N6247019R2004 Amendment 0006.pdf
PDF 708 KB Posted
- Solicitation number
- N62470-19-R-2004
About this file
This is a solicitation for base operations support services at Naval Support Activity Northwest Annex in Chesapeake, Virginia. The Navy seeks an contractor to provide recurring and non-recurring facility, utilities, and environmental management services. Key details include a single-award IDIQ contract structure, an 8(a) small business set-aside, a February 27th proposal due date, and requirements for facility management, utilities operations and maintenance, housekeeping, grounds maintenance, and environmental compliance support. The contractor must utilize MAXIMO for work tracking and report labor hours. The performance work statement outlines numerous technical requirements for managing personnel, safety programs, equipment, and implementing an environmental management system.
View the file
Other files
Show 40 more
Latest 50 of 105 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
BASE OPERATIONS SUPPORT (BOS) SERVICES AT NAVAL SUPPORT ACTIVITY NORTHWEST ANNEX (NWA) CHESAPEAKE, VIRGINIA
This amendment is issued to extend the solicitation’s due date from 13 February 2020 to 27 February 2020 at 2:00 PM Eastern Standard Time (EST) and to propound various amendments to Sections A, C, I, J, and K of this solicitation.
PLEASE SEE BLOCK SF-14 CONTINUATION PAGE FOR FURTHER DETAIL.
CS: Alex Cloud, thomas.cloud@navy.mil
1. CONTRACT ID CODE PAGE OF PAGES
J 1 105
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 31-Jan-2020
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X N6247019R2004
X 9B. DATED (SEE ITEM 11)
31-Dec-2019
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
31-Jan-2020
CODE
COMMANDER NAVFAC ATLANTIC
6506 HAMPTON BLVD
NORFOLK VA 23508-1278
N62470 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
N6247019R2004
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION SF 30 - BLOCK 14 CONTINUATION PAGE
The following have been added by full text:
AMENDMENT 0006
The purpose of this amendment is to disseminate the below information:
1.) SF-33, Block 9 – The due date of this solicitation is extended from 13 February 2020 to 27 February 2020 at
2:00 PM Eastern Standard Time (EST).
2.) Section A – The due date of this solicitation is extended from 13 February 2020 to 27 February 2020 at 2:00
PM EST.
3.) Section C – The following specifications within section C are revised: 0200000 (the hyperlinks in spec items
2.10.4.3 and 2.15.1.1 were repaired), 1502000, 1503020, 1503060, and 1602000.
4.) Section I – Clause 252.204-7018 was added via full text to this section, and clause 52.252-2 was revised.
5.) Section J – The below list of attachments have been added to the solicitation or otherwise revised.
Section F (Amendment 0006) Deliveries or Performance Tables J-1503020 (Amendment 0006) was revised.
J-10 (Amendment 0006)B-5.2.14 Utility Outage Reporting and Data Collection J-11 (Amendment 0006)B-15.6 Proper Work Classification J-12 (Amendment 0006) B-15.17 Work Tracking J-13 (Amendment 0006) B-15.27 Facility Emergency, Urgent, and Routine Service Request and Work Order Process J-14 (Amendment 0006) Site Visit Presentation J-15 (Amendment 0006) Site Visit Sign In J-1601000-12 (Amendment 0006) Utility Control Systems Inventory
6.) Section K – Provisions 252.204-7016 and 252.204-7017 were added via full text to this section.
NOTE: Revisions are provided by the use of red font; deletions are indicated by the use of red strikethrough font.
SECTION A - SOLICITATION/CONTRACT FORM
The required response date/time has changed from 13-Feb-2020 02:00 PM to 27-Feb-2020 02:00 PM.
The following have been modified:
SECTION A
NAVAL FACILITIES ENGINEERING COMMAND (NAVFAC), ATLANTIC
6506 HAMPTON BLVD
NORFOLK, VIRGINIA 23508-1278
NAVFAC RFP NUMBER: N62470-19-R-2004
BASE OPERATIONS SUPPORT (BOS) SERVICES FOR NAVAL SUPPORT ACTIVITY (NSA) NORTHWEST
ANNEX, CHESAPEAKE, VIRGINIA.
NOTICE: PROPOSALS ARE DUE BY 2:00 P.M. NORFOLK, VA LOCAL TIME ON 13 27 FEBRUARY
Proposal is to be submitted to office listed below:
Naval Facilities Engineering Command (NAVFAC), Atlantic Attn: Alex Cloud, Code ACQ22 6506 Hampton Blvd, Mail Room Norfolk, Virginia 23508-1278
PRE-PROPOSAL CONFERENCE/SITE VISIT:
A one-day pre-proposal conference/site visit will occur 30 January 2020 at the Naval Support Activity Northwest Annex (NWA), Chesapeake, VA. Pre-proposal conference registration will commence at 8:00 AM EST on the aforementioned date at building 237, the Mariner’s Club, just outside the front gate of NWA. A presentation will commence at 8:30 AM EST, and the physical site visit will follow. Please be advised that limited parking exists outside the gate at NWA; consequently, attendees are encouraged to carpool whenever possible. The space available just outside the Mariner’s Club and overflow space at building B-390 are available for parking. Please do not park in the two rows closest to B-390 on either side of the building. It is anticipated that lunch will occur between roughly 11:30 am until 12:30 pm. The Mariner’s Club provides meals for sale; other commercial establishments are not close to the base. Thus, attendees may also consider bringing their own lunch. All attendees must bring a copy of their completed form SF 5512 with them to the site visit along with a valid photo identification. Additionally, please bring a copy of the identity source document used on the SF 5512 or a current US passport in case of unforeseen access issues. Moreover, please allow enough time to visit the base pass office to receive a physical base access pass the morning of the pre-proposal conference/site visit before visiting pre-proposal conference registration. The NWA pass office opens at 6:00 AM EST.
Note: The Site Visit may entail significant walking to, from, or within various locations at NWA.
Please wear comfortable shoes. Please also be cognizant that the Site Visit may include a tour of special facilities. Consequently, please minimize any personal belongings carried on the base as it may cause delays entering the facility.
Site visit attendance is limited to two attendees per contractor. The below attachments are required to be submitted no later than 2:00PM on 13 January 2020 in order to attend the site visit. Forms received after 2:00 pm on 13 January 2020 will not be processed, and any associated attendees to those late forms will not be granted access to participate in the pre-proposal conference/site visit. Please ensure that all attendees bring a valid identification card, passport, or driver’s license on the day of the site visit.
Site Visit Registration (Attachments J-7 and J-9) must be completed no later than 2:00PM (Norfolk local time) on 13 January 2020. Attendees are required to submit:
1. Attachment J-7 Site Visit Registration Form – Attendees must complete fields in columns A—I. Attendees must transmit the completed Attachment J-7 Site Visit Registration Form, which form contains Privacy Act/PII data, to Barbara Taylor via secure, encrypted email to the following email address: barbara.taylor4.ctr@navy.mil. The email must be encrypted and include the following text in the subject line: “Site Visit Application for Solicitation N62470-19-R-2004 with Privacy Act/PII Data Included”
2. Attachment J-9 SECNAV 5512 - The form must be typed - Applicants must complete ALL blocks. Block 25 is pre-filled. Applicants must check YES or NO and INITIAL BOTH LINES in blocks 29 and 30 and sign and date block 31. Attendees must transmit the completed Attachment J-9 SECNAV 5512 form, which form contains Privacy Act/PII data, to Barbara Taylor via secure, encrypted email to the following email address:
barbara.taylor4.ctr@navy.mil. The email must be encrypted and include the following text in the subject line: “Site Visit Application for Solicitation N62470-19-R-2004 with Privacy Act/PII Data Included”
3. Attachments J-7 and J-9 may be sent via the same email to Barbara Taylor. A confirmation email will be sent 14 January 2020. If a confirmation is not given, your email was not received.
A.1 Contract Title
Base Operations Support (BOS) Services For Naval Support Activity (NSA) Northwest Annex, Chesapeake, Virginia.
A.2 Type of Contract
This acquisition will result in the award of a single award Indefinite-Delivery/Indefinite Quantity (IDIQ), performance-based type contract for BOS Services at NSA Northwest Annex, Virginia that is comprised of both Recurring Work and Non-Recurring Work Items.
A.3 COMPETITION REQUIREMENTS/SET-ASIDE
This procurement is a 100% set aside for eligible 8(a) firms in accordance with FAR 19.805(a)(1).
A.4 NAICS CODE
The NAICS code assigned to this procurement is 561210, Facility Support Services, having a small business size standard of $41.5 million. Refer to Section K, Representations, Certifications and Other Statements of Offerors.
A.5 REQUEST FOR PROPOSAL (RFP) FILES
It is the sole responsibility of the Offeror to obtain the RFP files, along with any amendments, from Contract Opportunities (www.beta.sam.gov.) Unprotected editable electronic file copies of the RFP documents, including Word, Excel, and/or Adobe files will not be provided. Please plan accordingly.
SECTION C - DESCRIPTIONS AND SPECIFICATIONS
The following have been modified:
0200000
0200000 – Management and Administration Spec Item Title
2 Management and Administration
2.1 Definitions and Acronyms
2.2 General Information
2.2.1 Government Regular Working Hours
2.2.1.1 Observed Federal Holidays
2.2.1.2 Restriction to Contractor Working Hours
2.2.2 Wage Determinations
2.2.3 Requirements Hierarchy
2.3 General Administrative Requirements
2.3.1 Required Conferences and Meetings
2.3.2 Training for Maintenance and Operation of New and Replacement Systems and Equipment
2.3.3 Partnering
2.3.3.1 Formal Partnering
2.3.3.2 Contract Partnering Administration
2.3.3.3 Contract Partnering Session Attendees
2.3.4 Permits and Licenses
2.3.5 Insurance
2.3.5.1 Certificate of Insurance
2.3.5.2 Minimum Insurance Amounts
2.3.6 Protection of Government Property
2.3.7 Government Information Technology (IT) System
2.3.8 Directives, Instructions, and References
2.3.9 Invoicing Procedures
2.4 Government-Furnished Property, Materials and Services
2.4.1 Government-Furnished Facilities (GFF)
2.4.2 Government-Furnished Utilities
2.4.3 Government-Furnished Materials (GFM)
2.4.4 Government-Furnished Equipment (GFE)
2.4.5 Government-Furnished Services (GFS)
2.5 Contractor-Furnished Items
2.6 Management
2.6.1 Safeguarding Information
2.6.2 Work Reception
2.6.3 Work Control
2.6.4 Work Schedule
2.6.5 Deliverables
2.6.6 Service Interruptions
2.6.7 NAVFAC MAXIMO
2.6.7.1 NAVFAC MAXIMO Data
2.6.7.2 NAVFAC MAXIMO Method of Data Entry
2.6.7.3 NAVFAC MAXIMO Access
2.6.7.4 NAVFAC MAXIMO Training
2.6.8 Quality Management System (QMS)
2.6.8.1 Quality Management (QM) Plan
2.6.8.2 Quality Inspection and Surveillance
2.6.8.3 Quality Inspection and Surveillance Report
2.6.9 Property Management Plan
2.6.10 System and Equipment Replacement
2.7 Personnel Requirements
2.7.1 Key Personnel
2.7.1.1 Project Manager (PM)
2.7.1.2 Quality Manager
2.7.1.3 Site Safety and Health Officer (SSHO)
2.7.1.4 Environmental/ Energy Manager
2.7.2 Employee Requirements
2.7.2.1 Employee Certification and Training
2.7.2.2 Employee Appearance
2.7.2.3 Employee Conduct
2.7.2.4 Identification as Contractor Employee
2.7.2.5 Removal of Employees
2.7.2.6 Proof of Legal Residency
2.7.3 Enterprise-wide Contractor Manpower Reporting Application (eCMRA)
2.8 Security Requirements
2.8.1 Employee Listing
2.8.2 Vehicles
2.8.3 Passes and Badges
2.8.4 Access to Installation
2.8.4.1 Defense Biometric Identification System (DBIDS) Program
2.8.4.2 DBIDS Credentials
2.8.5 Access to Buildings
2.8.6 Access Arrangements
2.8.6.1 Escort Arrangement for Secured Areas
2.8.7 Security Clearances
2.8.7.1 Access to Sensitive Unclassified Information
2.8.7.2 Access to Critical Sensitive Information
2.8.8 Access to Navy Marine Corps Intranet (NMCI)
2.8.9 Employee Status
2.9 Contractor Safety Program
2.9.1 Accident Prevention Plan (APP)
2.9.2 Activity Hazard Analysis (AHA)
2.9.3 Safety and Occupational Health (SOH) Risks and Compliance Plans
2.9.3.1 Alcohol and Drug Abuse Prevention Plan
2.9.3.2 Chemical Hazard Communication Program
2.9.3.3 Confined Space Program
2.9.3.4 Critical Lift Plan
2.9.3.5 Fall Prevention and Protection Plan
2.9.4 Crane Operations
2.9.4.1 Crane Inspections
2.9.4.2 Rigging Gear
2.9.4.3 Crane Operators
2.9.5 Accident and Damage Reporting
2.9.5.1 Accident Reporting and Notification Criteria
2.9.6 Fire Protection
2.9.7 Monthly On-Site Labor Report
2.9.8 OSHA Citations and Violations
2.9.9 Safety Inspections and Monitoring
2.9.10 Safety Certification
2.9.11 Safety Apparel on Jobsites
2.9.12 Emergency Medical Treatment
2.9.13 Excavations
2.9.14 Traffic Control Plan
2.9.14.1 Rush Hour Restrictions
2.10 Environmental Management and Sustainability
2.10.1 Environmental Compliance Assessment Training and Tracking System (ECATTS)
2.10.2 Energy Management Program
2.10.2.1 Water Conservation Plan
2.10.2.2 Energy Efficient Products
2.10.3 Environmental Protection
2.10.3.1 Sampling, Testing and Laboratory Services
2.10.3.2 ODS Requirements for Refrigerant Recycling
2.10.3.3 Solid Waste Management and Recycling
2.10.3.4 Non-Regulated Waste Disposal
2.10.3.5 Regulated Waste Disposal
2.10.3.6 Spill Prevention, Containment, and Clean-up
2.10.3.7 Hazardous Material Management
2.10.3.8 Protection of Endangered and Threatened Species (Flora and Fauna)
2.10.3.9 Noise Control
2.10.3.10 Salvage
2.10.3.11 Asbestos Containing Material (ACM)
2.10.3.12 Clean Air Act (CAA)
2.10.4 Sustainable Procurement and Practices
2.10.4.1 Environmentally Preferable Products
2.10.4.2 Use of Recovered Materials
2.10.4.3 Use of Biobased Products
2.11 Disaster Preparedness
2.12 Technical Library
2.13 Warranty Management
2.14 Recurring Work Procedures
2.14.1 Notification to the Government for Work Above the Recurring Work Limitations
2.14.2 Recurring Work Exhibit Line Item Numbers (ELINs)
2.15 Non-recurring Work
2.15.1 Unit Priced Task (UPT) Work (Non-Negotiated)
2.15.1.1 Acceptance and Performance
2.15.1.2 Invoicing and Receiving Payment
2.15.2 Unit Priced Labor (UPL)Work (Negotiated)
2.15.2.1 Non-recurring Work Preparation of Proposals
2.15.2.1.1 Labor Requirements
2.15.2.1.2 Material and Equipment Requirements
2.15.2.2 Issuance of Final Task Order
2.15.2.3 Changes to Scope of Work
2.15.3 Non-recurring work ELINS
2.16 Inventory Data Quantity Variation
0200000 - Management and Administration Spec Item
Title Description
2 Management and Administration
2.1 Definitions and
Acronyms
Definitions and Acronyms are listed in J-0200000-01.
