J-0200000-12 ELINS CLDJ 4-18-2024 Amendment 0009.xlsx

XLSX spreadsheet 8 MB Posted

Attached to
N62470-22-R-0005 Base Operations Support (BOS) Services Contract for Camp Lemonnier, Djibouti, Africa
Solicitation number
N62470-22-R-0005
Issued by

About this file

This document is a pricing exhibit for the Base Operations Support (BOS) Services Contract for Camp Lemonnier, Djibouti, Africa under Solicitation N62470-22-R-0005. The exhibit outlines the recurring work, non-recurring work, and pricing for a base period and first option period. The recurring work includes facility services such as force protection, fire and emergency services, airfield operations, supply services, utilities management, and environmental services across various functional areas. The non-recurring work includes tasks such as security lighting, containerized living unit replacement, mold remediation, and rental of equipment like generators and trucks. Pricing is provided for each contract line item number (CLIN) with detailed labor categories, units, and estimated quantities. The performance period is for the base period and first option period.

View the file

Other files

File Type Posted
J-1002000 Supply Services 11-28-2023 Amendment 0013.pdf PDF
N6247022R0005 Amendment 0013.pdf PDF
J-0200000-12 ELINS CLDJ Amendment 0012.xlsx XLSX spreadsheet
J-1601000-09 Utility Asset Inventory Amendment 0012.xlsx XLSX spreadsheet
J-1001000-03 Historical Workload Data.xlsx XLSX spreadsheet
J-1602000 Electrical Amendment 0012.pdf PDF
J-1503050 Grounds Maintenance and Landscaping Amendment 0012.pdf PDF
J-0402000 Fire Emergency Services Amendment 0012.pdf PDF
J-0403000 Emergency Management Amendment 0012.pdf PDF
J-0200000-12 ELINS CLDJ Amendment 0009.xlsx XLSX spreadsheet
J-1601000-09 Utility Asset Inventory Amendment 0009.xlsx XLSX spreadsheet
N6247022R0005 Amendment 0012.pdf PDF
J-1001000 Material Management Amendment 0012.pdf PDF
N6247022R0005 Amendment 0011.pdf PDF
N6247022R0005 Amendment 0010.pdf PDF
J-0402000-07 Fire and Emergency Services GFE Amendment 0009.xlsx XLSX spreadsheet
BPMS B-24.12 Fire Protection System Sustainment.pdf PDF
J-1002000-03 HAZMAT Locker Inventory.xlsx XLSX spreadsheet
J-1700000-02 Transportation Fleet Inventory Amendment 0009.xlsx XLSX spreadsheet
J-1502000-06 Systems Descriptions and Inventories Amendment 0009.xlsx XLSX spreadsheet
N6247022R0005 Amendment 0009.pdf PDF
J-1001000-03 Historical Workload Data Amendment 0009.xlsx XLSX spreadsheet
N6247022R0005 Amendment 0008.pdf PDF
J-1501000-03 BPMS B-15.1.5 ICAP Continuing Inspection Assessment.pdf PDF
J-1501000-03 BPMS B-15.17 Work Tracking.pdf PDF
J-1501000-03 BPMS B-15.27 Facility EUR SR and Work Order Mnmgmt.pdf PDF
J-1503050 Grounds Maintenance and Landscaping Amendment 0007.pdf PDF
J-1601000-05BPMS B-5.2.14 Utility Outage Incident Report Data.pdf PDF
J-0402000-06_Fire Extinguisher Inventory Amendment 0007.xlsx XLSX spreadsheet
N6247022R0005 Amendment 0007.pdf PDF
J-1501000-03 BPMS B-15.6 Proper Work Classification.pdf PDF
J-1 Past Performance Questionnaire (PPQs) Amend 0006.pdf PDF
N6247022R0005 Amendment 0006.pdf PDF
J-1606001-03 Water Treatment Plant Distribution System Inv Amendment 0006.xlsx XLSX spreadsheet
J-1503010-03 Custodial Facilities Inventory and Frequencies Amendment 0006.xlsx XLSX spreadsheet
J-1300000 Galley Amendment 0006.pdf PDF
J-1700000 Transportation Amendment 0006.pdf PDF
J-0200000-12 ELINS CLDJ Amendment 0006.xlsx XLSX spreadsheet
J-1700000-02 Transportation Fleet Inventory Amendment 0006.xlsx XLSX spreadsheet
J-1800000 Environmental Amendment 0006.pdf PDF
J-1503020 Pest Control Amendment 0006.pdf PDF
N6247022R0005 Amendment 0005.pdf PDF
J-8 Pre-Proposal Site Visit Roster.pdf PDF
N6247022R0005 Amend 0004.pdf PDF
J-9 Pre-Proposal Site Visit Powerpoint.pptx PPTX presentation
F - Section F Deliverables_corrected.pdf PDF
J-1503060 Pavement Clearance.pdf PDF
N6247022R0005 CLDJ Amendment 0003.pdf PDF
N6247022R0005 CLDJ Amend 0002.pdf PDF
J-7 DD254 Form (PDF) Solicitation N6247022R2005.pdf PDF
Show 40 more

Latest 50 of 114 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Base Period - RW

ATTACHMENT J-0200000-12
EXHIBIT LINE ITEM NUMBERS
SOLICITATION/CONTRACT # N62470-22-R-0005
EXHIBIT A - BASE PERIOD - RECURRING WORK
CLIN 0001
Recurring Work Price - Base Period
PROVIDE PRICES TO PERFORM FACILITY SERVICES RECURRING WORK - IN ACCORDANCE WITH SECTION C, SPEC ITEM 3
ELINs A001 THROUGH A103
ELIN / Sub ELINDescriptionQuantityUnit of IssueUnit PriceTotal Price
CNIC - Recurring Work (ELINs A001 through A040)
A001CNIC - Annex 0401000 Force Protection (CT), Spec Item 3
A001AAEntry Control Point Services, Spec Item 3.112MO$ -
A001ABEscort and Courier Services, Spec Item 3.212MO$ -
A001ACLight Carts Services, Spec Item 3.312MO$ -
A001ADSecurity Barrier and IDF Bunker, Spec Item 3.412MO$ -
A001AEPreventive Maintenance (PM) Program, Spec Item 3.512MO$ -
CNIC - Total Annex 0401000 Force Protection (CT), Spec Item 3$ -
A002CNIC - Annex 0402000 Fire & Emergency Services (FI), Spec Item 3
A002AAEmergency Medical Services, Spec Item 3.112MO$ -
A002ABFire Protection Services, Spec Item 3.212MO$ -
A002ACFire Prevention Services, Spec Item 3.312MO$ -
A002ADPublic Education, Spec Item 3.412MO$ -
A002AEFire Investigation, Spec Item 3.512MO$ -
CNIC - Total Annex 0402000 Fire & Emergency Services (FI), Spec Item 3$ -
A003CNIC - Annex 0403000 Emergency Management (EM), Spec Item 3
A003AAProgram Threat Assessment, Planning and Administrative Support, Spec Item 3.112MO$ -
A003ABEmergency Dispatch Center (EDC) Operation, Spec Item 3.212MO$ -
A003ACExercise Support, Spec Item 3.312MO$ -
A003ADTraining Support, Spec Item 3.412MO$ -
A003AEMaterial Management Support, Spec Item 3.512MO$ -
A003AFSelf-Assessment Support, Spec Item 3.612MO$ -
CNIC - Total Annex 0403000 Emergency Management (EM), Spec Item 3$ -
A004CNIC - Annex 0501050 Airfield Facilities (AO), Spec Item 3
A004AAAirfield Operations, Spec Item 3.112MO$ -
A004ABForeign Object Debris (FOD), Spec Item 3.212MO$ -
A004ACAirfield Vehicle Operator Course Training (AVOC), Spec Item 3.312MO$ -
A004ADFlight Planning Services, Spec Item 3.412MO$ -
CNIC - Total Annex 0501050 Airfield Facilities (AO), Spec Item 3$ -
A005CNIC - Annex 0501070 Passenger Terminal & Cargo Handling (AO), Spec Item 3
A005AAAir Terminal Operations Center (ATOC), Spec Item 3.112MO$ -
A005ABPassenger and Baggage Services, Spec Item 3.212MO$ -
A005ACCargo Handling Services, Spec Item 3.312MO$ -
A005ADRecord, Reports and Electronic Data Interchange, Spec Item 3.412MO$ -
A005AEFleet Services, Spec Item 3.512MO$ -
A005AFExercises, Deployments and Re-Deployments, Spec Item 3.612MO$ -
A005AGJoint Inspection, Spec Item 3.712MO$ -
CNIC - Total Annex 0501070 Passenger Terminal & Cargo Handling (AO), Spec Item 3$ -
A006CNIC - Annex 0700000 Ordinance (Ord), Spec Item 3
A006AAExplosive Safety Officer (ESO) Support, Spec Item 3.112MO$ -
A006ABAdministrative Support, Spec Item 3.212MO$ -
A006ACOperations, Spec Item 3.312MO$ -
CNIC - Total Annex 0700000 Ordinance (Ord), Spec Item 3$ -
A007CNIC - Annex 1001000 Material Management (SP), Spec Item 3
A007AATransportation Services, Spec Item 3.112MO$ -
A007ABFleet Logistics and Forward Operating Location (FOL) Material Processing, Spec Item 3.212MO$ -
CNIC - Total Annex 1001000 Material Management (SP), Spec Item 3$ -
A008CNIC - Annex 1002000 Supply Services (SP), Spec Item 3
A008AAHAZMAT Control and Management (HMCM) Services, Spec Item 3.112MO$ -
A008ABPOL Management Services, Spec Item 3.212MO$ -
A008ACMail Services, Spec Item 3.312MO$ -
A008ADMortuary Affairs, Spec Item 3.412MO$ -
CNIC - Total Annex 1002000 Supply Services (SP), Spec Item 3$ -
A009CNIC - Annex 1200000 MWR (MW), Spec Item 3
A009AACommon Support Services, Spec Item 3.112MO$ -
A009ABFitness Services, Spec Item 3.212MO$ -
A009ACCommunity Support Services, Spec Item 3.312MO$ -
CNIC - Total Annex 1200000 MWR (MW), Spec Item 3$ -
A010CNIC - Annex 1300000 Galley (GL), Spec Item 3
A010AAMeal Planning, Spec Item 3.112MO$ -
A010ABMeal Preparation, Spec Item 3.212MO$ -
A010ACMeal Services, Spec Item 3.312MO$ -
A010ADRemote Galley Meal Delivery Services (Combat Café), Spec Item 3.412MO$ -
A010AEScullery Operations, Spec Item 3.512MO$ -
A010AFHouse Keeping and Sanitation Services, Spec Item 3.612MO$ -
A010AGIMP Program, Spec Item 3.712MO$ -
CNIC - Total Annex 1300000 Galley (GL), Spec Item 3$ -
A011CNIC - Annex 1402000 Unaccompanied Housing (QO), Spec Item 3
A011AAFront Desk Operations, Spec Item 3.112MO$ -
A011ABSupport Services, Spec Item 3.212MO$ -
A011ACLaundry Services, Spec Item 3.312MO$ -
A011ADExpeditionary 320 Man Camp, Spec Item 3.412MO$ -
CNIC - Total Annex 1402000 Unaccompanied Housing (QO), Spec Item 3$ -
A012CNIC - Annex 1501000 Facility Management (FP), Spec Item 3
A012AAWork Control, Spec Item 3.112MO$ -
A012ABNAVFAC Maximo Data Entry, Spec Item 3.212MO$ -
A012ACInfrastructure Condition Assessment Program (ICAP) Services, Spec Item 3.312MO$ -
A012ADTechnical Support Services, Spec Item 3.412MO$ -
A012AEFacility Related Control Systems (FRCS), Operational Technology (OT), and Information Technology (IT) Systems and Applications, Spec Item 3.512MO$ -
CNIC - Total Annex 1501000 Facility Management (FP), Spec Item 3$ -
A013CNIC - Annex 1502000 Facility Investment (ST), Spec Item 3
Service Orders, Spec Item 3.1
A013AAEmergency Service Orders, Spec Item 3.1.112MO$ -
A013ABUrgent Service Orders, Spec Item 3.1.212MO$ -
A013ACRoutine Service Orders, Spec Item 3.1.312MO$ -
Facility Bullet (Spec Item 3.2)
A013ADFacility Bullet (Spec Item 3.2)12MO$ -
Preventive Maintenance (PM) Program, Spec Item 3.3
A013AEBoilers and UPV’s, Spec Item 3.3.112MO$ -
A013AFHVAC and Refrigeration Systems, Spec Item 3.3.212MO$ -
A013AGExterior Lighting Systems, Spec Item 3.3.312MO$ -
A013AHWeight Handling Equipment (WHE), Spec Item 3.3.412MO$ -
A013AJLightning Arrestors and Grounding Devices, Spec Item 3.3.512MO$ -
A013AKFire Protection Systems, Spec Item 3.3.612MO$ -
A013ALVertical Transportation Equipment (VTE), Spec Item 3.3.712MO$ -
A013AMCompressed Air Systems, Spec Item 3.3.812MO$ -
A013ANAuxiliary Generators, Spec Item 3.3.912MO$ -
A013APWater Chiller/Fountains, Spec Item 3.3.1012MO$ -
A013AQTruck Scales, Spec Item 3.3.1112MO$ -
A013ARAirfield Lighting, Spec Item 3.3.1212MO$ -
A013ASPOL System Facilities and Distribution Systems, Spec Item 3.3.1312MO$ -
A013ATSolar Hot Water Systems, Spec Item 3.3.1412MO$ -
A013AUUninterruptible Power Supply and Frequency Converter, Spec Item 3.3.1512MO$ -
A013AVPhotovoltaic Panel Systems, Spec Item 3.3.1612MO$ -
A013AWElectrical Distribution Panels, Spec Item 3.3.1712MO$ -
Integrated Maintenance Program (IMP), Spec Item 3.4
A013AXHVAC and Refrigeration Systems, Spec Item 3.4.112MO$ -
Inspection, Testing, and Certification Program, Spec Item 3.5
A013AYBoilers and UPT, Spec Item 3.5.112MO$ -
A013AZWeight Handling Equipment (WHE), Spec Item 3.5.212MO$ -
A013BAVertical Transportation Equipment (VTE), Spec Item 3.5.312MO$ -
Other Recurring Services Program, Spec Item 3.6
A013BBGrease Traps, Spec Item 3.6.112MO$ -
A013BCExhaust Hoods and Ducts, Spec Item 3.6.212MO$ -
A013BDLocksmith Services, Spec Item 3.6.312MO$ -
A013BERoll-Up Doors, Spec Item 3.6.412MO$ -
A013BFSurface Cleaning (Pressure Washing), Spec Item 3.6.512MO$ -
A013BGVehicle Wash Rack and Waste Water System, Spec Item 3.6.612MO$ -
A013BHSign Production, Spec Item 3.6.712MO$ -
A013BJMobile Weapons Range, Spec Item 3.6.812MO$ -
A013BKTurnstiles, Spec Item 3.6.912MO$ -
CNIC - Total Annex 1502000 Facility Investment (ST) , Spec Item 3$ -
A014CNIC - Annex 1503010 Custodial (FX), Spec Item 3
A014AAScheduled Services, Spec Item 3.112MO$ -
A014ABUnscheduled Services, Spec Item 3.212MO$ -
CNIC - Total Annex 1503010 Custodial (FX), Spec Item 3$ -
A015CNIC - Annex 1503020 Pest Control (FX), Spec Item 3
A015AAScheduled Pest Control Services, Spec Item 3.112MO$ -
A015ABUnscheduled Pest Control Services, Spec Item 3.212MO$ -
A015ACPest Management Reporting, Spec Item 3.312MO$ -
CNIC - Total Annex 1503020 Pest Control (FX), Spec Item 3$ -
A016CNIC - Annex 1503030 Integrated Solid Waste Management (ISWM) (FX), Spec Item 3
A016AASolid Waste Collection, Spec Item 3.112MO$ -
A016ABIncinerator Plant Operation, Spec Item 3.212MO$ -
A016ACSolid Waste Disposal, Spec Item 3.312MO$ -
A016ADVehicles and Equipment, Spec Item 3.412MO$ -
A016AESolid Waste Containers, Spec Item 3.512MO$ -
A016AFPreventive Maintenance Program, Spec Item 3.612MO$ -
CNIC - Total Annex 1503030 Integrated Solid Waste Management (ISWM) (FX), Spec Item 3$ -
A017CNIC - Annex 1503050 Grounds Maintenance/Landscaping (FX), Spec Item 3
A017AATree Maintenance, Spec Item 3.112MO$ -
A017ABIrrigation, Spec Item 3.212MO$ -
A017ACDebris Removal, Spec Item 3.312MO$ -
A017ADVehicle Barrier Ditch Maintenance, Spec Item 3.412MO$ -
A017AEStorm Drainage Systems, Spec Item 3.512MO$ -
A017AFVegetation Clearing, Spec Item 3.612MO$ -
A017AGMaintenance of Xeriscape Area, Spec Item 3.712MO$ -
CNIC - Total Annex 1503050 Grounds Maintenance/Landscaping (FX), Spec Item 3$ -
A018CNIC - Annex 1503060 Pavement Clearance (FX), Spec Item 3
A018AAPavement Sweeping, Spec Item 3.112MO$ -
CNIC - Total 1503060 Pavement Clearance (FX), Spec Item 3$ -
A019CNIC - Annex 1601000 Utility Management (UT), Spec Item 3
A019AAUtility Operations Management, Spec Item 3.112MO$ -
A019ABUtility Infrastructure Condition Assessment (UICAP) Support, Spec Item 3.212MO$ -
A019ACFRCS, OT, IT System and Application, Spec Item 3.312MO$ -
CNIC - Total Annex 1601000 Utility Management (UT), Spec Item 3$ -
A020CNIC - Annex 1602000 Electrical (UT) Spec Item 3
A020AAOperate Electrical Power Generation Plant, Spec Item 3.112MO$ -
A020ABOperate Electrical Power Transmission and Distribution Systems, Spec Item 3.212MO$ -
A020ACIntegrated Maintenance Plan (IMP), Spec Item 3.312MO$ -
CNIC - Total Annex 1602000 Electrical (UT) Spec Item 3$ -
A021CNIC - Annex 1604000 Wastewater (UT), Spec Item 3
A021AAOperation, Spec Item 3.112MO$ -
A021ABIntegrated Maintenance Program (IMP), Spec Item 3.212MO$ -
A021ACInspection Program, Spec Item 3.312MO$ -
A021ADOther Recurring Services, Spec Item 3.412MO$ -
CNIC - Total Annex 1604000 Wastewater (UT), Spec Item 3$ -
A022CNIC - Annex 1606001 Water (UT), Spec Item 3
A022AAOperation, Spec Item 3.112MO$ -
A022ABIntegrated Maintenance Program (IMP), Spec Item 3.212MO$ -
A022ACInspection, Testing and Certification Program, Spec Item 3.312MO$ -
A022ADEmergency and Public Notification Procedures, Spec item 3.412MO$ -
A022AECritical Spare Parts, Spec Item 3.512MO$ -
A022AFValve Exercising, Spec Item 3.612MO$ -
A022AGFire Hydrant Flow Testing, Spec Item 3.712MO$ -
CNIC - Total Annex 1606001 Water (UT), Spec Item 3$ -
A023CNIC - Annex 1700000 Transportation (TR), Spec Item 3
A023AAOperation, Spec Item 3.112MO$ -
A023ABSupport Services, Spec Item 3.212MO$ -
A023ACMaintenance, Spec Item 3.312MO$ -
A023ADTransportation Bullets, Spec Item 3.412MO$ -
CNIC - Total Annex 1700000 Transportation (TR), Spec Item 3$ -
A024CNIC - Annex 1800000 Environmental (EC), Spec Item 3
A024AADiscarded HM/HW/NRW/ORW Management, Spec Item 3.112MO$ -
A024ABOil and Hazardous Substance Spill Response and Cleanup Ashore, Spec Item 3.212MO$ -
A024ACUsed Oil Management, Spec Item 3.312MO$ -
A024ADArea Air Emissions Monitoring, Spec Item 3.412MO$ -
CNIC - Total Annex 1800000 Environmental (EC), Spec Item 3$ -
A025-A040Reserved
CNIC EURAFCENT SUBTOTAL:>>>>>>>>>>>>>>$ -
AIR FORCE - Recurring Work (ELINs A041 through A060)
Air Force (AF) Recurring Work
A041AF Chabelley Airfield - Annex 1300000 Galley (GL), Spec Item 3
A041AARemote Galley Meal Delivery Services, Spec Item 3.412MO$ -
AF Chabelley Airfield - Total Annex 1300000 Galley (GL), Spec Item 3$ -
A042AF CLDJ- Annex 1502000 Facility Investment (ST), Spec Item 3
AF CLDJ - Service Orders, Spec Item 3.1
A042AARoutine Service Orders, Spec Item 3.1.312MO$ -
AF CLDJ - Preventive Maintenance (PM) Program, Spec Item 3.3
A042ABHVAC and Refrigeration Systems, Spec Item 3.3.212MO$ -
A042ACExterior Lighting Systems, Spec Item 3.3.312MO$ -
A042ADLightning Arrestors and Grounding Devices, Spec Item 3.3.512MO$ -
AF CLDJ - Total Annex 1502000 Facility Investment (ST), Spec Item 3$ -
A0432AF Chabelley Airfield - Annex 1503030 Integrated Solid Waste Management (ISWM) (FX), Spec Item 3
A0432AASolid Waste Collection, Spec Item 3.112MO$ -
A0432ABSolid Waste Disposal, Spec Item 3.312MO$ -
A0432ACSolid Waste Containers, Spec Item 3.512MO$ -
AF Chabelley Airfield - Total Annex 1503030 Integrated Solid Waste Management (ISWM) (FX), Spec Item 3$ -
A0443AF Chabelley Airfield - Annex 1604000 Wastewater (UT), Spec Item 3
A0443AAOther Recurring Services, Spec Items 3.4.2, 3.4.312MO$ -
AF Chabelley Airfield - Total Annex 1604000 Wastewater (UT), Spec Item 3$ -
A0454AF Chabelley Airfield- Annex 1606001 Water (UT), Spec Item 3
A0454AAInspection, Testing and Certification Program, Spec Item 3.312MO$ -
A0454ABNon-Potable Water Services Chabelley Air Field, Spec Item 3.812MO$ -
AF Chabelley Airfield -Total Annex 1606001 Water (UT), Spec Item 3$ -
A0465AF Chabelley Airfield -Annex 1700000 Transportation (TR), Spec Item 3
A0465AAUnscheduled Bus Services, Spec Item 3.1.1.212MO$ -
A0465ABTruck and Tractor/Trailer Transport Services, Spec Item 3.1.312MO$ -
A046ACMaintenance, Spec Item 3.312MO$ -
AF Chabelley Airfield -Total Annex 1700000 Transportation (TR), Spec Item 3$ -
A0476AF Chabelley Airfield -Annex 1800000 Environmental (EC), Spec Item 3
A0476AADiscarded HM/HW/NRW/ORW Management, Spec Item 3.112MO$ -
A0476ABOil and Hazardous Substance Spill Response and Cleanup Ashore, Spec Item 3.212MO$ -
AF Chabelley Airfield -Total Annex 1800000 Environmental (EC), Spec Item 3$ -
A0487-A060Reserved
AIR FORCE SUBTOTAL:>>>>>>>>>>>>>>$ -
DLA - Recurring Work (ELINs A061 through A065)
A061DLA - Annex 1502000 Facility Investment (ST), Spec Item 3
DLA - Service Orders, Spec Item 3.1
A061AARoutine Service Orders, Spec Item 3.1.312MO$ -
DLA - Preventive Maintenance Program, Spec Item 3.3
A061ABHVAC and Refrigeration Systems, Spec Item 3.3.212MO$ -
A061ACFire Protection Systems, Spec Item 3.3.612MO$ -
DLA - Total Annex 1502000 Facility Investment (ST), Spec Item 3$ -
A062DLA - Annex 1700000 Transportation (TR), Spec Item 3
A062AAMaintenance, Spec Item 3.312MO$ -
DLA - Total Annex 1700000 Transportation (TR), Spec Item 3$ -
A063-A065Reserved
DLA SUBTOTAL:>>>>>>>>>>>>>>$ -
FLEET FORCES - Recurring Work (ELINs A066 through A070)
A066FLEET FORCES - Annex 1402000 - Unaccompanied Housing (QO)
A066AAMedical Laundry, Spec item 3.3.312MO$ -
FLEET FORCES - Total Annex 1402000 Unaccompanied Housing (QO), Spec Item 3$ -
A067-A070Reserved
FLEET FORCES SUBTOTAL:>>>>>>>>>>>>>>$ -
HOA - Recurring Work (ELINs A071 through A080)
A071HOA - Annex 1502000 Facility Investment (ST), Spec Item 3
HOA - Service Orders, Spec Item 3.1
A071AARoutine Service Orders, Spec Item 3.1.312MO$ -
HOA - Preventive Maintenance Program, Spec Item 3.3
A071ABBoilers and UPV's, Spec Item 3.3.112MO$ -
A071ACHVAC and Refrigeration Systems, Spec Item 3.3.212MO$ -
A071ADExterior Lighting Systems, Spec Item 3.3.312MO$ -
A071AEAuxiliary Generators, Spec Item 3.3.912MO$ -
A071AFWater Chillers/Fountains, Spec Item 3.3.1012MO$ -
HOA - Other Recurring Services Program, Spec Item 3.6
A071AGLocksmith Services, Spec Item 3.6.312MO$ -
HOA - Total Annex 1503010 Facility Investment (ST), Spec Item 3$ -
A072HOA - Annex 1503010 Custodial Services (FX)
A072AAScheduled Services, Spec Item 3.112MO$ -
A072ABUnscheduled Services, Spec Item 3.212MO$ -
HOA - Total Annex 1503010 Custodial (FX), Spec Item 3$ -
A073HOA - Annex 1604000 Wastewater (UT), Spec Item 3
A073AAOther Recurring Services, Spec Item 3.4.212MO$ -
HOA - Total Annex 16040000 Wastewater (UT), Spec Item 3$ -
A074HOA - Annex 1606001 Water (UT), Spec Item 3
A074AAInspection, Testing, and Certification Program, Spec Item 3.3.112MO$ -
HOA - Total Annex 1606001 Water (UT), Spec Item 3$ -
A075HOA - Annex 1700000 Transportation (TR), Spec Item 3
A075AAMaintenance, Spec Item 3.312MO$ -
HOA - Total Annex 1700000 Transportation (TR), Spec Item 3$ -
A076-A080Reserved
HOA SUBTOTAL:>>>>>>>>>>>>>>$ -
MSF - Recurring Work (ELINs A081 through A085)
A081MSF - Annex 1502000 Facility Investment (ST), Spec Item 3
MSF - Service Orders, Spec Item 3.1
A081AARoutine Service Orders, Spec Item 3.1.312MO$ -
MSF - Preventive Maintenance (PM) Program, Spec Item 3.3
A081ABHVAC and Refrigeration Systems, Spec Item 3.3.212MO$ -
A081ACExterior Lighting Systems, Spec Item 3.3.312MO$ -
A081ADFire Protection Systems, Spec Item 3.3.612MO$ -
A081AEAuxiliary Generators, Spec Item 3.3.912MO$ -
MSF - Other Recurring Services Program, Spec Item 3.6
A081AFLocksmith Services, Spec Item 3.6.312MO$ -
A081AGRoll-Up Doors, Spec Item 3.6.412MO$ -
MSF - Total Annex 1502000 Facility Investment (ST), Spec Item 3$ -
A082MSF - Annex 1503020 Pest Control (FX), Spec Item 3
A082AAScheduled Pest Control Services, Spec Item 3.112MO$ -
A082ABUnscheduled Pest Control Services, Spec Item 3.212MO$ -
MSF - Total Annex 1503020 Pest Control (FX), Spec Item 3$ -
A083-A085Reserved
MSF SUBTOTAL:>>>>>>>>>>>>>>$ -
NEX - Reurring Work (ELINs A086 through A095)
A086NEX - Annex 1502000 Facility Investment (ST), Spec Item 3
NEX - Service Orders, Spec Item 3.1
A086AARoutine Service Orders, Spec Item 3.1.312MO$ -
NEX - Preventive Maintenance (PM) Program, Spec Item 3.3
A086ABHVAC and Refrigeration Systems, Spec Item 3.3.212MO$ -
A086ACExterior Lighting Systems, Spec Item 3.3.312MO$ -
A086ADFire Protection Systems, Spec Item 3.3.612MO$ -
NEX - Total Annex 1502000 Facility Investment (ST), Spec Item 3$ -
A087NEX - Annex 1503010 Custodial Services (FX)
A087AAScheduled Services, Spec Item 3.112MO$ -
A087ABUnscheduled Services, Spec Item 3.212MO$ -
NEX - Total Annex 1503010 Custodial (FX), Spec Item 3$ -
A088NEX - Annex 1503020 Pest Control (FX), Spec Item 3
A088AAScheduled Pest Control Services, Spec Item 3.112MO$ -
A088ABUnscheduled Pest Control Services, Spec Item 3.212MO$ -
NEX - Total Annex 1503020 Pest Control (FX), Spec Item 3$ -
A089NEX - Annex 1700000 Transportation (TR), Spec Item 3
A089AAMaintenance, Spec Item 3.312MO$ -
NEX - Total Annex 1700000 Transportation (TR), Spec Item 3$ -
A090-A095Reserved
NEX SUBTOTAL:>>>>>>>>>>>>>>$ -
NGA - Recurring Work (ELINs A096 through A100)
A096NGA - Annex 1700000 Transportation (TR), Spec Item 3
A096AAMaintenance, Spec Item 3.312MO$ -
NGA - Total Annex 1700000 Transportation (TR), Spec Item 3$ -
A097-A100Reserved
NGA SUBTOTAL:>>>>>>>>>>>>>>$ -
TITAN SUPPORT SITE (TSS) - Recurring Work (ELINs A101 through A103)
A101TSS - Annex 1300000 Galley (GL), Spec Item 3
A101AARemote Galley Meal Delivery Services, Spec Item 3.412MO$ -
TSS - Total Annex 1300000 Galley (GL), Spec Item 3$ -
A102TSS - Annex 1502000 Facility Investment (ST), Spec Item 3
TSS - Preventive Maintenance Program (Spec Item 3.3)
A102AAHVAC and Refrigeration Systems, Spec Item 3.3.112MO$ -
A102ABWeight Handling Equipment (WHE), Spec Item 3.3.412MO$ -
A102ACCompressed Air Systems, Spec Item 3.3.812MO$ -
TSS - Total Annex 1502000 Facility Investment (ST), Spec Item 3$ -
A103TSS - Annex 1604000 Wastewater (UT), Spec Item 3
A103AAOperation, Spec Item 3.112MO$ -
TSS - Total Annex 1604000 Wastewater (UT), Spec Item 3$ -
TSS SUBTOTAL:>>>>>>>>>>>>>>$ -

TOTAL FOR LINE ITEM 0001 - BASE PERIOD - RECURRING WORK (ELINs A001 THROUGH A103) $ -

&"Times New Roman,Regular"Page &P of &N

SECTION J

EXHIBIT A

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Fence Board Height of 6'

Unit Price Per Linear Foot to Provide Reconditioning and Maintenance Service for Barbwire Fence.

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Per Linear Foot to Provide Reconditioning and Maintenance Service for Ornamental Steel Fence.

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Per Linear Foot to Provide Reconditioning and Maintenance Service for Wood Fence.

PROVIDE A UNIT PRICE FOR THE REMOVAL AND DISPOSAL OF FENCE COMPLETE, FENCE POSTS, BARBWIRE, BARBED TAPE.

IN ACCORDANCE WITH SECTION C, C.10.1.l

ELIN A001EW through A001FI

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Per Linear Foot to Provide Removal Service for Chain link Fence.

Including Fabric, Posts, Gates, Rails, Tension Wire, Barbwire/Barbed Tape.

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Per Linear Foot to Provide Removal Service for Chain link Fence Gates including tracks (not posts).

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Per Linear Foot to Provide Removal Service for Ornamental Steel Fence. Including Posts and Gates

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Per Linear Foot to Provide Removal Service for Wood Fence. Including Posts and Gates.

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Per Linear Foot to Provide Removal Service for Barbwire Fence. Including Posts and all wire.

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Each to Provide Removal Service for Fence Posts. Including Posts Footing with Braces and Supports as Required.

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Each to Provide Removal Service for Fence Posts. Post Cut-off Flush.

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Each to Provide Removal Service for Fence Posts. Driven Post.

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Each to Provide Removal Service for Fence Posts. Including Posts Footing with Braces and Supports as Required.

Posts Set in Concrete/Asphalt.

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Per Square Foot to Patch and Refinish Concrete or Asphalt Surface.

Surface Depth to Match Surrounding.

Unit Price Each to Remove and Dispose of or Save and Store (for reuse) Barbwire Single Arm Support.

Unit Price Each to remove and Dispose of or Save and Store (for reuse) Barbwire Double (V) Arm Support.

Lump Sum Price for the recycling of removed materials. Based on a Percentage Added to Removal Item Ordered

EXHIBIT A

Lump Sum Price for the Recycling of Removed Materials. Based on a Percentage Added to Removal Item Ordered, ELIN A001EK to A001EW. Figured on a Quantity of 1,000. The Quantity Provided is for Establishing the Percentage Rate Only.

PROVIDE A UNIT PRICE TO PERFORM EXPEDITED SERVICES.

IN ACCORDANCE WITH SECTION C, C.10.2

ELIN A001FJ

Lump Sum Price for Expedited Maintenance and Repair Services. Based on a Percentage Added to Task Order Total. Figured on a Quantity of 1,000. The Quantity Provided is for Establishing the Percentage Rate Only.

SECTION J

EXHIBIT A

PROVIDE A UNIT PRICE FOR THE RENTAL OF TEMPORARY CHAIN LINK FENCE.

IN ACCORDANCE WITH SECTION C, C.10.3

ELIN A001FK THROUGH A001FP

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Per Linear Foot to Provide Temporary Chain link Fence.

6' Fence Height Driven Posts

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

12' Panel, 6' Height

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

12' Panel, 6' Height, Free-Standing

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

With Barbwire, 7' Fence Height

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

12' Panel, With Barbwire, 7' Height

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

12' Panel, With Barbwire, 7' Height, Free-Standing

Base Period - NRW

ATTACHMENT J-0200000-12
EXHIBIT LINE ITEM NUMBERS
SOLICITATION/CONTRACT # N62470-22-R-0005
EXHIBIT A - BASE PERIOD - NON-RECURRING WORK
CLIN 0002
Non-Recurring Work Price - Base Period
PROVIDE PRICES TO PERFORM NON-RECURRING WORK SERVICES - IN ACCORDANCE WITH SECTION C, SPEC ITEM 4, AND TO PRICE ADDITIONS AND DELETIONS TO THE RECURRING WORK REQUIREMENTS - IN ACCORDANCE WITH ANNEX 0200000, SPEC ITEM 2.15.1, RECURRING WORK PREPARATION OF PROPOSAL
ELINs A700 THROUGH A855
ELINShort DescriptionLong DescriptionEstimated QuantitiesUnit of IssueUnit Price (USD)Extended Price (USD)
UNIT PRICED TASK (UPT) WORK
Specification 0401000 - Force Protection
A700Security Lighting ServicesThe Contractor shall furnish all labor, supervision, management, tools, materials, equipment, facilities, transportation, incidental engineering, and other items necessary to perform security lighting services at locations as directed by the Security Officer or Anti-Terrorism Officer. The Contractor shall provide light carts, set-up equipment, maintain equipment during use, and remove equipment at expiration of services. Complete all work within 3 working days or as specified in the order.10EA$0
A701Concertina WireThe Contractor shall furnish all labor, supervision, management, tools, materials, equipment, facilities, transportation, incidental engineering, and other items necessary to perform concertina razor wire (Blade spacing: 100 mm. Blade thickness: 0.6 mm. Coil diameter: 730 mm) removal and installation at security perimeter locations as directed by the Security Officer or Anti-Terrorism Officer. The Contractor shall adhere to proper disposal of old c-wire as per DoD-M 4160.21. Complete all work within 2 working days or as specified in the order.5,000LF$0
A702-A711Reserved
Specification 1402000 - Unaccompanied Housing
A712Expeditionary 320-Man CampThe Contractor shall furnish all labor, supervision, management, tools, materials, equipment, facilities, transportation, incidental engineering, and other items necessary to operate, and maintain the 320 Man Camp beyond the period of 120 days recurring work requirement as per spec item 3.4. Complete all work as specified in the order.45DA$0
A713-A722Reserved
Specification 1501000 - Facility Management
A723Asset Inventory & TaggingThe Contractor shall furnish all labor, supervision, management, tools, materials, equipment, facilities, transportation, incidental engineering, and other items necessary to perform a base-wide asset inventory validation and update for all facilities and utilities. Update NAVFAC Maximo to add, remove, or modify assets and asset information to obtain 100% NAVFAC Maximo accuracy. The Contractor shall ensure each assets are properly labeled in accordance with Labeling requirements in NAVFAC P-503 Conditions Based Maintenance Management and NAVFAC P-603 Utilities Infrastructure Management. A summary report shall be provided of assets inventoried and any changes applied. The report shall also specify whether or not the asset is covered under the contract for maintenance and repair. The survey is subject to the interpretation of the COR and KO. For those items not under the contract, the Contractor shall provide a proposal for including the asset for maintenance within the contract. Each asset in the proposal shall be a separate, severable line item. The KO may issue a contract modification for assets identified in the report as not under contract. The inventory and applicable NAVFAC Maximo updates shall be completed within 120 days. The report and proposal shall be submited for KO approval within 150 days.1EA$0
A724-A733Reserved
Specification 1502000 - Facility Investment
A734A/C Replacement 1.5 Ton Split UnitThe Contractor shall furnish all labor, tools, materials, new equipment, transportation, incidental engineering, and other items necessary to perform installation of new AC unit. Includes removal of the old AC, and testing to ensure new unit is operational. Complete all work within 10 working days or as specified in the order.10EA$0
A735A/C Replacement 2 Ton Split UnitThe Contractor shall furnish all labor, tools, materials, new equipment, transportation, incidental engineering, and other items necessary to perform installation of new AC unit. Includes removal of the old AC, and testing to ensure new unit is operational. Complete all work within 10 working days or as specified in the order.2EA$0
A736A/C Replacement > 5T < 10T Packaged UnitThe Contractor shall furnish all labor, tools, materials, new equipment, transportation, incidental engineering, and other items necessary to perform installation of new AC packaged unit. Includes removal of the old unit, 50 meters of duct work, and testing to ensure new unit is operational. Complete all work within 10 working days or as specified in the order.1EA$0
A737Generator Rental 50KVAPrice per calendar day to include delivery, setup, removal, required cables (up to 25 meters in length), distribution panels, all connections to the facility, fuel tank, operation, maintenance. The Contractor is responsible for all fuel and refueling. Complete all work within 6 working days after receipt of order.30DA$0
A738Generator Rental 100KVAPrice per calendar day to include delivery, setup, removal, required cables (up to 25 meters in length), distribution panels, all connections to the facility, fuel tank, operation, maintenance. The Contractor is responsible for all fuel and refueling. Complete all work within 6 working days after receipt of order.30DA$0
A739Generator Rental 250KVAPrice per calendar day to include delivery, setup, removal, required cables (up to 25 meters in length), distribution panels, all connections to the facility, fuel tank, operation, maintenance. The Contractor is responsible for all fuel and refueling. Complete all work within 6 working days after receipt of order.30DA$0
A740Generator Rental 500KVAPrice per calendar day to include delivery, setup, removal, required cables (up to 25 meters in length), distribution panels, all connections to the facility, fuel tank, operation, maintenance. The Contractor is responsible for all fuel and refueling. Complete all work within 6 working days after receipt of order.30DA$0
A741Interior PaintingThe Contractor shall furnish all labor, supervision, management, tools, materials, equipment, facilities, transportation, incidental engineering, and other items necessary to paint interior surfaces of facilities using washable interior latex paint having a flat, semi-gloss or gloss finish and color as specified in the task order. Work includes surface preparation, priming and application of 2 finish coats of paint. All products shall be lead-free, odorless, nontoxic, and compatible with surfaces where being used. The Contractor shall collect and dispose off base all paint chips, dust, and other waste paint materials resulting from any part of the painting process. Complete all work within 3 working days or as specified in the order.6,000SM$0
A742Exterior PaintingThe Contractor shall furnish all labor, supervision, management, tools, materials, equipment, facilities, transportation, incidental engineering, and other items necessary to paint exterior surfaces of facilities using acrylic resin exterior type paint with and without quartz having a flat, semi-gloss or gloss finish and color as specified in the task order. Work includes surface preparation, priming and application of 2 roller applied finish coats of paint. All products shall be lead-free, odorless, nontoxic, and compatible with surfaces where being used. The Contractor shall collect and dispose off base all paint chips, dust, and other waste paint materials resulting from any part of the painting process. Complete all work within 3 working days or as specified in the order.8,000SM$0
A743Pressure WashingThe Contractor shall furnish all labor, supervision, management, tools, materials, equipment, facilities, transportation, incidental engineering, and other items necessary to provide pressure washing services. Surfaces may be horizontal or vertical areas related to, attached to, or adjoining to facilities. The Contractor shall utilize high-pressure water equipment to clean exterior facility and adjoining surfaces as requested and to exclude windows surfaces. Pressure washing may require the use of manlift and other devices to perform work safely. This may require work after normal working hours to prevent disruption to operations. Complete all work within 3 working days or as specified in the order.15,000SM$0
A744CLU Floor ReplacementThe Contractor shall furnish all labor, supervision, management, tools, materials, equipment, facilities, transportation, incidental engineering, and other items necessary to replace Containerized Living Unit (CLU) floors. Work includes demolition of existing CLU floors, removal and reinstallation of toilet, sink, and shower units as needed, replacement of joists as needed, and installation of 3/4" marine grade plywood and floor finish. Floor finish material to meet indoor air quality requirements by FLOORSCORE, UL 2818 (Greenguard) Gold, and SCS Global Services Indoor Advantage Gold or equivalent third-party programs as approved by the COR. Complete all work within 14 calendar days or as specified in the order. Typical CLUs are 320SF.50EA$0
A745CWU Floor ReplacementThe Contractor shall furnish all labor, supervision, management, tools, materials, equipment, facilities, transportation, incidental engineering, and other items necessary to replace Containerized Working Unit (CWU) floors. Work includes demolition of existing CWU floors, removal and reinstallation of toilet and sink units as needed, replacement of joists as needed, and installation of 3/4" marine grade plywood and floor finish. Floor finish material to meet indoor air quality requirements by FLOORSCORE, UL 2818 (Greenguard) Gold, and SCS Global Services Indoor Advantage Gold or equivalent third-party programs as approved by the COR. Complete all work within 14 calendar days or as specified in the order.Typical CLUs are 320SF.10EA$0
A746CWU Roof ReplacementThe Contractor shall furnish all labor, supervision, management, tools, materials, equipment, facilities, transportation, incidental engineering, and other items necessary to replace Containerized Working Unit (CWU) roofs. Work includes demolition of existing CWU roofs, removal and reinstallation of any attached antenna and lighting protection systems, replacement of framing as needed, installation of corrugated metal roofing colored to meet the Base Exterior Achitecture Plan with a solar reflectance index (SRI) of 80 or higher, soffits, vents, and ridge vents to enable air flow for passive cooling, and installation of moisture and pest resistant spray-foam insulation equivalent to R-22 on top of the metal roof of the container. Complete all work within 14 calendar days or as specified in the order.Typical CLUs are 320SF.5EA$0
A747-A756Reserved
Specification 1503010 - Custodial
A757Cleaning activities of facilities where person(s) suspected of or with confirmed infectious disease have visitedThe Contractor shall clean and disinfect areas within facilities that person(s) suspected of or with confirmed infectious disease have visited. Cleaning and disinfection services shall comply with 29 CFR‐1910 and the Centers for Disease Control and Prevention (CDC) recommendations. CDC recommendations are available at: https://www.cdc.gov/coronavirus/2019‐ncov/community/organizations/cleaning‐disinfection.html.
The Contractor personnel shall comply with 29 CFR‐1910.1030 and the Centers for Disease Control and Prevention (CDC) recommendations when they are performing work where they may be exposed to blood or other potentially infectious materials. The Contractor shall ensure personnel performing work where they may be exposed to blood or other potentially infectious materials are trained on the hazards of the cleaning chemicals used in the workplace in accordance with 29 CFR 1910.1200 OSHA’s Hazard Communication standard, 29 CFR 1910.1030 Bloodborne Pathogens, 29 CFR 1910.132 Personal Protective Equipment (PPE), and the proper disposal of bio‐hazardous waste. Cleaning agents used shall be EPA approved for use against infectious diseases. A list of EPA Approved products is available at https://www.americanchemistry.com/Novel‐Coronavirus‐Fighting‐Products‐List.pdf. Surfaces shall be cleaned prior to disinfection, as instructed on the disinfectant manufacturer’s label. The Contractor shall ensure adequate contact time for effective disinfection. Task order completion times will be specified on each task order.2,000SM$0
A758Cleaning activities of facilities housing person(s) under quarantine during the quarantine periodThe Contractor shall collect and dispose of bagged refuse place outside the door of areas within facilities used to house person(s) under quarantine either with or without COVID‐19 following the guidelines of "Interim Cleaning Recommendations for Facilities Housing Persons Under Quarantine for Coronavirus Disease 2019 (COVID‐19), available at https://www.doh.wa.gov/Portals/1/Documents/1600/coronavirus/InterimCleaningGuidanceforPersonsUnderQuarantineforCOVID19.pdf. Cleaning and disinfection services shall comply with 29 CFR‐1910 and the Centers for Disease Control and Prevention (CDC) recommendations.CDC recommendations are available at https://www.cdc.gov/coronavirus/2019‐ncov/community/home/cleaning‐disinfection.html#disinfect

The Contractor personnel shall comply with 29 CFR‐1910.1030 and the Centers for Disease Control and Prevention (CDC) recommendations when they are performing work where they may be exposed to blood or other potentially infectious materials. The Contractor shall ensure personnel performing work where they may be exposed to blood or other potentially infectious materials are trained on the hazards of the cleaning chemicals used in the workplace in accordance with 29 CFR 1910.1200 OSHA’s Hazard Communication standard, 29 CFR 1910.1030 Bloodborne Pathogens, 29 CFR 1910.132 Personal Protective Equipment (PPE), and the proper disposal of bio‐hazardous waste.

Cleaning agents used shall be EPA Approved for use against COVID‐19. A list of EPA Approved products is available at https://www.americanchemistry.com/Novel‐Coronavirus‐Fighting‐Products‐List.pdf. Surfaces shall be cleaned prior to disinfection, as instructed on the disinfectant manufacturer’s label. The Contractor shall ensure adequate contact time for effective disinfection. Bagged refuse shall be collected daily for a period not to exceed 21 days. Task order completion times will be specified on each task order.2,000SM$0
A759Cleaning activities of facilities vacated by person(s) under quarantine with infectious diseaseThe Contractor shall clean and disinfect areas within facilities that housed person(s) under quarantine with COVID‐19 following the guidelines of "Interim Cleaning Recommendations for Facilities Housing Persons Under Quarantine for Coronavirus Disease 2019 (COVID‐19), available at https://www.doh.wa.gov/Portals/1/Documents/1600/coronavirus/InterimCleaningGuidanceforPersonsUnderQuarantineforCOVID19.pdf. Cleaning and disinfection services shall comply with 29 CFR‐1910 and the Centers for Disease Control and Prevention (CDC) recommendations.CDC recommendations are available at https://www.cdc.gov/coronavirus/2019‐ncov/community/home/cleaning‐disinfection.html#disinfect. The Contractor personnel shall comply with 29 CFR‐1910.1030 and the Centers for Disease Control and Prevention (CDC) recommendations when they are performing work where they may be exposed to blood or other potentially infectious materials. Areas within facilities that housed person(s) under quarantine with COVID‐19 shall not be entered for at least for 24 hours after rooms and areas have been vacated. The Contractor shall ensure personnel performing work where they may be exposed to blood or other potentially infectious materials are trained on the hazards of the cleaning chemicals used in the workplace in accordance with 29 CFR 1910.1200 OSHA’s Hazard Communication standard, 29 CFR 1910.1030 Bloodborne Pathogens, 29 CFR 1910.132 Personal Protective Equipment (PPE), and the proper disposal of bio‐hazardous waste.
Cleaning agents used shall be EPA Approved for use against COVID‐19. A list of EPA Approved products is available at https://www.americanchemistry.com/Novel‐Coronavirus‐Fighting‐Products‐List.pdf. Surfaces shall be cleaned prior to disinfection, as instructed on the disinfectant manufacturer’s label. The Contractor shall ensure adequate contact time for effective disinfection. Task order completion times will be specified on each task order.2,000SM$0
A760Disinfection of High Traffic Common Area SurfacesThe Contractor shall clean and disinfect frequently touched surfaces in high traffic common areas. Common areas include areas such as conference rooms, elevators, entryways, hallways, lobbies, and stairwells.

High traffic common area surfaces are identified as:

• Doorknobs, door handles, door push bars/plates, handicapped access buttons

• Interior/exterior door elevator surfaces (elevator buttons, elevator panels, and elevator doors)

• All railings in common areas to include stairwell handrails and railings

• Water fountain surfaces (push bars/buttons).

• Ice Machines

• Wall light switches

• Microwave Ovens

• Telephones to include wall phones

• Refrigerators

• Shelving

• Conference Room Tabletops

• Vending Machines

Surfaces shall be cleaned prior to disinfection as instructed on the disinfectant manufacturer’s label. The Contractor shall ensure adequate contact time for effective disinfection. The Contractor shall return furniture and other items moved during performance to their original positions. Cleaning agents used shall be EPA Approved for use against COVID‐19. A list of EPA Approved products is available at https://www.americanchemistry.com/Novel-Coronavirus‐Fighting‐Products‐List.pdf. Task order completion times will be specified on each task order.1,500SM$0
A761-A770Reserved
Specification 1503030 - Integrated Solid Waste Management (ISWM)
A771Additional Dumpster - 32 Cubic YardsProvide labor, management, supervision, tools, material, and equipment required to provide additional dumpster(s). The Contractor shall provide and deliver 32-cubic yards dumpster(s) at location(s) identified in the order. Dumpster(s) shall be removed within 1 working day past requirement termination. Dumpster(s) delivery shall be completed within 2 working days. The order will include the delivery date, location and duration.60DA$0
A772Additional Dumpster Pick-Up and Waste Disposal (Non-Hazardous) - 32 Cubic YardsThe Contractor shall furnish all labor, supervision, management, tools, materials, equipment, facilities, transportation, incidental engineering, and other items necessary to perform unscheduled refuse pick-up and disposal from 32-cubic yard dumpster(s). The Contractor shall dispose of waste in accordance with all applicable laws and regulations. Pick-up shall be completed within 1 working day.30EA$0
A773-A782Reserved
Specification 1503050 - Grounds Maintenance and Landscaping
A783Aggregate (Rock/Gravel) Spreading & ProcurementThe Contractor shall furnish all labor, supervision, management, tools, materials, equipment, transportation, incidental engineering, and other items necessary to perform rock/gravel spreading and distribution in and around facilities and open areas. Aggregate spread to thickness as directed by the KO. Ordered in lots of 125 Cubic Yards. Complete all work within 3 working days or as specified in the order.20LOT$0
A784Fill Dirt Spreading & ProcurementThe Contractor shall furnish all labor, supervision, management, tools, materials, equipment, transportation, incidental engineering, and other items necessary to perform fill dirt spreading and distribution in and around facilities and open areas. Dirt spread to thickness as directed by the KO. Ordered in lots of 125 Cubic Yards. Complete all work within 3 working days or as specified in the order.5LOT$0
A785-A794Reserved
Specification 1602000 - Electrical
A795Prime Power Generator Top End Overhaul - 1.6 to 5MW Power GeneratorThe Contractor shall furnish all labor, supervision, management, tools, materials, equipment, facilities, transportation, incidental engineering, testing, certification, and other items necessary to perform a top-end overhaul of 1.6-5MW Diesel Power Generator. Delivery shall be completed within 10 working days or as specified in the order.2EA$0
A796-A805Reserved
Specification 1604000 - Wastewater
A806Portable Toilet Cabin - Standard TypeThe Contractor shall furnish all labor, supervision, management, tools, materials, equipment, facilities, transportation, incidental engineering, and other items necessary to provide, deliver, clean and service portable toilet cabin(s) to specified location(s) - standard type. Unit price per day/per toilet. General characteristics of the toilet cabins shall be as follows: Chemical operating WC; Thermosetting plastic composition white walls; Anti-skid plastic composition footboard; Sling hook for crane; Air grids and locks; Male/female external selector; Soap and toilet paper dispensers; Autonomy: approx 250 uses; Dimensions: 120x120x225 cm (standard). The Contractor shall clean and service portable toilet cabin(s) 3 times per day as specified in the order to ensure all surfaces are cleaned and deodorized, and supplies are restocked. The Contractor shall dispose of waste resulting from the use of portable toilet cabin(s) in accordance with all applicable regulations. Portable toilet cabin(s) shall be removed within 1 working day past requirement termination. Delivery shall be completed within 2 working days or as specified in the order.25EA$0
A807Hand Wash StationThe Contractor shall furnish all labor, supervision, management, tools, materials, equipment, facilities, transportation, incidental engineering, and other items necessary to provide, deliver, clean and service hand wash station(s) to specified location(s) - standard type. Unit price per day/per station. The Contractor shall clean and service hand wash station 3 times per day or as specified in the order to ensure all surfaces are cleaned, water filled, and paper towels are restocked. Station(s) shall be removed within 1 working day past requirement termination. Delivery shall be completed within 2 working days or as specified in the order.25EA$0
A808Sewer Line CleaningThe Contractor shall perform cleaning of sewer pipelines to ensure proper operation, removal of all obstructions, and proper drainage. Cleaning shall be performed to facilitate inspection and maintenance. The Contractor shall schedule cleaning to immediately precede inspection and maintenance activities whenever possible.

The Contractor shall furnish high velocity hydro-jetting and vacuum removal equipment as necessary to thoroughly clean system of sludge, dirt, soil, sand, rocks, roots, and other solid or semi-solid materials. The Contractor shall contact the KO before using rodding on a sewage collection pipelines. Debris and solids shall be captured at the downstream manhole and removed for dewatering and disposal. The Contractor may dispose of semi-solids and liquids at the wastewater treatment plant compound. Work includes sampling of debris and solids for proper disposal as required. The Contractor shall sample for the following:

1. Percentage Moisture

2. Heavy Metals

3. Reactive…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .