETA (Fleet Landing)

719 / MSC/NSA Electric Roll-Up Door / PUJOL 1

725 / NSA Electric Sliding Gate / BFT 1

CAPODICHINO

403 Roll-Up Door; approx. dim. 4 mt length x 5 mt height; galvanized metal with plexiglass windows; flashlight and control buttons. Motor operated: 220V -

500W; Brand: FAAC; Model: MOTORIDUTTORE 641

LOCATION

DESCRIPTION

QTY

(ea.)

GRICIGNANO SUPPORT SITE

2082 / Hospital Solid Electronic Roll-Up Gates / Attached to the Fire Alarm System / Mfgr:

TRONIC, Mod: CN106 AIP55, 230Volts/ 50 Hz 0,400 Kw

2086 / Energy

Building

Overhead Door / Mfgr: TRONIC, Mod: CN106A 3

457 / Clinic Lattice Metal Electronic Roll-Up Gates 5

ATTACHMENT J-1502000-25

INTERNAL WATER TREATMENT SYSTEMS

The Contractor shall develop and implement an IMP for internal water treatment systems, and all mechanically and electrically interlocked ancillary parts, equipment, and components of the systems such as valves, reverse osmosis units, water softening units, chlorination systems, cathodic protection, pumps, strainers, filters, actuators, fittings, tanks, instrumentation, membranes, feeders, drains, etc. Sample of Water Tests Form is provided in J-1502000-26.a

ATTACHMENT J-1502000-25.a

INTERNAL WATER TREATMENT SYSTEMS

WATER QUALITY MONITORING TESTING SAMPLE FORM

USNH NAPLES FY16

DW QUALITY

MONITORING Ti m e lin e

Sa m p lin g_ Ev e n ts

ANALYTES

Sa m p lin g Lo ca ti o n s

U

SN

H -D

W P

O

ET

D

U

SN

H -D

W

To p f lo o r)

U

SN

H -D

W P

O

ET

D

U

SN

H -D

W

To p f lo o r)

U

SN

H -D

W P

O

ET

D

U

SN

H -D

W

To p f lo o r)

U

SN

H -D

W P

O

ET

D

U

SN

H -D

W

To p f lo o r)

1 1 1 1 1 1 1 1 4

1 1 1 1 1 1 1 1 4

1 1 1 1 1 1 1 1 4

1 1 1 1 1 1 1 1 4

1 1 1 1 1 1 1 1 4

1 1 1 1 1 1 1 1 4

1 1 1 1 1 1 1 1 4

1 1 1 1 1 1 1 1 4

0 0 0 1 1 1

0 0 0 1 1 1

0 0 0 1 1 1

1 1 1 1 1 1 1 1 4

0 0 0 1 1 1

0 0 0 1 1 1

0 0 0 1 1 1

0 0 0 1 1 1

0 0 0 1 1 1

0 0 0 1 1 1

0 0 0 1 1 1

0 0 0 1 1 1

0 0 0 1 1 1

0 0 0 1 1 1

0 0 0 1 1 1

0 0 0 1 1 1

0 0 0 1 1 1

0 0 0 1 1 1

0 0 0 1 1 1

0 0 0 1 1 1

0 0 0 1 1 1

0 0 0 1 1 1

1 1 1 1 1 1 1 1 4

6 4 10 6 4 10 6 4 10 27 4 31 61

Chlorite

TOTAL SAMPLES/LOCATION

pH

Chlorine, total residual

Temperature

Conductivity

Turbidity

Nickel

Sodium

Vanadium

Haloacetic Acids (HAA5)

Bromate

Boron

Calcium

Chromium

Copper

Magnesium

Uranium

Aluminum

Iron

Manganese

Barium

FY16 Q1

FY16 Q2

FY16 Q3

FY16 Q4

TO

TA

L

SA

M P

LE

S st

Q

TR

TO

TA

L

SA

M P

LE

S n d Q

TR

TO

TA

L

SA

M P

LE

S rd

Q

TR

TO

TA

L

SA

M P

LE

S/

A N

A

LY

TE

TO

TA

L

SA

M P

LE

S th

Q

TR

Total Trihalomethanes

VOC BLANK

Antimony

Arsenic

Thallium

Cadmium

Lead

Mercury

Selenium

Beryllium

ATTACHMENT J-1502000-26

ISOLATION ROOMS AND OTHER CONTROLLED PRESSURE SPACES

The Contractor shall develop and implement an IMP for isolation rooms and other controlled pressure spaces/areas, and all mechanically and electrically interlocked ancillary parts, equipment, and components of the systems such as air handling units, blowers, boilers, chillers, compressors (including air compressors), condensers, controls, cooling towers, dehumidifiers, diffusers, driers, ducts, electrical disconnects, evaporators, fans, fan coil units, filters, fire dampers, fresh air dampers, heaters, heat exchangers, heat pumps, hoods, humidification systems, insulation, intakes, package units, piping, pumps, refrigeration boxes, registers, returns, strainers, ultraviolet lighting, valves, VAV boxes, variable frequency drives, water treatment systems, monitoring and control systems including the

EMCS, filter, pre-filters, etc. Other controlled pressure related spaces/areas include operating rooms, processing rooms and sterile storage rooms. The IMP shall include an Air Flow Monitoring Program. The below list is provided to give a general sense of the magnitude of work but may not include all assets required to be maintained.

ROOM NO. QUANTITY SIZE

3184 (Isolation Room) 1 15 sm

3185 (Entrance to Isolation Room 3184) 1 7 sm

3186 (Restroom to Isolation Room 3184) 1 5 sm

3183 (Isolation Room) 1 15 sm

3182 (Entrance to Isolation Room 3184) 1 7 sm

3181 (Restroom to Isolation Room 3184) 1 5 sm

ISOLATION ROOMS INVENTORY

NOMENCLATURE / TECHNICAL

SPECIFICATION

Roof Fan and Electronic System;

FLAKTWOODS; HR50/6M

Total of 2 Isolation Rooms (including entrance areas and restrooms)

ATTACHMENT J-1502000-26

ISOLATION ROOMS AND OTHER CONTROLLED PRESSURE SPACES – Cont.

NOMENCLATURE / TECHNICAL SPECIFICATION QUANTITY SIZE

OPERATING AND STERILE PROCESSING/STORAGE ROOMS INVENTORY

Sterile Processing Room 1 124 sm

1 63 sm

Operating Rooms 1 39 sm

1 39 sm

1 39 sm

1 39 sm

Operating Rooms - Decon 1 18 sm

1 17 sm

Operating Rooms - Scrub Area 1 13 sm

1 13 sm

Operating Rooms - Sterile Storage 1 15 sm

Multi Service Ward - Sterile Storage 1 7 sm

Operating Rooms - Sterile Work Room/Area 1 49 sm

Operating Rooms - Sterile Storage 1 43 sm

1 56 sm

1 61 sm

1 44 sm

1 12 sm

Emergency Department Sterile Storage 1 24 sm

Procedural Rooms in the Main OR Area 1 20 sm

1 24 sm

Pharmacy Compounding Center: Room 1 15 sm

INVERTER PLC DRIVE

PLC Drive Motion Art 230V AC In/Out 2

CONVERTERS DC DC

Converters 2

MOTORIZED SHUTTERS

Motorized Shutters 1

CAPTATORS CLASS 300

Captor / KIMO Model CP300 1

Captor / KIMO Model CP301 1

Captor / KIMO Model CP302 1

Captor / KIMO Model CP303 1

ATTACHMENT J-1502000-27

HVAC AND REFRIGERATION SYSTEMS

HVAC and Refrigeration Systems commence at the utility isolation point of connection and terminate at the conditioned air point of delivery. The Contractor shall develop and implement an IMP for HVAC and refrigeration systems to include all major components and all mechanically and electrically interlocked ancillary parts, equipment, and components of the systems such as; air handling units, central air conditioning, blowers, boilers, chillers, compressors, air compressors, condensers, controls, cooling towers, dehumidifiers, diffusers, driers, ducts, electrical disconnects, evaporators, fans, fan coil units, filters, fire dampers, fresh air dampers, heat exchangers, heat pumps, hoods, humidification systems, insulation, intakes, package units, piping, pumps, refrigeration boxes, registers, returns, strainers, ultraviolet lighting, valves, VAV boxes, variable frequency drives, water treatment systems, monitoring, controls, and instrumentation systems, heaters all types, furnaces, mechanical ventilating equipment for cold storage plants, chilled water and pure water production equipment, controlled air systems equipment, distribution systems, control devices, environmental controls, etc. For detailed current systems locations refer to attachments J-1501000-04.a and J-1501000-04.b.

Sample of Chiller Operating Log is provided in J-1502000-27.a.

ATTACHMENT J-1502000-27.a

HVAC AND REFRIGERATION SYSTEMS – Cont.

CHILLER OPERATING LOG

CHILLER NO. _____ MONTH OF _______________________

CONDENSER EVAPORATOR REFRIGERANT VOLTS AMPS HR START

TEMP PRESS TEMP PRESS PRESSURE (volts) (amps) METER COUNT

DAY in out in out in out in out COND EVAP

(C) (C) (bar) (bar) (C) (C) (bar) (bar) (bar) (bar)

ATTACHMENT J-1502000-28

MOISTURE DETECTION SYSTEMS

Moisture detection systems commence at, and includes the utility isolation point of connection and terminate at the moisture detection sensor. The Contractor shall develop and implement an IMP for the moisture detection systems, and all mechanically and electrically interlocked ancillary parts, equipment, and components of the systems such as sensors, monitors, alarms, notifiers,…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .