Attachment F - Section F Deliverables Amendment 0004.pdf

PDF 360 KB Posted

Attached to
Base Operations Support (BOS) Services at U. S. Naval Support Activity (NSA) Naples, Italy and Outlying Areas
Solicitation number
N6247022R0008
Issued by

View the file

Other files

File Type Posted
J-0200000-10.c SAAR-N Sample Form for BOSC Amendment 0004.pdf PDF
J-1502000-39.a - HVAC Duct Cleaning Annual Scheduleb Amendment 0004.xlsx XLSX spreadsheet
J-0200000 Management and Administration v2.7 Amendment 0004.pdf PDF
J-0200000-10.b. How to Request a Maximo Account Amendment 0004.pptx PPTX presentation
J-1501000-04.b Assets Inventory - DHA Amendment 0004.xlsx XLSX spreadsheet
J-0200000-10.a How to Purchase PKI to Access Maximo Amendment 0004.pptx PPTX presentation
J-1502000 Facility Investment v2.3 - Naples BOSC Amendment 0004.pdf PDF
J-0200000-13 ELINS 05.30.2023 Amendment 0004.xlsx XLSX spreadsheet
N6247022R0008 Amendment 0004.pdf PDF
J-1503030 Integrated Solid Waste Management v2.2 Amendment 0004.pdf PDF
J-3 Section B Supplies or Services and Prices.docx DOCX document
J-9 Pre-Proposal Conference and Site Visit Sign-In Sheets (Amendment 0003).pdf PDF
N6247022R0008 Amendment 0003.pdf PDF
J-1502000 Facility Investment v2.3 revised Amendment 0003.pdf PDF
J-0200000-13 ELINS revised Amendment 0003.xlsx XLSX spreadsheet
J-1 Past Performance Questionnaire (PPQ).doc DOC document
J-10 Pre-Proposal Conference Presentation (Amendment 0003).pdf PDF
J-2 Corporate Experience Project Data Sheet.docx DOCX document
J-1800000 J Environmental v2.1 revised Amendment 0003.pdf PDF
J-1503010 Custodial v2.5 revised Amendment 0003.pdf PDF
N6247022R0008 Amendment 0002.pdf PDF
J-7 Base Access Information Spreadsheet.xlsx XLSX spreadsheet
J-8 Site Visit Map.pdf PDF
N6247022R0008 Amendment 0001.pdf PDF
J-1503010-07.c Custodial Inventory - REGION and Other Commands.xlsx XLSX spreadsheet
J-1501000-04.a Assets Inventory - Region.xlsx XLSX spreadsheet
J-1800000 Environmental v2.1.pdf PDF
J-1606001 Water (Overseas).pdf PDF
J-4 Pre-Award Inquiry Form.xlsx XLSX spreadsheet
J-1503010-14 Non-Recurring Port Call Custodial Services.xlsx XLSX spreadsheet
J-1604000 Wastewater Ver 2.1.pdf PDF
J-0200000-04.a Hazardous Material Spill Report (Code Orange).pdf PDF
J-1502000-39.a HVAC Duct Cleaning Annual Schedule.xlsx XLSX spreadsheet
J-2 Corporate Experience Project Data Sheet.pdf PDF
J-1502000 Facility Investment v2.3.pdf PDF
J-0200000-04.b ICRA Template USNHNAPINST 6220.1.pdf PDF
J-1700000 Transportation v2.1.pdf PDF
J-1501000-03 Site Maps Naples BOS.pdf PDF
J-1503010-07.b Custodial Inventory - DoDEA.xlsx XLSX spreadsheet
J-0200000-05 SERVICE PROVIDER INFORMATION v1 - 2013-07-07.xlsx XLSX spreadsheet
J-1601000 Utility Management v2.0.pdf PDF
J-6 Antimafia Screening Attachment 2.pdf PDF
Attachment F - Section F Deliverables.pdf PDF
J-1601000-05 Utility Assets Inventory.pdf PDF
J-1502000-38.a Sample As Built Anchor Points (Bldg 402).pdf PDF
J-1502000-04 PM and IMP Services Matrix.xlsx XLSX spreadsheet
J-1503030 Integrated Solid Waste Management v2.2.pdf PDF
J-1503050 Grounds Maint and Landscaping v2.6.pdf PDF
J-0200000-06 ASSET INFORMATION v2 - 2017-04-26.xlsx XLSX spreadsheet
J-3 Section B Supplies or Services and Prices.pdf PDF
Show 40 more

Latest 50 of 72 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SECTION F: DELIVERIES OR PERFORMANCE

DELIVERABLES

Annex/ Spec Item

Form Attachmen t Number

Deliverable Title Date (s) of Submission

Distribution

Frequency Original Copies

(including original)

0200000 Management and Administration 0200000/

2.2.1.2 N/A Request to Work

Outside Government’s Regular Working Hours

At least seven calendar days prior to requested day

KO/COR 2 As required

0200000/ 2.3.4

N/A Permits and Licenses

Within 15 calendar days after award and any time as requested by the

KO

KO 1 As specified

0200000/ 2.3.5

N/A Certificate of Insurance

Within 15 calendar days after award

KO 1 As specified

0200000/ 2.3.10.3

N/A TJC Compliance and Documentation Plan

Within 30 calendar days after award

KO/COR/

Naval Hospital

Facility Department

3 As specified

0200000/ 2.6.1

N/A Plans of Action and Milestones (POA&Ms)

Within 15 calendar days prior to contract start and within seven calendar days of changes.

KO/COR/

Command Security Manager

3 As required

0200000/ 2.6.1

N/A Cybersecurity Incident

Immediately upon discovery during regular working hours and by 0800 the following work day for discoveries after regular working hours

KO/COR/

Command Security Manager

3 As required

Spec Item

Form Attachmen t Number

Deliverable Title Date (s) of Submission

Distribution

Frequency Original Copies

(including original)

0200000/ 2.6.4

N/A Work Schedules Within 15 calendar days prior to contract start, 10 days prior to the beginning of the month in which services are scheduled to be performance, and within two calendar days of changes.

COR 1 Monthly

0200000/ 2.6.5

N/A Notification of any Difficulty in Scheduling Work

By the end of each workday

KO and COR 1 As required

0200000/ 2.6.6

N/A Status of Deliverables

Within 30 minutes of the inquiry during regular working hours, and by 0800 the following work day for inquiries after regular working hours

KO and COR 1

0200000/ 2.6.7

N/A Service Interruptions

At least five working days in advance

KO and COR 1 As required

0200000/ 2.6.8.2

N/A Pipe Delimited Flat-File

By the end of each workday

KO or a representative designated by the KO

1 Daily

0200000/ 2.6.8.2

N/A Sample Pipe Delimited Flat-File

Within 30 calendar days prior to contract start.

KO or a representative designated by the KO

1 As required to demonstrate the ability to properly format the flat-file 0200000/

2.6.8.2 N/A Asset and

Specification Data When an asset is repaired, replaced, installed, or otherwise affected

KO or a representative designated by the KO

1 As required

Spec Item

Form Attachmen t Number

Deliverable Title Date (s) of Submission

Distribution

Frequency Original Copies

(including original)

2.6.8.3 N/A List of personnel

requiring access to Government’s Maximo

Within 30 calendar days prior to contract start.

KO/COR 2 As specified

2.6.8.9 N/A List of personnel

requiring access to Government’s

DMLSS

Within 30 calendar days prior to contract start.

KO/COR 2 As specified

0200000/ 2.6.10.1

N/A Quality Management Plan

Within 15 calendar days after award and within seven calendar days of changes

KO/COR 2 As specified

0200000/ 2.6.10.2

N/A Quality Inspection and Surveillance File

Upon request during

Government’s regular working hours and within five calendar days of termination of the contract

KO/COR 2 As specified

0200000/ 2.6.11

N/A Property Management Plan

Within 45 calendar days after award.

KO and COR 1 As specified

0200000/ 2.6.7.3

N/A Contractor Quality Inspection and Surveillance Report

First work day of each month

KO/COR 2 Monthly

0200000/ 2.7.1

N/A List of Key Personnel and Qualifications

Within 15 calendar days after award

KO/COR 2 As specified

0200000/ 2.7.1

N/A Organizational Chart

Within 15 calendar days after award

KO/COR 2 As specified

0200000/ 2.7.1

N/A Dedicated Staffing List

Within 30 calendar days after award.

KO and COR 1 As specified

0200000/ 2.7.2.6

N/A Proof of Legal Residency

Prior to be admitted to site of work

KO 1 As specified

0200000/ 2.7.2.8

N/A Record and Verification of Immunizations

Within 24 hours of request

KO 1 As specified

Spec Item

Form Attachmen t Number

Deliverable Title Date (s) of Submission

Distribution

Frequency Original Copies

(including original)

0200000/ 2.7.3

N/A Service Contract Reporting (SCR)

No later than 31 October

KO 1 Annually for labor executed during the period of performance during each Government fiscal year

(FY)

0200000/

2.8.1 N/A Employee List Within 15

calendar days after award and within seven calendar days of changes

KO/COR 2 As required

0200000/ 2.8.4

Govt Provided

Application for CNRE Installation Access Pass

30 calendar days prior to the date for which base access is required

KO 1 As specified

0200000/ 2.8.8

N/A Completed Personnel Security Investigation Documentation

Prior to be admitted to site of work

KO/COR 2 As specified and then annually

0200000/ 2.8.9

N/A OF-306

Declaration for Federal Employment and Digital Fingerprints

Prior to commencement of work

KO, COR, and Security Manager

1 As required

0200000/ 2.9.1

N/A Accident Prevention Plan

Within 15 calendar days after award and within seven calendar days of changes

KO/COR 2 As specified

0200000/ 2.9.2

N/A Activity Hazard Analysis

Together with the Accident

Prevention Plan and for changes

KO/COR 2 As specified

0200000/ 2.9.3

N/A Occupational Risk and Compliance Plans and Programs

Together with the Accident

Prevention Plan and for changes

KO/COR 2 As specified

2.9.4.7 N/A Control of

Hazardous Energy (lockout/tagout)

Within 30 calendar days after annual inspection.

KO/COR 1 Annually

Spec Item

Form Attachmen t Number

Deliverable Title Date (s) of Submission

Distribution

Frequency Original Copies

(including original)

0200000/ 2.9.6

N/A NAVFAC

Contractor Incident Reporting System

(CIRS)

Within five calendar days of accident

KO/COR 2 As required

0200000/ 2.9.6

J-0200000-

Weight Handling Equipment Accident Report (Crane and Rigging Gear)

Within 30 calendar day of accident

KO/COR 2 As required

2.9.6 J-0200000-

Weight Handling Equipment Accident Report

Within 15 working days of accident

KO/COR 2 As required

0200000/ 2.9.6

J-0200000-

Crane and Rigging Gear Near Miss Report

Within 30 calendar day of accident

KO/COR 2 As required

0200000/ 2.9.8

N/A Monthly On-Site Labor Report

First work day of each month

KO 1 Monthly

0200000/ 2.9.9

N/A OSHA Citations and Violations Corrective Action Report

Within 48 hours after receiving a citation

KO/COR 2 As required

0200000/ 2.9.10

N/A Safety Inspection and Monitoring Report

Upon request KO/COR 2 As required

0200000/ 2.9.11

N/A Safety Certifications

Within 15 calendar days after award and as old certifications expire

KO/COR 2 As specified

0200000/ 2.10

N/A EMS Goals and Policy Measurement Information

Upon request KO/COR 2 As required

0200000/ 2.10.1.1

N/A Water Conservation Plan

Within 15 calendar days after award and for changes

KO/COR 2 As specified

0200000/ 2.10.2

N/A Environmental Protection Plan

Within 15 calendar days prior to contract start and within seven calendar days of changes

KO/COR 2 As specified

0200000/ 2.10.2.1

N/A Sampling Plan Prior to Sampling

KO/COR 2 As required

0200000/ 2.10.2.1

N/A Laboratory Analysis

Upon Request KO/COR 2 As specified

Spec Item

Form Attachmen t Number

Deliverable Title Date (s) of Submission

Distribution

Frequency Original Copies

(including original)

0200000/ 2.10.2.2

N/A Class I and II ODS Report

Within 24 hours following delivery of refrigerant to DLA and Upon

Request

KO/COR 2 As required

0200000/ 2.10.2.3

J-0200000-

Solid Waste Management and Recycling Reports

First work day of each month.

KO COR 2 Monthly

0200000/ 2.10.2.3

J-0200000-

Summary Solid Waste Management and Recycling Report

By October 10th

KO/COR 2 Annually

0200000/ 2.10.2.5

N/A Waste Stream Determination

Within 30 calendar days prior to start of contract performance and within 14 days of identification of any new waste stream.

KO/COR 2 As required

0200000/ 2.10.2.8

N/A Emergency Planning and Community Right- To-Know Act (EPCRA) Report

Within 15 calendar days after contract award and not less than 10 working days prior to planned use of hazardous material

KO/COR 2 As specified

0200000/ 2.10.2.5

J-0200000-

Contractor Hazardous Material Inventory Log

Within 15 calendar days after the end of each calendar year and at termination of the contract.

KO/COR 2 Annually

0200000/ 2.10.2.12

N/A Asbestos Containing Material Notification

Verbally within one hour and follow-up with written ACM Notification within 24 hours

KO/COR 2 As specified

Spec Item

Form Attachmen t Number

Deliverable Title Date (s) of Submission

Distribution

Frequency Original Copies

(including original)

0200000/ 2.10.3.2

N/A Recovered Material Certification

When a product containing recovered materials is equal to or better than the original and could be used

KO/COR 2 As specified

0200000/ 2.11

N/A Mission Essential Contractor Services Plan

Within 15 calendar days prior to contract start and within seven calendar days of changes.

KO/COR 2 As Required

0200000/ 2.11

N/A Mission Critical/Mission Essential Personnel

Within 15 calendar days prior to contract start and within seven calendar days of changes.

KO/COR 2 As specified

0200000/ 2.14.1

N/A Recurring Work Proposals

Within five calendar days following receipt of request

KO/COR 2 As required

2.14.2 N/A Notification to the

Government for Work Above the Recurring Work Limitations and Rough Order of Magnitude

Within two hours of identification

KO/COR 2 As required

0200000/ 2.14.3

N/A Inventory Update Report

When requested and at the end of each contract period

KO/COR 2 Annually and as requested

2.15.1.1 N/A Non-Recurring

Work Quantities Ordered via FedMall

By the fifth day of the following month

KO/COR 2 Monthly

0200000/ 2.15.2.1

N/A Non-Recurring Work Proposal

Within ten calendar days after Government's Request for

Proposal

KO 1 As specified

Spec Item

Form Attachmen t Number

Deliverable Title Date (s) of Submission

Distribution

Frequency Original Copies

(including original)

1501000 Facility Management 1501000/

2.3.1 N/A System Access

Personnel Listing Within 30 calendar days after contract award

COR/KO 2 Upon award and any change in personnel

1501000/ 3.1.1

N/A Assets Inventory 15 working days after the start of each option year

KO/COR/

Hospital

Facilities Dept

3 Annually

1501000/ 3.2.1

N/A MAXIMO Asset Changes Report

By COB the third workday of each month

COR/KO/

FMD

3 Monthly

1502000 Facility Investment 1502000/

2.2.1 N/A

Certification, Training, and Licensing

Within 15 days after award or as requested by the KO

KO/COR 2 Once for initial submittal, when changes occur, and then as requested 1502000/

2.3.9 N/A Third Party

Certifications Prior to purchase of any material that will come in contact with water for human consumption

KO/COR 2 As specified

1502000/ 2.3.10

N/A Monthly Production Meetings Minutes

Within 5 working days of meeting

KO/COR 2 Monthly

1502000/

N/A Monthly Maintenance Summary Report

Within first 2 working day of each month

KO/COR 2 Monthly

1502000/ 3.1

N/A Service Order Summary Report

First work day of each month

KO/COR 2 Monthly

1502000/ 3.1

N/A Monthly Service Order Summary Report

First work day of each month

KO/COR 2 Monthly

1502000/ 3.1.1

N/A Emergency Service Order Status Report

Within 30 minutes of completion of an emergency service order

KO/COR 2 Monthly

1502000/ 3.2

Monthly Maintenance Summary Report

Within first 2 working day of each month

KO/COR 2 Monthly

Spec Item

Form Attachmen t Number

Deliverable Title Date (s) of Submission

Distribution

Frequency Original Copies

(including original)

1502000/ 3.3

Preventive

Program Plan

30 calendar days after contract award

KO/COR 2 Annually

1502000/ 3.3

Monthly PM Work Schedule

Five work days prior to the beginning of each month

KO/COR 2 Monthly

1502000/ 3.3.1

N/A DDC Software and Firmware Report

First work day of each month

KO/COR/

Naval Hospital

Facility Department

3 Monthly

1502000/ 3.3.3

Fall Protection Inspections and Repair Services Report

Within 5 working days after inspection

KO/COR 2 As specified

1502000/ 3.4

Integrated

Program Plan

30 calendar days after contract award

KO/COR/

Naval Hospital

Facility Department

3 Annually

1502000/ 3.4

N/A Monthly IMP Schedule and IMP Maintenance and Repair Status

Five work days prior to the beginning of each month

KO/COR/

Naval Hospital

Facility Department

3 Monthly

1502000/ 3.4.3,1

Certification of Load Test and Condition Inspection Form

First work day of each month

KO/COR/

Naval Hospital

Facility Department

3 Monthly

1502000/ 3.4.4.2

N/A Boiler Water Treatment Report

Within 5 working days from test completion

KO/COR 2 As specified

1502000/ 3.4.4.4

Boiler Air Emission Testing Report

Within 2 working days from test completion

KO/COR 2 As specified

1502000/ 3.4.6

N/A Compressed and Medical Air, Gas & Vacuum Systems Maintenance Report

First work day of each month

KO/COR/

Naval Hospital

Facility Department

3 Monthly

1502000/ 3.4.6.1

Public Address (PA), Nurse Call and Code Blue Systems Inspection Report

Within 2 working days from inspection

KO/COR/

Naval Hospital

Facility Department

3 As specified

Spec Item

Form Attachmen t Number

Deliverable Title Date (s) of Submission

Distribution

Frequency Original Copies

(including original)

1502000/ 3.4.7

N/A DDC Maintenance Report

First work day of each month

KO/COR/

Naval Hospital

Facility Department

3 Monthly

1502000/ 3.4.15

N/A Water Quality Monitoring Tests Report

Within one working day after receipt of the test results by the Contractor

KO/COR/

Naval Hospital

Facility Department

3 Quarterly

1502000/ 3.4.16.1

N/A Air Flow Monitoring Report

Within 14 calendar days after quarterly testing and weekly during infectious patient stay

KO/COR/

Naval Hospital

Facility Department

3 As specified

1502000/ 3.4.16.2

N/A Critical Spare Parts Inventory

30 calendar days after contract award

KO/COR 2 As specified

1502000/ 3.4.16.2

N/A Proposed Critical Spare Parts List

Prior to purchasing spare parts

KO/COR 2 As specified

1502000/ 3.4.17.1

HVAC Water Testing and Treatment Program

30 calendar days after contract award

KO/COR/

Naval Hospital

Facility Department

3 As specified

1502000/

HVAC Water Treatment Test Reports

Within 2 working days from work completion

KO/COR/

Naval Hospital

Facility Department

3 As specified

1502000/

Monthly Pathogenic Biological Agents Water Quality Tests Report

Within 2 working days from work completion

KO/COR/

Naval Hospital

Facility Department

3 As specified

1502000/ 3.4.17.2

Condenser Tube Inspection Program

30 calendar days after contract award

KO/COR/

Naval Hospital

Facility Department

3 As specified

1502000/ 3.4.19.1

PA, Nurse Call and Code Blue Systems Inspection and Testing Program

30 calendar days after contract award

KO/COR/

Naval Hospital

Facility Department

3 As specified

1502000/ 3.4.19.1

PA, Nurse Call and Code Blue Systems Inspection Report

Within 5 calendar days after inspection

KO/COR/

Naval Hospital

Facility

3 As specified

Spec Item

Form Attachmen t Number

Deliverable Title Date (s) of Submission

Distribution

Frequency Original Copies

(including original)

1502000/ 3.4.23.1

Inspection and Test Report for Vertical Transportation Equipment

First work day of each month

KO 2 Monthly

1502000/ 3.5

Other Recurring Services Program Plan

30 calendar days after contract award

KO/COR 2 Annually

1502000/ 3.5

Summary Report

Within 2 working days from work completion

KO/COR 2 As specified

1502000/ 3.5.1

N/A Kitchen Exhaust Hoods and Ducts Cleaning Schedule

Five work days prior to the beginning of each month

KO/COR 2 Monthly

1502000/ 3.5.2

N/A Grounding Systems for Incoming Electrical Substations Testing and Certification Records

Within 5 working days after performance of work

KO/COR 2 As specified

1502000/ 3.5.3

Lightning Arrestor and Grounding Point Testing and Certification Records

Within 5 working days after performance of work

KO/COR 2 As specified

1502000/ 3.5.4

Medium Voltage (MV) Breakers Testing and Certification Records

Within 5 working days after performance of work

KO/COR 2 As specified

1502000/ 3.5.5

Inspecting, Cleaning and Sanitizing of HVAC Duct Systems Report

Within 5 working days after performance of work

KO/COR 2 As specified

1502000/ 3.5.6

Gutters and Downspouts Inspection Stamped Video Recordings or Digital Photos

Within 5 working days after performance of work

KO/COR 2 As specified

1502000/ 3.6

Plan For MTFs

30 calendar days after contract award

KO/COR/

Naval Hospital

Facility

3 Annually

Spec Item

Form Attachmen t Number

Deliverable Title Date (s) of Submission

Distribution

Frequency Original Copies

(including original)

1502000/ 3.6

Summary Report for MTFs

Within 2 working days from work completion

KO/COR/

Naval Hospital

Facility Department

3 As specified

1502000/ 3.6.2

Faucet Aerator Replacement Report

First work day of each month

KO/COR/

Naval Hospital

Facility Department

3 As specified

1502000/ 3.6.3

Roof Inspection and Cleaning Report

Within 3 working days from work completion

KO/COR/

Naval Hospital

Facility Department

3 As specified

1502000/ 3.6.4

Electrical Receptacles Records and Inspection Report

Within 3 working days from work completion

KO/COR/

Naval Hospital

Facility Department

3 As specified

1502000/ 3.6.5

Fire Doors and Fire Walls Inspection Records and Report

Within 3 working days from work completion

KO/COR/

Naval Hospital

Facility Department

3 As specified

1502000/ 3.6.8

Under Ground (UG) Fuel Oil Storage Tanks Quarterly Inspection Report

Within 5 working days from beginning of each quarters

KO/COR/

Naval Hospital

Facility Department

3 As specified

1502000/ 3.6.9

Visual and Audible Check on HVAC Systems Inspection Records and Report

Within 3 working days from work completion

KO/COR/

Naval Hospital

Facility Department

3 As specified

1502000/ 3.6.11

Potable Water Testing and Treatment Program

30 calendar days after contract award

KO/COR/

Naval Hospital

Facility Department

3 As specified

1502000/ 3.6.11

Monthly Water Treatment Test Report

Within 2 working days from work completion

KO/COR/

Naval Hospital

Facility Department

3 As specified

1503010 Custodial 1503010/

2.2.1 N/A Pathogen Training

Certificates Upon request KO 1 Upon request

1503010/ 2.3.2.1

N/A Health Official Note

Prior to returning to work

KO/COR 2 As specified

1503010/ 2.3.2.2

N/A Pathogen Training Certificates

Prior to commencing work and upon request

KO/COR 2 As specified

Spec Item

Form Attachmen t Number

Deliverable Title Date (s) of Submission

Distribution

Frequency Original Copies

(including original)

1503010/ 2.3.2.3

N/A Health Official Note

Prior to returning to work

KO/COR 2 As specified

1503010/ 2.3.2.4

N/A Hospital General Procedure Manual

Within 30 calendar days after award and as requested

KO/COR 2 As specified

1503010/ 2.3.4.2

N/A List of Proposed Cleaning Products

Within 15 calendar days after award

KO/COR 2 As specified

1503010/

2.3.4.3 / 3.1.3.2

N/A Proposed Restroom Supplies Samples and Technical Documentation

Within 15 calendar days after award

KO/COR 2 As specified

1503010/

N/A Copy of Updated Inventories and Maps

Within 15 days of update

KO/COR 2 As specified

1503010/

N/A Annual Work Schedule

Within 15 days after award and annually thereafter

KO/COR 2 1 each year

1503010/

N/A Monthly Work Plan

First work day of each month

KO/COR 2 Monthly

1503010/ 3.2

N/A Unscheduled Services Report

First work day of each month

KO/COR 2 Monthly

1503010/ 3.3.5

N/A Work Schedule for Summer Cleaning of Schools

No later than July 31st

KO/COR/

School

Facility Dept

3 1 each year

1503010/ 3.5

N/A Work Schedule for MTF Special Cleaning Services

Within 15 days after award and annually thereafter

KO/COR/

Hospital

Facility Dept

2 1 each year

1503020 Pest Control 1503020/

2.2.1 N/A Copy of State

Certification for Contractor Personnel

15 calendar days prior to start of work.

Copies of renewed certifications shall also be submitted

KO/COR 2 As required

1503020/ 2.3.1

N/A Copy of Local/State Business License

Prior to contract award. Copies of renewed licenses shall also be submitted

KO/COR 1 As required

Spec Item

Form Attachmen t Number

Deliverable Title Date (s) of Submission

Distribution

Frequency Original Copies

(including original)

1503020/ 2.3.2

N/A Permits 5 days prior to the start of work requiring permits and any time as requested by the

KO

KO/COR 2 As required

1503020/ 2.3.4

N/A Ultra-Low Volume (ULV) Equipment Calibration and Droplet Analysis Report

15 days prior to the start of work and thereafter every 50 hours of

ULV equipment use

KO/COR 2 As required

1503020/ 2.3.5

N/A Planned Pesticide Use Sheets including Pesticide Labels and Safety Data Sheets (SDS)

15 days prior to the start of work and 5 business days in advance prior to use of any substitute product

KO/COR 2 1 for each pesticide per pest as required

1503020/

N/A Contractor's Work Plan (CWP)

15 days prior to the start of work

KO/COR 2 1 each year

1503020/

N/A Report of Conditions Conducive to Pest Infestation

1 working day after citing conditions

KO/COR 2 As required

1503020/ 3.2.2

N/A Report of Pest Control Service Orders

Electronically once per month by the 15th of the following month (Example: July data must be submitted by August 15)

KO/COR 2 Monthly

1503020/ 2.4

N/A Pest Management Record

Electronically within 1 day of each pest management operation

KO/

COR

2 As required

Spec Item

Form Attachmen t Number

Deliverable Title Date (s) of Submission

Distribution

Frequency Original Copies

(including original)

1503020/ 3.3

N/A Report of Pest Management Operations

Electronically once per month by the 15th of the following month (Example: July data must be submitted by August 15)

KO/COR 2 Monthly

1503030 Integrated Solid Waste Management 1503030/

2.2.1 NA Proof of all

Certification, Training, and Licensing Requirements

Within 15 calendar days prior to start of work and as requested by the KO. Copies of renewed certifications shall also be submitted.

KO/COR 2 Once for initial submittal, when changes occur, and then as requested / as required by Section H –

Special Contract

Requirements, FAC

5252.237-

Substitutions of Key

Personnel

(JUN 1994)

1503030/ 2.3.1

N/A Proposed Changes to Waste Classification

As required KO/COR 2 As required

1503030/ 2.3.2

N/A Contractor’s Recycling Plan

Within 30 days upon award

KO/COR 2 As required

1503030/2.

3.3

N/A Weight Tickets As specified KO/COR 2 With invoice/ Monthly

1503030/ 2.3.4

N/A Permits and Licenses

Within 30 days after award and any time as requested by the

KO

KO 1 As required

Spec Item

Form Attachmen t Number

Deliverable Title Date (s) of Submission

Distribution

Frequency Original Copies

(including original)

1503030/2.

3.5

N/A Yearly Report Within 10 days after completion of each contract period / NLT end of February for the previous calendar year

KO/COR 2 As specified

1503030/ 3.1

N/A Solid Waste Collection Schedule

15 days after award/

Annually

KO/COR 2 As specified

1503030/

3.4 / 3.4.3 /

3.4.4

N/A Sample of Containers

15 days after award/ Before purchasing containers

KO/COR 2 As specified

1503030/ 3.4.2

N/A Sample of Container Labels

15 days after award/ Before purchasing labels

KO/COR 2 As specified

1503030/ 3.5

N/A Sample of Disinfectant

15 days after award/ Before purchasing disinfectant

KO/COR 2 As specified

1503050 Grounds Maintenance and Landscaping 1503050/

2.2.1 N/A Proof of all

Certification, Training, and Licensing Requirements

Within 15 calendar days prior to start of work. Copies of renewed certifications shall also be submitted.

KO/COR 2 Once for initial submittal, when changes occur, and then as requested / as required by Section H –

Special Contract

Requirements, FAC

5252.237-

Substitutions of Key

Personnel

(JUN 1994)

Spec Item

Form Attachmen t Number

Deliverable Title Date (s) of Submission

Distribution

Frequency Original Copies

(including original)

1503050/ 2.3.2

N/A Permits Within 15 calendar days prior to start of work and any time as requested by the

KO

KO/COR 2 As required

1503050/ 2.3.9.1

N/A Water Conservation Plan

Within 15 calendar days prior to contract start

KO/COR 2 Annually and five calendar days prior to implementing changes to the schedule 1503050/ 3 J-1503050 Recycling Report

Form With each invoice KO/COR 3 As specified

1503050/ 3 N/A SDS sheets, catalog cut sheets, samples of all proposed fertilizers, and mulch

Prior to bringing on-board installation and prior to use

KO/COR 2 As Required

1503050/ 3 N/A Contractor Work Schedules

Within 15 calendar days prior to contract start

KO/COR 2 Annually and five (5) calendar days prior to implementing any changes to the schedule

1503050/ 3.1.1.3

N/A Soil Analysis test results and proposed fertilizer

15 days after receipt of the test results by the Contractor

KO/COR 2 As specified

1503050/ 3.1.1.3

N/A Proposed type of seed

Prior to use KO/COR 2 As specified

3.3 N/A Grounds

Maintenance Service Order Summary of Completion Report

By the fifth day of each month

KO/COR 2 Monthly

1503060 Pavement Clearance 1503060/

3.1.1 N/A Pavement

Sweeping Schedule 30 working days after award and 15 working days after the start of each option year

KO/COR 2 Annually

Spec Item

Form Attachmen t Number

Deliverable Title Date (s) of Submission

Distribution

Frequency Original Copies

(including original)

1503060/ 3.2.1

N/A Garage Sweeping and Mopping Schedule

30 working days after award and 15 working days after the start of each option year

KO/COR 2 Annually

1601000 Utility Management 1601000/

2.2.1 N/A System Access

Personnel Listing Within 30 calendar days after contract award

KO/COR 2 Once for initial submittal, when changes occur, and then as requested 1601000/

2.3.1 N/A System Access

Personnel Listing Within 30 calendar days after contract award

KO/COR 2 Upon award and any change in personnel

1601000/ 3.1

N/A Monthly Service Order Summary Report

First work day of each month

KO/COR 2 Monthly

1601000/ 3.2.1

N/A Assets Inventory 15 working days after the start of each option year

KO/COR 2 Annually

1601000/ 3.2.1

N/A MAXIMO Asset Changes Report

By COB the third workday of each month

KO/COR and

FMD

3 Monthly

1604000 Wastewater 1604000/

2.2.1 N/A Proof of all

Certification, Training, and Licensing Requirements

Within 30 days after award and as requested by the KO

KO/COR 2 Once for initial submittal, when changes occur, and then as requested 1604000/

N/A Critical Spare Parts

Inventory Within 30 days following award and as requested

KO/COR 2 As specified

1604000/ 3.1

N/A Preventive Maintenance Program

Within 30 days following award

KO/COR 2 As specified

1604000/ 3.1

N/A Monthly PM Work Schedule

By the 25th day of each month

Spec Item

Form Attachmen t Number

Deliverable Title Date (s) of Submission

Distribution

Frequency Original Copies

(including original)

1604000/ 3.1.1

N/A Pre-repair and Post-repair Reports on Manholes

3 days after the end of the month during which work is performed

KO/COR 2 Monthly

1604000/ 3.1.2

N/A Pre-repair and Post-repair Reports on Wet Wells

3 days after the end of the month during which work is performed

KO/COR 2 Monthly

1604000/ 3.2

N/A Inspection Program and Schedule

15 days after award

KO/COR 2 Annually and any time a change is made 1604000/

3.2 N/A Inspection Reports 15 days after

performance of the work

KO/COR 2 As required

1604000/ 3.2.2

N/A Manhole Photographs and Reports

15 days after performance of the work

KO/COR 2 As required

1604000/ 3.4.3

N/A Wet Well Photographs and Reports

15 days after performance of the work

KO/COR 2 As required

1604000/ 3.3.1

N/A Sewer and Storm Water Pipelines and Drains Cleaning Schedule

15 days after award

KO/COR 2 Annually and any time a change is made 1604000/

3.3.2 N/A Schedule of Wet

Well Services 15 days after award KO/COR 2 Annually and any time a change is made 1604000/

3.3.2.1 N/A Wet Well Volume

Report 10 days after the end of each fiscal year

KO/COR 2 Annually

1604000/ 3.3.2.2

N/A Wet Well Cleaning Report

15 days after performance of the work

KO/COR 2 As required

1604000/ 3.3.3

N/A Septic Tanks Monthly Report by the 5th of the following month

KO/COR/

Capodichino FSC Office

3 As required

1604000/ 3.4

N/A Holding Tank Servicing Report

15 days after award

KO/COR 2 Annually and any time a change is made 1606001 Water (Overseas)

Spec Item

Form Attachmen t Number

Deliverable Title Date (s) of Submission

Distribution

Frequency Original Copies

(including original)

1606001/ 2.2.1

N/A Key Personnel At a minimum of 30 calendar days prior to start of contract performance and immediately upon any changes

KO/COR 2 As specified

1606001/ 2.2.2

N/A Proof of all Certification, Training, and Licensing Requirements

At a minimum of 30 calendar days prior to start of contract performance and 5 working days after changes

KO/COR 2 Once for initial submittal, when changes occur, and then as requested

1606001/ 2.3.2

N/A Water for Human Consumption Third Party Certification

Prior to purchase of materials

KO/

NAVFAC

PWD Naples Environmental

Office

2 As specified

1606001/

N/A Outage Request At a minimum of ten workdays prior to commencement of work

KO/COR 2 As specified

1606001/ 3.1

N/A Standard Operating Procedures (SOP)

At a minimum of 15 working days prior to commencement of work and 5 working days after changes

KO/COR 4 As required

1603000/ 3.1

N/A Notification of Unsafe Conditions Report

Within 24 hours of occurrence

KO/COR 4 ea. per occurrence

As specified

1603000/ 3.1

N/A Water Use Contingency Plan

At a minimum of 15 working days prior to commencement of work and 5 working days after changes

KO/COR/

Installation

Environmental Office

2 Once and any time a change is made

1603000/ 3.1.1.1

N/A Approval of Proposed Water Laboratory

15 days prior to the start of work

KO/COR

2 As required

Spec Item

Form Attachmen t Number

Deliverable Title Date (s) of Submission

Distribution

Frequency Original Copies

(including original)

1603000/ 3.1.1.1

N/A Laboratory Water Analysis Report

15 days after performance of the work

KO/

Preventive Medicine Authority

2 Monthly and for review upon request

1603000/ 3.1.1.2

N/A Monthly Water Quality (FAC, Inorganic/Organic Chemicals, and Radiological Results) Report

Within three working days following the end of the month

KO/COR 2 Monthly

1603000/ 3.1.1.2

N/A Fecal Coliform Report

Within two days after positive result and Monthly

KO/COR 2 As specified

1603000/ 3.1.1.2

N/A Total Coliform Report

Within three working days following the end of the month

KO/COR 2 Monthly

1603000/ 3.1.1.2

N/A Disinfection Profiling and Benchmarking - Monitoring, Profiling and Analysis Report

Within three working days following the end of the month

KO/COR 2 Monthly

3.1.3 N/A Monthly Water

Operating Records Report

Within three working days following the end of the month during which work is performed

KO/COR 2 Monthly

1606001/ 3.2

N/A Preventive Maintenance (PM) Program

At a minimum of 30 calendar days prior to commencement of work and 5 working days after changes

KO/COR 2 Annually.

Update as changes occur.

1606001/ 3.2

N/A PM Scheduled, Unaccomplished Maintenance, Repair Status, and Summary of maintenance and repair accomplished Report

Within three working days following the end of the month during which work is performed

Spec Item

Form Attachmen t Number

Deliverable Title Date (s) of Submission

Distribution

Frequency Original Copies

(including original)

1606001/ 3.3

N/A Water Service Emergency Plan

At a minimum of 15 calendar days prior to commencement of work and 5 working days after changes

KO/COR 2 Once. Update as changes occur

1606001/ 3.4

N/A Inspection, Testing and Certification Program and Schedule

At a minimum of 30 calendar days prior to commencement of work and 5 working days after changes

KO/COR 2 As specified

1606001/ 3.4

N/A Inspection, Testing, and Certification Program Summary Report

Within three working days following the end of the month during which work is performed

KO/COR 2 As specified

1606001/ 3.4.1

N/A Water System Instrumentation and Control Devices’ Testing and Calibration Schedule

At a minimum of 30 calendar days prior to commencement of work and 5 working days after changes

KO/COR 2 As specified

1606001/ 3.5.1

N/A Water Service Emergency Plan

At a minimum of 15 calendar days prior to commencement of work and 5 working days after changes

KO/COR 2 Once. Update as changes occur

1606001/ 3.5.2

N/A Public Notification Procedure

As specified KO/COR/ Public

As necessary to meet requirement

As required

1606001/ 3.5.2

N/A Water Quality Public Notifications and Water Quality Violation Report

As specified KO/COR/ Public

As necessary to meet requirement

As required

Spec Item

Form Attachmen t Number

Deliverable Title Date (s) of Submission

Distribution

Frequency Original Copies

(including original)

1606001/ 3.5.3

N/A Consumer Confidence Report

(CCR)

Draft by April 1st, Final by

June 1st, Distribute and make available to population before July 1st

KO/COR/

Population

As necessary to meet requirement

Annually

1606001/3.

N/A Critical Spare Parts Inventory

Within 30 days following award

KO/COR 2 Once. Update if the requirements change

1606001/ 2.4.1

N/A Potable Water Bulk Delivery Documentation

Prior to deliver any drinking water

KO/COR 2 As specified

1700000 Transportation 1700000/ 2.3.2.1

N/A List of Proposed Buses and Drivers

Prior to start of contract and prior to a new employee starting work

KO/COR 2 As required for changes

1700000/2.

3.2.1

N/A Safety Inspection Test Certificate

Prior to start of contract

KO/COR 2 As required

1700000/2.

3.6

N/A Monthly Summary Report

Monthly KO/COR 2 Monthly

1700000/2.

3.7

N/A Vehicle Insurance Policies

Prior to start of contract

KO/COR 4 As required

1800000 Environmental 1800000/

2.2.1 N/A Training Plan 15 days after

award/ Annually

KO/Installatio n

Environmental Office

2 Annually

1800000/ 2.2.1

N/A Training Documentation

15 days after award/

Annually

KO/Installatio n

Environmental Office

2 Once

1800000/ 2.3.2

N/A Health and Safety Plan

Within 15 days after contract award for review and approval

KO/COR/

Installation

Environmental Office

2 Once and any time a change is made

1800000/ 2.3.3

N/A Spill Response and Preparedness Implementation Plan

Within 15 days after contract award for review and approval

KO/COR/

Installation

Environmental Office

3 Once and any time a change is made

Spec Item

Form Attachmen t Number

Deliverable Title Date (s) of Submission

Distribution

Frequency Original Copies

(including original)

1800000/ 3.1

N/A Annual Work Schedule

30 working days after award and 15 working days after the start of each option year

KO/COR/

Installation

Environmental Office/Naval

Hospital Facility

Department

4 Within 15 days after award and annually thereafter

1800000/ 3.1

N/A Monthly Work Plan

Five work days prior to the beginning of each month

KO/COR/

Installation

Environmental Office/Naval

Hospital Facility

Department

4 Monthly

1800000/ 3.2.4

N/A RMW Disposal Report (Manifest)

10 days after the end of the reporting period

KO/COR/

Installation

Environmental Office/Naval

Hospital Facility

4 Monthly

File details come from the government source that posted it. Updated .