2.2 General
Information
2.2.1 Government
Regular
The Government's regular working hours are from 0745-1615, five days per week, Monday through Friday, except observed Federal holidays. Exceptions
Item
Title Description
Working Hours to the regular hours of operation are detailed in subsequent sections of this PWS. Work in certain annexes or sub-annexes require Contractor continuous operations, 24 hours a day, every day of the year including holidays. The performance of other work requirements shall be accomplished within the Government’s regular working hours unless the specific work requirement specified herein necessitates otherwise. Any other work outside Government regular working hours requires prior KO approval.
2.2.1.1 Observed
Federal Holidays
The Government observes the following holidays: New Year’s Day, Martin Luther King Jr.’s Birthday, President’s Day, Memorial Day, Independence Day, Labor Day, Columbus Day, Veterans’ Day, Thanksgiving Day, and Christmas Day.
2.2.1.2 Restriction to
Contractor Working Hours
If the Contractor wishes to work outside of the Government's regular working hours for the Contractor’s convenience, the Contractor shall submit a written Request to Work Outside Government’s Regular Working Hours per Section F.
Excludes work to be performed during specified hours.
2.2.2 Wage
Determinations
Wage Determinations are included in J-0200000-02.
2.2.3 Requirements
Hierarchy
Requirements or definitions specified in each spec item of this contract apply to subordinate paragraphs. For example, requirements shown in spec item 3.1 would apply to spec items 3.1.1, 3.1.2, 3.1.2.1 and so on.
Likewise, Performance Standards specified at a lower digit level (i.e. spec item 3.1.1, 3.1.2, 3.1.2.1) apply when performance is assessed at a higher tier (i.e., spec item 3.1) based on the composite work requirements.
2.3 General
Administrative Requirements
2.3.1 Required
Conferences and Meetings
The Contractor shall attend administrative and coordination meetings. The Contractor shall provide sign-in sheets and prepare minutes of all meetings and submit per Section F for review and comments. Comments received within two working days shall be incorporated into the minutes and a copy of the final revision shall be submitted per Section F for concurrence. Historically, there have been approximately four meetings per week.
2.3.2 Training for
Maintenance and Operation of New and Replacement Systems and Equipment
When construction, renovation, or repair work is performed by means other than this contract, the Contractor shall attend Government provided training, as applicable, for maintenance and operation of new and replacement systems and equipment at no additional cost to the Government.
2.3.3 Partnering To increase the likelihood of successful performance of this contract, the Government requires cohesive partnerships with its Contractors and subcontractors. Key stakeholders, including the supported commands who will receive services, principal individuals from NAVFAC, the performance assessment team, and representative(s) of the installation(s) will be invited to participate in the partnering process. Key members of the prime and sub-contractor teams, including senior management personnel must participate.
The partnership will draw on the strength of each organization in an effort to achieve quality contract services done right the first time, within the contract price, as scheduled, and without any safety mishaps.
Item
Title Description
Partnering should accomplish three goals:
- The first goal is to develop a cohesive team with common purpose, commitment and established communication processes.
- The second goal of partnering is contract specific, identifying risks and opportunities for the team to address.
- The third goal is to sustain the Partnership throughout the contract by identifying and addressing issues that affect the Partnership.
2.3.3.1 Formal
Partnering
The initial session should be scheduled concurrent with the Pre-Performance Conference and held no later than 30 days after award. The initial Partnering Meeting will be at least one day in duration and held at a neutral location off the installation that is acceptable to the Contractor and to the Government.
Follow-on sessions should be scheduled every three to six months and typically last a half day or less. The frequency, duration, and locations of follow-on sessions should be agreed to by both parties during the initial Partnering Meeting. The Contractor shall pay all costs associated with the partnering effort including facilitator, meeting room, and other incidental items. Before the partnering session, the Contractor shall coordinate with the facilitator the requirements for incidental items (audio-visual equipment, computer(s), two easels, flipchart paper, colored markers, note paper, pens/pencils, colored flash cards, etc.) and have these items available at the partnering session. The Contractor will provide copies of any documents used for the Partnering Meeting for distribution to all attendees. The facilitator must be acceptable to both the Contractor and the Government. The participants shall pay their own costs for meals, lodging, and transportation associated with partnering.
2.3.3.2 Contract
Partnering Administration
Upon award, the ACO will contact the Contractor, supported command(s), Region, and Installation(s) stakeholders, and the performance assessment team to discuss implementation of partnering. Commence discussions with the Contractor to select a facilitator and location that are acceptable to both partners A partnership agreement, The Charter, should be in place as early as possible so issues arising, even before work begins, can be resolved using the issues resolution process. Replacement of Core Management Team members (stakeholders who attended the initial session and manage the contract work day-to-day) is discouraged since it will disrupt the synergy that has been developed. If replacement of a team member proves to be unavoidable, a follow-on partnering session must be held to officially turn the responsibilities of the position over to the new member.
The Core Management Team consisting of the attendees below must be present during the initial and all follow-on partnering sessions. These are the core mandatory attendees. Other stakeholders may attend if they desire or as recommended by the partners.
2.3.3.3 Contract
Partnering Session Attendees
The Contractor shall bring the necessary personnel to successfully partner on this contract. Asterisk indicates mandatory personnel.
* President/Vice President
* Project Manager
* Quality Manager
* Site Safety and Health Officer Sub-contractor Reps
2.3.4 Permits and
Licenses
The Contractor shall obtain all required permits, licenses, and authorizations to perform work under this contract and comply with all the applicable Federal, state and local laws and regulations. The Contractor shall submit copies of Permits and Licenses per Section F.
Item
Title Description
2.3.5 Insurance The Contractor shall submit a Certificate of Insurance per Section F as evidence of the existence of the following insurance coverage in amounts not less than the amounts specified below in accordance with the FAR Clause
52.228-5, INSURANCE – WORK ON A GOVERNMENT INSTALLATION.
This insurance must be maintained during the performance period.
2.3.5.1 Certificate of
Insurance
The Certificate of Insurance shall provide for at least 30 calendar days written notice to the KO by the insurance company prior to cancellation or material change in policy coverage. Other requirements and information are contained in the aforementioned insurance clause.
2.3.5.2 Minimum
Insurance Amounts
The Contractor shall procure and maintain, during the entire period of performance under this contract, the following minimum insurance coverage:
Comprehensive General Liability: $500,000 per occurrence
Automobile Liability: $200,000 per person, $500,000 per occurrence, $20,000 per occurrence for property damage
Workmen's Compensation: As required by Federal and state worker's compensation and occupational disease statutes
Employer's Liability coverage: $100,000, except in states where worker's compensation may not be written by private carriers
Other as required by state law
2.3.6 Protection of
Government Property
During execution of the work, the Contractor shall protect Government property. The Contractor shall return areas damaged as a result of negligence under this contract to their original condition at no cost to the Government.
2.3.7 Government
Information Technology (IT) System
The Navy uses Navy Marine Corps Internet (NMCI) for Information Technology (IT) systems. Additional information about NMCI may be obtained at https://www.homeport.navy.mil/
2.3.8 Directives, Instructions, and References
Department of Defense (DoD), Secretary of the Navy (SECNAV), Chief of Naval Operations (OPNAV), and other applicable Directives, Instructions, and References are listed in J-0200000-03. The Contractor shall comply with the most current version of directives, instructions, and references including versions published during the term of the contract.
2.3.9 Invoicing
Procedures
Refer to Section G for invoicing instructions.
2.4 Government-
Furnished Property, Materials and Services
2.4.1 Government-
Furnished Facilities (GFF)
The Government will furnish or make available to the Contractor the facilities listed in Attachment J-0200000-04. In addition, the Contractor will be allocated 5 parking spaces in front of Building 38 and 2 parking spaces in front of Building 2. The Contractor shall maintain all pavement striping and identification of the reserved parking spaces.
The Contractor shall maintain all shops, material storage, buildings, structures, and all other areas furnished for the performance of this contract in a clean, Item
Title Description neat, orderly and sanitary condition. Contractor shall update (sign-off) fire extinguishers and comply with NAVFAC MIDLANT Instruction 11320.11.
The Contractor shall provide all housekeeping, interior painting, maintenance, repair, and related materials. Contractor maintenance and repair liability for GFF under the firm fixed price portion of the contract shall be limited to that specified for service orders.
The Contractor shall dispose of refuse, waste material, garbage, rubbish and debris on a daily basis. Prior to making any alterations to Government furnished facilities, the Contractor shall obtain written approval from the KO. Upon completion of the contract, all facilities shall be returned to the Government in the same or better condition as received, except for reasonable wear. The Contractor shall be liable for the cost of any repairs caused by negligence or abuse on its part, or on the part of its employees.
2.4.2 Government-
Utilities
The Government will furnish water and electricity at existing outlets required for the work to be performed under the contract. The Contractor shall provide and maintain, at its expense, the necessary service lines from the existing Government outlets to the work site. Provide and maintain backflow prevention devices on connections to domestic water lines and electrical transformer provisions on connections to electric lines. Meet all Federal, State, local, and installation codes and regulations for backflow prevention devices and electrical transformer provisions. Services required by the Contractor, for which there are no available Government outlets, shall be provided by the Contractor at no cost to the Government.
The Government will provide 8 local telephone lines without instruments.
These lines will not have long distance or toll capabilities. Information concerning the location of existing outlets may be obtained from the KO upon award of this contract.
The Contractor shall ensure the most effective and efficient use of utilities by its employees to conserve energy and financial resources. The Installation Energy Management Program, Water Conservation Programs and energy reduction requirements shall be followed to reduce and eliminate waste of utilities.
2.4.3 Government-
Furnished Materials
(GFM)
The Government will not provide materials for the Contractor’s use on this contract.
2.4.4 Government-
Equipment
(GFE)
The Government will not provide equipment for the Contractor’s use on this contract.
2.4.5 Government-
Furnished Services (GFS)
The Government will not provide services to the Contractor on this contract.
2.5 Contractor-
Furnished Items
Except for items identified as Government Furnished, the Contractor shall provide all equipment, materials, parts, supplies, components, and facilities to perform the requirements of this contract. The KO may inspect Contractor-furnished items for adequacy and compliance with contract requirements.
Inadequate or unsafe items shall be removed and replaced by the Contractor at
Item
Title Description no cost to the Government. Materials containing asbestos, lead, and polychlorinated biphenyls (PCBs) shall not be brought onsite. Energy efficient tools and equipment shall be used when available. The KO may at any time require Samples, Safety Data Sheets (SDS) or Manufacturer’s Data Cut Sheets of Materials used in this contract.
2.6 Management The Contractor shall manage the total work effort associated with the services required herein to meet the performance objectives and standards. Such management includes but is not limited to planning, scheduling, cost accounting, report preparation, establishing and maintaining records, and quality assurance. The Contractor shall provide a staff with the necessary management expertise to ensure performance objectives and standards are met.
2.6.1 Safeguarding
Information
The Contractor shall safeguard controlled unclassified information and information associated with Government property in accordance with the latest revision of CNSSI 1253, DoDI 8582.01, NIST SP 800-53, NIST SP 800-171, SECNAV Defense Industrial Base (DIB) Memo, and applicable contract clauses. At a minimum, this information shall be protected at the moderate confidentiality level as defined in NIST SP 800-171.
Contractor information and data systems that contain information associated with Government property shall comply with DoD Risk Management Framework (RMF) and shall not contain any information associated with Government property beyond that included in attachments: J-0200000-05 Service Provider Information.
The Contractor shall develop Plans of Action and Milestones (POA&Ms) per NIST SP 800-171, track accomplishment, and submit to the Government per Section F.
If cybersecurity incident is encountered or suspected related to any (Contractor or Government) Information Technology (IT) or Operating Technology (OT) systems, including Monitoring and Control Systems, the Contractor shall notify the Government per Section F.
2.6.2 Work Reception The Contractor shall provide the capability to receive, prioritize, correspond, and respond to trouble/service calls and task orders during Government regular working hours and provide a point of contact at a local or toll free number who can perform the above function during other than Government regular working hours. Telephone message service or device is not acceptable. The Contractor shall immediately notify the KO of any change in the telephone number(s).
2.6.3 Work Control The Contractor shall implement all necessary work control procedures to ensure timely accomplishment of work requirements, as well as to permit tracking and reporting of work in progress. The Contractor shall plan and schedule work to assure material, labor, and equipment are available to complete work requirements within the specified time limits and in conformance with the quality standards established herein. Verbal scheduling and work status updates shall be provided when requested by the KO. A status update of any item of work must be provided two hours of the inquiry during regular working hours, and by 0800 the following work day for inquiries after regular working hours.
2.6.4 Work Schedule The Contractor's work shall not interfere with normal Government business. In those cases where some interference is unavoidable, the Contractor shall minimize the impact and effects of the interference. The Contractor shall provide advance access of all of its work schedules to the Government. The
Item
Title Description
Contractor shall notify the KO of any difficulty in scheduling work due to Government controls. The notification shall include, at a minimum, the following:
• The date and time the work was initially coordinated.
• The name and phone number of the Government person with whom the work was initially coordinated.
• The name and phone number of the Government person who prevented the work from being performed as previously coordinated.
• The alternative date and time the Government person requested the work be accomplished.
2.6.5 Deliverables Deliverable requirements are specified in Sections C, F, H, I, J, and within the Directives, Instructions, and References. The Contractor shall submit accurate and complete documents within the specified timeframes. The Contractor shall revise/modify deliverables and reports, as directed by the KO, at no additional cost to the Government.
Except where otherwise specified, all deliverables shall be submitted electronically in a Microsoft Office Version 2010 compatible format.
Deliverables shall include the company name, contract number, contract title, date, and shall be unprotected and capable of being sorted by CLIN, work order number, asset number, section, annex/sub-annex, spec item and ELIN/Sub- ELIN or clause. All formulas shall be traceable.
Government acceptance of deliverables shall not relieve the Contractor of the responsibility for any error or omission which may exist in the deliverable, as the Contractor is responsible for all requirements of this contract.
The Contractor shall establish and maintain a secure website for posting an electronic copy of all deliverables listed in Section F. The Contractor shall allow only authorized Government and Contractor personnel to access the website. Government personnel access shall be limited to viewing and downloading of deliverables, but restricted from posting to the website. The Contractor shall notify the Government by email whenever there are new or updated deliverables posted to the website. Each deliverable posting on the website and each email notification shall include the title of the deliverable, the spec item requiring the deliverable, and the date and time the deliverable was posted. All deliverables shall be available to authorized Government personnel 24 hours/day and 365 days/year for the duration of the contract.
2.6.6 Service
Interruptions
If any utilities or other services must be discontinued (even temporarily) due to scheduled contract work, the Contractor shall notify the KO, affected tenants, and customers in accordance with local procedures. If the discontinued service is due to an emergency breakdown the Contractor shall notify the KO, affected tenants and customers as soon as practicable and provide the status of repairs, as directed by the KO, until normal operation is restored.
Scheduled utility outages and interruptions to equipment, system(s) operation, or other services shall be scheduled after hours of operation.
Work other than Emergency or Urgent service orders requires (even temporarily) to discontinue any utility or service that effect station activities or reduces heating or air conditioning services, the Contractor shall file, via KO, an outage request a minimum of 10 working days prior to the scheduled outage.
Item
Title Description
The request shall define the affected area, include the time the outage shall occur and an estimate of when normal service is to be resumed.
The Contractor shall participate in planning work that may affect installed systems for which the Contractor is responsible and may include outages by other contractors or Government activities. The Contractor shall provide knowledgeable personnel to attend outage meetings as required at no additional cost to the Government.
The Contractor shall shut-down, restart, and perform operational checks on all equipment affected by both scheduled and unscheduled utility outages and service interruptions, at no additional cost to the Government.
