SECTION J – 1502000
FACILITY INVESTMENT
DOCUMENTS, EXHIBITS, AND OTHER ATTACHMENTS
TABLE OF CONTENTS
ATTACHMENT
NUMBER
ATTACHMENT TITLE
J-1502000-01 DEFINITIONS AND ACRONYMS
J-1502000-02 REFERENCES AND TECHNICAL DOCUMENTS
J-1502000-03 FACILITIES DESCRIPTION
J-1502000-04 PREVENTIVE MAINTENANCE (PM) PROGRAM AND INTEGRATED MAINTENANCE
PROGRAM (IMP) SERVICES MATRIX
J-1502000-05 ANTICIPATED SERVICE ORDERS
J-1502000-06 SAMPLE OF PROJECT WORK ORDERS
J-1502000-07 DIRECT DIGITAL CONTROL (DDC) SYSTEMS DESCRIPTION
J-1502000-07.a DIRECT DIGITAL CONTROL (DDC) SYSTEM CHECKLIST
J-1502000-08 EXHAUST HOODS AND DUCTS
J-1502000-09 GROUNDING SYSTEMS FOR INCOMING ELECTRICAL SUBSTATIONS
J-1502000-10 LIGHTNING ARRESTORS AND GROUNDING SYSTEMS
J-1502000-11 MEDIUM VOLTAGE (MV) BREAKERS
J-1502000-11.a MV BREAKERS LOCATION MAPS AND SINGLE-LINE DIAGRAMS
J-1502000-11.b SAMPLE POWER OUTAGE SCHEDULE
J-1502000-12 AIR EXHAUST SYSTEMS
J-1502000-13 AUTOMATED DOORS
J-1502000-14 AUXILIARY GENERATOR SYSTEMS
J-1502000-15 BOILERS AND UNFIRED PRESSURE VESSELS (UPVS) EQUIPMENT AND SYSTEMS
J-1502000-16 CARBON MONOXIDE (CO) DETECTION SYSTEMS
J-1502000-17 COMPRESSED AND MEDICAL AIR, GAS AND VACUUM SYSTEMS
J-1502000-18 EMERGENCY AND EXIT LIGHTING SYSTEMS
J-1502000-19 EMERGENCY EYEWASH AND SHOWER STATIONS
J-1502000-20 ELECTRICAL SYSTEMS
J-1502000-21 ELECTRONIC SECURITY SYSTEMS
J-1502000-22 FIRE PROTECTION SYSTEMS
J-1502000-23 FOOD SERVICE EQUIPMENT
J-1502000-24 GATES AND OVERHEAD AND ROLL-UP DOORS
J-1502000-25 INTERNAL WATER TREATMENT SYSTEMS
J-1502000-25.a SAMPLE OF WATER TESTS FORM
J-1502000-26 ISOLATION ROOMS
J-1502000-27 HVAC AND REFRIGERATION SYSTEMS
J-1502000-27.a OPERATING LOG SAMPLE FORM FOR CHILLERS
J-1502000-28 MOISTURE DETECTION SYSTEMS
J-1502000-29 PUBLIC ADDRESS (PA), NURSE CALL AND CODE BLUE SYSTEMS
J-1502000-30 REFRIGERATION SYSTEMS
J-1502000-31 SUMP PUMPS
J-1502000-32 UNINTERRUPTED POWER SYSTEMS (UPS)
J-1502000-33 VERTICAL TRANSPORTATION EQUIPMENT (VTE) AND SYSTEMS
J-1502000-34 KITCHEN EXHAUST HOODS AND DUCTS (CLEANING)
J-1502000-35 ELECTRICAL RECEPTACLES
J-1502000-36 FIRE DOORS AND FIRE WALLS
J-1502000-37 UNDER GROUND (UG) FUEL OIL STORAGE TANKS
J-1502000-38 FALL PROTECTION SYSTEMS FOR FACILITIES AND STRUCTURES
J-1502000-38.a SAMPLE AS BUILT ANCHOR POINTS (BLDG 402)
J-1502000-39 HVAC DUCT SYSTEMS
J-1502000-39.a HVAC DUCT SYSTEMS ANNUAL INSPECTING, CLEANING AND DISINFECTING
SCHEDULE
J-1502000-40 GUTTERS AND DOWNSPOUTS
ATTACHMENT J-1502000-01
DEFINITIONS AND ACRONYMS
DEFINITION DESCRIPTION
Crane, Category 1 Portal cranes, Hammerhead cranes, Locomotive cranes, Derricks, Floating cranes
(YD), Tower cranes, Container cranes, Mobile cranes (except those indicated as category 4), including truck, cruiser, crawler, warehouse/industrial cranes, and cranes used for dragline, pile driving, clamshell, magnet, bucket work, and Aircraft crash cranes.
Crane, Category 2 & 3 Cranes with rated capacities of 20,000 pounds or greater are category 2. Examples are
Overhead traveling cranes, Gantry cranes (rail mounted), Wall cranes, Jib cranes, Pillar cranes, Pillar jib cranes, Monorails and associated hoists, Fixed hoists including chain falls. Pedestal mounted commercial boom assemblies (fixed length, telescoping, and articulating types) attached to stake trucks, trailers, flatbeds, or railcars, or stationary mounted to piers, etc., with OEM rated capacities less than 2,000 pounds.
Crane, Category 4 Commercial truck mounted cranes, Truck mounted articulating boom cranes, Pedestal mounted commercial boom assemblies (fixed length, telescoping, and articulating types) attached to stake trucks, trailers, flatbeds, or railcars, or stationary mounted to piers, etc., with OEM rated capacities of 2,000 pounds and greater. Commercial truck mounted cranes and truck mounted articulating boom cranes with OEM capacities of
2,000 pounds and greater require a licensed operator even if the cranes are down rated below 2,000 pounds capacity for administrative purposes.
Equipment, Collateral Encompasses built-in and large substantially affixed equipment/property that is normally acquired and installed as part of a facility project.
Equipment, Installed Encompasses building-type equipment, built-in equipment, and large, substantially affixed equipment/property, and is normally acquired and installed as part of a facility project. Installed equipment is normally required to make a facility useful and operable. Removing such equipment would impair the usefulness, safety, or environment of the facility or the facility restoration work required after its removal, is substantial.
Equipment, Personal
Property
Personal property equipment includes all equipment other than collateral equipment.
Such equipment, when acquired and used in a facility or a test apparatus, can be severed and removed aster erection or installation without substantial loss of value or damage thereto or to the premises where installed.
Facilities Life Cycle A facilities life cycle is divided into four stages, requirements (planning and design), acquisition (construction and acceptance), stewardship (operations, maintenance and repair), and disposal.
Facilities Maintenance
Management
The planning, prioritizing, organizing, controlling, reporting, evaluating, and adjusting of facilities maintenance operations to support the CNO/NAVFAC facilities policy and objectives and satisfy customers’ facility needs. Defined by the International Facility
Management Association as “the practice of coordinating the physical workplace with the people and work of the organization.”
