J-1601000 Amendment 0004.pdf
PDF 1 MB Posted
- Solicitation number
- N62470-19-R-2004
About this file
This document contains an amendment to a federal contract solicitation for base operations support services. The solicitation is for base operations support services at the Naval Support Activity Northwest Annex in Chesapeake, Virginia. The solicitation is being issued by the Naval Facilities Engineering Command and includes requirements for utilities management, facilities management, and engineering services to support the base. Attachments to the solicitation provide details on historical workload, outage reporting guidelines, meter inventories, asset tagging procedures, and degradation indices for utilities infrastructure. The document also references a spreadsheet listing historical utility service orders and a control systems inventory.
View the file
Other files
Show 40 more
Latest 50 of 105 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SECTION J
DOCUMENTS, EXHIBITS, AND OTHER ATTACHMENTS
TABLE OF CONTENTS
ATTACHMENT NUMBER ATTACHMENT TITLE
J-1601000-01 Points Of Demarcation
J-1601000-02 Definitions and Acronyms
J-1601000-03 References and Technical Documents
J-1601000-04 Utility Outage Reporting Requirements
J-1601000-05 Historical Utility Service Order Workload
J-1601000-06 Historical Utility Project Work Order Workload Reserved
J-1601000-07 Meter Inventory
J-1601000-08 Service Desk Guide for Utility Outages
J-1601000-09 Utility Asset Tagging Guidance
J-1601000-10 Specification Attributes
J-1601000-11 Utilities Energy Management-Degradation Index (UEM-DI)
J-1601000-12 Utility Control Systems Inventory
ATTACHMENT J-1601000-01
POINTS OF DEMARCATION
ATTACHMENT J-1601000-02
DEFINITIONS AND ACRONYMS
DEFINITION DESCRIPTION
Assessment A general term referring to either a survey or inspection of a facility to determine condition.
Asset A general term used to refer to an item, such as a component, system, building or facility, that is managed by an automated data management program, e.g., FCAP.
Business Management System (BMS)
A web-based tool that provides a systematic method for the management of business processes, common practices, and process quality improvements that produce and support the most efficient and effective delivery of NAVFAC’s products and services.
Utility Investment Strategy
The Contractor shall engage in the Navy’s utility investment strategy to provide efficient and effective utilities that directly support warfighter readiness at the lowest possible life cycle cost, while maintaining fully functional capabilities.
Utilities Maintenance Management
The planning, prioritizing, organizing, controlling, reporting, evaluating, and adjusting of utility maintenance operations to support the CNO/NAVFAC utilities policy and objectives and satisfy customers’ facility needs. Defined by the International Facility Management Association as “the practice of coordinating the physical workplace with the people and work of the organization.”
Integrated Maintenance Plan
IMP is a recurring state-of-the-art, reliability-centered inspection, testing, maintenance and repair program that determines best practices for managing the functions and consequences of failures of facilities equipment and system components. IMP encompasses accepted commercial practices, including reactive, preventive, predictive and proactive maintenance, into one optimal program. The IMP approach gives the Contractor full responsibility to maintain systems and equipment and perform repairs whenever necessary to ensure equipment and systems are operational and remain in a constant state of readiness.
In-house Performed by Government employees.
Inspection A rigorous, detailed assessment of the condition of a facility performed to generate a fundable scope and cost estimate for prioritization and funding of maintenance and repair.
Job or Work Order An authorization for work that requires planning and estimating and has an individual line of accounting for financial and performance evaluation.
Planned utility outage A Planned Utility Outage is a scheduled utility service interruption at or before the utility service point affecting at least one occupied facility, pier, or berth. Service/Trouble Desk personnel gather pertinent information prior to the outage event and from the field after the event, and record the outage event in the MAXIMO Work Order Outage Log. These events REQUIRE PLANNING AND COORDINATION WITH AFFECTED CUSTOMERS at a minimum 10 days for routine and 3-4 days for urgent requests in advance of the outage.
NOTE: Planned utility outages that occur without notification to proceed after a request to defer the outage cannot be met are reclassified as unplanned utility outages.
Reportable utility outage
A reportable utility outage is defined as a loss of NAVFAC delivered utility services to an occupied facility, pier or berth that is greater than 5 minutes in duration. Utility system failures that do not cause a disruption of services to occupied facilities, piers, or berths are not considered an outage.
Supervisory Control And Data Acquisition
(SCADA)
A version of telemetry commonly used in wide-area industrial applications, such as electrical power generation and distribution and water distribution, which includes supervisory control of remote stations as well as data acquisition from those stations over a bidirectional communications link.
Service Point The service point is the point of connection between the serving utility and the facility and is also the ’Point of Demarcation’ where ownership changes. This is the transition between NAVFAC UEM and customer funding for maintenance and repair services on equipment.
ATTACHMENT J-1601000-02
DEFINITIONS AND ACRONYMS
DEFINITION DESCRIPTION
Unplanned Utility Outage
An Unplanned Utility Outage is an unscheduled utility service interruption at or before the utility service point affecting at least one occupied facility, pier, or berth, and lasting longer than 5 minutes in duration. Service/Trouble Desk personnel enter information from the field about the incident, response, and the repair in a MAXIMO Work Order Outage Log.
ACRONYM TITLE
AIS Automated Information System AMI Advanced Metering Infrastructure ANSI American National Standards Institute ArcGIS A geographic information system for working with maps and geographic information developed by ESRI.
BCS Building Control System CIRCUITS Centralized and Integrated Reporting for the Comprehensive Utilities DI Degradation Index DDC Direct Digital Control Systems ESRI Environmental Systems Research Institute FPOC Facility Point of Connection GIG Global Information Grid GIS Geographic Information System ICS Industrial Control Systems IMP Integrated Maintenance Program iNFADS Internet Navy Facilities Assets Data Store SCADA Supervisory Control And Data Acquisition STIG Security Technical Implementation Guide WIB Work Induction Board WIS Work Induction System UEM Utilities and Energy Management UEM-DI Utilities and Energy Management Degradation Index UICAP Utilities Infrastructure Condition Assessment Program COF Consequence of Failure LOF Likelihood of Failure UEM Utility Energy Management UFC Unified Facilities Criteria UMIG Utilities Mission Integration Group UCS Utility Control System
ATTACHMENT J-1601000-03
REFERENCES AND TECHNICAL DOCUMENTS
Reference Title
MO-221 Utilities Metering
MO-321 Facilities Management
MO-209 Engineering Criteria
OPNAVINST 5100.23G Navy Occupational Safety & Health Program Manual
ATTACHMENT J-1601000-04
UTILITY OUTAGE REPORTING REQUIREMENTS
In accordance with the NAVFAC MAXIMO data requirements provided in Spec Item 2.6.6 in Annex 0200000, the Contractor shall include the following information for work order data related to utility outages:
• Utility outage responding personnel will report the number of buildings and pier berths affected by the outage to the Service/Trouble Desk.
• Update outage information and actions taken to restore service on Work Order as information becomes available to include: for example, Master System Affected, Outage Start Date, Number of Buildings Affected, Outage End Date, and outage cause. Once the work is completed, update records to add any missing data within 30 days and prior to work order close-out.
Utility Outage Cause Codes:
Code 0 - False Alarm - A False Alarm, determined not an outage
Code 1 - Commercial Power/Utility Loss - Outage caused when commercial service provider fails to supply a NAVFAC utility distribution system, such as a loss of generation
Code 2 - Weather - Outage caused by named storms, tornados, lightning strikes, flood, or during a severe weather warning / watch
Code 3 - Equipment Failure - Outage caused by failed circuits, transformers, breaks, leaks, etc.
Code 4 - Animal - Outage caused by animal/pest damage from birds, squirrels, reptiles, etc.
Code 5 - Vegetation - Outage caused by vegetation damage not due to severe weather, such as those due to neglecting to maintain of right of ways
Code 6 - Foreign Interference - Outage caused by excavation, customer interference, vandalism, etc.
Code 7 - Ship - Outage caused by actions aboard ship or by ship personnel
Code 8 - Operational Error - Unplanned outage caused by utilities personnel
Code 9 - Navy Power/Utility Loss – Outage by other utility causes, such as planned.
ATTACHMENT J-1601000-05
HISTORICAL UTILITY SERVICE ORDER WORKLOAD
See EXCEL Spreadsheet J-1601000-05 Utility Service Orders
ATTACHMENT J-1601000-06
HISTORICAL UTILITY PROJECT WORK ORDER WORKLOAD RESERVED
Samples of Service Order Work Orders
Description of work
Project Work Order Level 1
Provide two electricians for power outage May 20 21 2017
Provide and install booster pump on fuel line for boiler B-348
Project Work Order Level 2
Repair Main lift station B-67 soft start controller bad must be replaced.// had to be modified due to price increase on the soft start breaker
ATTACHMENT J-1601000-07
SERVICE DESK GUIDE FOR UTILITY OUTAGES
See PDF document J-1601000-07 Service Desk Guide for Utility Outages
ATTACHMENT J-1601000-08
METER INVENTORY
WATER METERS
Funding Activity: NAVFAC
Meter No. Facility No./Location Meter No. Facility No./Location 1 Bldg 14 46 705/707 Meadowlark 2 Bldg 267 47 701/703 Meadowlark 3 Bldg 352 48 1014/1016 Osprey 4 Bldg 344 49 901 Mockingbird 5 IAMS 50 903 Mockingbird 6 Bldg 399 51 900/902 Mockingbird 7 Bldg 397 52 904/906 Mockingbird 8 Bldg 257 53 905/907 Mockingbird 9 Bldg 431 54 909/911 Mockingbird 10 Bldg CG-01 55 908/910 Mockingbird 11 Bldg 360 56 912/914 Mockingbird 12 Bldg 238 57 916/918 Mockingbird 13 Bldg 310 58 920/922 Mockingbird 14 Bldg CG-03 59 924/926 Mockingbird 15 Bldg 366 60 917/919 Mockingbird 16 Bldg 351 61 913 Mockingbird 17 Bldg 237 62 915 Mockingbird 18 Bldg 383 63 800 Warbler 19 Bldg 280 64 802 Warbler 20 Bldg 374 65 801 Warbler 21 Security 66 803 Warbler 22 201 Garden 67 805/807 Warbler 23 103/105 Bobwhite 68 804 Warbler 24 401/403 Redwing 69 806 Warbler 25 405/407 Redwing 70 808/810 Warbler 26 400/402 Redwing 71 809/811 Warbler 27 404/406 Redwing 72 813/815 Warbler 28 408/410 Redwing 73 812/814 Warbler 29 412/414 Redwing 74 816/818 Warbler 30 416/418 Redwing 75 820/822 Warbler 31 600/602 Meadowlark 76 824 Warbler 32 604/606 Meadowlark 77 826 Warbler 33 608/610 Meadowlark 78 821/823 Warbler 34 601/603 Meadowlark 79 817/819 Warbler 35 605/607 Meadowlark 80 Galley 36 609/611 Meadowlark 81 Bldg 2 37 613/615 Meadowlark 82 Bldg 452 38 617/619 Meadowlark 83 Bldg 500, JRCF 39 612/614 Meadowlark 84 RV Campground 40 616/618 Meadowlark 85 Bldg 396 41 700/702 Meadowlark 86 Bldg 404 42 704/706 Meadowlark 87 Bldg. 390 43 708/710 Meadowlark 88 HSNG 1 44 712/714 Meadowlark 89 HSNG 2 45 716/718 Meadowlark 90 HSNG 3
ELECTRICIAL METERS
Meter No. Location
EM #1 Bldg 145 XFMR BACK OF BLDG
EM #2 ConTel Bldg
EM #3 CG-3 XFMR
EM #4 Bldg 366 XFMR
EM #5 Bldg 351 XFMR southside
EM #10 Bldg 237 XFMR
EM #11 Bldg 390 MEDICAL
EM #12 Bldg 383 XFMR
EM #13 Bldg 374 XFMR
EM #14 Bldg 280 XFMR
EM #15 POLE #2D-1
EM #16 POLE #2D
EM #17 Bldg 294 XFMR
EM #18 Bldg 2 SUB STATION
EM #20 Bldg 4 EXCHANGE
EM #21 Bldg 5 & Bldg 6
EM #22 Bldg 3 EAST WALL
EM #23 JRCF (Pole NO503WE74) ELSTER
EM #24 Bldg 38A XFMR
EM #25 B-342 XFMR (next to Bldg 144)
EM #26 Bldg 348 XFMR
EM #27 CG-1 XFMR
EM #28 Bldg 240 XFMR
EM #29 Bldg 295 NORTH WALL
EM #30 Bldg 14 TECH XFMR
EM #31 Bldg 14 NON TECH
EM #32 Bldg 404
EM #33 Bldg 14 EWOPFAC
EM #34 Bldg 141 XFMR
EM #35 Bldg 352 XFMR S-W CORNER
EM #36 Bldg 267 ON WALL
EM #37 Bldg 344 XFMR
EM #38 Bldg 363 RAYTHEON
EM #39 IAMS RANGE XFMR
Meter No. Location
EM #40 Bldg 41 PARKING LOT
EM #41 Bldg 41 R-108 TEC
EM #42 Bldg 41 R-108 NON TECH
EM #43 Bldg 41 R-185 TECH
EM #44 Bldg 41 R-185 NON TECH
EM #45 Bldg 31 XFMR WEST
EM #46 Bldg 301 XFMR
EM #47 Bldg 257 NATOSAT- COM SWITCHGEAR
EM #48 CG ANTENNA (remote) XFMR
EM #49 Bldg 441 HAZMAT BLDG
EM #50 Bldg 348 XFMR
EM #51 Bldg 348 POOL
EM #52 Bldg 348 MECH. RM
EM #53 Bldg 269 XFMR
EM #54 Bldg 238 XFMR Coast Guard BOAT SHOP
EM #55 Bldg 310 FSSC ADMIN
EM #56 Bldg 360 MARINE
EM #57 Bldg 65 OLD GYM
EM #58 Bldg 7 GALLEY
EM #59 Bldg 367 WATER TREATMENT
EM #60 Bldg 393 WAREHOUSE
EM #61 Bldg 431 WAREHOUSE
EM #62 Bldg 141 DISA ANTENNA
EM #63 Bldg 432 COMMUNITY BLDG
EM #64 NEW RECREATION AREA
EM #65 Bldg 2 XFMR
EM #66 Bldg 30 HAZMAT
EM #67 NIWA RUBB COMPOUND
EM #68 CAR WASH Bldg 397
EM #70 Bldg 66 Located in Bldg 7 SW-GEAR
EM #71 Groundwater Test Facility Meter
EM #72 131 MOUS Compound (Bldg 452 marked)
EM #73 Camp Ground
EM #74 Navy Exchange
ATTACHMENT J-1601000-09
UTILITY ASSET TAGGING GUIDANCE
The Contractor shall label all utility assets following the format below. All fields indicated align to asset data stored in MAXIMO.
ATTACHMENT J-1601000-10
SPECIFICATION ATTRIBUTES
CLASSIFICATION REQUIRED SPECIFICATION FIELD
Actuator Actuator Type
Actuator Rated Pressure
Actuator Rated Pressure UOM
AirDryer Air Dryer Type
Barscreen Bar Screen Type
BatterySystem Battery Role
BatterySystem Battery Type
BatterySystem Number Of Batteries
Boiler Type ID
Boiler National Board No.
Boiler Capacity
Boiler Capacity UOM
Boiler Primary Fuel Type
Boiler Secondary Fuel Type
Burner UL Number
Burner Fuel Type
CapacitorBank Cap Bank Type
CapacitorBank Control Type
CapacitorBank Install Type
CapacitorBank Nominal Voltage
CapacitorBank Voltage Class
CapacitorBank Total Bank KVAR
ChemicalAddtion Chemical Type
Chiller Capacity
Chiller Capacity UOM
Chiller Compressor Type
Compressor NFAID
Compressor Compressor Type
CondensateCollector Steam Condensate Collector Type
CondensateCollector Associated Line Type
ControlSystem Type
ControlSystem Voltage
ControlValve Type
ControlValve Diameter
ControlValve Diameter UOM
ControlValve Regulation Type
Classification Required Specification Field
ControlValve Material
DeaeratorAndStorageTank Deaerator Type
DeaeratorAndStorageTank Deaerator Capacity
DeaeratorAndStorageTank Deaerator Capacity UOM
DeaeratorAndStorageTank Storage Tank Volume
DeaeratorAndStorageTank Volume UOM
DeaeratorAndStorageTank Tank Material
DifferentialRelay Differential Relay Type
DifferentialRelay Calibration Date
DynamicProtectiveDevice Dyn Pro Dev Type
DynamicProtectiveDevice Device Control
DynamicProtectiveDevice Voltage Class
DynamicProtectiveDevice Interr Mechanism
DynamicProtectiveDevice Gang Operated
DynamicProtectiveDevice Interr Medium
DynamicProtectiveDevice Install Type
DynamicProtectiveDevice Nominal Voltage
ElectricLine Electric Line Type
ElectricLine Circuit Length
ElectricLine Length UOM
ElectricLine Voltage Class
ElectricLine Conductors per Phase
ElectricLine Install Type
ElectricLine Nominal Voltage
ElectricLine Radial Feeder
ElectricLine Cable in Conduit
ElectricMeter Electric Meter Role
ElectricMeter Meter Form
ElectricMeter Meter Class
ElectricMeter Nominal Voltage
ElectricPanel Panel Type
ElectricPanel Voltage
ElectricPanel Amp Rating
ElectricPanel Number Spaces
ElectroMechanicalRelay Relay Type
ElectroMechanicalRelay IEEE Device No
ElectroMechanicalRelay Calibration Date
ElectroMechanicalRelay Voltage Class
Enclosure Enclosure Type
Engine Driven Asset
Engine Fuel Type
ExpansionJoint Steam Exp Joint Type
ExpansionJoint Assoc Line Type
ExpansionJoint Diameter
ExpansionJoint Diameter UOM
ExpansionJoint Material
ExteriorLights Exterior Lights Type
ExteriorLights Nominal Voltage
ExteriorLights Light Ownership
ExteriorLights Wattage
ExteriorLights Lamp Type
ExteriorLights Quantity
Fan Fan Role
Filter Filter Type
Filter Filter Material
Filter Capacity
Filter Capacity UOM
Filter Rated Flow
Filter Rated Flow UOM
GearDrive Shaft Alignment
GearDrive Rated Power
GearDrive Power UOM
Generator Rated KW
Generator Generator Type
Generator Voltage Class
Generator Nominal Voltage
GreaseTrapAndOilWaterSeparator Pretreatment Device Type
GreaseTrapAndOilWaterSeparator System Type
GreaseTrapAndOilWaterSeparator Material
GritRemoval Grit Removal Type
Ground Grounding Device Type
Ground Ground Type
HeatExchanger Heat Exchanger Role
Hydrant Year Manufactured
Hydrant Bonnet Color
Hydrant Material
Hydrant Hydrant Type
Hydrant Seat Diameter
Hydrant Diameter UOM
Instrumentation Instrumentation Type
Insulator Insulator Type
Insulator Insulator Material
Insulator Install Type
Insulator Voltage Class
IonExchangeUnit Capacity
IonExchangeUnit Capacity UOM
LVBreakerPanel Install Type
LVBreakerPanel Nominal Voltage
LVBreakerPanel Wire
LVBreakerPanel Rated Ampacity
LVBreakerPanel Number Phases
LVBreakerPanel Number Spaces
LVBreakerPanel Spaces Filled
MechanicalMeter Mech Meter Role
MechanicalMeter Mech Meter Billing Type
MechanicalMeter Remote Read Indicator
MechanicalMeter Material
MechanicalMeter Meter Type
Mixer Mixer Type
Motor Motor Type
Motor Motor Control Type
Motor RPM
Motor Rated HP
Motor Nominal Voltage
Motor Voltage Class
OvercurrentRelay Overcurrent Relay Type
OvercurrentRelay Calibration Date
Pipe Service Area
Pipe Line Type
Pipe Pipe Length
Pipe Pipe Length UOM
Pipe Material
PowerInverter Nom. Input Volt.
PowerInverter Nom. AC Volt. Out
PowerInverter Cont/Nom Pwr Out.
Pump Type
Pump Submersible Indicator
Pump Rated Flow
Pump Rated Flow UOM
Pump Mechanical System Type
Pump Material
Receptacle Receptacle Type
Receptacle Install Type
Receptacle Voltage Class
Receptacle Nominal Voltage
Receptacle Rated Ampacity
ReliefValve Type
ReliefValve Diameter
ReliefValve Diameter UOM
ReliefValve Material
RotatingBiologicalContactor Capacity
RotatingBiologicalContactor Capacity UOM
ShorePowerBox Shore Power Box Type
ShorePowerBox Voltage Class
ShorePowerBox Nominal Voltage
ShorePowerBox Install Type
SolidStateRelay Relay Type
SolidStateRelay IEEE Device No
SolidStateRelay Calibration Date
SolidStateRelay Voltage Class
Stack Material
Stack Height
Stack Height UOM
Stack Mult. Boilers
Stack Mounting System
StaticProtectiveDevice Device Type
StaticProtectiveDevice Install Type
StaticProtectiveDevice Voltage Class
SupportStructure Structure Material
SupportStructure Supp Struct Type
SupportStructure Thermal Support Type
SurfaceStructure Structure Material
SurfaceStructure Surface Structure Type
SwitchUnit Switch Type
SwitchUnit Voltage Class
SwitchUnit Sw Insul Medium
SwitchUnit Nominal Voltage
SwitchUnit Gang Operated
SwitchUnit Install Type
SystemValve Type
SystemValve Diameter
SystemValve Diameter UOM
SystemValve Material
Tank Type
Tank Material
Tank Contents
Tank Volume
Tank Volume UOM
Transformer TransformerType
Transformer Rated KVA
Transformer Install Type
Transformer Nominal HV
Transformer HV Protection
Transformer Nominal LV
Transformer CoolingType
Transformer HSide Taps
Trap Type
TreatmentProcessStructure Capacity
TreatmentProcessStructure Capacity UOM
UndergroundStructure Underground Struc Type
UndergroundStructure Structure Material
VoltageRegulator Volt Reg Type
VoltageRegulator Install Type
VoltageRegulator Rated KVA
VoltageRegulator Nominal Voltage
Well Rated Flow
Well Rated Flow UOM
ATTACHMENT J-1601000-11
UTILITIES ENERGY MANAGEMENT-DEGRADATION INDEX (UEM-DI)
Likelihood Category Degradation Index
F ul ly F un ct io na l
Negligible = 1 No noticeable defects. Some aging or wear may be visible. Fully functional.
Not Likely = 2 Only minor deterioration or defects are evident. Noticeable wear or aging is visible. Fully functional. Minor maintenance may be required.
Possible = 3 Deterioration or defects are evident. Function is not significantly affected. Minor repairs are required.
F un ct io n A ffe ct ed
Likely = 4 Serious deterioration or defects in at least some portion of the asset.
Function is significantly affected. Extensive repairs or replacement are required.
Very Likely = 5 Extensive deterioration or defects in the asset. Not functional, barely functional, or beyond repair.
ATTACHMENT J-1601000-12
UTILITY CONTROL SYSTEMS INVENTORY
See EXCEL spreadsheet J-1601000-12 Utility Control Systems Inventory
File details come from the government source that posted it. Updated .