This document appears to be an attachment titled "F - Section F Deliverables_corrected.pdf" that outlines the deliverables required under a federal contract for Base Operations Support (BOS) services at Camp Lemonnier, Djibouti, Africa.
The key details include:
- The contract covers a wide range of services including facility management, utility management, environmental, airfield operations, and more.
- Contractors are required to submit various reports, plans, notifications, and certifications on specified schedules, ranging from daily to annually. Examples include work schedules, preventive maintenance plans, inspection reports, hazardous waste management documentation, and more.
- Deliverables must be submitted to the Contracting Officer (KO), Contract Representative (COR), and other designated personnel.
- Penalties or other requirements may apply for missed or late deliverables.
The document provides a comprehensive list of the required contract deliverables, their submission frequencies, and distribution requirements.
View the file
Other files
Show 40 more
Latest 50 of 114 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Original Copies (including original)
0200000/ 2.2.1.3 N/A Request to Work Outside Government’s Regular Working Hours
At least seven calendar days prior to requested day. KO 1 As required
0200000/ 2.3.1.1 N/A Monthly Performance Review Meeting Minutes
Within two working days after the meeting KO 1 Monthly
0200000/ 2.3.4 N/A Permits and Licenses Before work commences and as requested by the KO. KO 1 As specified
0200000/ 2.3.5 N/A Certificate of Insurance Within 15 calendar days after award KO 1 As specified 0200000/ 2.4.1.1 N/A Equipment Replacement Plan Provided at beginning of contract for review KO 1 As specified 0200000/ 2.4.3 N/A Monthly GFE Inventory Report Within 10 working days following the end of the month. KO 1 Monthly
0200000/ 2.6.1 N/A Plans of Action and Milestones (POA&Ms)
Within 15 calendar days prior to contract start and within seven calendar days of changes.
KO 1 As specified
0200000/ 2.6.1 N/A Cybersecurity Incident Notification Immediately upon discovery during regular working hours and by 0800 the following work day for discoveries after regular working hours
KO 1 Each Occurrence
0200000/ 2.6.4 N/A Electronic Scheduling and Work Status Updates
Within two hours of the inquiry during regular working hours, and by 0900 the following work day for inquiries after regular working hours.
KO 1 As specified
0200000/ 2.6.4 N/A Work Schedules Within 15 calendar days prior to contract start, 10 days prior to the beginning of the month in which services are scheduled to be performance, and within two calendar days of changes.
KO 1 Monthly
0200000/ 2.6.5 N/A Notification of any Difficulty in Scheduling Work
By the end of each workday.
KO 1 As required
0200000/ 2.6.6 N/A Status of Deliverables Within two hours of the inquiry during regular working hours, and by 0900 the following work day for inquiries after regular working hours.
KO 1 As required
0200000/2.6.7 N/A Service Interruptions At least five working days in advance. KO 1 As required
0200000/2.6.8.2 N/A Pipe Delimited Flat-File By the end of each workday. KO 1 Daily 0200000/2.6.8.2 N/A Sample Pipe Delimited Flat-File Within 30 calendar days prior to contract start. KO 1 As required to demonstrate the ability to properly format the flat-file
0200000/2.6.8.2 N/A Asset and Specification Data When an asset is repaired, replaced, installed, or otherwise affected
KO 1 As required
0200000/2.6.8.3 N/A List of Personnel Requiring MAXIMO Accounts
Within 45 calendar days prior to contract start and within seven calendar days of changes.
KO 1 As specified
0200000/2.6.9.1 N/A Quality Management Plan Within 30 calendar days prior to contract start and within seven calendar days of changes.
KO 1 As specified
0200000/2.6.9.1 N/A Revised Quality Management Plan Within seven calendar days of changes. KO 1 As specified 0200000/2.6.9.2 N/A QC Inspection File Within five calendar days of completion/ termination of the contract.
COR 1 As specified
0200000/2.6.9.3 N/A Contractor Quality Inspection and Surveillance Report
Second work day of each month. KO 1 Monthly
Annex 0200000 Management & Administration
SECTION F: DELIVERIES OR PERFORMANCE
Deliverables shall be submitted via electronic means unless directed by the Contracting Officer.
DELIVERABLES
Annex/ Spec Item Form Attachment
Number Deliverable Title Date (s) of Submission
Distribution
Frequency
0200000/2.6.10 N/A Property Management Plan No later than 30 days prior to start of the contract and within seven calendar days of changes
KO 1 As specified
0200000/2.7.2 N/A List of Key Personnel and Qualifications Within 15 calendar days after award KO 1 As specified
0200000/2.7.2 N/A Organizational Chart Within 15 calendar days after award KO 1 As specified
0200000/2.7.4 N/A Service Contract Reporting (SCR) No later than 31 October. KO 1 Annually for labor executed during the period of performance during each Government fiscal year (FY)
0200000/2.7.4 N/A Monthly Labor Pool Report 3rd day of the month for previous month KO 1 Monthly
0200000/2.8.1 N/A Employee List Within 15 calendar days prior to contract start and within seven calendar days of changes.
KO 1 As required
0200000/2.8.8 N/A OF-306 Declaration for Federal Employment and Digital Fingerprints
Prior to commencement of work. KO and Security Manager
1 As required
0200000/2.8.9 N/A List of personnel requiring access to and the justification for their access to Government IT, OT, and FRCS
Within 15 calendar days prior to contract start and within seven calendar days of changes.
KO and Security Manager
1 As required
0200000/2.9.1 N/A Accident Prevention Plan Within 15 calendar days after award and within seven calendar days of changes.
KO 1 As specified
0200000/2.9.2 N/A Activity Hazard Analysis Together with the Accident Prevention Plan and within seven calendar days of changes.
KO 1 As specified
0200000/2.9.3 N/A Compliance Plans, Programs, and Procedures
Together with the Accident Prevention Plan and within seven calendar days of changes.
KO 1 As specified
0200000/2.9.3.6 N/A Control of Hazardous Energy (lockout/tagout)
Within 30 calendar days after annual inspection. KO 1 As specified
0200000/2.9.5 J-0200000-03 NAVFAC Contractor Incident Reporting System (CIRS)
Within five calendar days of accident. KO 1 As required
0200000/2.9.5 J-0200000-03 Weight Handling Equipment Accident Report
Within 15 working days of accident. KO 1 As required
0200000/2.9.5 J-0200000-03 Crane and Rigging Gear Near Miss Report
Within 15 working days of accident. KO 1 As required
0200000/2.9.7 N/A Monthly On-Site Labor Report First work day of each month. KO 1 Monthly 0200000/2.9.8 N/A OSHA Citations and Violations
Corrective Action Report Within 48 hours after receiving a citation. KO 1 As required
0200000/2.9.9 N/A Contractor Safety Inspection and Monitoring Report
Upon request. KO 1 As required
0200000/2.9.10 N/A Safety Certifications Within 15 calendar days prior to contract start and as old certifications expire.
KO 1 As specified
0200000/2.10.1 N/A Energy Audit Checklist First work day of each month. IEM 1 Monthly building energy audit 0200000/2.10.1 N/A Water and energy consumption data First work day of each month. IEM 1 Monthly 0200000/2.10.1.1 N/A Water Conservation Plan Within 15 calendar days after award and within seven calendar days of changes.
IEM 1 As specified
0200000/2.10.1.2 N/A Energy Conservation Plan
Within 15 calendar days after award and within seven calendar days of changes.
IEM 1 As specified
0200000/2.10.2 N/A Environmental Protection Plan Within 15 calendar days after award and within seven calendar days of changes.
EV 1 As specified
0200000/2.10.2.1 N/A Class I and II ODS Report Within 24 hours following delivery of refrigerant to
DLA.
KO 1 As required
0200000/2.10.2.4 N/A Spill Reports Within 48 hours of every occurrence EV 1 As required 0200000/2.10.2.5 N/A Emergency Planning and Community
Right to Know Act (EPCRA) Report First work day of each month. KO 1 Monthly
0200000/2.10.2.5 N/A Contractor Hazardous Material Inventory Log
Within 15 calendar days after the end of each calendar year and at termination of the contract
KO 1 Beginning of contract and as required
0200000/2.10.2.10 N/A Hazardous Air Pollutants Report Monthly and Semi-Annual KO/EV 1 Monthly and Semi-Annual
0200000/2.10.3 N/A Sustainable Procurement and Practices Plan
Within 15 calendar days after award and within 15 calendar days after exercised option periods.
KO 1
Annually
0200000/2.10.3 N/A Sustainable Delivery of Services Report Within five calendar days after each contract period.
KO 1
Annually
0200000/2.10.3.2 N/A Recovered Material Certification As specified
KO 1
When a product containing recovered materials is equal to or better than the original and could be used.
0200000/2.11 N/A Mission Essential Contractor Services Plan
Within 15 calendar days after award and within seven calendar days of changes.
KO 1 As required
0200000/2.11 N/A Mission Critical/Mission Essential Personnel List
Within 15 calendar days after award and within seven calendar days of changes.
KO 1 As required
0200000/2.12.6 N/A Contingency Plan Within 15 calendar days after award and within seven calendar days of changes.
KO 1 As required
0200000/2.13 N/A Technical Library Table of Contents Within 15 calendar days prior to contract start and within seven calendar days of changes.
KO 1 As required
0200000/2.15.1 N/A Recurring Work requirements As specified KO 1 As required 0200000/2.15.2 N/A Detailed Scope of Work As specified KO 1 As required 0200000/2.15.2 N/A Detailed Estimate As specified KO 1 As required 0200000/2.16.1.1 N/A Non-Recurring Work FedMall Fifth day of the following month. KO 1 As required 0200000/2.17 N/A Mobilization Plan Within 15 calendar days after award and within seven calendar days of changes.
KO 1 As required
0200000/2.20 N/A Pre-Existing Conditions Survey & Proposal
Within 100 days of the contract start date. KO 1 As required original) 0401000/3.5 N/A Preventive Maintenance Program and
Schedule Within 30 days prior to contract start KO/ISO 1 Annually, at Contract start, whenever equipment inventory changes occur
0401000/3.5 N/A Unaccomplished Maintenance Report 3rd day of the month for previous month
KO & Secuirty Officer
1 Monthly
Annex 0401000 Force Protection
SECTION F: DELIVERIES OR PERFORMANCE
Deliverables shall be submitted via electronic means unless directed by the Contracting Officer.
DELIVERABLES
Annex/ Spec Item Form Attachment
Number Deliverable Title Date (s) of Submission original) 0402000/2.2 N/A Required Personnel certification and licenses 0402000/2.2.1 Contractor developed Place in G-2, Installation
Folder
Proof of all Certification, Training, and Licensing Requirements
Within 30 calendar days after contract award
KO, EM
Regional Program Director, Region Fire Chief
1 Once as specified and whenever changes in operational requirements occur
0402000/2.4.3 N/A Physical fitness test records Upon Request
KO, Region Fire Chief
1 Upon Request
0402000/2.4.6 N/A Drug Screening and Testing Results Upon Request KO, Region Fire Chief
1 Upon Request
0402000/ 3.1 Contractor developed
EMS Response Report Within 7 days of the incident
Region EMS Representative, Local Medical Director, Naval Safety Center
Once per incident, upon request
0402000/ 3.1 Contractor developed
Ambulance Report Within 7 days of the incident
Region EMS Representative, Local Medical Director, Naval Safety Center, Region Fire
Chief
Once per incident, upon request
0402000/ 3.2 Per ESAMS Fire Protection Response Reports Within 24 hours of the incident ESAMS 1 Once per incident
0402000/ 3.2.1 Per HMERP and
SOPs Place in
NFIRS
Hazards Response Documentation Within 14 days of each occurrence of release of hazardous materials
KO, EMO,
Region Fire
Chief 1 Once per occurrence
Annex 0402000 - Fire and Emergency Services
SECTION F: DELIVERIES OR PERFORMANCE
Deliverables shall be submitted via electronic means unless directed by the Contracting Officer.
DELIVERABLES
Annex/ Spec Item Form Attachment
Number Deliverable Title Date (s) of Submission
0402000/ 3.2.1.1 Contractor developed
CBRNE Emergency Response Plan Within 30 calendar days after contract award
KO, EMO,
Region Fire
Chief
Once as specified and whenever changes in operational requirements
0402000/ 3.2.1.2 Contractor developed
HM Spill Response Self- Assessment Reports
Within 3 days of completion of drills
KO, EMO,
Region Fire
Chief 1 Once per occurrence
0402000 / 3.2.2 Contractor developed
Technical Rescue Self-Assessment Reports
Within 3 days of completion of drills
KO, EMO,
Region Fire
Chief 1 Once per occurrence
0402000/ 3.2.3 Contractor developed Place in
ESAMS
Fire Suppression Self-Assessment Report Within 3 days of completion of drills
KO, EMO,
Region Fire
Chief 1 Once per occurrence
0402000/ 3.3 Contractor Developed
Inspection Findings Report Within 3 days after each inspection
KO, EMO,
Region Fire
Chief 1 Once per occurrence
0402000/ 3.5 Contractor developed
Fire and Emergency Incident Response Report in accordance with the NFIRS
Within 3 days of the incident KO, Region Fire Chief
1 Once per occurrence
0402000/ 3.5 Per NFPA 921 Fire Investigation Report Within 3 days of incident.
KO, Region Fire Chief
1 Once per incident original)
0403000/ 2.2.1 Contractor developed
Proof of all certifications and training Within 30 calendar days after contract award
EMO 1 As specified
0403000/ 2.2.1 Contractor developed
Certification and Training Plan For EDC Operators
Within 30 calendar days after contract award
EM Regional Program Director
Semiannually thereafter as may be required
0403000/ 3.1.5 Contractor developed
Technical Library Access Plan Within 15 calendar days following award
KO 1 Once as specified
0403000/ 3.2 Contractor developed
Time to Dispatch Within 5 calendar days of the following month
EMO 1 Monthly; when requested
0403000/ 3.3.1 Contractor developed
Operation Risk Management Plan Within 30 calendar days following award
KO, EMO 1 Once as specified
0403000/ 3.3.2 Contractor developed
Self-Evaluation Report (AAR) Within ten days of completion of the exercise
KO, EMO 1 Once per each Exercise
0403000/ 3.3.3 Corrective Actions Documentation EMO
0403000/ 3.4 Contractor developed
Annual Training Plan Within 30 days following contract award and by 30 September thereafter
KO, EMO 1
Once as specified;
annually
0403000/ 3.5 Contractor developed
Equipment Management Report
Within the first week of the following month and at any time within two hours following request
KO, EMO 1 Monthly; when requested
0403000/ 3.6 Contractor developed
Self-Assessment Plan Within 30 calendar days following award
KO, EMO 1 Once as specified
0403000/ 3.6 Contractor developed
Self-Assessment Evaluation Report Within 30 calendar days following award Report
KO, EMO 1 Once as specified
0403000/ 3.7 Contractor developed
Preventive Maintenance (PM) Program for EM Equipment
Within 30 calendar days following contract award
Once 1 Once as specified;
Annually
Annex 0403000 - Emergency Management
SECTION F: DELIVERIES OR PERFORMANCE
Deliverables shall be submitted via electronic means unless directed by the Contracting Officer.
DELIVERABLES
Annex/ Spec Item Form Attachment
Number Deliverable Title Date (s) of Submission original) 0501050/2.2.1 N/A Name of the Air Operations
Manager Within 30 days after award or as requested by the KO
KO/COR 1 Once for initial submittal, then as requested
0501050/2.2.2 N/A Name of the Alt. Operations/Air Terminal Leader
Within 30 days after award or as requested by the KO
KO/COR 1 Once for initial submittal, then as requested
1501050/2.2.4 N/A Proof of all certification, training, and licensing requirements
Within 30 days after award or as requested by the KO
KO, Air Ops Officer and/or Ops Officer
Once for initial submittal, then as requested
0501050/3 N/A Report of Exceeded MOG Weekly, As required
KO, Air Ops Officer, Ops
Officer, CNRE N32
3 As required
0501050/ 3.1 N/A Customer Satisfaction Summary Report Forms
Monday of each week KO, Air Ops
Officer 2 Weekly
0501050/ 3.1.7 3750.1x Crash and Recovery Salvage Plan Annually KO, Air Ops
Officer 2 Annually
0501050/ 3.1.8 N/A Summary of Aircraft Supported & Services Performed
5th day of following month KO, Air Ops
Officer 2 Monthly
0501050/ 3.2 N/A FOD Prevention Program 30 days of contract start KO, Air Ops
Officer 2 Daily
0501050/ 3.2 N/A FOD Prevention Reports Daily Prior to 8am and Monthly
KO, Air Ops Officer
Daily, Monthly, as directed
0501050/3.3 N/A AVOC Training and Licensing Records
As requested by the KO, Air Ops Officer, Ops Officer
KO, Air Ops Officer, Ops
Officer
Once for initial submittal, then as requested
0501050/3.4 DD1810 Flight Planning Report Daily HN ATC, Air Ops Officer
2 Daily
Annex 0501050 – Airfield Facilities
SECTION F: DELIVERIES OR PERFORMANCE
Deliverables shall be submitted via electronic means unless directed by the Contracting Officer.
DELIVERABLES
Annex/ Spec Item Form
Attachment Number
Deliverable Title Date (s) of Submission original)
0501070/ 2.2.1 N/A Name of the Air Operations Manager Within 30 days after award or as requested by the KO
KO/COR 1
Once for initial submittal, then as requested
0501070/ 2.2.2 N/A Name of the Alt. Operations/Air Terminal leader
Within 30 days after award or as requested by the KO
KO/COR 1
Once for initial submittal, then as requested
0501070/ 2.3 N/A Proof of all Certification, Training and Licenses
Within 15 days after award or as requested by the KO
KO, Air Ops Officer and/or Ops Officer
Once for initial submittal, then as requested
0501070/ 3.2.6 N/A Tansportation Dispatch log 5th calander day of each month KO, Air Ops
Officer and/or Ops Officer
1 Monthly
0501070/ 3.4 N/A 7107 Monthly Station Traffic Handling Report
20 days after start of the new month
KO, Air Ops Officer
0 Monthly
0501070/3.4 N/A MOG Tracker Report First work day of each week KO, Air Ops
Officer and/or Ops Officer
2 Weekly
0501070/ 3.4 N/A Daily Offshore Station On-Hand Report End of business day KO, Air Ops Officer/AMC
PM
2 Daily
0501070/ 3.4 N/A Global Asset Report Tool (GART) Update
As required KO, Air Ops Officer/AMC
PM
2 As required
0501070/ 3.4 N/A Short, Lost, Cannot Locate, and Pilfered Shipment Report
Per Occurrence, End of business day
KO, Air Operations
Officer 2 Each Occurrence
0501070/ 3.4 N/A Over Shipment Report Per Occurrence, End of business day
KO, Air Operations
Officer 2 Each Occurrence
0501070/ 3.4 N/A MHE Mishap Report Per Occurrence End of business day
KO, Air Operations
Officer/CNRE N32
2 Each Occurrence
0501070/ 3.4 N/A Mishandled Baggage Report and Summary
Per Occurrence, End of business day
KO, Air Operations
Officer 2 Each Occurrence
0501070/3.1.2 N/A 72-hr HOUR FLT Schedule No later than 0900 daily
Air Operations Officer/COR CNRE N32 1 Daily ADD
Annex 0501070 – Passenger Terminal and Cargo Handling
SECTION F: DELIVERIES OR PERFORMANCE
Deliverables shall be submitted via electronic means unless directed by the Contracting Officer.
DELIVERABLES
Annex/ Spec Item Form Attachment
Number Deliverable Title Date (s) of Submission original)
0700000/ 2.2.1 N/A Proof of all certification, training, and licenses
Within 15 days after award or as requested by the KO
KO, ESO 1
Once for initial submittal, then as requested
0700000/ 3.1 Outstanding work request status report Upon Request
KO, ESO,
Weapons Officer
1 Every Two Years
0700000/ 3.1 N/A Fire Symbol/NEW Report Weekly ESO, Weapons
Officer 1 Weekly
0700000/ 3.1 N/A Graphic Display of Ordnance Complex 30 days after contract start ESO, Weapons
Officer 1 Annually
0700000/ 3.2 N/A ASP Operations And Inventories Upon Request ESO, Weapons
Officer 1 Upon Request
0700000/ 3.2.2 N/A Inventory Discrepancy Report
Within two working days of discovery with explanation of issue and corrective action performed.
Weapons Officer
1 Each Occurrence
0700000/ 3.3.1 N/A Inventory Reconciliations and Corrections Report
30 days after contract start and within 5 days after start of month
Weapons Officer
1 Monthly
0700000/ 3.3.3 ASP facilities, Vehicles, and MHE Inspection Report
30 days after contract start and within 5 days after start of month
Weapons Officer
1 Monthly
Annex 0700000 - Ordnance
SECTION F: DELIVERIES OR PERFORMANCE
Deliverables shall be submitted via electronic means unless directed by the Contracting Officer.
DELIVERABLES
Annex/ Spec Item Form Attachment
Number Deliverable Title Date (s) of Submission original)
1001000/ 2.2.1 N/A Proof of all Certification, Training and Licenses
Within 15 days after award or as requested by the KO
KO 1
Once for initial submittal, then as requested
1001000/ 2.3.1 N/A List of personnel requiring system access Within 30 calendar days following contract award
KO 1
Once & Updated as Required
1001000/ 3.2.1 N/A Mail-On-Hand Report No later than 1400 hours each calendar day
KO 1 Daily
1001000/ 3.2.1 N/A Fleet Mail SOPs Within 30 calendar days following award
KO 1
Once and when changes occur
1001000/ 3.2.2 N/A Transient Personnel Movement SOPs Within 30 calendar days following award
KO 1
Once and when changes occur
1001000/ 3.2.3 N/A Downrange Mail- On-Hand Report No later than 1400 hours each calendar day
KO 1 Daily
1001000/ 3.2.3 N/A Downrange Mail SOPs Within 30 calendar days following award
KO 1
Once and when changes occur
Annex 1001000 Material Management
SECTION F: DELIVERIES OR PERFORMANCE
Deliverables shall be submitted via electronic means unless directed by the Contracting Officer.
DELIVERABLES
Annex/ Spec Item Form Attachment
Number Deliverable Title Date (s) of Submission original)
1002000/ 2.2.1 N/A Proof of all Certification, Training and Licenses
Within 15 days after award or as requested by the KO
KO 1
Once for initial submittal, then as requested
1002000/ 2.2.2 N/A Security Classification Specification, Form DD254
Within 15 days after award or as requested by the KO
KO 1 Prior to being employed.
1002000/ 2.2.3 Notice of Personnel Changes
1002000/ 2.3.1 N/A List of personnel requiring system access Within 30 calendar days following contract award
KO 1
Once & Updated as Required
1002000/ 2.3.3 N/A Product Quality Surveillance Plan Within 30 calendar days following contract award
KO 1 Once
1002000/ 3.1.1.1 N/A HAZMAT Line Item Additions Within 24-hours of identification KO, EV 1 Upon identification
1002000/ 3.1.1.1 N/A Recommended stock level changes First working day of the month KO, EV 1 Monthly
1002000/ 3.1.4 N/A Customer HAZMAT Storage Area Assessment Plan
Within 30 calendar days of contract start.
KO, Customer, EV
Once and when changes occur
1002000/ 3.1.9 N/A Customer HAZMAT Storage Area Assessment Results
Within 3 working days of assessment
KO, Customer, EV
1 Semi- Annually
1002000/ 3.2.1.2 N/A Product Quality Surveillance Record Within 1 calendar day of request KO, Fuels
Officer On request, end of contract
1002000/ 3.2.1.2 N/A Fuel Sampling Log Within 1 calendar day of request KO, Fuels
Officer 1 As requested
1002000/ 3.2.1.3 N/A FAS Reports including pass down logs, fuel receipts, and daily summary reports
By 1000 hours each calendar day Government fuel accounting office
1 Daily
1002000/ 3.2.1.3 N/A Fuel Service Data Tables 5th workday of each month KO, Fuels
Officer 1 Monthly
1002000/ 3.2.2.1 N/A Fuel Consumption Report First working day of the month for the pervious month
KO, Fuels Officer
1 Monthly
1002000/ 3.2.3 N/A Preventive Maintenance (PM) Program 15 calendar days prior to the start of work and annually
KO 2 Annually
1002000/ 3.2.3 N/A Preventive Maintenance (PM) Schedule 5 calendar days prior to end of the month
KO 2 Monthly
1002000/ 3.2.3 N/A Completed Preventive Maintenance (PM) Report
First working day of the month for the pervious month
KO 2 Monthly
1002000/ 3.3 N/A Mail Services SOP Within 30 calendar days following award
KO 1
Once and when changes occur
Annex 1002000 Supply Services
SECTION F: DELIVERIES OR PERFORMANCE
Deliverables shall be submitted via electronic means unless directed by the Contracting Officer.
DELIVERABLES
Annex/ Spec Item Form Attachment
Number Deliverable Title Date (s) of Submission original)
1200000/ 2.2 N/A Current Organization Staffing Chart Within 15 days after award or as requested by the KO
KO/MWR Site Director
Once and when changes occur
1200000/ 2.2.1 N/A Proof of all certification, training, and licensing
Within 15 days after award or as requested by the KO
KO/MWR Site Director
Once for initial submittal, then as requested
1200000/ 3, 3.1.1 N/A Standard Operating Procedures (SOPs) Within 30 days following contract award
KO/MWR Site Director
Annually thereafter and as changes occur.
1200000/3 N/A Patron Utilization Report Summary Monthly and Annually KO/MWR Site
Director 2 Monthly and Annually
1200000/ 3.1 N/A Meeting Agendas and written minutes As directed by MWR Site Director
KO/MWR Site Director
As directed by MWR Site Director
1200000/ 3.1.1 N/A Customer Feedback Summary Report Within 5 days following beginning of month
KO/MWR Site Director
2 Monthly
1200000/ 3.1.1 N/A Customer Feedback Cards Within 5 days following beginning of month
MWR Site Director
1 As Requested
1200000/ 3.1.1 N/A Evaluation Report for Trips, outings and Special Events
Within 5 days following completion of each trip
KO/MWR Site Director
Each trip, outing and special event
1200000/ 3.1.1 N/A Customer Survey Action Response Report
Within 30 days following completion of survey
KO/MWR Site Director
2 Annually
1200000/ 3.1.2 N/A Annual Marketing Plan Within 30 days following contract award and annually thereafter
KO/MWR Site Director
2 Quarterly
1200000/ 3.1.3 N/A Daily Walk- Through Deficiencies Report
Within one working day following walk- through inspections
KO/MWR Site Director
For deficiencies that exceed the contractor’s limit of liability
1200000/ 3.2 N/A Annual Fitness Center Schedule of Events
Within 30 calendar days following award, by 30 April thereafter
KO/MWR Site Director
2 Annually
1200000/ 3.2 N/A Monthly Updated Schedule of Events Within 15 calendar days prior to the applicable month
KO/MWR Site Director
2 Monthly
1200000/3.2.3.3 N/A Pool Equipment Preventive Maintenance (PM) Program
Within 15 calendar days prior to the start of the contract
KO/MWR Site Director
2 Annually
Annex 1200000 MWR
SECTION F: DELIVERIES OR PERFORMANCE
Deliverables shall be submitted via electronic means unless directed by the Contracting Officer.
DELIVERABLES
Annex/ Spec Item Form Attachment
Number Deliverable Title Date (s) of Submission
1200000/3.2.3.3 N/A Pool Equipment Preventive Maintenance (PM) Work Schedule
Within 5 working days prior to the beginning of the month
KO/MWR Site Director
2 Monthly
1200000/ 3.3 N/A Annual Community Support Schedule of Events
Within 30 calendar days following award, by 30 April thereafter
KO/MWR Site Director
2 Annually
1200000/ 3.3 N/A Monthly Updated Schedule of Events Within 15 calendar days prior to the applicable month
KO/MWR Site Director
2 Monthly
1200000/ 3.3 N/A Activity Plan for Trips, Outings, and Special Events
Prior to each event KO/MWR Site
Director 2 Upon Request
1200000 /3.3.2 N/A Gear Issue Equipment Availability Report
Within 30 days KO/MWR 2 Quarterly
1200000/3.3.5 N/A Current Movie Inventory Report Within 15 calendar days prior to the applicable month
KO/MWR Site Director
2 Monthly
1200000/ 3.3.7 N/A Special Activity Evaluation Report Within 5 days following the event
KO, MWR Site Director
2 As specified
1200000/ 3.3.8 N/A Activity Plans for Special events, holidays, and ethnic theme events
30 calendar days prior to the scheduled event if previously included in the annual calendar of events or marketing plan
KO, MWR Site Director
Monthly
1200000/ 3.3.9 N/A Daily and Weekly Reservation Reports Weekly KO, MWR Site
Director 2 As specified original)
1300000/ 2.2.4 N/A Proof of all Certification, Training and Licenses
Within 15 days after award or as requested by the KO
KO 1
Once for initial submittal, then as requested
1300000/2.2.5 N/A Records Of Employee Medical Examinations
Available for review upon request
KO 1 Upon Request
1300000/ 3 J-1300000-06 Customer Survey Monthly Summary Within five days after the end of each month
KO 2 Monthly
1300000/ 3.1 N/A Contingency Plan Within 30 days after contract award
KO, FSO 2 As Specified
1300000/ 3.1.1 N/A 21-day Cycle Menu Within 30 days after contract award and 45 days prior to the end of each calendar year
KO 2 As Specified
1300000/ 3.1.1 N/A Menu Change Approval Request Within 7 days prior to day of menu change
FSO, KO 2 As Specified
1300000/3.1.1 N/A Menu Review Board Meeting Minutes Within 3 days following each meeting
FSO, KO 2
Within 3 days following each meeting
1300000/ 3.1.2.1 N/A NAVSUP Form 335 Subsistence Ledger End of each workday
NAVSUP
personnel utilizing FSM 2 Daily
1300000/ 3.1.2.2 N/A Consumable Inventory report Within 5 days after the end of the month
KO 2 Monthly
1300000/ 3.2 N/A NAVSUP Form 1090 Food Preparation Worksheet
For each meal prepared
NAVSUP
personnel utilizing FSM 2 Daily
1300000/3.3 N/A Meal Services Monthly Summary Report.
NAVSUP Forms 1291 & 1292
5th day of each month
NAVSUP
personnel utilizing FSM 1 Monthly
1300000/ 3.3.1 N/A NAVSUP Form 1359 General Mess Summary Document
5th day of each Month
NAVSUP
personnel utilizing FSM 1 Monthly
1300000/ 3.5.3 N/A Mess Gear Inventory Record Twice a month each time inventory is conducted
KO, FSO 2 Upon Request
Annex 1300000 Galley
SECTION F: DELIVERIES OR PERFORMANCE
Deliverables shall be submitted via electronic means unless directed by the Contracting Officer.
DELIVERABLES
Annex/ Spec Item Form Attachment
Number Deliverable Title Date (s) of Submission
130000 / 3.5.3 N/A Replacement Request for Damaged Items After each inventory FSO, KO 2 Twice per month after each inventory
130000/ 3.6 N/A Schedule for Housekeeping and Sanitation Services
Within 30 days after contract award
KO 2 As Specified
130000/ 3.7 N/A Integrated Maintenance Plan Within 30 days after contract award
KO 1
Annually and any time a change is made to the schedule
130000/ 3.7 N/A Monthly IMP Schedule By the 25th day of each month KO 1 Monthly original)
1402000/ 2.2 N/A
List of Trained Personnel and the Training Curriculum for Managing and Servicing Electronic Cards, Keys and Locking Systems
Upon Request KO 1 Upon Request
1402000/ 3 Habitability and Functionality Inspection Report
Within 5 days after end of each month
Housing Officer 1 Monthly
1402000/ 3.1 N/A Monthly Summary of Customer Comments Report and All Supporting Individual Comment Cards
Within 5 days after end of each month
Housing Officer 1 Monthly
1402000/3.2.1 N/A Change of Occupancy Services Plan and Schedule
Within 5 days after the end of each quarter
Housing Officer/ KO
2 Quarterly
1402000/3.2.1 N/A Inventory and Condition Inspection Report
Within 5 days of each COS Housing Officer 2 Upon completion of each
COS
Annex 1402000 - Unaccompanied Housing
SECTION F: DELIVERIES OR PERFORMANCE
Deliverables shall be submitted via electronic means unless directed by the Contracting Officer.
DELIVERABLES
Annex/ Spec Item Form Attachment
Number Deliverable Title Date (s) of Submission original)
1501000/3.1.1 N/A List of Service Requests At the end of the week
PW
Requirements Branch
2 Weekly
1501000/3.1.3 N/A Weekly MAXIMO Work order Report
By 0900 hours Monday of each week
KO, PWO 2 Weekly
1501000/3.3.1 N/A Monthly Summary of MAXIMO Asset Changes Report
Within 10 days of identification or notification of change
KO 1
Monthly and when changes are made
1501000/3.3.3 N/A Condition Assessment Plan for Non-Dynamic Assets
As specified KO 1 As specified
1501000/3.4.2 N/A Technical Library Documentation Within 1 hour of request Requesting Customer
1 Upon Request
1501000/3.4.3 N/A Data Call Reports
Within 2 hours of receipt of request for verbal or minimal written responses, otherwise within Government provided timeframe, but not to exceed 5 working days from initial request
KO, Requesting Customer
2 Upon Request
1501000/3.5 N/A Daily Report Systems in Override/Bypass/Manual
Daily KO, UEM 2 Daily
1501000/3.5 N/A FRCS, OT, and IT Systems Alarms Report
Within 10 days before service start date and seven days from any changes
KO, UEM 2
Monthly and when changes are made
Annex 1501000 Facility Management
SECTION F: DELIVERIES OR PERFORMANCE
Deliverables shall be submitted via electronic means unless directed by the Contracting Officer.
DELIVERABLES
Annex/ Spec Item Form
Attachment Number
Deliverable Title Date (s) of Submission
Copies
(including 1502000/2.2.1 N/A Proof of all certification, training, and licensing Within 10 days before service start date and as requested by the KO
KO 1 Once for initial submittal, then as
1502000/3.1 N/A Monthly summary of completed and unaccomplished service orders
First work day of each month KO 2 Monthly
1502000/ 3.2 N/A Facility Bullet Report (Completed and Unaccomplished bullets)
First work day of each month KO 2 Monthly
1502000/ 3.3 N/A Preventive Maintenance (PM) Program 30 calendar days after contract award KO 2 Annually
1502000/ 3.3 N/A Monthly PM Work Schedule Five work days prior to the beginning of each month
KO 1 Monthly
1502000/ 3.3.5 N/A Ground Test Results First work day of each month
KO, ESO,
Weapons Officer 1 Monthly
1502000/ 3.3.15 N/A Monthly Operating Records Report Five work days prior to the beginning of each month
KO 1 Monthly
1502000/ 3.3.15 N/A UPS Sytems Status Report Five work days prior to the beginning of each month
KO 1 Monthly
1502000/3.4 N/A Integrated Maintenance Program (IMP) Within 10 days before service start date KO 2 Annually
1502000/3.4 N/A Monthly and Daily IMP Schedules Five work days prior to the beginning of each month
KO 1 Monthly
1502000/ 3.4.1 N/A Critical Facility HVAC and Refrigeration Critical Spare Parts List
Within 10 days before service start date KO 1 Annually
1502000/ 3.5 N/A Inspection, Testing and Certification Orogram Summary Report
First work day of each month KO 2 Monthly
1502000/ 3.5 N/A Inspection, Testing and Certification Schedule and Equipment Certifications
First work day of each month KO 2 Monthly
1502000/ 3.5.3 N/A Inspection and Test Report for Vertical Transportation Equipment (VTE)
First work day of each month KO 2 Monthly
1502000/ 3.6 N/A Other Recurring Services Program Summary Report
First work day of each month KO 2 Monthly
1502000/ 3.6 N/A Monthly Maintenance Schedule Report Five work days prior to the beginning of each month
KO 2 Monthly
1502000/3.6.5 N/A Monthly Surface Cleaning Hours Expended Report
First work day of each month KO 2 Monthly
1502000/ 3.6.6 N/A Waste2Water Monitoring Report First work day of each month KO, N4 EV 1 Monthly
Annex 1502000 Facility Investment
SECTION F: DELIVERIES OR PERFORMANCE
Deliverables shall be submitted via electronic means unless directed by the Contracting Officer.
DELIVERABLES
Annex/ Spec Item Form
Attachment Number
Deliverable Title Date (s) of Submission original) 1503010/2.3.1 N/A
Pathogen Training Certificates 15 days prior to contract start.
KO 1
Within 15 days prior to contract start and as requested
1503010/3.1 N/A Annual Work Schedule for custodial services
15 days prior to contract start.
KO 1
Within 15 days prior to contract start and annually thereafter
1503010/3.1 N/A Monthly Work Plan for custodial services
Five days prior to the start of the next month
KO 1 Monthly
Annex 1503010 Custodial Services
SECTION F: DELIVERIES OR PERFORMANCE
Deliverables shall be submitted via electronic means unless directed by the Contracting Officer.
DELIVERABLES
Annex/ Spec Item Form
Attachment Number
Deliverable Title Date (s) of Submission original)
1503020/ 2.2.1 Proof of State/DoD Certification for Contractor Personnel
15 calendar days prior to start of work. Copies of renewed certifications shall also be submitted.
KO 2 As required
1503020/ 2.3.1 Permits 5 days prior to the start of work requiring permits.
KO 2 As required
1503020/ 2.3.3 Ultra-Low Volume (ULV) Equipment Calibration and Droplet Analysis Report
15 days prior to the start of work and thereafter every 50 hours of ULV equipment use.
KO 2 As required
1503020/ 2.3.4 J-1503020-02 Planned Pesticide Use Sheets including Pesticide Labels and Safety Data Sheets
(SDS)
15 calendar days prior to start of work. Note: Any proposed changes in pesticide usage shall be submitted for KO approval at least 5 business days in advance of pesticide use.
KO 2
1 for each pesticide per pest as required
1503020/ 3 J-1503020-04 Contractor's Work Plan 15 calendar days prior to start of work.
KO 2 1 per proposal
1503020/ 3 J-1503020-06 Report of Conditions Conducive to Pest Infestation
1 working day after citing conditions.
KO 2 As required
1503020/ 3 J-1503020-06 Stored Product Pest Survey (per the appropriate Pest Group Sheet)
Within 1 day of the survey. KO, PAR 2 As required
1503020/ 3 J-1503020-07 Adult Mosquito Catch (per the appropriate Pest Group Sheet)
The same day as collected in a labeled, resealable plastic bag.
Installation Preventive Medicine Department, KO, PAR
2 As required
Annex 1503020 - Pest Control
SECTION F: DELIVERIES OR PERFORMANCE
Deliverables shall be submitted via electronic means unless directed by the Contracting Officer.
DELIVERABLES
Annex/ Spec Item Form
Attachment Number
Deliverable Title Date (s) of Submission
1503020/ 3 J-1503020-07 Larval Mosquito Survey Report (per the appropriate Pest Group Sheet)
Within 1 day of the survey. KO, PAR 2 As required
1503020/ 3.2.1 Summary of Completed Service Orders Report
Monthly, within 5 working days of beginning of month.
KO 2 As required
1503020/ 3.3 J-1503020-11 Pest Management Record for each pest management operation
Electronically once per month by the 15th of the following month
KO 2 Monthly
1503020/ 3.3 J-1503020-11 Pest Management Operations Report Electronically once per month by the 15th of the following month
KO 2 Monthly original)
1503030/ 2.3.1 N/A Copies of Disposal Permits Within 15 days of contract start
KO 1
Once, update as changes occur
1503030/ 3 N/A Incinerator Plant Contingency Plan Within 30 days following award
KO, EV 2
Once. Update as changes occur.
1503030/ 3.1 N/A Solid Waste Collection Schedule
15 days prior to contract start. The Contractor shall submit changes to the solid waste collection schedule in writing to the KO for approval.
KO 1
Once. Update as changes occur
1503030/ 3.2 N/A Incinerator Plant Operating Logs Within five days of start of month
KO 1 Monthly
1503030/ 3.2 N/A Fuel Logs Within five days of start of month
KO 1 Monthly
1503030/ 3.3 N/A Weight Tickets As specified KO 12 With the monthly invoice
1503030/ 3.3.4 N/A Mattress Disposal Plan Within 15 days of contract start
KO 1
Once and when changes occur
1503030/ 3.6 J-1503030-05 Critical Spare Parts List
1503030/ 3.6 N/A PM Program and Work Schedule Within 15 days of contract start
KO 1 Annually
1503030/ 3.6 N/A Monthly PM Schedule
Annex 1503030 - Integrated Solid Waste Management
SECTION F: DELIVERIES OR PERFORMANCE
Deliverables shall be submitted via electronic means unless directed by the Contracting Officer.
DELIVERABLES
Annex/ Spec Item Form
Attachment Number
Deliverable Title Date (s) of Submission original)
1503050/ 2.3.1.1 N/A Water Conservation Plan 15 days prior to contract start KO 1 15 days prior to contract start/ Annually
1503050/ 3 N/A SDS sheets and Catalog Cut sheets and/or samples all proposed fertilizers
As specified KO 2 As required
1503050/ 3 N/A Monthly Work Schedule 5 days prior to start of month KO 2 Monthly
1503050/ 3.1 N/A Tree Maintenance Plan 15 days prior to contract start KO 2 Annually
1503050/ 3.3 N/A Debris Removal Schedule 5 days prior to start of month KO 2 Monthly
1503050/ 3.7 N/A Maintenance of Xeriscape Areas Schedule
15 days prior to contract start KO 2 Annually
Annex 1503050 Grounds Maintenance Services
SECTION F: DELIVERIES OR PERFORMANCE
Deliverables shall be submitted via electronic means unless directed by the Contracting Officer.
DELIVERABLES
Annex/ Spec Item Form
Attachment Number
Deliverable Title Date (s) of Submission original)
1503060/ 3.1 N/A Pavement Sweeping Schedule
15 working days after award & 15 working days after the start of each option year
KO 2 Annually
Annex 1503060 Pavement Clearance
SECTION F: DELIVERIES OR PERFORMANCE
Deliverables shall be submitted via electronic means unless directed by the Contracting Officer.
DELIVERABLES
Annex/ Spec Item Form
Attachment Number
Deliverable Title Date (s) of Submission original)
1601000/ 2.2.1 N/A Proof of all certification, training, and licensing
Within 10 days before service start date and as requested by the KO
KO 1 Once for initial submittal, then as requested
1601000/ 3.1.1 N/A Utility Maps At the end of the following work day when updates are required
KO, UEM 1 Upon request
1601000/ 3.1.2 J-1601000-05 Utility Outage Report At the end of the following workday
KO, UEM 2 As required
1601000/ 3.1.3 N/A Monthly Meter Reading Report By the 25th day of each month KO, UEM 2 Monthly
1601000/3.2.1 N/A MAXIMO Asset Changes Report Within 10 days of identification or notification of change
KO 1
Monthly and when changes are made
1601000/3.3 N/A Report for all configuration changes and system upgrades As specified KO, UEM 2
As required and every occurrence
1601000/3.3 N/A Report for any system that is in override/bypass/manual or other methods to bypass full auto operation
As specified KO, UEM 2 As required and every occurrence
1601000/3.3 N/A Emergency Response Plan Within 10 days before service start date and as requested by the KO
KO, UEM 2 As required
1601000/3.3 N/A Report for system alarms in FRCS, OT, and IT operation or incidence
As specified
KO, UEM 2
As required and every occurrence
1601000/3.3.2 N/A Maintenance Plan Within 10 days before service start date and seven days from any changes
KO, UEM 2 As required
1601000/3.3.2 N/A System Integration and turnover discrepancy report
Within 5 calendar days of Government changes to the system KO, UEM 2 As required
Annex 1601000 Utility Management
SECTION F: DELIVERIES OR PERFORMANCE
Deliverables shall be submitted via electronic means unless directed by the Contracting Officer.
DELIVERABLES
Annex/ Spec Item Form Attachment
Number Deliverable Title Date (s) of Submission original)
1602000/ 2.2.1 N/A Proof of all Certification, Training, and Licensing Requirements
Within 30 days following award
KO, Production Division Director
Once. Update as changes occur
1602000/ 3 N/A Critical Spare Parts List 15 days after award KO, Chabelley
BCE
Once. Update if the requirements change.
1602000/ 3 N/A Electrical Power Generation Contingency Plan
Within 30 days following award
KO, Production Division Director
Once. Update as changes occur
1602000/ 3.1 N/A Standard Operation Procedures- Plant Controls and Monitoring System
Within 30 days after contract start and within five days of any changes
KO 2
Once. Update if the requirements change.
1602000/ 3.1.2 N/A Daily and Monthly Operating Records Report
3 days after following the end of the month during which work is performed
KO, Production Division Director
2 Daily and Monthly
1602000/ 3.3 N/A Integrated Maintenance Program (IMP) for Electrical Control Systems
15 days after KO, Production
Division Director
Annually and any time a change is made to the schedule
1602000/ 3.3 N/A Integrated Maintenance Program (IMP) for Electrical Power Generation Systems
15 days after award KO, Production
Division Director
Annually and any time a change is made to the schedule
1602000/ 3.3 N/A Integrated Maintenance Program (IMP) for Electrical Transmission and Distribution Systems
15 days after award KO, Production
Division Director
Annually and any time a change is made to the schedule
Annex 1602000 Electrical
SECTION F: DELIVERIES OR PERFORMANCE
Deliverables shall be submitted via electronic means unless directed by the Contracting Officer.
DELIVERABLES
Annex/ Spec Item Form Attachment
Number Deliverable Title Date (s) of Submission
1602000/ 3.3 N/A Monthly IMP Schedule and IMP Maintenance and Repair Status Report Control Systems
By the 25th day of each month KO, UEM 2 Monthly
1602000/ 3.3 N/A
Monthly IMP Schedule and IMP Maintenance and Repair Status Report for Electrical Power Generation Systems
By the 25th day of each month KO, UEM 2 Monthly
1602000/ 3.3 N/A
Monthly IMP Schedule and IMP Maintenance and Repair Status Report for Electrical Transmission and Distribution Systems
By the 25th day of each month KO, UEM 2 Monthly original)
1604000/ 3 N/A Wastewater Plant Contingency Plan Within 30 days following award KO, UEM 2 Once. Update as changes occur.
1604000/ 3.1 N/A Standard Operation Procedures
Within 30 days after contract start and within five days after making changes to any plant operating procedure, equipment or component.
KO, and Onsite 2 Once. Update as changes occur.
1604000/ 3.1 N/A Notification of Unsafe Conditions Report
Immediately upon discovery. KO, UEM 2 Each Discovery
1604000/ 3.1.1 N/A Laboratory Analysis of Wastewater Effluent Report
Within 2 days of discovery when found non-compliant. 4 days after the end of the month if compliant.
KO, UEM 2
Monthly or within 2 days if found non- compliant
1604000/ 3.1.2 N/A Schedule of Operator Attendance 7 days prior to the start of work Within 2 days of Request
KO, UEM 2
7 days prior to the start of work and as requested
1604000/ 3.1.3 N/A Wastewater Treatment Operating Records, Logs and Reports
3 days after the end of the month during which work is performed
KO, UEM 2 Monthly
1604000/ 3.2 N/A Integrated Maintenance Program (IMP) for Wastewater Control Systems
15 days after award KO, UEM 2 Annually and any time a change is made.
1604000/ 3.2.2 N/A Schedule to Replace Expendable Components
15 days after award KO, UEM 4 Annually and any time a change is made.
1604000/ 3.3 N/A Inspection Program and Schedule 15 days after award KO 4 Annually and any time a change is made.
1604000/ 3.3 N/A Inspection Reports and Video Footage
15 days after performance of the work KO 4 As required
1604000/ 3.3.2 N/A Manhole Photographs and Reports 15 days after performance of the work KO 4 As required
1604000/ 3.3.3 N/A Wet Well Photographs and Reports 15 days after performance of the work KO 4 As required
1604000/ 3.4.2 N/A Septic Tank and Holding Tank Servicing Schedule
15 days after award KO, UEM 2 Annually and any time a change is made.
1604000/ 3.4.3 N/A Portable Toilet and Hand-Washing Unit Servicing Schedule
15 days after award KO, UEM 2 Annually and any time a change is made.
1604000/ 3.4.4 N/A Purple Pipe Reclaim Water System Report
By the 25th day of each month KO, UEM 2 Monthly
Annex 1604000 Wastewater
SECTION F: DELIVERIES OR PERFORMANCE
Deliverables shall be submitted via electronic means unless directed by the Contracting Officer.
DELIVERABLES
Annex/ Spec Item Form
Attachment Number
Deliverable Title Date (s) of Submission original)
1606001/ 2.2.1 N/A List of Key personnel and Qualifications Within 30 days following award KO, COR 2 Once. Update as changes occur.
1606001/ 2.2.2 N/A Proof of all Certification, Training, and Licensing Requirements
Within 30 days following award KO, UEM 2 Once. Update as changes occur.
1606001/ 3 N/A Outage Requests for Maintenance and Repairs
As specified KO 1 As specified
1606001/ 3 N/A Unscheduled Water Disruption Situation Report
As specified KO, UEM 1 As specified
1606001/ 3.1 N/A Standard Operating Procedures 15 days after award and 5 days after changes
KO, UEM 2
Once. Update if the requirements change.
1606001/ 3.1 N/A Modifications to Standard Operating Procedures
15 days after award and 5 days after changes
KO, UEM 2
Once. Update if the requirements change.
1606001/ 3.1 N/A Notification of Unsafe Conditions Report Immediately KO, UEM 2 As Required
1606001/ 3.1 N/A Water Use Contingency Plan Within 30 days following award KO, UEM 2 Once. Update as changes occur.
1606001/ 3.1.1.1 N/A Proposed Laboratories used for water quality sampling and analysis
Within 30 days following award KO, UEM 2 Once. Update as changes occur.
1606001/ 3.1.1.1 N/A Laboratory Sampling and Analysis Reports
Within two days of occurrence KO, UEM 2 As Specified
1606001/ 3.1.1.2 N/A Monthly Water Quality Report Five work days prior to the beginning of each month
KO 1 Monthly
1606001/ 3.1.1.2 N/A Fecal Coliform Report Five work days prior to the beginning of each month
KO 1 Monthly
1606001/ 3.1.1.2 N/A Monthly Disinfection Profiling and Benchmarking - Monitoring, Profiling and Analysis Report
Five work days prior to the beginning of each month
KO 1 Monthly
1606001/ 3.1.1.2 N/A Annual Break Point Test - Results and Analysis
Five work days prior to the beginning of each month
KO 1 As specified
1606001/ 3.1.5 N/A Raw Water Collection System Monitoring and Maintenance Report
Five work days prior to the beginning of each month
KO 1
Monthly and when changes are made
Annex 1606001 Water
SECTION F: DELIVERIES OR PERFORMANCE
Deliverables shall be submitted via electronic means unless directed by the Contracting Officer.
DELIVERABLES
Annex/ Spec Item Form
Attachment Number
Deliverable Title Date (s) of Submission
1606001/ 3.1.5 N/A Wellhead Protection Program Within 30 days following award KO, UEM 2 Once. Update as changes occur.
1606001/ 3.2 N/A Integrated Maintenance Program (IMP) for Water Control Systems
Within 15 days following award KO, UEM 2 As specified
1606001/ 3.2 N/A Integrated Maintenance Program (IMP) for Water Production System
Within 15 days following award KO, UEM 2 As specified
1606001/ 3.2 N/A Integrated Maintenance Program (IMP) for Water Distribution System
Within 15 days following award KO, UEM 2 As specified
1606001/ 3.2 N/A Notification of repair work exceeding the Liability Limit
Within three days following Contractor discovery
KO 2 As specified
1606001/ 3.2 N/A Monthly IMP Schedule and IMP Maintenance and Repair Status Report for Water Control Systems
3 days following the end of the month
KO, UEM 2 Monthly
1606001/ 3.2 N/A Monthly IMP Schedule and IMP Maintenance and Repair Status Report For Water Production Systems
3 days following the end of the month
KO, UEM 2 Monthly
1606001/ 3.2 N/A Monthly IMP Schedule and IMP Maintenance and Repair Status Report for Water Distribution Systems
3 days following the end of the month
KO, UEM 2 Monthly
1606001/ 3.3 N/A Inspection, Testing and Certification Program and Schedule
First work day of each month KO, UEM 2 As Specified
1606001/ 3.3 N/A Inspection, Testing, and Certification Program Summary Report
First work day of each month KO, UEM 2 As specified
1606001/ 3.3.1 N/A Letter/memo appointing a Backflow Prevention and Cross Connection Control Program Manager
As specified KO 1 Monthly and when changes are madeAs specified
1606001/ 3.3.1 N/A Notification for testing and certification for backflow prevention devices
Within 10 days of identification or notification of change
KO 1
Monthly and when changes are made
1606001/ 3.3.2 N/A Water System Instrumentation and Control Devices’ Testing and Calibration Schedule
First work day of each month KO, UEM 2 As specified
1606001/ 3.4.1 N/A Water Service Emergency Plan Within 15 days following award KO, UEM 2 As specified
1606001/ 3.4.2 N/A Public Notification Exceeding MCL for toatal coliform, nitrates, nitrites
Within 72 Hours of occurrence KO, EV 2 As specified
1606001/ 3.4.2 N/A Public Notification Exceeding MCL for lead/copper, organic chemicals, radionuclides, inorganic chemicals
Within 14 Days of occurrence KO, EV 2 As specified
1606001/ 3.4.2 N/A PWD Notification Exceeding MCL Same Day Notice KO, EV 2 As specified
1606001/ 3.4.2 N/A Water Quality Public Notification Within 15 days following award KO, EV 2 As specified
1606001/ 3.4.2 N/A Water Quality Violation Report Within 15 days following award KO, EV 2 As specified
1606001/ 3.4.3 N/A Consumer Confidence Report Within 15 days after contract start
KO, EV 2 April 1st of each year
1606001/ 3.5 N/A Critical Spare Parts Inventory Within 30 days following award KO, UEM 2 Once. Update if the requirements change.
1606001/ 3.6 N/A Valve Exercising Plan Within 15 days following award KO, UEM 2 As specified
1606001/ 3.7 N/A Fire Hydrant Flow Testing Plan and Schedule
First…