Integrated Maintenance
Program (IMP)
IMP is a recurring state-of-the-art, reliability-centered inspection, testing, maintenance and repair program that determines best practices for managing the functions and consequences of failures of facilities equipment and system components. IMP encompasses accepted commercial practices, including reactive, preventive, predictive and proactive maintenance, into one optimal program. The IMP approach gives the
Contractor full responsibility to maintain systems and equipment and perform repairs whenever necessary to ensure equipment and systems are operational and remain in a constant state of readiness. Service Orders will not be issued for accomplishment of repairs on systems and equipment maintained under IMP.
Life-Cycle Costs A form of economic analysis that considers the total cost of owning, operating, and maintaining a building or system over its useful life.
DEFINITION DESCRIPTION
Maintenance, Preventive
Maintenance designed to increase the availability of the facilities/equipment by reducing the number of unexpected breakdowns or service interruptions. It is any planned maintenance activity that improves equipment life and avoid any unplanned maintenance requirements.
Management
Information Systems-
Maintenance
A computerized system that will provide sufficient information for management to evaluate differences between budgets and actual costs and evaluate performance.
Repair Repair is the restoration of facilities or equipment to such a condition that it may be effectively utilized for its designated purposes by overhaul, reconstruction, or replacement of constituent parts or materials which have deteriorated by action of the elements or usage, and which have not been corrected through maintenance. This term also applies to replacement of the entire unit or system if beyond economical repair.
The intent of repair is to have the equipment at normal working condition.
Replacement Replacement, as a distinct work element, is confined to a program of planned replacement of a facility or its components. It may be further limited to major components such as air conditioning compressors, furnaces or hot water heaters.
Replacement is performed when the equipment has reached the end of its useful life;
when it no longer can perform due to degradation of its internal components and repair is no longer cost effective. Included under the replacement would be the major rebuilding of any component, since rebuilding also restores performance.
Restoration Restoration of real property to such a condition that it can be used for its intended purpose. Includes repair or replacement work to restore facilities damaged by inadequate sustainment, excessive age, natural disaster, fire, accident or other causes.
Sustainment Maintenance and repair activities necessary to keep a typical inventory of facilities in
“normal working condition”. Sustainment includes regularly scheduled maintenance as well as cyclical major repairs or replacement of components that occur periodically over the expected service life of the facilities.
Weight Handling
Equipment (WHE)
Weight handling equipment consists of cranes (e.g., portal cranes, jib cranes), rigging gear (e.g., slings, shackles), and associated equipment (e.g., portable hoists, dynamometers).
ACRONYM TITLE
ACO Administrative Contracting Officer
BPVC Boiler and Pressure Vessel Code
BW Biweekly
CDR Contract Discrepancy Report
CIA Controlled Industrial Area
CMMS Computerized Maintenance Management System
COR Condition of Readiness
DBH Diameter at Breast Height
DoD Department of Defense
DoN Department of Navy
DRMO Defense Reutilization Management Office
EPA Environmental Protection Agency
EPCRA Emergency Planning and Community Right-to-Know Act
FAR Federal Acquisition Regulation
FFP Firm Fixed Price
FIFRA Federal Insecticide, Fungicide, and Rodenticide Act
FSC Facility Support Contract
GFE Government-furnished Equipment
GFF Government-furnished Facilities
GFM Government-furnished Materials
GPWS Guide Performance Work Statements
HCA Head Contracting Agency
HVAC Heating, Ventilation, and Air Conditioning
ICAP Infrastructure Condition Assessment Program
ICP Integrated Contingency Plan
IDIQ Indefinite Delivery Indefinite Quantity
IFLOLS Improved Fresnel Lens Optical Landing System
IPM Integrated Pest Management
IPMIS Integrated Pest Management Information System
IPMP Integrated Pest Management Plan
KO Contracting Officer
LAN Local Area Network
M Monthly
MSDS Material Safety Data Sheets
NFPA National Fire Protection Association
NAVFAC Naval Facilities Engineering Command
NMCI Navy Marine Corps Intranet
NOSC Navy-On-Scene Coordinator
PAP Performance Assessment Plan
PAR Performance Assessment Representative
PAW Performance Assessment Worksheet
PEO Program Executive Officer
PM Project Manager
PRCSP Permit Required Confined Space Program
PWS Performance Work Statement
Q Quarterly
QC Quality Control
RPIE Real Property Inventory Equipment
SC Security Clearances
SCADA Supervisory Control And Data Acquisition
ACRONYM TITLE
SM Semimonthly
SOP Standard Operating Procedures
SPAR Senior Performance Assessment Representative
SRM Sustainment, Restoration and Modernization
TE Technical Evaluation
UFC Unified Facilities Criteria
UPV Unfired Pressure Vessel
VIQ Variation in Quantity
WBS Work Breakdown Structure
ATTACHMENT J-1502000-02
REFERENCES AND TECHNICAL DOCUMENTS
The Contractor shall adhere to the applicable portions of the following publications and directives in performing the services required under this contract. This list shall not be considered all-inclusive and does not release the
Contractor from all obligations that must be fulfilled in the observance and execution of this contract.
When U.S., European and/or Italian directives, instructions and industry standards are applicable to the work to be performed under this contract, the most stringent directives, instructions and industry standards shall govern.
REFERENCE TITLE
DM 1 March 1974 Norme per l'Abilitazione alla Conduzione di Generatori di Vapore
DPR 162/99 Norme per l’attuazione delle direttive 95/16/CE e 2006/42/CE (Ascensori e
Montacarichi)
CEI EN 50110-1 Operation of Electrical Installations
CEI 11-27 Lavori su Impianti Elettrici
UFC 3-410-01 Heating, Ventilating, and Air Conditioning Systems
UFC 3-410-06 Operation and Maintenance: Central Heating Plants
UFC 3-430-07 Operations and Maintenance: Inspection and Certification of Boilers and Unfired
Pressure Vessels
UFC 3-550-01 Exterior Electrical Power Distribution
UFC 3-560-01 Electrical Safety O&M
UFC 3-570-06 Cathodic Protection
UFC 3-600-02 Operations and Maintenance: Inspection, Testing, and Maintenance of Fire
Protection Systems
NAVMED P-5010-4 Manual of Naval Preventive Medicine
OSHA Occupational Safety and Health – Laws and Regulations
Technical Manual (OTM)
OSHA Instruction TED 01-00-015, Section III: Chapter 7, Legionnaires’ Disease
UNI EN 81-1 Safety rules for the construction and installation of lifts – Part 1 : Electric lifts
UNI EN 81-2 Safety rules for the construction and installation of lifts – Part 2 : Hydraulic lifts
SIEMENS O&M Operation and Maintenance of Telemetry Alarm System Manual
NAVFAC P-717 Preventive/Recurring Maintenance Handbook
NAVFAC MO-114 Building Maintenance
NAVFAC MO-115 Systems Maintenance Refrigeration
NAVFAC MO-118 Inspection of Vertical Transportation Equipment
NAVFAC MO-119 Building Maintenance; Galley Equipment
NAVFAC MO-200 Facilities Engineering Electrical Exterior Facilities
NAVFAC MO-206 Operation and Maintenance of Air Compressor Plants
NAVFAC MO-209 Maintenance of Steam, Hot Water and Compressed Air Distribution Systems
NAVFAC MO-210 Maintenance & Operation of Water Supply System, Treatment & Distribution
Systems
NAVFAC MO-220 Maintenance and Operation of Gas Systems
NAVFAC MO-225 Industrial Water Treatment
NAVFAC MO-324 Inspection and Certification of Boilers and Unfired Pressure Vessels
NAVFAC MO-912 Standard for Ventilation Control and Fire Protection of Commercial Cooking
Operations
NAVFACINST 11300.37 Energy and Utilities Policy Manual
NEC National Electrical Code
NESC National Electrical Safety Code
NFPA National Fire Protection Agency Standards
NFPA Standard 25 Standard for the Inspection, Testing, and Maintenance of Water-Based Fire
Protection Systems
REFERENCE TITLE
NFPA Standard 96 Standard for Ventilation Control and Fire Protection of Commercial Cooking
Operations
NFPA Standard 99 Standards for Health Care Facilities
ASME BPVC VI 1998 American Society of Mechanical Engineers, Boiler & Pressure Vessel Code
MIL-HDBK-1152 Inspection & Certification of Boilers & Unfired Pressure Vessels
OPNAVINST 5090.1 Environmental Readiness Program Manual
ASHRAE American Society of Heating, Refrigerating and Air Conditioning Engineers
ATTACHMENT J-1502000-03
FACILITIES DESCRIPTION
The Facilities Description file is provided as a separate attachment. Refer to Excel file “J-1502000-03 Facilities
Description”.
ATTACHMENT J-1502000-04
PREVENTIVE MAINTENANCE (PM) PROGRAM AND INTEGRATED MAINTENANCE PROGRAM (IMP)
SERVICES MATRIX
The Preventive Maintenance (PM) Program and Integrated Maintenance Program (IMP) Services Matrix is provided as a separate attachment. Refer to Excel file “J-1502000-04 PM and IMP Services Matrix”.
ATTACHMENT J-1502000-05
ANTICIPATED SERVICE ORDERS
Service Order
Classification
Service Order
Type
Estimated
Annual
Quantity
Limit of Liability
(Labor & Material)
FUNDING ACTIVITY: REGION
Emergency I 40 $ 350
II 45 $ 800
III 12 $ 1,500
IV 6 $ 2,500
V 6 $ 3,500
Urgent I 15 $ 350
II 45 $ 800
III 12 $ 1,500
IV 6 $ 2,500
V 6 $ 3,500
Routine I N/A N/A
II 15 $ 800
III 12 $ 1,500
IV 6 $ 2,500
V 6 $ 3,500
FUNDING ACTIVITY: Defense Health Agency
Emergency I N/A N/A
II
Urgent I 10 $ 350
II 5 $ 1,000
Routine I N/A N/A
II
ATTACHMENT J-1502000-06
ANTICIPATED PROJECT WORK ORDERS
Project Work
Orders Level
Estimated
Annual
Quantity
Limit of Liability
(Labor & Material)
FUNDING ACTIVITY: REGION
1 4 $ 10,000
2 2 $ 25,000
FUNDING ACTIVITY: Defense Health Agency
1 1 $ 30,000
2 N/A N/A
ATTACHMENT J-1502000-07
DIRECT DIGITAL CONTROL (DDC) SYSTEMS
The Contractor shall develop a PM program (Region funded) for the Direct Digital Control (DDC) Systems software and firmware only. Region funded DDC System is a Honeywell proprietary system, model EBI System (R500.1).
It includes approximately 156 CPUs, 60 CPU Expansions and 2 Servers. Only CPU expansion in the panelboard are part of the contract. Those in the false ceiling are not included. See J-1502000-07.a for required checklist and deliverable details.
The Contractor shall develop and implement an IMP (Defense Health Agency funded) for the Direct Digital Control
(DDC) Systems and all mechanically and electrically interlocked ancillary parts, equipment, and components of the
DDC Systems, such as: Control Units, CPU, UPS, LON Interface, Thermostats, Temperature Probes, Control Air
Compressors, etc.
Defense Health Agency funded DDC System provides ventilation and conditioned air to critical hospital and patient treatment rooms, monitors critical laboratory exhaust and isolation rooms and is considered critical to life and health of patients. System shall be monitored 24 hours a day. This is an ICS partner of Schenider Electric proprietary system - Satchewell has been delegated in support for the territory of Italy. It includes approximately 73 DDC units complete with UPS - 7 Temperature Probes and 9 Thermostats in Bldg. 2086, and 308 Temperature Probes and 12
Thermostats in Bldg. 2082. Network Maps will be provided after contract award.
ATTACHMENT J-1502000-07.a
DIRECT DIGITAL CONTROL (DDC) SYSTEM CHECKLIST
Checkpoints Check Box
Initial Honeywell EBI Upgrade patches Six: ___ ___ ___ ___ ___ ___
Back-up Honeywell EBI Databases on DVD and provide to Contracting Officer's Representative Six: ___ ___ ___ ___ ___ ___
Check Honeywell C-Bus communication (HVAC) Three: ___ ___ ___
Check Client Honeywell EBI Three: ___ ___ ___
Install Honeywell EBI standard patches/upgrades Six: ___ ___ ___ ___ ___ ___
Ghost of Honeywell EBI system Three: ___ ___ ___
Control of the Honeywell EBI Server energy Six: ___ ___ ___ ___ ___ ___
Check of the Honeywell C-BUS data traffic Three: ___ ___ ___
Technical support third party interfaces Six: ___ ___ ___ ___ ___ ___
Check database sol Honeywell IRC controls Three: ___ ___ ___
Diary of Maintenance Six: ___ ___ ___ ___ ___ ___
Update Documentation Six: ___ ___ ___ ___ ___ ___
Check Communication of OPC (Modbus/Protocols) Three: ___ ___ ___
A copy of the required above Checklist is due to the Contracting Officer upon completion of the maintenance cycle and included with the Diary of Maintenance performed at each visit.
Update of Documentation is due within 10 calendar days of the performed maintenance cycle and included with the Diary of Maintenance and Checklist
ATTACHMENT J-1502000-08
EXHAUST HOODS AND DUCTS
The Contractor shall develop and implement a PM program for the exhaust hoods and ducts and all mechanically and electrically interlocked ancillary parts, equipment, and components such as: filters, fans, fan housing, plenums, grease removal devices, waterproof covers, access panels, motors, cable, retainers, ducts, baffles, full length of ventilation ducts, etc. The below list is provided to give a general sense of the magnitude of work but may not include all assets required to be maintained.
FUNDING ACTIVITY: Defense Health Agency
BLDG NO. /
LOCATION
DESCRIPTION
QTY
(ea.)
GRICIGNANO SUPPORT SITE
2082 / Hospital /
Room 1168
Exhaust Hood, Kitchen / Brand: Rosenberg; Model A26-71040 D14.12)VW710-
6D (EF
2082 / Hospital /
Room 1177
ATTACHMENT J-1502000-09
GROUNDING SYSTEMS FOR INCOMING ELECTRICAL SUBSTATIONS
Grounding systems for incoming electrical substation commence at, and includes the utility isolation point of connection and terminate at foundation. The Contractor shall develop and implement an Inspection, Testing and
Certification program for grounding systems and all mechanically and electrically interlocked ancillary parts, equipment, and components such as: brakes, cables, circuit breakers, frequency drives, hoist, hooks, inverters, latches, surge suppressors, trackage, transformers, motors, wiring, monitoring and controls systems, conductors, bonding, ground rods, air terminals, etc. The below list is provided to give a general sense of the magnitude of work but may not include all assets required to be maintained.
TYPE OF SYSTEM LOCATION
UTILITIES
LOCATION
Grounding System for Utilities
Electrical Distribution, Capodichino
Bldg. 409, Capodichino Main Substation and downstream Substations (see layout below – 16 ea.
SS Substations + 409/411 = 18 Total
Capodichino:
CAPODI-ED00
Grounding System for Utilities
Electrical Distribution, Carney Park
Bldg. SS-560, Carney Park Main Substation and downstream Substation, Golf Course (see layout below)
Carney Park:
CARPAR-ED02
Grounding System for Utilities
Electrical Distribution, Lago Patria
Bldg. ED-05, Lago Patria Main Substation and downstream Substations, SS-1, SS-2 (see layout below)
Lago Patria: N/A
GROUNDING SYSTEMS FOR INCOMING ELECTRICAL SUBSTATIONS - Cont.
ATTACHMENT J-1502000-10
LIGHTNING ARRESTORS AND GROUNDING SYSTEMS
Lightning arresting and grounding systems commence at, and includes the utility isolation point of connection and terminate at foundation. The Contractor shall develop and implement an Inspection, Testing and
Certification program for the lighting arrestors and grounding systems and all mechanically and electrically interlocked ancillary parts, equipment, and components such as: brakes, cables, circuit breakers, frequency drives, hoist, hooks, inverters, latches, surge suppressors, trackage, transformers, motors, wiring, monitoring and controls systems, conductors, bonding, ground rods, air terminals, etc. The below schematics of the grounding system is provided to give a general sense of the magnitude of work but may not include all assets required to be maintained.
LOCATION: BLDG 2082 - HOSPITAL - GRICIGNANO SUPPORT SITE
LOCATION: BLDG 2086 - ENERGY BUILDLING - GRICIGNANO SUPPORT SITE
Schematics of grounding system for Bldg 2086 will be made available after contractor award.
ATTACHMENT J-1502000-11
MEDIUM VOLTAGE (MV) BREAKERS
The Contractor shall develop and implement a PM for the MV Breakers and all mechanically and electrically interlocked ancillary parts, equipment, and components, such as: main disconnects, secondary disconnects, medium-voltage circuit breaker contact assemblies, auxiliary contact assemblies, arc chutes, overcurrent protective devices, circuit breakers, etc. The below list is provided to give a general sense of the magnitude of work but may not
BLDG NO. NOTES MANUFACTURER
QTY
(ea.)
EQUIPMENT MODEL
1 SF6 circuit breaker Sepam S41
1 Protection relay 800A SF1 SM6
7 Venus circuit breaker 1250A 24GL31 Venus
2 Venus circuit breaker 1250A 24GL31 Venus
2 Circuit breaker (spare) Sepam S62
4 Circuit breaker (spare) Sepam S42
2 Merlin Gerin circuit breaker 630A SF1 type1 SF6
2 Protection relay Sepam S42
2 Load break switch SM6 Type IM
1 F6 circuit breaker 400A SF set
1 protection relay VIP 17
2 Merlin Gerin circuit breaker 630A SF1 type1 SF6
2 protection relay Sepam S20E
2 load break switch SM6 Type IM
1 SF6 circuit breaker SF set
1 protection relay VIP 17
1 Merlin Gerin circuit breaker 630A SF1 type1 SF6
1 Potection relay Sepam S20E
2 Merlin Gerin circuit breaker 630A SF1 type1 SF6
2 Protection relay Sepam S20E
2 Load break switch SM6 Type IM
3 Circuit breaker HD4
3 Protection relay PR 512
2 Merlin Gerin circuit breaker 630A SF1 type1 SF6
2 Protection relay Sepam S20E
2 Load break switch SM6-24 DM1-A
1 Circuit breaker HAD
1 Protection relay PR 512
2 Merlin Gerin circuit breaker 630A SF1 type1 SF6
2 Protection relay Sepam S20E
2 Load break switch SM6-24 DM1-A
1 Merlin Gerin circuit breaker 630A SF1 type1 SF6
1 Protection relay Sepam S20E
1 Merlin Gerin circuit breaker 630A SF1 type1 SF6
1 Protection relay VIP 17
1 Circuit breaker 630A SF1 type1 SF6
1 Protection relay SF6 Sepam S41
1 Disconnect breaker SM6
2 Merlin Gerin circuit breaker 630A SF1 type1 SF6
2 Protection relay Sepam S20E
2 load break switch SM6-24 DM1-A
1 VOR circuit breaker MG500
1 Load break switch UNICAM R
1 load break switch SM6-24 DM1-A
SS-5 Loop Schneider Electric
443-ES 443 ITI/NGM
415-ES 415 Magrini Galileo
430-PVES 430-Fot. Schneider Electric
SS-4 Loop Schneider Electric
403-ES 403 Schneider Electric
SS-3 Loop Schneider Electric
407-ES 407 ABB
SS-2 Loop Schneider Electric
406-ES
Serving Bldg #'s 405 and
ABB
412-ES 412 Merlin Gerin
404-ES 404 Schneider Electric
401-ES
Serving Bldg #'s 467, 468, 401, and 430 Merlin Gerin
SS-1 Loop Schneider Electric
411 Main Distribution Schneider Electric
SS-1A Loop Schneider Electric
FUNDING ACTIVITY: REGION
CAPODICHINO
409 Main Substation Schneider Electric
(ea.)
EQUIPMENT MODEL
1 Merlin Gerin circuit breaker 630A SF1 type1 SF6
1 Protection relay Sepam S20E
1 load break switch SM6-24 DM1-A
440-SS-6 loop Schneider Electric 2 Load break switch SM6 Type IM
1 circuit breaker 630A SF1 type1 SF6
1 load break switch SM6-24 DM1-P
1 Protection relay Sepam S40
1 Merlin Gerin circuit breaker 630A SF1 type1 SF6
1 load break switch SM6-24 DM1-P
1 Protection relay Sepam S40
1 Merlin Gerin circuit breaker 630A SF1 type1 SF6
1 load break switch SM6-24 DM1-P
1 Drotection relay Sepam S40
3 Load break switch SM6 Type IM
1 Protection relay Sepam S20 CEI 0.16
1 Load break switch SM6 type DM1C
2 Circuit breaker 630A SF1 type1 SF6
2 load break switch SM6-24 DM1-A
2 Protection relay Vip 37
2 Circuit breaker HD4
2 Protection relay PR 521
2 Merlin Gerin circuit breaker 630A SF1 type1 SF6
2 Protection relay Sepam S20E
2 load break switch SM6-24 DM1-A
2 SF6 circuit breaker SF set
2 Protection relay VIP 13
2 Merlin Gerin circuit breaker 630A SF1 type1 SF6
2 Schneider protection relay Sepam S20E
2 load break switch SM6-24 DM1-A
1 Merlin Gerin circuit breaker 630A SF1 type1 SF6
1 Protection relay Sepam S20E
3 Load break switch SM6 Type IM
2 Protection relay Sepam S20. CEI 0.16
2 Load break switch SM6 type DM1C
1 Circuit breaker SF6 set
1 Protection relay VIP 17
1 Circuit breaker SF6
1 Protection relay VIP 17
1 Load break switch UNICAM R
2 Merlin Gerin circuit breaker 630A SF1 type1 SF6
2 Protection relay Sepam S20E
2 Load break switch SM6-24 DM1-A
1 SF6 circuit breaker SF set
1 Protection relay VIP 13
1 Circuit breaker HAD
1 Protection relay PR 512
1 Merlin Gerin circuit breaker 630A SF1 type1 SF6
1 Protection relay Sepam S20E
1 load break switch SM6-24 DM1-A
1 Merlin Gerin circuit breaker 630A SF1 type1 SF6
1 Protection relay Vip 37
2 Load break switch SM6-24 DM1-A
2 Merlin Gerin circuit breaker 630A SF1 type1 SF6
2 Protection relay Sepam S20E
2 Load break switch SM6-24 DM1-A
1 Circuit breaker HAD-DX
1 Protection relay PR 512
2 Merlin Gerin circuit breaker 630A SF1 type1 SF6
2 Protection relay Sepam S20E
2 Load break switch SM6-24 DM1-A
1 Merlin Gerin circuit breaker 630A SF1 type1 SF6
1 protection relay Sepam S20E
FUNDING ACTIVITY: REGION
CAPODICHINO
433-ES 433 Schneider Electric
446 ES 446 ABB
SS-16 Loop Schneider Electric
449 ES 449 Schneider Electric
SS-15 Loop Schneider Electric
457 ES 457 ABB
SS-14 Loop Schneider Electric
SS-13 Loop Schneider Electric
448 ES
Serving Bldg #'s 448 and
Schneider Electric
459 ES 459 Schneider Electric
461 ES 461 Messina/NMG
463-ES 463 Schneider Electric
SS-12 Loop Schneider Electric
450-ES
Serving Bldg #'s 450, 451, 452, and 453 Schneider Electric
SS-10 Loop Schneider Electric
442B-ES 442B TrA, TrB ABB
SS-9 Loop Schneider Electric
440-SS-7 loop Schneider Electric
SS-8 loop Schneider Electric
440-USS-2 440 Schneider Electric
440-USS-3 440 Schneider Electric
447-ES 447 Schneider Electric
440-USS-1 440 Schneider Electric
(ea.)
EQUIPMENT MODEL
4 Circuit breaker 630A SF1 type1 SF6
1 Protection relay Sepam S41
3 Protection relay Sepam S20E
Golf course electrical substation
Golf course Messina/NMG 1 Load break switch UNICAM R - SVT-R
3 Merlin Gerin circuit breaker 630A SF1 type1 SF6
3 Protection relay Sepam S41E
3 Load break switch + fuse SM6-24 DM1-A
1 Merlin Gerin circuit breaker 630A SF1 type1 SF6
1 Protection relay Sepam S40
2 Load break switch 630 A IMS
1 Merlin Gerin circuit breaker 630A SF1 type1 SF6
1 Protection relay Sepam S40
2 Load break switch 630 A IMS
SS-2 Loop+tr Schneider Electric
FUNDING ACTIVITY: REGION
LAGO PATRIA (SATCOM)
ED05
Enel incoming main distribution Schneider Electric
SS-1 Loop+tr Schneider Electric
CARNEY PARK
SS-560
Enel incoming main distribution Schneider Electric
ATTACHMENT J-1502000-11.a
MEDIUM VOLTAGE (MV) BREAKERS Cont.
The MV Breakers location maps and single-line diagrams are provided as a separate attachment. Refer to PDF file
“J-1502000-11.a MV Breakers Location Maps and Single-Line Diagrams”.
ATTACHMENT J-1502000-11.c
MEDIUM VOLTAGE (MV) BREAKERS Cont.
A sample of power outage schedule is provided as a separate attachment. Refer to Excel file “J-1502000-11.b
Sample Power Outage Schedule”.
ATTACHMENT J-1502000-12
AIR EXHAUST SYSTEMS
The Contractor shall develop and implement an IMP for the air exhaust systems and all mechanically and electrically interlocked ancillary parts, equipment, such as: fans, ductwork, air filters, plenums, and air outlets, etc.
The below list is provided to give a general sense of the magnitude of work but may not include all assets required to be maintained.
Bldg No. System Description Manufacturer/
Model Technical Specification
Qty
(ea.)
719 Air Exhaust Fan, Roof-Type 1
752 Air Exhaust Fan 1 HP 2
Air Exhaust Fan Q=100cum/h - Pa 60 - 18w - with timer 1
Air Exhaust Fan DYNAIR Tower-type, duct work system, 400 cu mt/hr, 0.15kW, 350x150 mm joints 1
Exhaust Fan w/Speed Regulator VORTICE Q=300cum/h - Pa 80 - 0.15kw 1
Ductwork System 250X150mm sect. w/ 3ea 200X100mm grid 1
757 Air Exhaust System ASPIRA 10/4", IPX4, 230V 50hz, 21W, 80 cu mt/hr 4
Exhaust Fan Unit ASPIRA 15LT/220V 2
Exhaust Tower VORTICE 15LT/220V 1
FUNDING ACTIVITY: REGION
GAETA (Fleet Landing)
GAETA (Old Mill Inn)
Not Identified
752A
ATTACHMENT J-1502000-13
AUTOMATED DOORS
The Contractor shall develop and implement an IMP for automated doors and all mechanically and electrically interlocked ancillary parts, equipment, and components, such as: sensors, switches, weather-stripping, pulleys, belts, controllers, engines, motors, controllers, hangers, stoppers, locks, and adapters There are approximately 30 automated doors, single and double sliding, and single and double swing. The below floor plans are provided to give a general sense of the magnitude of work but may not include all assets required to be maintained.
AUTOMATED DOORS - Cont.
AUTOMATED DOORS - Cont.
ATTACHMENT J-1502000-14
AUXILIARY GENERATOR SYSTEMS
Auxiliary generator systems commence at and include the utility isolation point of connection. The Contractor shall develop and implement an IMP for auxiliary generator systems and all mechanically and electrically interlocked ancillary parts, equipment, and components, such as: batteries, fuel tanks, generator, inverters, rectifiers, regulators, prime mover, pumps, piping, automatic transfer switches (ATS), switchgear, meters, monitoring and control systems, uninterruptible power supply, wiring, programing logic control (PLC), redundant gen-set control panel (RGCP) etc. The below list is provided to give a general sense of the magnitude of work but may not include all assets required to be maintained.
LOCATION
DESCRIPTION
QTY
(ea.)
GRICIGNANO SUPPORT SITE
2082 / Hospital Generator Set / Caterpillar, 3500b, 800kw / 100v / 1500a 3
Chillers Battery Charger / SICES Automazione 3/400 24 VCC 20A
ATTACHMENT J-1502000-15
BOILERS AND UNFIRED PRESSURE VESSELS (UPVS) EQUIPMENT AND SYSTEMS
Boiler and Unfired Pressure Vessels (UPVs) equipment and systems commence at and include the utility isolation point of connection and terminate at the steam/hot water point of delivery. The Contractor shall develop and implement an IMP for the Boiler and Unfired Pressure Vessels (UPVs) equipment and systems and all mechanically and electrically interlocked ancillary parts, equipment, and components, such as: burners, heat exchangers, flash tanks, meters, pressure vessel, pumps, piping, valves, steam regulating valves, steam traps, distribution lines, insulation, chemical feed system, condensation return lines, condensate meters, monitoring and controls systems, etc. The IMP shall include Seasonal Start-Up and Shutdown, Testing and Treatment Services, Inspection, Testing, and Certification and Boiler Air Emission Testing. The below list is provided to give a general sense of the magnitude of work but may not include all assets required to be maintained.
FUNDING ACTIVITY: REGION
LOCATION: GAETA (Old Mill Inn)
Bldg No.
Main Tenant /
Facility
Description
Location Equipment
Description Manufacturer
Model No./
Type
Technical
Specification
Qty
(ea.)
707 MWR Recreational
Bldg - Open Mess
External BOILER (Gas
Burned)
RBL 456400 BTU/hr 100 P/4 1
External WATER HEATER
(Gas Burned)
VAILLANT TurboMAG 16 ltrs per min.
LOCATION: GRICIGNANO SUPPORT SITE
BLDG NO. /
LOCATION
DESCRIPTION
QTY
(ea.)
2086 / Energy
Building
Boiler (Steam) - Thermal / THE/Q 1300 3S / 1300 Kw / 3
Boiler Feed Pump / Grundfos NK80-160/175A 3
Boiler Circulating Pump / Grundfos TP-80-90/4 2
Boiler Hot Water Tank / Junker, Temp 90° press 8 bar HW 4000 2
ATTACHMENT J-1502000-16
CARBON MONOXIDE (CO) DETECTION SYSTEMS
The Contractor shall develop and implement an IMP for Carbon Monoxide (CO) detection equipment and systems and all mechanically and electrically interlocked ancillary parts, equipment, and components, such as: notifiers, control panels, annunciators, alarms, detectors, switches, circuits, transmitters, relays, wiring, etc.
CO detectors located in Bldgs 430 and 461 are 24V hard wired.
The below list is provided to give a general sense of the magnitude of work but may not include all assets required
Bldg No.
Main Tenant / Facility
Description Manufacturer/Model
No. of CO
Sensors Additional Information
1 ea. panel CERBERUS CP 132 +
1 ea. panel NOTIFIER G-500S
461 East Parking NOTIFIER G-500S 56 1 ea. Control unit with 2 ea. modules separating the two lower levels
FUNDING ACTIVITY: REGION
430 West Parking 60 2 ea. Control units
ATTACHMENT J-1502000-17
COMPRESSED AND MEDICAL AIR, GAS AND VACUUM SYSTEMS
Compressed air systems commence at and includes the utility isolation point of connection and terminate at the compressed air point of delivery. The Contractor shall develop and implement an IMP for the compressed air systems and all mechanically and electrically interlocked ancillary parts, equipment, and components, such as:
compressors, regulators, unfired pressure vessels, air drying systems, distribution systems, air supply connectors, monitoring and control systems, electrical disconnects, alarm panels, piping, outlets, alarms, medical air, medical oxygen, medical nitrogen, medical nitrous oxide, medical vacuum, medical anesthesia vacuum, medical LP/natural gas, medical gas manifolds, etc. In Bldg 2082, Hospital, Gricignano Support Site, there are approximately 33 medical gas alarm panels, 26 Zone Valves, 43 Pressure Gauges and 571 Med Gas Outlets. In Bldg 2086, Energy
Building, Gricignano Support Site, there are approximately 1 Dental and 3 Medical Compressed Air, 2 pump service panels, 6 Alarm panel Anesthetic GAS, 1 Medical Gas Control Unit. For detailed current systems locations refer to attachment J-1501000-04.b.
ATTACHMENT J-1502000-18
EMERGENCY AND EXIT LIGHTING SYSTEMS
Emergency and exit lighting systems commence at, and includes the utility isolation point of connection. The
Contractor shall develop and implement an IMP to clean, re-lamp, and make all necessary repairs to the emergency and exit lighting systems and all mechanically and electrically interlocked ancillary parts, equipment, and components, such as: replacement of defective bulbs, batteries, lamps, tubes, ballasts, fuses, starters, switches, diffusers, covers, reflectors, photocells, controls, etc. In Bldg 2082, Hospital, Gricignano Support Site, there are approximately 400-500 emergency lights and 100-150 exit lights. At Gaeta (Fleet Landing), there are approximately
30-35 emergency lights and 12-16 exit lights. At Gaeta (Old Mill Inn), there are approximately 10-15 emergency/exit lights.
ATTACHMENT J-1502000-19
EMERGENCY EYEWASH AND SHOWER STATIONS
Emergency eyewash and shower station systems commence at, and includes the utility isolation point of connection.
The Contractor shall develop and implement an IMP for the emergency eyewash and shower stations and all mechanically and electrically interlocked ancillary parts, equipment, and components, such as: outlets, valves, activators, actuators, inlets, signage, showerheads, restrictors, bowls, filters, flanges, piping, etc. The below list is provided to give a general sense of the magnitude of work but may not include all assets required to be maintained.
EYE WASH /
SHOWER
STATION NO.
LOCATION ADDITIONAL INFO
1 Gricignano Support Site - Bldg 2082
- Hospital - Central Sterilization
Sink Type Eye Wash
2 Gricignano Support Site - Bldg 2082
- Hospital - Dental Laboratory
Regular Type Eye Wash
3 Gricignano Support Site - Bldg 2082
- Hospital - Pharmacy
Sink Type Eye Wash
4 Gricignano Support Site - Bldg 2082
- Hospital - Laboratory
Regular Type Eye Wash
5 Gricignano Support Site - Bldg 2082
- Hospital - Kitchen
Regular Type Eye Wash
6 Gricignano Support Site - Bldg 2082
- Hospital - Main Operating Room
Flexible Type Eye Wash
7 Gricignano Support Site - Bldg 2082
- Hospital - Spoiled Utility Room
Flexible Type Eye Wash
8 Gricignano Support Site - Bldg 2086
- Central Energy Bldg - Ground
Floor East Side
Shower Type Eye Wash
9 Gricignano Support Site - Bldg 2086
- Central Energy Bldg - Ground
Floor West Side
Shower Type Eye Wash with electrical water heater 25
Liters
10 Gricignano Support Site - Bldg 2086
- Central Energy Bldg - First Floor
Shower Type Eye Wash
11 Gricignano Support Site - Water
Storage Tanks
Shower Type Eye Wash with electrical water heater 25
Liters
12 Gricignano Support Site - Facilities
Maintenance Workshop
Regular Type Eye Wash
13 Gricignano Support Site - Bldg 2082
- Hospital - Hazardous Storage Area
Shower Type Eye Wash with electrical water heater 25
Liters
14 Gricignano Support Site - Bldg 2082
- Hospital - Morgue
Shower Type Eye Wash
15 Gricignano Support Site - Bldg 2088
- NSA Veterinary Clinic
Eye Wash
16 Capodichino - Bldg 457 -
Medical/Dental Clinic
Eye Wash
17 Capodichino - Bldg 457 -
Medical/Dental Clinic
Eye Wash
ATTACHMENT J-1502000-20
ELECTRICAL SYSTEMS
The Contractor shall develop and implement an IMP for the electrical systems and all mechanically and electrically interlocked ancillary parts, equipment and components of the electrical systems; such as: motor starters, variable frequency drives, panel boards, main distribution panels, transformers, automatic transfer switches, fuel transfer pumps, switchgears, power factor correction units, auxiliary generators, generator control systems, quick panels, batteries, battery chargers, breakers, buss work, cables, capacitors, circuit interrupters, control panels, disconnects, duct banks, hand holes, hardware, insulators, inverters, manholes, meters and metering systems, meter bases, overcurrent protection devices (including fiber optics), overhead and undergrounds lines, poles, rectifiers, regulators, relays, secondary service drops, switchboards, substations, supervisory control and data acquisition (SCADA) systems, switchgear, switches, towers, transformers, wiring, monitoring and controls systems, electric water heaters, etc. The below list is provided to give a general sense of the magnitude of work but may not include all assets required to be maintained.
ATTACHMENT J-1502000-21
ELECTRONIC SECURITY SYSTEMS
The Contractor shall develop and implement an IMP for the electronic security systems (Intrusion Alarm and Closed
Circuit Television systems) and all mechanically and electrically interlocked ancillary parts, equipment and components such as: controllers, switches, sensors, detectors, rectifiers, notifiers, alarms, power supplies, wiring, recorders, etc. The below list is provided to give a general sense of the magnitude of work but may not include all assets required to be maintained.
Bldg
No.
Main Tenant / Facility
Description
Manufacturer/
Model
No. of
Motion
Detectors
No. of
Magnetic
Contacts
No. of
Alarm
Sirens
No. of
Zones
Approx. Area
Covered (m
No. of
Floors Other Information
450 Community Bank Office DIGIPLEX / EVO 21 N/A 1 21 360 sqm 1 3 ea. Keypads
458 Child Development Center
(CDC)
ARITECH
ADVISOR
1 on exit back door
(balanced polarized)
1 (with flashing light)
1 -- 1 2 ea. Keypads (1 by main panel and 1 by exit back door)
498 ATM Space G.E. ARITECH
MASTER ATS2010
3 3 (duress-type push buttons)
2 (AS632) 8 10 1 3 ea. Keypads
752 NSA (Various) ARITECH ATS1010 9 4 2 up to 8 -- -- Serving NEX, Post
Office, Supply, and NSA
Conf. Room
GAETA (Fleet Landing)
FUNDING ACTIVITY: REGION
INTRUSION ALARM SYSTEMS
ATTACHMENT J-1502000-22
FIRE PROTECTION SYSTEMS
Fire protection systems commence at and include the utility isolation point of connection and includes the fire alarm and fire suppression/extinguishing systems. The Contractor shall develop and implement an IMP for the fire protection systems and all mechanically and electrically interlocked ancillary parts, equipment and components;
such as: fire alarm control panels, remote annunciator panels, audio alarms, audio visual alarms, duct smoke detectors, heat detectors, manual pull/push stations, tamper switches, fire department connections, visual alarms, waterflow switches, rises, standpipe systems, wet chemical extinguishing systems, fire pumps, water storage tanks, fire-smoke dampers, telephone dialers, panel notifiers, manual push stations, AFFF Foam, air compressors, alarm devices, alarm valves, annunciators, antennas, backflow prevention devices (does not include drinking water backflows), Dry Chemicals, batteries, connections, control panels, detectors, diesel engines, electric motors, fuses, gauges, initiating devices, meters, notification appliances, nozzles, piping, pumps, receivers, sensors, sprinkler heads, tanks, transmitters, voice communication devices, valves (including post indicator valves), monitoring and controls systems, etc.
***Informational Notes:
AFFF drainage trenches shall be maintained clear and automatic valves, which close the sanitary drain and divert
AFFF to a storage tank in event of activation.
Smoke Detectors at Bldg 401 are located at a height over 4 meters; the use scaffoldings or other appropriate equipment is required.
Sprinkler Heads marked at Bldgs 401, 402, 406, 415, 448 and 451 are located at a height over 4 meters; the use scaffoldings or other appropriate equipment is required.
Approximately 2,270 sprinkler heads are located at a height over 4 meters; the use scaffoldings or other appropriate equipment is required.
ATTACHMENT J-1502000-23
FOOD SERVICE EQUIPMENT
Food service equipment commences at and include the utility isolation point of connection. The Contractor shall develop and implement an IMP for food service equipment and all mechanically and electrically interlocked ancillary parts, equipment and components of the systems. Food service equipment includes dishwashing machines, ice machines, ovens, and gas kettles.
ATTACHMENT J-1502000-24
GATES AND OVERHEAD AND ROLL-UP DOORS
The Contractor shall develop and implement an IMP for gates and overhead and roll-up doors systems both manual and motorized, and all mechanically and electrically interlocked ancillary parts, equipment, and components of systems such as pulleys, rails, springs, rollers, hinges, hoists, motors, etc. The below list is provided to give a general sense of the magnitude of work but may not include all assets required to be maintained.
LOCATION
DESCRIPTION
QTY
(ea.)
GAETA (Fleet Landing)
719 / MSC/NSA Electric Roll-Up Door / PUJOL 1
725 / NSA Electric Sliding Gate / BFT 1
CAPODICHINO
403 Roll-Up Door; approx. dim. 4 mt length x 5 mt height; galvanized metal with plexiglass windows; flashlight and control buttons. Motor operated: 220V -
500W; Brand: FAAC; Model: MOTORIDUTTORE 641
LOCATION
DESCRIPTION
QTY
(ea.)
GRICIGNANO SUPPORT SITE
2082 / Hospital Solid Electronic Roll-Up Gates / Attached to the Fire Alarm System / Mfgr:
TRONIC, Mod: CN106 AIP55, 230Volts/ 50 Hz 0,400 Kw
2086 / Energy
Building
Overhead Door / Mfgr: TRONIC, Mod: CN106A 3
457 / Clinic Lattice Metal Electronic Roll-Up Gates 5
ATTACHMENT J-1502000-25
INTERNAL WATER TREATMENT SYSTEMS
The Contractor shall develop and implement an IMP for internal water treatment systems, and all mechanically and electrically interlocked ancillary parts, equipment, and components of the systems such as valves, reverse osmosis units, water softening units, chlorination systems, cathodic protection, pumps, strainers, filters, actuators, fittings, tanks, instrumentation, membranes, feeders, drains, etc. Sample of Water Tests Form is provided in J-1502000-26.a
ATTACHMENT J-1502000-25.a
INTERNAL WATER TREATMENT SYSTEMS
WATER QUALITY MONITORING TESTING SAMPLE FORM
USNH NAPLES FY16
DW QUALITY
MONITORING Ti m e lin e
Sa m p lin g_ Ev e n ts
ANALYTES
Sa m p lin g Lo ca ti o n s
U
SN
H -D
W P
O
ET
D
U
SN
H -D
W
To p f lo o r)
U
SN
H -D
W P
O
ET
D
U
SN
H -D
W
To p f lo o r)
U
SN
H -D
W P
O
ET
D
U
SN
H -D
W
To p f lo o r)
U
SN
H -D
W P
O
ET
D
U
SN
H -D
W
To p f lo o r)
1 1 1 1 1 1 1 1 4
1 1 1 1 1 1 1 1 4
1 1 1 1 1 1 1 1 4
1 1 1 1 1 1 1 1 4
1 1 1 1 1 1 1 1 4
1 1 1 1 1 1 1 1 4
1 1 1 1 1 1 1 1 4
1 1 1 1 1 1 1 1 4
0 0 0 1 1 1
0 0 0 1 1 1
0 0 0 1 1 1
1 1 1 1 1 1 1 1 4
0 0 0 1 1 1
0 0 0 1 1 1
0 0 0 1 1 1
0 0 0 1 1 1
0 0 0 1 1 1
0 0 0 1 1 1
0 0 0 1 1 1
0 0 0 1 1 1
0 0 0 1 1 1
0 0 0 1 1 1
0 0 0 1 1 1
0 0 0 1 1 1
0 0 0 1 1 1
0 0 0 1 1 1
0 0 0 1 1 1
0 0 0 1 1 1
0 0 0 1 1 1
0 0 0 1 1 1
1 1 1 1 1 1 1 1 4
6 4 10 6 4 10 6 4 10 27 4 31 61
Chlorite
TOTAL SAMPLES/LOCATION
pH
Chlorine, total residual
Temperature
Conductivity
Turbidity
Nickel
Sodium
Vanadium
Haloacetic Acids (HAA5)
Bromate
Boron
Calcium
Chromium
Copper
Magnesium
Uranium
Aluminum
Iron
Manganese
Barium
FY16 Q1
FY16 Q2
FY16 Q3
FY16 Q4
TO
TA
L
SA
M P
LE
S st
Q
TR
TO
TA
L
SA
M P
LE
S n d Q
TR
TO
TA
L
SA
M P
LE
S rd
Q
TR
TO
TA
L
SA
M P
LE
S/
A N
A
LY
TE
TO
TA
L
SA
M P
LE
S th
Q
TR
Total Trihalomethanes
VOC BLANK
Antimony
Arsenic
Thallium
Cadmium
Lead
Mercury
Selenium
Beryllium
ATTACHMENT J-1502000-26
ISOLATION ROOMS AND OTHER CONTROLLED PRESSURE SPACES
The Contractor shall develop and implement an IMP for isolation rooms and other controlled pressure spaces/areas, and all mechanically and electrically interlocked ancillary parts, equipment, and components of the systems such as air handling units, blowers, boilers, chillers, compressors (including air compressors), condensers, controls, cooling towers, dehumidifiers, diffusers, driers, ducts, electrical disconnects, evaporators, fans, fan coil units, filters, fire dampers, fresh air dampers, heaters, heat exchangers, heat pumps, hoods, humidification systems, insulation, intakes, package units, piping, pumps, refrigeration boxes, registers, returns, strainers, ultraviolet lighting, valves, VAV boxes, variable frequency drives, water treatment systems, monitoring and control systems including the
EMCS, filter, pre-filters, etc. Other controlled pressure related spaces/areas include operating rooms, processing rooms and sterile storage rooms. The IMP shall include an Air Flow Monitoring Program. The below list is provided to give a general sense of the magnitude of work but may not include all assets required to be maintained.
ROOM NO. QUANTITY SIZE
3184 (Isolation Room) 1 15 sm
3185 (Entrance to Isolation Room 3184) 1 7 sm
3186 (Restroom to Isolation Room 3184) 1 5 sm
3183 (Isolation Room) 1 15 sm
3182 (Entrance to Isolation Room 3184) 1 7 sm
3181 (Restroom to Isolation Room 3184) 1 5 sm
ISOLATION ROOMS INVENTORY
NOMENCLATURE / TECHNICAL
SPECIFICATION
Roof Fan and Electronic System;
FLAKTWOODS; HR50/6M
Total of 2 Isolation Rooms (including entrance areas and restrooms)
ATTACHMENT J-1502000-26
ISOLATION ROOMS AND OTHER CONTROLLED PRESSURE SPACES – Cont.
NOMENCLATURE / TECHNICAL SPECIFICATION QUANTITY SIZE
OPERATING AND STERILE PROCESSING/STORAGE ROOMS INVENTORY
Sterile Processing Room 1 124 sm
1 63 sm
Operating Rooms 1 39 sm
1 39 sm
1 39 sm
1 39 sm
Operating Rooms - Decon 1 18 sm
1 17 sm
Operating Rooms - Scrub Area 1 13 sm
1 13 sm
Operating Rooms - Sterile Storage 1 15 sm
Multi Service Ward - Sterile Storage 1 7 sm
Operating Rooms - Sterile Work Room/Area 1 49 sm
Operating Rooms - Sterile Storage 1 43 sm
1 56 sm
1 61 sm
1 44 sm
1 12 sm
Emergency Department Sterile Storage 1 24 sm
Procedural Rooms in the Main OR Area 1 20 sm
1 24 sm
Pharmacy Compounding Center: Room 1 15 sm
INVERTER PLC DRIVE
PLC Drive Motion Art 230V AC In/Out 2
CONVERTERS DC DC
Converters 2
MOTORIZED SHUTTERS
Motorized Shutters 1
CAPTATORS CLASS 300
Captor / KIMO Model CP300 1
Captor / KIMO Model CP301 1
Captor / KIMO Model CP302 1
Captor / KIMO Model CP303 1
ATTACHMENT J-1502000-27
HVAC AND REFRIGERATION SYSTEMS
HVAC and Refrigeration Systems commence at the utility isolation point of connection and terminate at the conditioned air point of delivery. The Contractor shall develop and implement an IMP for HVAC and refrigeration systems to include all major components and all mechanically and electrically interlocked ancillary parts, equipment, and components of the systems such as; air handling units, central air conditioning, blowers, boilers, chillers, compressors, air compressors, condensers, controls, cooling towers, dehumidifiers, diffusers, driers, ducts, electrical disconnects, evaporators, fans, fan coil units, filters, fire dampers, fresh air dampers, heat exchangers, heat pumps, hoods, humidification systems, insulation, intakes, package units, piping, pumps, refrigeration boxes, registers, returns, strainers, ultraviolet lighting, valves, VAV boxes, variable frequency drives, water treatment systems, monitoring, controls, and instrumentation systems, heaters all types, furnaces, mechanical ventilating equipment for cold storage plants, chilled water and pure water production equipment, controlled air systems equipment, distribution systems, control devices, environmental controls, etc. For detailed current systems locations refer to attachments J-1501000-04.a and J-1501000-04.b.
Sample of Chiller Operating Log is provided in J-1502000-27.a.
ATTACHMENT J-1502000-27.a
HVAC AND REFRIGERATION SYSTEMS – Cont.
CHILLER OPERATING LOG
CHILLER NO. _____ MONTH OF _______________________
CONDENSER EVAPORATOR REFRIGERANT VOLTS AMPS HR START
TEMP PRESS TEMP PRESS PRESSURE (volts) (amps) METER COUNT
DAY in out in out in out in out COND EVAP
(C) (C) (bar) (bar) (C) (C) (bar) (bar) (bar) (bar)
ATTACHMENT J-1502000-28
MOISTURE DETECTION SYSTEMS
Moisture detection systems commence at, and includes the utility isolation point of connection and terminate at the moisture detection sensor. The Contractor shall develop and implement an IMP for the moisture detection systems, and all mechanically and electrically interlocked ancillary parts, equipment, and components of the systems such as sensors, monitors, alarms, notifiers, interfaces, etc.
The moisture detection system located in Bldg 442 covers…