N6247022R0005 Amendment 0006.pdf
PDF 807 KB Posted
- Attached to
- N62470-22-R-0005 Base Operations Support (BOS) Services Contract for Camp Lemonnier, Djibouti, Africa
- Solicitation number
- N62470-22-R-0005
About this file
This document is Amendment 0006 to Solicitation N6247022R0005 for a Base Operations Support (BOS) Services Contract for Camp Lemonnier, Djibouti, Africa. The amendment revises Sections A, C, J, and L of the solicitation. Key details include:
The proposal due date has been extended to June 5, 2024. Revisions have been made to various annexes, including Annex 0700000 Ordnance, Annex 1300000 Galley, and Annex 1700000 Transportation. Revised versions of several attachments in Section J have been provided, including the Past Performance Questionnaire, equipment and inventory lists, and environmental requirements. Minor revisions have also been made to Section L regarding page count. Responses to pre-proposal inquiries 40-137 are included. All other terms and conditions remain unchanged.
View the file
Other files
Show 40 more
Latest 50 of 114 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
N6247022R0005: BASE OPERATIONS SUPPORT (BOS) SERVICES CONTRACT FOR CAMP LEMONNIER, DJIBOUTI AFRICA This amendment is issued to provide revisions to Sections A, C, J, and L. (SEE CONTINUATION PAGE)
CS: Kathleen Delashmitt, kathleen.a.delashmitt.civ@us.navy.mil
1. CONTRACT ID CODE PAGE OF PAGES
J 1 123
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 08-May-2024
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X N6247022R0005
X 9B. DATED (SEE ITEM 11)
04-Mar-2024
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
08-May-2024
CODE
COMNAVFACSYSCOM ATLANTIC
6506 HAMPTON BLVD
NORFOLK VA 23508-1278
N62470 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
N6247022R0005
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION SF 30 - BLOCK 14 CONTINUATION PAGE
The following have been added by full text:
AMENDMENT 0006
The purpose of this amendment is to disseminate the below information.
1. Section A – The proposal due date has been revised.
2. Section C – Revisions to Annexes 0700000, 1300000, 1606001, 1700000 are issued.
3. Section J – Revised versions of J-1 Past Performance Questionnaire, J-0200000-12
ELINs, J-1300000 Galley, J-1503010-03 Custodial Facilities Inventory and Frequencies, J-1503020 Pest Control, J-1606001-03 Water Treatment Plant & Distribution Systems Inv., J-1700000 Transportation, J-1700000-02 Transportation Fleet Inventory, J-1800000 Environmental have been attached.
4. Section L – Minor revisions to section L.5(b) regarding page count are issued.
5. Responses to Pre-Proposal Inquiries 40-137 are provided below.
6. Extension of proposal due date to June 5, 2024 is provided.
7. All other terms and conditions are unchanged.
NOTE: Revisions are provided by the use of red font; deletions are indicated by the use of red strikethrough font.
Que stion No.
REFERENCE QUESTION GOVERNMENT
RESPONSE
Page Section Para.
40 209, Solici tation
1300000 – Galley, Attch J- 1300000-03
1.1 Under Annex 1300000, Spec Item 1.1, Concept of
Operations, it states, “… CLDH dining facilities include the 544 person capacity main galley at building 310, the “Combat Café” satellite galley located in building 101, the Titan Support Site (TSS) satellite galley located in building 840, and a satellite facility at Chabelley Air Field.” Attachment J- 1300000-03 lists “Grab & Go” locations that are not mentioned in the PWS. Are bidders to assume those
Grab & Go services are provided at the Galley facilities identified in the revised Annex 1300000 C Galley. Grab & Go services are provided during the days and hours of operations shown in Attachment J-1300000-03.
See Amendment 0006 for locations are not applicable to this contact since they’re not mentioned in the PWS?
revised Annex 1300000 C Galley and J-1300000-03 files.
41 210, Solici tation
1300000 – Galley
2.2.1, 2.2.2, and 2.2.4
SI 2.2.1 identifies the Senior Galley Manager, SI
2.2.2 identifies the Galley Manager, and SI 2.2.4 mentions a Food Services Manager and an Assistant Food Service Manager. Are these four separate positions or is the Senior Galley Manager supposed to be the Food Services Manager and the Galley Manager supposed to be the Assistant Food Services Manager?
The Senior Galley Manager and Galley Manager are separate positions and one must be on-site during daytime meal hours. The Contractor shall staff Galley personnel as necessary to meet services performance standards. See revised Annex 1300000 C Galley.
42 222, Solici tation
1300000 – Galley, Attch J- 1300000-03
3.4 Under Spec item 3.4 -Remote Galley Meal Delivery
Services, Related Information, it states, “The contractor shall transport breakfast, lunch, dinner, and midnight meals to the “Combat Café”, the Titan Support Site, and Chabelley Air Field galley locations to coincide with normal meal times at each location…. The Contractor shall load meals at the CLDJ galley and unload and set up serving lines at the remote dinning facilities. At the end of each meal period the Contractor shall remove and transport all containers, utensils and equipment to CLDJ galley for cleaning and re-use as appropriate.” Attachment J-1300000-03 shows two different Chabelley Air Field locations: a main location and a “Grab & Go” location. The location have different hours of operation from one another. Is the Contractor required to man both locations or just the main Chabelley location?
"Grab & Go" locations are co-located within certain Galley facilities. Locations shall be manned as required to ensure "Grab & Go" items are available during daily meal time operations.
43 Solici tation
Annex 1700000 Spec Item
3.3.5 TR
Service Orders
3.3.5 In Spec Item 3.3.5 it states “The Contractor shall
respond to disabled BSVE and transient unit vehicles within the DLDJ installation boundary and up to a 100 mile radius of Camp Lemonnier. The Contractor shall respond to TR service order requests within 30 minutes during Government regular working hours.”
The use of the word “respond” is ambiguous in this section. If the government means that the Contractor shall be located at the disabled vehicle within 30 minutes, that presents an issue. It’s not possible for a Contractor to get to a vehicle 99 miles away within 30 minutes. If the government means “respond” to attempt to contact the person with the issue, that’s very possible. Will the government please clarify what it means by “respond” and revise this section, if necessary?
Please see revised Annex 1700000 spec item 3.3.5.
44 J- 17000 00-05
Attachment J-1700000- Transportati on Historical Data
In Attachment J-1700000-05, the Government has a Table titled “Historical Annual BSVE Recovery Services” and has items such as battery replacement, wiper replacement, air conditioning, etc. Many of these items do not appear to be recovery type work.
Such as a broke Air Conditioner does not warrant recovery services, nor does Wiper replacements.
Additionally, in J-1700000-02, there are only 272
Historical data provided is only information available.
Please see Amendment 0006 for revised J-1700000-05.
vehicles listed in total (on the Master tab or 259 when you add up all of the vehicles on the other tabs). Yet, in 2020 there were 296 towing events, in 2021 296 towing events, and 2022 there were 281 towing events. That means there were on average, at least 1 tow per vehicle each year? That information does not make sense from a rationale perspective.
Will the Government please re-evaluate and correct its data?
45 J- 17000 00-05
Attachment J-1700000- Transportati on Historical Data
In Attachment J-1700000-05, the Government lists “Historical Annual BSVE Repair Tasks”. This numbers do not appear to align properly with the BSVE inventory found in J-1700000-02, which lists a total of 272 or 259 vehicles, depending on whether you add up the sum of vehicles on all of the tabs, or just total the vehicles on the Master Tab. For example, on average (taking the mean number of repairs) the Contractor has historically replaced on an annual basis 426 batteries for 272 vehicles. That’s over 1.5 battery replacements per vehicle per year.
That doesn’t make sense, typically car battery warranties are at a minimum, one year alone. On average, 152 Air conditioning systems are repaired per year, for all 272 vehicles. Additionally, on average, 918 tire repairs and/or replacements are performed on only 272 vehicles. This does not track.
Will the Government please review and correct the data or please explain how this is possible?
Historical data provided is only information available.
Please see Amendment 0006 for revised J-1700000-05.
46 Attac hment J- 17000 00-02
Attachment J-1700000-
This attachment is an excel file with the following tabs: CNIC, CNIC-MWR, CNIC-NCIS, HOA, DLA, NEX, NGA, AF-CADJ, and Master. The master file lists 272 vehicles, the sum of all of the vehicles on the other tabs is 259. Which count is the Government expecting Contractors to service? Will the Government please update the attachment with the correct vehicle lists and ensure the master tab reconciles with the other tabs?
Please see Amendment 0006 for revised J-1700000-02.
47 385, Solici tation
Annex 1700000
3.1.1 The Government requires the Contractor to staff the
shuttle bus and run it for the designated hours.
However, there is no information provided in regards to the average number of passengers on said shuttle bus. As such, it’s not possible to anticipate the proper sizing of equipment for the contractor to propose (e.g., 15 passenger van vs. 30 passenger bus).
Additionally, throughout the PWS, the government mentions fuel conservation. As such, utilizing the right size of shuttle bus, helps conserve fuel (a van burns less fuel than a 30 passenger bus). Will the Government please provide the average number of passengers per shuttle per trip for each hour so that bidders may properly plan to support the scope that best conserves fuel?
Please see Amendment 0006 for revised Annex 1700000 spec item 3.1.1.
48 386, Solici tation
Annex 1700000
3.1.2 The Government states “During periods of FP
Charlie and Delta posture, the contractor shall be able to relocate up to 70 barriers within 30 minutes timeframe.” This statement is quite ambiguous and requires a large amount of clarity. What are the specs of the barriers (e.g. type, size, weight)? What does the Government mean by relocate (e.g. move a few feet, put on a flatbed and move it two miles across base, move all barriers from CLDJ to Chabelley Air Field)? Also, isn’t this Spec Item redundant with Annex 0401000 Spec Item 3.4.1 which requires the contractor to move security barriers?
Please see Amendment 0006 for revised Annex 1700000 spec item 3.1.2.
49 389, Solici tation J0200 000-
ELIN
S
CLDJ
Non- Recur ring
CLIN
x822 x823
Annex 1700000
3.1.3 The Government states: “The Contractor shall
provide truck and tractor/transport services to ensure appropriately sized vehicles are provided and operated in a safe and timely manner.” CLIN x822 and x823 also require the contractor to provide a Tractor Trailer. It’s unclear why the Government has this in both the recurring and non-recurring scope and offers no explanation as to when one takes precedence to the other. Will the Government please correct the RFP and offer clear guidance on what part is recurring and what part is non-recurring?
The NRW requirements are ordered in addition to any RW requirements and may be ordered for work other than what is described in Spec Item 3.1.3.
50 449 L.5.b "Non-price proposals shall be submitted on 8 ½ x 11 inch paper (or equivalent European A4 paper) with a font no smaller than 11 point."
Question: Will the Government allow a smaller font size for tables, graphics, and call-out boxes?
Please follow instructions in Section L.5 (b) of the Solicitation.
51 449 L.5.b 51 "Non-price proposals shall be submitted on 8 ½ x 11 inch paper (or equivalent European A4 paper) with a font no smaller than 11 point.""
Question: Will the Government allow for 11x17 pages for oversized graphics such as an organizational chart?
Please follow instructions in Section L.5 (b) of the Solicitation.
52 454 L.5 52 "Offerors may also address any adverse past performance issues."
Question: Is adverse performance in this instance related to any CPAR ratings of below Satisfactory?
If not, would the Government define this further so contractors can appropriately address adverse past performance issues? Please also confirm that any pages related to responding to this requirement are excluded from page requirement.
Please follow instructions in Section L.5 (b) of the Solicitation.
53 454 L.5 Tab C Offerors may also address any adverse past performance issues.
Question: Please advise if the 2 double sided/4 single sided pages allocated to address past performance are uncounted pages.
Please follow instructions in Section L.5 (b) of the Solicitation.
54 454 L.5 Tab C Offerors may also address any adverse past performance issues.
Question: Please advise if adverse performance narrative should be included in Factor 1 - corporate experience, or in Factor 4 - past performance.
Please follow instructions in Section L.5 (b) of the Solicitation.
55 N/A Annex 1700000
ATTACHM
ENT J-
1700000-02
60 Attachment J-0200000-12 ELINS CLDJ 11-28-2023 provides separate ELINS for Annex 17, Spec Item
3.3 Maintenance and is organized by Command
(CNIC, AF, DLA, Fleet, HOA, NEX, NGA).
Attachment J-1700000-02 Transportation Fleet Assets provides the Activity in column I, however, it is not clearly broken out specifically by Commands (CNIC, AF, DLA, Fleet, HOA, NEX, NGA).
Question: Will the Government breakout Attachment J-1700000-02 Transportation Fleet Assets by Command (CNIC, AF, DLA, Fleet, HOA, NEX, and
NGA)?
See Amendment 0006 for revised J-1700000-02.
56 355 1606000 Water
2.2.2 "There are several references to CNIC M-5090.1 throughout the PWS.
Question: Is this still a valid manual? Or should Contractors refer to a more recent publication (CNIC M-5090.1A)?"
The Contractor shall comply with the most current version of directives, instructions, and references, including versions published during the term of the contract.
57 355 1606000 Water
2.2.2 "The Laboratory Analyst must possess a minimum bachelor's degree in chemistry, physical science, or chemical engineering, and by experience and training demonstrate knowledge and competence in the protocols for sample collection, preservation, and analyses for chemical and microbiological parameters. "
Question: Can years of experience (minimum of 10 years) be used in lieu of degree requirement as long as the analyst can demonstrate knowledge and competence?
No, education and experience, as specified, are required.
58 356 1606000 Water
2.3.2 "The Contractor shall establish, maintain, and utilize an onsite CLDJ compliance laboratory approved for use in accordance with CNIC M-5090 series for those analytes where use of a third-party accredited laboratory is not feasible."
Question: Will equipment required to establish or maintain a compliance laboratory be provided by the Government?
No. Contractor is responsible for providing necessary equipment.
59 357 1606000 Water
3 "The Contractor shall operate and maintain all water systems in accordance with the most stringent standards specified by Djibouti and U.S. laws and regulations, specifically OEBGD, CNIC M-5090.1."
Question: Language is ambiguous. Are there other US Laws and regulations the contractor should be aware?
Contractor is responsible for determining all applicable laws and regulations. At a minimum, the Contractor should follow standards as stated in OEBGD, CNIC M- 5090.1.
60 358 1606000 Water
3.1 "The Contractor shall operate the raw water supply, water treatment plant and distribution system to efficiently and safely produce and distribute quality FFHC and non-FFHC drinking water to ensure that all drinking water requirements are met, 24 hours per day, seven days per week, throughout the contract period."
Question: What is non-FFHC drinking water?
Recommend revising the language to read "FFHC drinking and non-FFHC water".
See Amendment 0006 for revised Annex 1606001 Water (Overseas).
61 231 Annex 1402000
Spec Item 2.4
"The Government will provide room furnishings required for the performance of UH services."
Question: Do the furnishings include mattress replacements?
Yes.
62 152 Annex 1001000
Spec Item 2.2.1
"Evaluation and physical required every 2 years."
Question: What are the physical requirements?
Medical physical screening.
See revised technical specification 1001000 Spec Item 2.2.1.
63 152 Annex 1001000
Spec Item 2.3.1
Systems Access Question: What is the clearance or background investigation required for access to the systems listed? Can access be granted to third country nationals or local nationals?
Contractor personnel accessing systems must be able to obtain a CAC. More information can be found at http://www.cac.mil/common-access-card/getting-your-cac/for-contractors/
64 N/A Annex 1700000
ATTACHM
ENT J-
1700000-05
Spec Item 3.3.3
Attachment J-0200000-12 ELINS CLDJ 11-28-2023 provides separate ELINS for Annex 17, Spec Item
3.3 Maintenance and is organized by Command
(CNIC, AF, DLA, Fleet, HOA, NEX, NGA).
Attachment J-1700000-05 Historical Data for repair tasks, recovery, dispatches and operations does not distinguish between Commands.
Question: Will the USG please breakout repair tasks, recovery, dispatches and operations on Attachment J- 1700000-05 by Command (CNIC, AF, DLA, Fleet, HOA, NEX, and NGA)?
The Contractor shall price based on the breakdown of the vehicle inventory for each customer.
65 389 Annex 1700000
Spec Item 3.1.3
Spec item 3.1.3 states "Transport services include line hauling within a 100 mile of Camp Lemonnier radius up 80 dispatch hours."
Question: Will the Government clarify if the 80 dispatch hours is per trip?
Up to 80 dispatch hours per trip. See revised technical specification 1700000 Spec Item 3.1.3.
66 N/A Annex 1700000
ATTACHM
ENT J-
1700000-02
N/A Attachment J-170000-02 does not distinguish between Government-owned, leased, or assets under warranty, or their maintenance requirements.
Question: Will the Government clarify if the Contractor is required to perform maintenance on all the Fleet assets listed in J-170000-2?
The Contractor performs maintenance on fleet assets listed in J-1700000-02.
67 378 Annex 1606001
3.8 and J- 1606001-
The Government states: "The Contractor shall transport non-potable water from Camp Lemonier to all tanks and water bladders located at Chabelley Air Field. The Contractor shall maintain a 7 day supply of non-potable water at all times. The listing of tanks and bladders at Chabelley Air Field is provided in J- 1606001-09.”
Question: The Government did not provide Attachment J-1606001-09 as they indicated in the Spec Item. Will the Government please provide this Attachment?
Please see Attachment J- 1606001-09 Tanks and Bladders Inventory provided in the Section J file "1606001 J Water (Overseas)"
68 140 0700000 - Ordnance
3.
Recurrin g Work.
In the previous contract, the Government provided ASP security. It is now the responsibility of the Contractor.
Are changes in effect now or does it begin with the new contract?
Requirements stated in Annex 0700000 Spec Item 3 apply to the new contract.
69 145 0700000 - Ordnance
3.3 Operatio ns
The previous contract stated in paragraph 3.2.3 Facilities, Vehicles and MHE, "...Informational Note: Historically, Contractor vehicle requirements to adequately provide ordnance services include:
2 - 6 - pack pickup trucks 1 - 5 - passenger vehicle 2 - 5- Ton flatbed trucks 2 - Gator/Mule UTV 6 - Hand pallet trucks 2 - Rough terrain Tel-Hander forklifts 2 - DS Warehouse forklift 2 - EE Warehouse forklift
Paragraph 3.3. Operations of the solicitation states, "...At a minimum the Contractor shall provide the following vehicles and equipment in order to adequately perform ordnance operations services:
1 - 5- Ton flatbed truck 3 - Hand pallet trucks 1 - Rough terrain Tel-Hander forklifts 1 – 12 K DS Warehouse forklift 1 – 10 K DS Warehouse forklift 1 – 6 K DS Warehouse forklift
Is the new listing of equipment in the solicitation in effect now or does it begin with the new contract?
Requirements stated in Annex 0700000 Spec Item 3.3 apply to the new contract.
70 141 0700000 - Ordnance
3.3.3
ASP
Facility, Vehicles, and
MHE
Inspectio ns
The paragraph states, "ASP facilities are listed in J- 1700000-03."
There is no Annex J-1700000-03 listed in the solicitation. Additionally, a search through the base solicitation document shows references to J- 1700000-03 in paragraph 2.3.4.2 Allowable Downtime Standards found on page 382, "Downtime hours per shop repair order shall not exceed the Allowable Individual Downtime by Alpha Code specified in J-1700000-03."
Please clarify and provide the listing of ASP facilities.
ASP facilities are listed in J- 0700000-03. See Amendment 0006 for revised Annex 0700000.
71 1300000 - Galley
Spec Item 3.5.1
Annex 1300000 Galley, Spec Item 3.5.1 requires Machine Washing. J-1300000-08 has one Pots and Pans Washer; however, there do not appear to be any Dishwashers.
How many Dishwashers are there in the Galley?
There are two Scullery Stations in the main Galley, one at the east end and one at the west end. Each scullery location has a tray accumulation conveyor system, a Hobart Pulper Machine, and Hobart Dishwasher Machine.
72 222 1300000 - Galley
3.4 Remote Galley Meal Delivery Services
Subparagraphs 3.4.1, 3.4.2, and 3.4.3, now include the requirement for the Contractor to prepare, deliver, serve, clean and return meals to the outlying locations.
This is a change from the previous contract. Is this in effect now or does it begin with the new contract?
Requirements stated in Annex 1300000 Spec Item 3.4 and sub-spec items apply to the new contract.
73 353 1606001 - Water (Overseas)
2.2.1 Key Personne l
This paragraph adds four positions as Key Personnel.
They include the 2.2.1.1 Operator in Responsible Charge; 2.2.1.2 Assistant Operator in Responsible Charge; 2.2.1.3 Laboratory Director/Manager; and 2.2.1.4 Laboratory Quality Assurance Manager.
Are these positions currently filled or do they begin with the new contract?
Requirements stated in Annex 1606001 Water (Overseas) Spec Item 2.2.1 and sub spec items apply to the new contract.
74 356 1606001 - Water (Overseas)
2.3.2 Laborato ry Certificat ion.
The paragraph states, "The Contractor shall meet all Overseas Drinking Water (ODW) on-site (CLDJ) laboratory certification requirements specified in OPNAVINST 5090.1, OEBGD, CLDJ Drinking Water Sampling Plan, and CNIC M-5090.1. Camp Lemmonier is a remote location where use of a third-party accredited laboratory is not feasible for all analytes (i.e. short time hold parameters). The Contractor shall establish, maintain, and utilize an onsite CLDJ compliance laboratory approved for use in accordance with CNIC M-5090 series for those analytes where use of a third-party accredited laboratory is not feasible."
Is this currently in place or does it begin with the new contract?
Requirements stated in Annex 1606001 Water (Overseas) Spec Item 2.3.2 apply to the new contract.
75 385 1700000 – Transportati on
3.1.1.1 Schedule d Shuttle Services
The paragraph states, "The Contractor shall run two buses at 10 minute intervals. Buses shall complete each route cycle once every 20 minutes."
The inventory listing in J-1700000-02 Transportation only shows one Bluebird Bus. Are there additional buses or are the 15-passenger vans used for this service?
The Contractor is responsible for providing the shuttle buses required to perform shuttle services.
76 391 1700000 – Transportati on
3.3 Maintena nce
Are all the items listed in J-1700000-02 GFE or a combination of GFE/Contractor owned? If Contractor owned, is there a requirement for all maintenance to be performed on the installation or can the Contractor subcontract this to another commercial organization off the installation but within Djibouti?
Items listed in J-1700000-02 are Government Owned.
77 449 L (b) Volume II: Non- Price Proposal
The Non-Price Submittal Requirements states there is a page limit of forty (40) single-sided or twenty
(20) double-sided pages for the entirety of Tab C.
This includes Corporate Experience, which could easily take a third to half of that page count, and the 2-page safety narrative. The Government is requesting six subsections to be addressed within Factor 2 Technical/Management Approach.
Will the Government remove Factor 1 and 3 from that 40-page limit or increase the overall page limit to allow offerors to adequately address the annexes required for Factor 2?
Please see revisions in Amendment 0006.
78 J-1606001- 03_Water Treatment Plant Distribution System Inv
Spec Items 3.1, 3.2, 3.3
The inventory provided for the "J-1606001- 03_Water Treatment Plant Distribution System Inv" does not match and lacks sufficient data in line with the "J-1606001-03 Water Treatment Plant and Distribution System Description"" as there are items that has no quantity, model, manufacturer and exact locations.
Question: For the Contractor to accurately propose to perform Operation, Spec Item 3.1, Integrated Maintenance Program (IMP), Spec Item 3.2, & Inspection, Testing and Certification Program, Spec Item 3.3. Will the Government provide this information for reservoirs, wells, water storage tanks, cathodic protection for water tanks, pumps, filters, membranes, chemical treatment, valves and automatic controls, SCADA system, software system, backflow devices, fire protection distribution system piping, meters, supply, plant and distribution system piping, and HVAC equipment for ROWPU facilities, water laboratory, meters, telemetry system, probe sensors, motorized valves, motor control centers, float switches, graphic control panel and control console?
See Amendment 0006 for revised technical specification 1606001 Water (Overseas) and Attachment J-1606001-03.
79 J-1606001- 03_Water Treatment Plant Distribution System Inv
N/A Could the government clarify the correct reference number for this inventory? The file name and the solicitation indicate J-1606001-03, while the contents are labeled as J-1606000-04.
See Amendment 0006 for revised Attachment J- 1606001-03.
80 N/A J-1606001- 08 Fire Hydrant Inventory
N/A In the provided data, there are locations that have no fire hydrant ID, maker and model indicated. Could the Government provide an inventory with complete specifications of fire hydrants?
Information provided is only data available.
81 N/A J-1606001- 07 Valve Inventory
N/A In the provided data, there are valves that have no classification indicated. Could the Government provide an inventory with complete classification of valves?
Information provided is only data available.
82 N/A J-0200000-
12 ELINS
CLDJ 11-
28-2023
N/A A022_CNIC - Annex 1606001 Water (UT), will the Government provide a separate Sub-Elin for Preventive Maintenance?
See ELIN X0022AB Integrated Maintenance Program (IMP), Spec Item 3.2
83 216 N6247022R
0005 CLDJ
BOSC
Solicitation
Spec Item 3.1.2.2
Spec item 3.1.2.2 Consumable supplies under 1300000– Galley, states that "the Contractor shall maintain a stock baseline of 500,000 sets for To-Go meals. Each set includes a clamshell (3-compartments), plastic flatware, paper cup (16 oz), and lid cup(16 oz)". Question: Could the government clarify whether the 500,000 sets of To-Go meals are included in the Historical Meal Demand data in attachment J-1300000-04?
Spec Item 3.1.2.2 refers to supply stocks and not meal demand data.
84 222 N6247022R
0005 CLDJ
BOSC
Solicitation
Spec Item 3.3.6
Spec item 3.3.6 Packaged Meal Preparation under 1300000– Galley, states that "Informational Note:
The annual packaged meal preparation is estimated at 200,000 per year". Question: Could the Government provide the Historical Meal Demand data for breakfast, lunch, dinner, and midrates?
Information is not available.
Contractor should estimate level of effort based on 200,000 annually.
85 222 N6247022R
0005 CLDJ
BOSC
Solicitation
Spec Item 3.4.1
Spec item 3.4.1 Chabelley Air Field under 1300000– Galley, states that "Daily meal preparation requirements for Chabelley Air Field have averaged 300 personnel during the day and 50- 75 personnel at night". Question: For the annual estimated 200,000 packaged meal preparation, could the Government provide the Historical Meal Demand data for breakfast, lunch, dinner, and midnight meals?
Information is not available.
The Chabelley Galley is operated per the hours shown in Attachment J-1300000-03.
Packaged meal preparation annual estimate is across all locations and varies in accordance with number of personnel at each location.
86 223 N6247022R
0005 CLDJ
BOSC
Solicitation
Spec Item 3.4.2
Spec Item 3.4.2 Titan Support Site (TSS) Meal Delivery under 1300000– Galley, states that "Meal preparation shall be in quantities sufficient to feed 550 personnel". Question: For the meals of the 550 personnel, could the Government provide the Historical Meal Demand data for breakfast, lunch, dinner, and midnight meals?
Information is not available.
The Titan Support Site Galley is operated per the hours shown in Attachment J- 1300000-03. Packaged meal preparation annual estimate is across all locations and varies in accordance with number of personnel at each location.
87 223 N6247022R
0005 CLDJ
BOSC
Solicitation
Spec Item 3.4.3
Spec Item 3.4.3 Combat Café under 1300000– Galley, states that "Daily meal preparation requirements for Combat Café have averaged 200 personnel during the day". Question: For the meals of the 200 personnel, could the Government provide the Historical Meal Demand data for breakfast, lunch, dinner, and midnight meals?
Information is not available.
The Combat Cafe is operated per the hours shown in Attachment J-1300000-03.
Packaged meal preparation annual estimate is across all locations and varies in accordance with number of personnel at each location.
88 10 J-1300000-
07 MESS
GEAR
INVENTOR
Y RECORD
N/A Could the government provide the existing mess gear inventory?
Information is not available.
89 N/A J-1300000- 08 Galley Equipment Inventory
Spec item 1.1
a. Could the Government include the locations of this equipment based on the dining facilities mentioned in the PWS 1300000 – Galley Spec Item 1.1?
b. Will the Government provide an ELIN for this equipment inventory for equipment maintenance?
a. Information is not available.
b. Galley equipment maintenance is performed under Annex 1300000 Spec Item 3.7, ELIN X010AG.
90 385 N6247022R
0005 CLDJ
BOSC
Solicitation
Spec Item 3.1.1.1
In Spec Item 3.1.1.1 Scheduled Shuttle Services under Annex 1700000 – Transportation, states that "the current bus route will be provided prior to contract start". Question: Kindly at least provide the number of stops and average number of passengers.
What ELIN schedule will this be categorized?
Scheduled Shuttle bus routes run on the CLDJ installation and cycle every 20 minutes.
Stops may be changed due to changes in population densities/facility use/distances, etc. Routes will be determined and provided prior to contract start. ELIN X0023AA Operation, Spec Item 3.1
91 390 N6247022R
0005 CLDJ
BOSC
Solicitation
Spec Item 3.2.2
In Spec Item 3.2.2 Vehicle Washrack under Annex 1700000 – Transportation, kindly provide the minimum number of staffs needed for wash rack operation and the historical data for wash rack equipment maintenance.
The Contractor should estimate the staffing required to perform the services stated.
Historical data for washrack equipment maintenance is not available.
92 398 N6247022R
0005 CLDJ
BOSC
Solicitation
Spec Item 3.4
In Spec Item 3.4 TR Bullets under Annex 1700000 – Transportation, states that "The initial cumulative TR Bullet value is $200,000.00". Question: is this generic number provided by the Government, with no further pricing information required?
$200,000.00 is a NTE amount annually. Actual amount invoiced annually could be less based on actual values of TR Bullets issued.
93 375 N6247022R
0005 CLDJ
BOSC
Solicitation
Spec Item 3.4
In Spec Item. 3.4 Emergency and Public Notification Procedures under Annex 1606001 - Water (Overseas), Question: Could the Government provide historical data for the past 12 months of performance?
Historical data is not available.
94 141 N6247022R
0005 CLDJ
BOSC
Solicitation
N/A This is for Annex 0700000 - Ordnance, could the government provide WLD for Explosive Safety Officer (ESO) Support?
See Informational Note provided in Annex 0700000 Spec Item 3 for estimated staffing requirements.
95 142 N6247022R
BOSC
Solicitation
Spec Item 3.2
In Spec Item 3.2 Administrative Support under Annex 0700000 - Ordnance, Question: could the Government provide what labor category they need for Administrative Support?
The Contractor should determine labor category requirements for Administrative Support.
96 142 N6247022R
0005 CLDJ
BOSC
Solicitation
Spec Item 3.2
In Spec Item 3.2 Administrative Support under Annex 0700000 - Ordnance, Question: Could the Government provide what services they need for Administrative Support?
See Informational Note provided in Annex 0700000 Spec Item 3 for estimated staffing requirements. Service required are stated in Spec Item 3.2 and sub-spec items.
97 N/A J-1606001- 05 Backflow Prevention Devices Inventory_C
ADJ
N/A Could the Government clarify to which Elin/Sub- Elin the BFP inventory for customer Chabelley will fall?
See Amendment 0006 for revised J-0200000-12.
98 N/A J-1606001-
TANKS AN
D BLADDE
RS INVENT
ORY
N/A “Piping, hoses, nozzles, connectors, and associated items" are quantified as "Multi". Could the Government provide a detailed inventory including quantities and specifications for these items?
Detailed inventory of piping, hoses, nozzles, connectors, and associated items is not available.
99 373 Annex 1606001 - Water (Overseas), Spec Item 3.4.3.
Backflow Prevention Devices, Attachment J-0200000- 12 ELINs and Attachment J-1606001- 05 Backflow Prevention Device Inventory Tab Chabelley
Spec Item 3.4.3
Is it the Government’s intention to remove Chabelley TAB from Attachment J-1606001-05 or add Spec
3.4.3. in Attachment J-0200000-12 ELINs?
See Amendment 0006 for revised Attachment J- 0200000-12 ELINs.
100 378 Annex 1606001 - Water (Overseas) , Spec Item
3.8 Non-
Potable Water Services
Spec Item 3.8
Can the Government provide historical frequency of water delivery to Chabelley Air Field?
Historical frequency of delivery is unavailable.
Delivery should be scheduled to continuously meet minimum water supply levels.
Chabelley Air Field
101 N/A Section:
Attachment J-1700000- 02 Fleet Inventory
N/A The Master tab inventory totals do not match the count of the equipment annotated between the other 8 tabs.
Is Contractor required to maintain only inventories annotated under the 8 tabs or under the Master tab?
See Amendment 0006 for revised 1700000-02.
102 385 Annex 1700000 Transportati on, Spec Item 3.1.1 Shuttle Services
Spec Item 3.1.1
Can the Government provide the size of the buses required for shuttle services? (30 pax or 40 pax)
30 Pax. See revised technical specification 1700000 Spec Item 3.1.1
103 386 Annex 1700000 Transportati on, Spec Item 3.1.1.2 Shuttle Services
Spec Item 3.1.1.2
Can the Government provide the size and number of buses required for unscheduled services? (30 pax or 40 pax)
30 Pax. Service provided as requested. See technical specification 1700000 Spec Item 3.1.1.2: "Informational Note: Historically there have been approximately 2500 unscheduled bus requests for up to 30 passengers per bus annually."
104 386 Annex 1700000 Transportati on, Spec Item 3.1.1.2 Shuttle Services
Spec Item 3.1.1.2
Can the Government provide frequency for bus services provided for Chabelley Air Field?
No information is available.
Service provided as requested.
105 389 Annex 1700000 Transportati on, Spec Item 3.1.3.
Truck and Tractor/Trail er Transport Services
Spec Item 3.1.3
Can the Government provide historical data for Truck and Tractor/Trailer Transport Services provided for Chabelley Air Field?
No information is available.
Service provided as requested.
106 392 Annex 1700000 Transportati on, Spec Item 3.3.
Maintenance
Spec Item 3.3
Is the Government’s intention for the Contractor to classify as abuse, damages caused due to end user negligence i.e. end user failing to present vehicle/equipment for scheduled maintenance?
Yes. The Contractor shall notify the KO upon identifying evidence or suspicion of damages resulting from accident or abuse.
107 404 Annex 1800000 – Environmen tal Spec Item 3.1
Spec Item 3.1
Is it the Government’s intention for Contractor to have full time Environmental service in Chabelley Air Field HWSA (Hazardous Waste Storage Area) or it will be considered as HWAP (Hazardous Waste Accumulation Point)?
See Attachment J-1800000-04.
108 449 N6247022R
BOSC
Solicitation
SN b, ¶ 1 Non-price proposals shall be submitted on 8 ½ x 11 inch paper (or equivalent European A4 paper) with a font no smaller than 11 point. Question: Will the government allow the use of a smaller font for headers/footers, graphics and tables for the purpose of space savings?
Please follow instructions in section L.5 (b) of the Solicitation.
109 459 N6247022R
0005 CLDJ
BOSC
Solicitation
SN 3. d. d. The Technical Approach to Safety narrative shall be limited to two (2) single-sided pages or one (1) doublesided page. Information on pages beyond this will not be considered. Question: Please clarify if the 2 page limit is only applicable to the safety "narrative" and that the TCR/DART data is outside of the 2 page count limit? If TCR/DART data is outside of the 2 page limit is it also outside of the 40 page count limit specified for the Non-Price Proposal?
No, it is not outside the page count.
110 451 N6247022R
0005 CLDJ
BOSC
Solicitation
SN 2. i. The offeror shall clearly demonstrate its understanding of current industry standards, policies, procedures, and processes utilized in accomplishing the size, scope, and complexity of service requirements set forth in the performance objectives and standards of the Performance Work Statement.
Question: Please clarify where in the required outline specified in paragraphs a to f annexes, the government would like the narrative for understanding of current industry as it relates to standards, policies, procedures, and processes utilized in accomplishing the size, scope, and complexity of service. Will the government allow for additional page count to provide this explanation of understanding?
Please see revisions in Amendment 0006.
111 6, 414 N6247022R
0005 CLDJ
BOSC
Solicitation
Section B.2
Section B.2 states that phase-in shall be for a period of "no more than 90 days", but Section F.2 states that pricing should include a phase-in of "no more than 45 days." This appears to be a conflict. Please clarify the length of phase-in.
Please see revisions in Amendment 0003.
112 457-
N6247022R
0005 CLDJ
BOSC
Solicitation
Section M - Factor 1 Corporat e Experien ce
When the Agency states that X, Y or Z feature in the offeror's experience "may be evaluated more favorably," does that mean the agency will be evaluating offerors on whether they have that feature and if they do assign that offeror a Strength?
Please see Sections L and M.
113 457-
N6247022R
0005 CLDJ
BOSC
Solicitation
Section M - Factor 1 Corporat e Experien ce
Besides the features that the RFP states may lead to the offeror being evaluated "more favorably," is it possible for an offeror to obtain Strengths on this factor on any other basis (we are not asking what basis, just if the agency will consider whether an offeror warrants a Strength on this factor for any other reason)?
Please see Sections L and M.
114 458-
N6247022R
0005 CLDJ
BOSC
Solicitation
Section M - Factor 3 Safety
The evaluation criteria for Factor 3 Safety states that "Declining trends [in TCR or DART] that push risk levels from Moderate Risk (MR) or higher to Low Risk (LR) or Very Low (VLR) would indicate a Strength". Please confirm that a trend of exclusively Low or Very Low Risk TCR or DART ratings would also indicate a Strength.
Please see Sections L and M.
115 458-
N6247022R
0005 CLDJ
BOSC
Solicitation
Section M - Factor 3 Safety
Will the Technical Approach to Safety Narrative be evaluated for Strengths and Weaknesses?
Please see Sections L and M.
116 457-
N6247022R
0005 CLDJ
BOSC
Solicitation
Section M - Factor 1 Corporat e Experien ce
In evaluating Factor 1, will an offeror be evaluated more favorably if the offeror demonstrates "Reverse Osmosis Water Treatment Plant operations similar to the requirements of Annex 1606001, [and] WHE services and vehicle maintenance similar to the requirements of Annex 1700000"? Will an offeror be evaluated more favorably if the offeror demonstrates both in the same project?
Please see Sections L and M.
117 457-
N6247022R
0005 CLDJ
BOSC
Solicitation
Section M - Factor 1 Corporat e Experien ce
The RFP states "Offerors who submit at least one recent/relevant project that demonstrates experience self-performing or managing Base Operating Services (BOS) (or equivalent) contracts at a remote and/or OCONUS location may be evaluated more favorably." Will an offeror be evaluated more favorably if it submits more than one such project?
Or is the government only looking at whether the offeror submits at least one such project for more favorable evaluation.
Please see Sections L and M.
118 457-
N6247022R
0005 CLDJ
BOSC
Solicitation
Section M - Factor 1 Corporat e Experien ce
In evaluating and rating offerors on Factor 1, will the agency be evaluating each project for degree of relevancy? Or will the agency be evaluating each project as relevant/not-relevant, and then considering whether the offerors project portfolio has the characteristics described in paragraphs of the Factor 1 evaluation criteria.
Please see Sections L and M.
119 450- 451, 457-
N6247022R
0005 CLDJ
BOSC
Solicitation
Sections L & M - Factor 1 Corporat e Experien ce
There is a potential ambiguity between the aggregate annex relevancy requirements in Sections L and M.
Section M includes 5 annexes, but Section L includes 4 annexes. The discrepancy is Annex 1502000. We presume that 1502000 is required for collective experience (as stated in M), since it is required for an individual project to be relevant. If our understanding is incorrect, please clarify.
No ambiguity is present.
Please see Sections L and M.
120 450- 451, 457-
N6247022R
0005 CLDJ
BOSC
Solicitation
Sections L & M - Factor 1 Corporat e Experien ce
There is a potential conflict between the JV requirement in L and M. In Section L the RFP states that the JV must include at least one project "by at least one JV Member," but in Section M it states that "each member of the JV must demonstrate experience on at least one relevant project" (unless the JV is covered by an MPA). Please clarify.
Please see revisions to section L.5(b).
121 457-
N6247022R
0005 CLDJ
BOSC
Solicitation
Section M - Factor 1 Corporat e Experien ce
The RFP states "Offerors who submit at least one recent/relevant project that demonstrates experience self-performing or managing Base Operating Services (BOS) (or equivalent) contracts at a remote and/or OCONUS location may be evaluated more favorably." Please define equivalent.
Please see Sections L and M.
122 450- 451, 457-
N6247022R
0005 CLDJ
BOSC
Solicitation
Section L & M - Factor 1 Corporat e Experien ce
In evaluating projects for similarity in size, will the evaluation be based on whether the project meets the threshold in Section L Factor 1 paragraph d? Will the agency consider projects more relevant in size if they exceed the threshold in paragraph d, or merely evaluate whether the project meets the threshold in paragraph d?
Please see Sections L and M.
123 450- 451, 457-
N6247022R
0005 CLDJ
BOSC
Solicitation
Section L & M - Factor 1 Corporat e Experien ce
In evaluating projects for similarity in complexity, what features will the agency be looking for in a project? Will the agency consider projects more relevant in complexity if they exceed a certain threshold, or merely evaluate whether the project meets a complexity threshold?
Please see Sections L and M.
124 450- 451, 457-
N6247022R
0005 CLDJ
BOSC
Solicitation
Section L & M - Factor 1 Corporat e Experien ce
In evaluating projects for similarity in scope, what features will the agency be looking for in a project?
Will the agency consider projects more relevant in scope if they exceed a certain threshold, or merely evaluate whether the project meets a scope threshold?
Please see Sections L and M.
125 459-
N6247022R
0005 CLDJ
BOSC
Solicitation
Section M - Factor 5 Past Performa nce
Our understanding is that each project will be evaluated for" degree of similarity" on the Past Performance factor, and that this mean that the government will evaluate each project for degrees of relevancy on Factor 5, and not merely whether the project is relevant or not relevant. If our understanding incorrect, please clarify.
Please see Sections L and M.
126 1 N6247022R
0005 CLDJ
BOSC
Solicitation
SF33,
Solicitati on Block
The SF33 states Sealed offers in original and 4 copies to be provided 2:00 PM 18 Apr 2024. We would like to respectfully request an extension to provide sufficient time for the government to review and respond to questions, and sufficient time for Contractors to process the government's answers once they are issued.
Please see revisions in Amendment 0005.
127 6 B.9 Can the Government clarify the Phase In time period for pricing of no more than 90 days when viewed beside the Phase Out as no more than 30 days? Is the Government’s desire for the awardee to Phase In up to 60 days prior to the incumbent beginning to Phase Out? And does the Government intend to chair Phase In / Phase Out meetings or provide oversight / guidance for the beginning of Recurring Work?
Please see revisions in Amendment 0003.
128 414 F.2 Please clarify the pricing that is not to exceed 45 days for Phase In but there is a potential for up to 90 days mentioned in B.9.
Please see revisions in Amendment 0003.
129 414 F.3 Please clarify if the estimated 20 November 2025 is at the completion of the Phase In period and demobilization has concluded.
Phase-in is intended to be complete prior to start of services.
130 2 A n/a With over 100 questions asked by our company and no responses received from the Government to all submitted questions, requesting an extension of no less than 3 weeks following the receipt of responses to clarification questions. This extension will be crucial to provide offerors sufficient time to prepare thorough and compliant proposals.
Please see revisions in Amendment 0005.
131 410 Annex 1800000
Spec Item 3.3.2
"All used oil picked up from U.S. Navy detachments within the Republic of Djibouti or other designated locations within the Republic of Djibouti is intended to be processed for recycling."
Question: Please confirm that all used oil is generated in the Republic of Djibouti. Who is responsible for transporting the used oil?
Used oil picked up from U.S.
Navy detachments within the Republic of Djibouti or other locations within the Republic of Djibouti is intended to be processed for recycling. The Contractor is responsible for transporting used oil from designated locations.
132 N/A Amendment
N/A With the large number of questions still unanswered and many RFP clarifications yet to be received from the Government, we respectfully request a 4-week extension to the proposal submission deadline as we await clarification responses. This will allow time to consider responses to questions in the preparation of complete/compliant proposals for all competitors.
Please see revisions in Amendment 0005.
133 283-
Solicitation, Annex 1503010
All Custodial - Mobile Drinking Water Filling Stations are listed as part of the density. a) Will there be a requirement beyond simple cleaning or will filter replacement and equipment maintenance be included in the requirements?
b) If yes, please provide manufacture make/model or drawings.
Equipment maintenance is performed under Annex 1502000 Facility Investment.
134 352-
Solicitation, Annex 1606001
All Water Treatment – Can we receive the latest feed water analysis from each of the active wells.
Latest feed water analysis information form active wells is not available.
135 N624 R000
5+CL
DJ+A
mend ment +000 3.pdf, page
L.3 Non- Price Submitta l Require ments
Question: Considering the numerous of technical approach elements required to be addressed in Section L as well as the need to demonstrate "adequate staffing for each of the annexes" and demonstrate "a reasonable understanding of the requirements and labor skills needed to successfully perform", will the Government increase page count by at least 10 pages?
Please see revisions in Amendment 0006.
136 1 J-1 Past Performance…
This is the start of the file's text. The full file is on GovTribe.