SECTION J – 1604000
WASTEWATER
DOCUMENTS, EXHIBITS, AND OTHER ATTACHMENTS
TABLE OF CONTENTS
ATTACHMENT
NUMBER ATTACHMENT TITLE
J-1604000-01 DEFINITIONS AND ACRONYMS
J-1604000-02 REFERENCES AND TECHNICAL DOCUMENTS
J-1604000-03 WASTEWATER AND STORM DRAIN COLLECTION SYSTEMS
J-1604000-04 SEWER LINES AND STORM DRAINS SYSTEMS
J-1604000-05 SEPTIC TANKS
J-1604000-06 HISTORICAL SEPTIC TANKS, SEWER LINES AND HOLDING TANK
SEWAGE WASTE TONNAGE DATA
J-1604000-07 HOLDING TANK
ATTACHMENT J-1604000-01
DEFINITIONS AND ACRONYMS
DEFINITION DESCRIPTION
Applicable Regulatory Drivers
The Italian national, regional, and local laws and regulations, including but not limited to the Italian Legislative Decree no.152 of 3 April 2006 (D.Lgs.152/06), as well as, when found not in conflict with them and more protective of the human health and environment, the applicable provisions of the Environmental Final Governing Standards for Italy (I- FGS), and of the additional documents listed in the References and Technical Documents in J-1604000-02, including any amendments to the foregoing.
Equipment, Collateral Encompasses built-in and large substantially affixed equipment/property that is normally acquired and installed as part of a facility project.
Equipment, Installed Encompasses building-type equipment, built-in equipment, and large, substantially affixed equipment/property, and is normally acquired and installed as part of a facility project. Installed equipment is normally required to make a facility useful and operable.
Removing such equipment would impair the usefulness, safety, or environment of the facility or the facility restoration work required after its removal, is substantial.
Equipment, Personal Property
Personal property equipment includes all equipment other than collateral equipment.
Such equipment, when acquired and used in a facility or a test apparatus, can be severed and removed aster erection or installation without substantial loss of value or damage thereto or to the premises where installed.
Facilities Life Cycle A facilities life cycle is divided into four stages, requirements (planning and design), acquisition (construction and acceptance), stewardship (operations, maintenance and repair), and disposal.
Facilities Maintenance Management
The planning, prioritizing, organizing, controlling, reporting, evaluating, and adjusting of facilities maintenance operations to support the CNO/NAVFAC facilities policy and objectives and satisfy customers’ facility needs. Defined by the International Facility Management Association as “the practice of coordinating the physical workplace with the people and work of the organization.”
Integrated Maintenance Plan
IMP is a recurring state-of-the-art, reliability-centered inspection, testing, maintenance and repair program that determines best practices for managing the functions and consequences of failures of facilities equipment and system components. IMP encompasses accepted commercial practices, including reactive, preventive, predictive and proactive maintenance, into one optimal program. The IMP approach gives the Contractor full responsibility to maintain systems and equipment and perform repairs whenever necessary to ensure equipment and systems are operational and remain in a constant state of readiness.
Life-Cycle Costs A form of economic analysis that considers the total cost of owning, operating, and maintaining a building or system over its useful life.
Repair Repair is the restoration of facilities or equipment to such a condition that it may be effectively utilized for its designated purposes by overhaul, reconstruction, or replacement of constituent parts or materials which have deteriorated by action of the elements or usage, and which have not been corrected through maintenance. This term also applies to replacement of the entire unit or system if beyond economical repair. The intent of repair is to have the equipment at normal working condition.
Replacement Replacement, as a distinct work element, is confined to a program of planned replacement of a facility or its components. It may be further limited to major components such as air conditioning compressors, furnaces or hot water heaters. Replacement is performed when the equipment has reached the end of its useful life; when it no longer can perform due to degradation of its internal components and repair is no longer cost effective. Included under the replacement would be the major rebuilding of any component, since rebuilding also restores performance.
ATTACHMENT J-1604000-01
DEFINITIONS AND ACRONYMS
DEFINITION DESCRIPTION
Restoration Restoration of real property to such a condition that it can be used for its intended purpose. Includes repair or replacement work to restore facilities damaged by inadequate sustainment, excessive age, natural disaster, fire, accident or other causes.
Sustainment Maintenance and repair activities necessary to keep a typical inventory of facilities in “normal working condition”. Sustainment includes regularly scheduled maintenance as well as cyclical major repairs or replacement of components that occur periodically over the expected service life of the facilities.
SCADA A version of telemetry commonly used in wide-area industrial applications, such as electrical power generation and distribution and water distribution, which includes supervisory control of remote stations as well as data acquisition from those stations over a bidirectional communications link.
ACRONYM TITLE
ANSI American National Standards Institute ASHRAE American Society of Heating, Refrigerating and Air-Conditioning Engineers ASME American Society of Mechanical Engineers MACP Manhole Assessment and Certification Program NASSCO National Association of Sewer Service Companies NPDES National Pollutant Discharge Elimination System PACP Pipeline Assessment and Certification Program SCADA Supervisory Control and Data Acquisition SRM Sustainment, Restoration and Modernization UFC Unified Facilities Criteria WEF Water Environmental Federation
ATTACHMENT 1604000-02
REFERENCES AND TECHNICAL DOCUMENTS
The Contractor shall adhere to the applicable portions of the current edition of the following publications and directives in performing the services required under this contract. This list shall not be considered all-inclusive and does not release the Contractor from all obligations that must be fulfilled in the observance and execution of this contract.
When U.S., European and/or Italian directives, instructions and industry standards are applicable to the work to be performed under this contract, the most stringent directives, instructions and industry standards shall govern.
REFERENCE TITLE
EI 11C201 Wastewater Collection and Pumping MIL-HDBK-1005/9 Industrial and Oily Wastewater Control UFC 3-240-02N Wastewater Treatment Systems UFC 3-240-04A Wastewater Collection UFC 3-240-07FA Sanitary and Industrial Wastewater Collection: Gravity Sewers and Appurtenances UFC 3-240-09FA Domestic Wastewater Treatment UFC 4-832-01N Design: Industrial and Oily Wastewater Control
ATTACHMENT J-1604000-03
WASTEWATER AND STORM DRAIN COLLECTION SYSTEMS INVENTORY
FUNDING ACTIVITY: REGION
LOCATION: GAETA
WASTEWATER COLLECTION SYSTEM
Bldg No. Location Equipment Description Technical Specifications Qty
752 Fitness/Rec. Center Buried gravity pipeline 8” diameter 60 lm Fitness/Rec. Center Sewer tank (wet well) 1 cu mt capacity 2 Fitness/Rec. Center Inspection pit 0.05 cu mt capacity 1
752A Underground concrete sewer tank (wet well)
Manhole with cast iron covering 1
Buried pressurized pipeline 3.15" diam., 4 ea. floor clean-outs 100 lm Laundry Drain Pit Submersible pump Mfgr: Idromec, Mod. PV/M 3/A, 1.5
HP, installed in the tank
Laundry Drain Pit Minimum level sensor
Laundry Drain Pit Maximum level sensor 1
Control panel Feeding/controlling pump and sensors 1 Laundry Buried gravity pipeline 8” diameter 20 lm Laundry Sewer tank (wet well) 1 cu mt capacity 1 Laundry Inspection pit 0.05 cu mt capacity 2
757 Trailers/Laundry Underground concrete sewer tank (wet well)
Manhole with cast iron covering 2
Trailers/Laundry Buried pressurized pipeline 3.15" diam. 200 lm Trailers/Laundry Submersible pump 1.5 HP, installed in the tank 2 Trailers/Laundry Minimum level sensor
Trailers/Laundry Maximum level sensor 1 Trailers/Laundry Control panel Feeding/controlling pump and sensors 1
WASTEWATER AND STORM DRAIN COLLECTION SYSTEMS INVENTORY – Cont.
LOCATION: GAETA
SHIP-TO-SHORE WASTEWATER LIFT STATION
Location Equipment Description Manufacturer Model/Type Technical Specification Qty
Wastewater Tank Air blower MAPRO TURBOTRON 250 m3/h 1 Lift Station Butterfly valve on blower
VALSAR WAFER G/1 DN 125 1
Lift Station Check valve on blower VALSAR AISI 304 DN 65 2 Lift Station Submersible pumps FAGGIOLATI
PUMPS
B210T3A30 50 m3/h 3
Lift Station Ball valve on pump RBR VALVOLE Serie 10WAFER
TYPE
3" 3
Lift Station Check valve on pump FIL-PEMTO D6666AISI 316 3" 3 Lift Station Control panel for pumps MANIERO
ELETTRONICA
QTDE30/Kw-T 5,5 Kw 1
Lift Station Ultrasonic level meter AUTOMATION
PROGETTI
AP5117 -
NT680E
6 Digital Outputs 1
Lift Station Ultrasonic level probe AUTOMATION
PROGETTI
AP5126 0.25m-5m 1
Lift Station T-Connection 1 Wastewater Tank Electromagnetic flowmeter
DANFOSS MAG1100 -
MAG 5000
DN 8036-90 m3/h 1
Wastewater Tank Printer MJKII
AUTOMATION
MJK 791 2 Timers with hr/24 -hr/yr valves
Wastewater Tank Autom. Feeder for Tank Cathodic Protection
ELME CP2 49V.8A.
D.C.
Feeding 220 V, 50 Hz.Output current 8A
Wastewater Tank Zinc reference electrode SEAGUARD S/D 30 X 400/2 PE/POLIOLEFINA- 0,6/1 kV, F1x16mm2
Wastewater Tank Tubular anodes SEAGUARD CPR-8C/CPR-
10FW
1", length 44" 4
Wastewater Tank Exhaust fan on tank DYNAIR BOX-T 9/9 Air flow: 2000 m3/h 1 Wastewater Tank Activated charcoal filters on tank
FCR P-CARB, PCA-
1/12 Size: 610x610x470 mm
Wastewater Tank General Control Panel
PWW
VEMER PWW Gen. Disconnect Switch. LED and Relays
Wastewater Tank Air blower control panel
PWS
VEMER PWS Disconnect switches.
Thermal protection
Pier Alarm Panel Q.AL 1 for lift station
VEMER Q.AL 1 230-400V/24V
AC/DC. Relays
R1,R2,RT2
Lift Station Alarm Panel Q.AL 2 for lift station
VEMER Q.AL 2 230-400V/24V
AC/DC. Relays
R1,R2,RT2
Next to Bldg 752A
Alarm Panel Q.AL 3 for lift station
VEMER Q.AL 3 230-400V/24V
AC/DC. Relays
R1,R2,RT2
WASTEWATER AND STORM DRAIN COLLECTION SYSTEMS INVENTORY – Cont.
GAETA - WASTEWATER SYSTEM LAYOUT
To City Sewer Line
Pressurized Pipeline
Gravity Pipeline
Italian Navy Pipeline
ATTACHMENT J-1604000-04
SEWER LINES AND STORM DRAINS SYSTEMS INVENTORY
Funding Activing: REGION
LOCATION: CAPODICHINO –
SEWER LINES AND STORM DRAINS SYSTEMS
Equipment Description Technical Specification and Frequencies of Services (Approx. Quantities and Sizes)
Sewer Trunk Line - 2,000 mt total length
- 300 mm diameter Inspection/Cleaning/Unclogging: Semi-Annually
Inspection Pits - 50 each
- 1 cu mt each Cleaning: Quarterly
Main Conveyor - 1 each Inspection/Cleaning/Unclogging: Quarterly
Drain Trunk Line - 3,500 mt total length
- 300 mm diameter Inspection/Cleaning/Unclogging: Semi-Annually
Inspection Pits and Grates - 100 each
- 1 cu mt each Inspection/Cleaning/Unclogging: Semi-Annually
Internal Grates, Rain Water Collection Bldg 461, East Parking Garage
- 50 mt total length
- 40 cm diameter Inspection/Cleaning/Unclogging: Semi-Annually
LOCATION: LAGO PATRIA SATCOM
SEWER LINE SYSTEMS
Equipment Description Technical Specification and Frequencies of Services (Approx. Quantities and Sizes)
Sewer Gravity Line - 160 mt total length
- 300 mm diameter Inspection/Cleaning/Unclogging: Semi-Annually
Gravity Line Inspection Pits - 4 each
- 1 cu mt each Cleaning: Quarterly
Lift Station - 1 each Inspection/Cleaning/Unclogging: Quarterly
Pressurized Line - 50 mt total length Inspection/Cleaning/Unclogging: Semi-Annually
Pressurized Line Inspection Pits - 2 each
- Inspection: Required in conjunction with the above operations
SEWER LINES AND STORM DRAINS SYSTEMS – Cont.
CAPODICHINO - SEWER SYSTEM LAYOUT
Note: this layout is approximate and may not be showing the entire Capodichino sewer system to be maintained under this contract.
LAGO PATRIA SATCOM - SEWER SYSTEM LAYOUT
SEWER LINES AND STORM DRAINS SYSTEMS – Cont.
CAPODICHINO - STORM DRAIN SYSTEM LAYOUT
Note: this layout is approximate and may not be showing the entire Capodichino storm drain system to be maintained under this contract.
ATTACHMENT J-1604000-05
SEPTIC TANKS INVENTORY
LOCATION: CAPODICHINO
SEPTIC TANKS
Bldg No. Layout Code1
Equipment Description Size
Servicing Frequency Routing
Emptying Complete Empting
402 A Septic Tank 6 m3 As Required (refer to Technical
Specification 1604000, Spec
Item 3.3.3)
Quarterly 401 B1 Inspection Pit 1 m3
B2 Septic Tank 5 m3
LOCATION: CARNEY PARK
SEPTIC TANKS
Bldg No. Layout Code1
Equipment Description Size
Routing Emptying
Complete Empting
526/540 A1 Septic Tank 10 m3 As Required (refer to Technical
Specification 1604000, Spec
Item 3.3.3)
Quarterly A2 Septic Tank 10 m3
A3 Septic Tank 10 m3 525 B Septic Tank 9 m3 524 C Septic Tank 9 m3 522 D Septic Tank 9 m3 528 E Septic Tank 12 m3 500 F Septic Tank 9 m3 514 G Septic Tank 12 m3 551 H Septic Tank 12 m3
522/554 J Septic Tank 10 m3
Note 1: Refer to the below attached Capodichino and Carney Park maps for approximate locations
SEPTIC TANKS INVENTORY – Cont.
CAPODICHINO - SEPTIC TANKS AND INSPECTION PIT
SEPTIC TANKS INVENTORY – Cont.
CARNEY PARK - SEPTIC TANKS AND HOLDING TANK
ATTACHMENT J-1604000-06
HISTORICAL SEPTIC TANKS, SEWER LINES SEWAGE WASTE TONNAGE DATA
LOCATION CER CODE TYPE OF WASTE Annual Quantity (Liter)
FY2020 FY2021
Capodichino 200304 Septic Tank Sludge /
Fanghi delle Fosse Settiche
131,080 129,000 Carney Park 1,002,060 1,142,120
Gaeta 19,080 19,060
Carney Park 161002 Aqueous Liquid Wastes / Soluzioni Acquose di Scarto 129,560 109,180
ATTACHMENT J-1604000-07
HOLDING TANK INVENTORY
Funding Activity: REGION
CARNEY PARK - Holding Tank1
Bldg No. Equipment Description Size Frequencies of Services
528 Swimming Pool Holding Tank
16 m3 From mid-April to Pool Opening Day (Memorial Day): 2 times a week From Opening Day to 2nd week in September: every 2 weeks
Note 1: Refer to attached Carney Park map (J-1604000-05) for holding tank location.