2.6.7 NAVFAC
MAXIMO
MAXIMO is the Computerized Maintenance Management System (CMMS) used by the Government for work order history, asset management, and condition assessment. The Contractor shall provide all required data for NAVFAC MAXIMO as identified below:
2.6.7.1 NAVFAC
MAXIMO Data
Required data fields for work orders are indicated in the Service Provider Information provided in J-0200000-05. Asset inventory data requirements are indicated in the Asset Information provided in J-0200000-06, including additional data for Utilities assets listed in Specification Information in J- 0200000-07. Required data for documenting condition assessments is indicated in the Characteristic Meter Reading Information provided in J-0200000-08.
Specified data shall be provided for all work performed in 1501000 Facility Management, 1502000 Facility Investment, 1601000 Utilities Management, 1602000 Electrical, 1604000 Wastewater, 1605000 Steam, 1606000 Water.
Further instructional information detailing the process for submitting the specified information for NAVFAC MAXIMO Data Reporting is provided in J- 0200000-09.
The Service Provider, Asset, Specification, and Characteristic Meter Reading Interfaces are used in multiple processes for loading data into MAXIMO by the Government and the format may be updated periodically.
As part of the update the Contractor may be asked to modify the file to add/move columns in their submission. The Contractor also shall provide up to 10 extra data elements or columns with as many as 150 characters per element for the Government to define during contract performance at no additional cost to the Government. The Government will provide the Contractor 60 calendar days’ notice of modifications to the Service Provider, Asset, Specification, or Characteristic Meter Reading Interfaces file format.
2.6.7.2 NAVFAC
MAXIMO
Method of Data Entry
The Contractor shall provide data for NAVFAC MAXIMO using the methods detailed below:
The Contractor shall manually enter required work order and condition assessment data directly into NAVFAC MAXIMO. The Contractor shall ensure all information is updated by the end of each workday for all work performed.
If the Contractor does not have access to NAVFAC MAXIMO at contract start, work order and condition assessment data shall be submitted in a pipe delimited flat-file following the NAVFAC MAXIMO Data Reporting process described
Item
Title Description in J-0200000-10 per Section F. Any failures in processing of the flat-file shall be corrected and resubmitted by the Contractor. In order to demonstrate the ability to properly format the flat-file, the Contractor shall provide a Sample Pipe Delimited Flat-file prior to contract performance per Section F. Flat file submission of work order and condition assessment data will be allowed for a period not to exceed six months unless an extension is approved in writing by the KO.
The Contractor shall submit asset and specification data in a spreadsheet flat-file following the NAVFAC MAXIMO Data Reporting process described in J- 0200000-10 per Section F.
2.6.7.3 NAVFAC
MAXIMO
Access
The process for obtaining access and establishing MAXIMO accounts are detailed in the NAVFAC MAXIMO System Access Procedures provided in J- 0200000-10.
Once accounts have been established, MAXIMO can be accessed at https://maximo.navfac.navy.mil.
The Contractor shall provide all necessary computer equipment and Internet Service Provider (ISP) accounts to access MAXIMO for Direct Entry of required data.
A maximum of five MAXIMO accounts will be approved for the Contractor.
Changes of personnel requiring MAXIMO accounts more than once per year may result in required compensation to the Government for the administrative costs in processing account requests.
The Contractor shall submit a list of personnel requiring MAXIMO accounts per Section F.
2.6.7.4 NAVFAC
MAXIMO
Training
The Government will provide or make available initial training on NAVFAC MAXIMO to Contractor personnel responsible for direct entry of work order, asset, specification, and condition assessment data. Additional training will be provided by the Government when there are significant changes to the NAVFAC MAXIMO software or data entry requirements. Training due to changeover of personnel will be the responsibility for the Contractor. The Contractor will be provided a general user guide, local instructions, and other materials by the Government as reference material for the use of NAVFAC
MAXIMO.
2.6.8 Quality
Management System (QMS)
The Contractor shall establish and maintain a complete QMS program in accordance with the provisions specified herein. The Contractor’s QMS program shall provide an effective and efficient means of identifying and correcting problems throughout the entire scope of operations. The Contractor's QMS program shall address:
• Accurate documentation of work processes, procedures, and output measures.
• A systematic procedure for assessing compliance with performance objectives and standards.
• Accurate documentation of quality inspections and surveillance conducted throughout the execution of work.
• Assessment-driven corrective actions and process adjustments as
Item
Title Description appropriate in a timely manner.
2.6.8.1 Quality
Management (QM) Plan
The Contractor shall develop and submit a QM Plan per Section F. The QM Plan shall describe the QMS methodology and approaches used under this contract. As part of the acceptance process the QC Manager shall provide the Government a presentation of the Contractors QM Plan and jointly complete the Government’s QMS Pre-Performance Review Checklist. If any changes are made during the period of performance, the Contractor shall submit the revised QM Plan for acceptance per Section F.
The Contractor’s QM Plan shall include, at a minimum, the following:
• Policy and objectives of Quality Management System (QMS)
• Quality organization o List of personnel o Responsibilities & lines of authority o Training and qualifications
• Approach to assuring quality of services provided and conformance with performance objectives and standards
• Methods and procedures for effective planning, operation and control of processes and performance of work
• Procedures for inspection and surveillance of services o Scheduling and performance of inspection and surveillance o Measurement, data collection and analysis o Corrective action, preventive action, and continuous improvement o Oversight of subcontracted work
• Documentation and records management
• Communication with government (customers)
2.6.8.2 Quality
Inspection and Surveillance
The Contractor shall establish and maintain an inspection and surveillance system in accordance with the FAR Clause 52.246-4, INSPECTION OF SERVICES – FIXED PRICE, to ensure that the work performed conforms to the contract requirements. The Contractor shall document and maintain a file of all scheduled and performed inspections and surveillances, inspection and surveillance results, and dates and details of corrective and preventive actions.
The quality inspection and surveillance file shall be the property of the Government and made available during the Government’s regular working hours. The file shall be submitted to the KO after termination of the contract per Section F.
2.6.8.3 Quality
Inspection and Surveillance Report
The Contractor shall submit a copy of the Contractor Quality Inspection and Surveillance Report per Section F. The Contractor Quality Inspection and Surveillance Report shall include narrative of events; a tabulated summary and results of the quality inspection and surveillance events performed and inspection -driven corrective actions taken and the results attained; and management process adjustments during the previous month. The Government may adjust the frequency of the submittal based on the Contractor’s quality of performance.
2.6.9 Property
Management Plan
The Contractor shall establish and maintain a plan that meets the contract clause requirements of Specification Item 2.4, Government-Furnished Property, Materials and Services, of this Annex. This plan shall identify the Contractor’s policies, procedures, and practices in receiving and performing physical inventories, key control, repairing and maintaining, preserving and protecting, and reporting the disposition of accepted government property in its possession.
The Property Management Plan shall be submitted per Section F.
2.6.10 System and The Contractor shall maintain the integrity and performance of existing energy
Item
Title Description
Equipment Replacement saving, water conservation or other sustainability design features of systems and equipment in the performance of repair and replacement work. Except where otherwise specified, replacement components shall be of the same model/style or equivalent as the component being replaced. Substitutes for replacement components must be accepted by the KO prior to use. The KO will furnish available information for the existing systems and equipment.
2.7 Personnel
Requirements
The Contractor shall comply with the personnel requirements stated below.
2.7.1 Key Personnel The Contractor shall submit a List of Key Personnel and Qualifications per Section F. The Contractor shall provide any additional information requested by the KO or COR, necessary to certify their qualifications.
The Contractor shall submit an Organizational Chart per Section F showing lines of authority of the key personnel and on-site supervisor(s) for this contract. The chart shall include names of personnel and their position title in this contract. As a minimum, include the PM, Quality Manager, SSHO, and on-site supervisor(s) and who they will report directly to for this contract. The key personnel shall be revised as applicable for the contract.
2.7.1.1 Project Manager
(PM)
The Contractor shall provide a PM and designated alternate, as applicable, who has the have full authority to act for the Contractor on all contract matters relating to this contract. The PM or alternate shall be on-site during the Government's regular working hours and shall be available on-site within one hour after the Government's regular working hours.
The PM shall have at least five years of experience in managing a workforce providing services on contracts of similar size, scope, and complexity.
2.7.1.2 Quality
Manager
The Contractor shall provide a Quality Manager or designated alternate shall be on-site during the Government's regular working hours and shall be available on-site within two hours after the Government’s regular working hours. The QM shall have full authority and responsibility for assuring quality objectives and standards identified in this contract are met. The Quality Manager must report directly to a senior corporate official and shall not report directly to the Project Manager.
The Quality Manager shall have fulfilled the following pre-requisite training and experiences before being hired as the Quality Manager under this contract:
The Quality Manager shall have at least five years of experience in preparing and enforcing QMS programs on contracts of similar size, scope and complexity. The Quality Manager shall not have any duties other than QM .
2.7.1.3 Site Safety and
Health Officer
(SSHO)
The SSHO must meet the requirements of EM 385-1-1 Section 1 and ensure that the requirements of 29 CFR 1926.16 are met for the project. Provide a Safety oversight team that includes a minimum of one Competent Person at each project site to function as the Site Safety and Health Officer (SSHO). The SSHO or an equally-qualified Designated Representative/alternate shall be on-site at all times when work is being performed to implement and administer the Contractor's safety program and government-accepted Accident Prevention Plan. The SSHO's training, experience, and qualifications shall be as required by EM 385-1-1 paragraph 01.A.17, entitled SITE SAFETY AND HEALTH OFFICER (SSHO), and all associated sub-paragraphs.
A Competent Person shall be provided for all of the hazards identified in the
Item
Title Description
Contractor's Safety and Health Program in accordance with the accepted Accident Prevention Plan, and shall be on-site at all times when the work that presents the hazards associated with their professional expertise is being performed. Provide the credentials of the Competent Persons(s) to the Contracting Officer for acceptance in consultation with the Safety Office.
The Contractor shall provide a SSHO whose primary duty and responsibility is to prepare and enforce the Contractor’s safety program on this contract. The SSHO shall have fulfilled the following pre-requisite training and experiences before being hired as the SSHO under this contract:
The SSHO shall have completed five years of satisfactory experience in preparing and enforcing safety programs on contracts of similar size and complexity in the past or three years’ experience if he possesses a Certified Safety Professional (CSP) or safety and health degree. The SSHO shall have completed the OSHA 30-hour construction safety class or equivalent and maintain competency through 24 hours of formal safety and health related coursework every four years. The SSHO shall not have any duties other than
SSHO .
2.7.1.4 Environmental/
Energy Manager
The Contractor shall provide an Environmental/Energy Manager whose primary duty and responsibility is to ensure Contractor operations adhere to the goals and policies of the…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .