N6247019R2004 AMD 0004.pdf
PDF 216 KB Posted
- Solicitation number
- N62470-19-R-2004
About this file
This is an amendment to a solicitation for base operations support services at Naval Support Activity Northwest Annex in Chesapeake, Virginia. The amendment revises specification item 1601000 in section C to remove sections addressing project work orders. It also deletes attachment J-1601000-06 and releases a new attachment J-0200000-18 to reflect these changes. The services required include utility management, operations and maintenance, custodial services, pest control, refuse collection and disposal, grounds maintenance, roads and grounds, equipment operations, and environmental services. The period of performance is one base year with four one-year options. The solicitation is open to small businesses and requests pricing for recurring and non-recurring work. The Naval Facilities Engineering Command is the contracting agency.
View the file
Other files
Show 40 more
Latest 50 of 105 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
BASE OPERATIONS SUPPORT (BOS) SERVICES AT NAVAL SUPPORT ACTIVITY NORTHWEST ANNEX (NWA) CHESAPEAKE, VIRGINIA
This amendment is issued to revise spec item 1601000 in section C, to revise attachment J-1601000, and to issue revised attachment J-0200000-18 Amendment 0004.
PLEASE SEE BLOCK 14 CONTINUATION PAGE FOR FURTHER DETAIL.
CS: Alex Cloud, thomas.cloud@navy.mil
1. CONTRACT ID CODE PAGE OF PAGES
J 1 17
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 23-Jan-2020
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X N6247019R2004
X 9B. DATED (SEE ITEM 11)
31-Dec-2019
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
23-Jan-2020
CODE
NAVFAC ATLANTIC
6506 HAMPTON BLVD
NORFOLK VA 23508-1278
N62470 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
N6247019R2004
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION SF 30 - BLOCK 14 CONTINUATION PAGE
The following have been added by full text:
AMENDMENT 0004
The purpose of this amendment is to disseminate the below information.
1.) Section C – Specification Item 1601000 is revised to remove the sections addressing project work orders.
Please note that revisions are provided by the use of red font; deletions are indicated by the use of red strikethrough font.
2.) Section J – Attachment J-1601000-06 within Attachment J-1601000 has been deleted and is now reserved.
Please note that revisions are provided by the use of red font; deletions are indicated by the use of red strikethrough font.
3.) Section J – A new attachment J-0200000-18 Amendment 0004 is being released to reflect the above two changes. Please note that this document supersedes any and all previous versions of the ELINS attachment and that no color-indicated changes appear.
SECTION C - DESCRIPTIONS AND SPECIFICATIONS
The following have been modified:
1601000
1601000 – Utility Management Table of Contents
Spec Item Title
1 General Information
1.1 Concept of Operations
2 Management And Administration
2.1 Definitions and Acronyms
2.2 Personnel
2.2.1 Certification, Training, and Licensing
2.3 Special Requirements
2.3.1 System Access
2.3.2 System Training
2.4 References and Technical Documents
3 Recurring Work
3.1 Utility Service Orders
3.1.1 Emergency Service Orders
3.1.2 Urgent Service Orders
1601000 – Utility Management Table of Contents
3.1.3 Routine Service Orders
3.2 Project Work Orders Reserved
3.2.1 Project Work Order Level 1 Reserved
3.2.2 Project Work Order Level 2 Reserved
3.3 Utility Operations Management
3.3.1 Utility Outage Scheduling and Coordination
3.3.2 Meter Reading
3.3.3 Utility Location Services
3.4 Utility Infrastructure Condition Assessment (UICAP) Support
3.4.1 Inventory Management
3.4.2 Condition Assessment
3.5 Utility Control Systems
4 Non-Recurring Work
1601000 – Utility Management Spec Item
Title Description
1 General Information The Contractor shall provide all labor, management, supervision, tools, materials, and equipment necessary to perform utility management services at Naval Support Activity Northwest Annex (NSA NW), Chesapeake, Virginia.
1.1 Concept of Operations The intent of 1601000 Utilities Management is to specify the requirements common to management and support of utility systems to include chiller plants, electrical, natural gas, wastewater, steam, and water.
Points of demarcation between utility system and facility systems are described in J-1601000-01. This service point (demarcation) is the point of connection between the serving utility and the facility and is where ownership changes.
Item
Title Description
2 Management and Administration
2.1 Definitions and Acronyms Definitions and Acronyms are listed in J-1601000-02.
2.2 Personnel The Contractor shall provide personnel with the qualifications, technical knowledge, experience and skills required to provide utility management services that ensure delivery of safe, reliable, cost effective utility services in compliance with applicable environmental and energy security requirements.
2.2.1 Certification, Training, and Licensing
Personnel operating Building Control Systems shall be trained and certified Building or Utility Systems Automation Systems Technician and complete DoD Cyber Awareness training and complete a SAAR-N. DoD Cyber Awareness training must be completed annually. In addition, personnel must have demonstrated experience at a minimum of 3 years of similar size and complexity of the NSA Northwest Annex network.
Item
Title Description
The Contractor shall submit proof of all certification, training, and licensing requirements per Section F.
2.3 Special Requirements
2.3.1 System Access The Government will provide access to the following systems:
MAXIMO
The Contractor shall submit a complete list of personnel requiring access to these systems per Section F. The Contractor shall provide information on each employee as required by Government information technology personnel.
Additional information regarding NAVFAC MAXIMO data requirements and account access is provided in Spec Item 2.6.6 in Annex 0200000.
2.3.2 System Training The Government will provide one training session on the systems identified above. In addition, the Government will provide technical assistance to the Contractor’s functional systems manager for five working days prior to full performance start date.
Periodically, the Government will provide no-cost training on new systems and system enhancements to a limited number of Contractor personnel who are expected to provide training to remaining Contractor personnel. The Contractor shall send employees to Government-directed training on forthcoming systems either on-site or at a location specified by the Government.
All costs of attendance at either on-site or off-site training, including, but not limited to, wages, travel, and per diem shall be borne by the Contractor. Historically, there has been a requirement for approximately five man-days of such off-site training per year.
2.4 References and Technical
Documents
References and Technical Documents are listed in J-1601000-03.
Item Title
Performance Objective Related Information
Performance Standard
3 Recurring Work
The Contractor shall provide utility management services to ensure utility systems and infrastructure supports installation mission requirements.
The Contractor shall be knowledgeable of and comply with installation utility management reporting and coordination requirements identified within applicable NAVFAC BMS processes and NSA Northwest Annex Utility Standing Operating Procedures (SOP).
Utility management services are performed as specified.
Utility management services are completed within the specified time.
3.1 Utility Service
Orders
The Contractor shall perform utility
The Contractor shall receive utility service orders in
Utility service order work is
Item Title
Performance Objective Related Information
Performance Standard service order work in a timely manner to ensure utility systems and equipment are restored to a safe, normal working condition and function properly.
accordance with the work reception requirements in Annex 2. Information related to utility outage response shall be reported as specified in J-1601000-04.
The Contractor shall schedule and perform service orders in a way that minimize disruptions to customers and Government operations.
The Contractor shall perform service orders to accomplish any work identified within the points of demarcation for utility systems. Service orders are not limited to work performed on existing utility systems and equipment identified in the respective Section J attachments or spec items for each Annex.
Additional utility systems and equipment added during the course of the contract will become part of the service order program at no additional cost to the Government
Samples of required work and historical utility service order workload are provided in J- 1601000-05. Historical data and supporting information provided is intended to illustrate the volume of service orders issued and examples of work that has been performed in the past and is not to be construed as a limiting factor to services ordered and performed in the future.
The Contractor shall maintain sufficient materials and equipment on hand to support service order work responded to and completed within the specified time.
Utility systems and equipment are restored to normal working condition, including recertification if applicable.
When repair is complete the utility system or equipment does not present danger to personnel or equipment.
Item Title
Performance Objective Related Information
Performance Standard requirements. Lack of availability of material or equipment will not relieve the Contractor from the requirement to complete service order work within the time limits specified.
The Government may combine multiple repair requirements received for the same trade in the same location at the same time into one service order as long as the service order threshold is not exceeded.
The Contractor shall notify the KO upon identification that the service order will exceed the liability limits specified below in accordance with reporting requirements in Annex 2. If non-recurring work is issued for repairs, the Government will only pay for the portion of labor and/or material that exceeds the service order limits.
Service orders will not be issued for accomplishment of repairs on utility systems and equipment maintained under an Integrated Maintenance Program (IMP).
The Contractor shall submit a monthly summary of completed service orders per Section F.
3.1.1 Emergency
Service Orders
The Contractor shall respond to emergency service orders and arrest emergent conditions to minimize and mitigate damage to utility systems and equipment and danger
The Contractor shall perform emergency service orders 24 hours a day, seven days a week throughout the contract period.
The Contractor shall respond to emergency service orders with the appropriate service
Emergency service orders responded to within 30 minutes of receipt of call.
Emergency service orders are arrested within 24 hours of receipt of call.
Item Title
Performance Objective Related Information
Performance Standard to personnel.
personnel and equipment to commence work immediately.
Emergency service orders are limited to a recurring ceiling of $5,000 in labor (including all burdens and mark-ups) cost, direct material and equipment cost, and subcontract costs.
The Contractor shall remain at the work site until the emergency has been arrested.
The emergency service request is complete once the emergency has been arrested and any additional work necessary up to the limit of liability has been performed.
The emergency service order is complete once the emergency has been arrested.
The Government may issue an urgent or routine service order or non-recurring task order for the follow-on work required to repair/restore the utility system, ground structure, personal property equipment or installed equipment and system.
Work is continued without interruption until emergent condition is arrested.
3.1.2 Urgent Service
Orders
The Contractor shall complete urgent service orders in a timely manner and ensure utility systems and equipment are restored to a safe, normal working condition and function properly.
The Contractor shall perform urgent service orders to repair deficiencies without extended delay, therefore preventing further damage to utility systems, ground structures, personal property equipment, and installed equipment and systems.
Urgent service orders are limited to a recurring ceiling of $5,000 in labor (including all burdens and mark-ups) cost, direct material and equipment cost, and subcontract costs.
Urgent service orders are completed within five working days.
Item Title
Performance Objective Related Information
Performance Standard
3.1.3 Routine
Service Orders
The Contractor shall complete routine service orders in a timely manner and ensure utility systems and equipment are restored to a safe, normal working condition and function properly.
The Contractor shall perform routine service orders to allow for completion within 30 working days from receipt of service order request.
Routine service orders are limited to a recurring ceiling of $5,000 in labor (including all burdens and mark-ups) cost, direct material and equipment cost, and subcontract costs.
Performance of routine service orders is not required outside of Government regular working hours.
Routine service orders are
30 calendar days.
3.2 Project Work
Orders Reserved
The Contractor shall perform project work to ensure work is completed within the specified response time, limits of liability and completion times.
The Contractor shall receive project work orders in accordance with the work reception requirements in Annex 2.
Project work is intended to allow for the execution of work not defined elsewhere in the contract and is generally issued for work that is not complex in nature and a detailed cost estimate or job plan is not necessary.
The Government may issue project work orders for work requirements at any location within the defined boundaries of this contract for any reason at the discretion of the government.
Project work order work may include multiple trades providing repairs to existing utility assets and equipment as well as newly installed utility assets and equipment, work to utilities located on the installation but not listed in the utilities inventory.
Utilities and equipment that are not maintained through a recurring work schedule or
Project work orders are completed within 30 calendar days of receipt of the original project work order or by the specified date.
When project work orders are complete the utility, system, or equipment does not present any hazard or danger to personnel.
Utilities, systems, and equipment are restored to operable condition and function properly in accordance with
OEM
specifications.
When project order work is complete the utility, system, or equipment does not present any hazard or danger to personnel.
Item Title
Performance Objective Related Information
Performance Standard program, labor hour support for non-contract projects, and any work requirements typical to the annexes and sub-annexes contained in this
PWS.
Project work orders are not limited to work performed on existing utilities and equipment identified in the respective Section J attachments or spec items for each Annex. Additional utilities and equipment added during the course of the contract will become part of the project order program at no additional cost to the Government.
The Contractor shall notify the KO upon identification that the project work will exceed the limits listed below.
The Contractor shall submit a detailed estimate proposal to the KO within two work days for each project work that exceeds the limits.
Notification of work exceeding the project work order limit shall be submitted to the KO within two hours of identification. If the labor and material required are beyond the project work order liability limit a non-recurring work task order may be issued for repairs exceeding the project work order limit.
The Contractor shall be responsible for all labor and material costs up to the project work order limits.
Item Title
Performance Objective Related Information
Performance Standard
The Contractor shall submit a monthly summary of completed project orders per Section F.
Project Work Order Historical Data is provided in J-1601000-06.
3.2.1 Project Work
Order Level 1 Reserved
The Contractor shall perform project work order level 1 to ensure requested services are completed within the specified response time, limits of liability and completion times.
Project Work Order Level 1:
work that exceeds the service order limit but is estimated to be less than $5,000 in labor (including all burdens and mark-ups) cost, direct material and equipment cost, and subcontract costs.
Project Work Order Level 1 are completed as specified in the project work order.
3.2.2 Project Work
Order Level 2 Reserved
The Contractor shall perform project work order level 2 to ensure requested services are completed within the specified response time, limits of liability and completion times.
Project Work Order Level 2:
work that exceeds the Service Order limit but shall not exceed $10,000 in labor (including all burdens and mark-ups) cost, direct material and equipment cost, and subcontract costs.
Project Work Order Level 2 are completed as specified in the project work order.
3.3 Utility
Operations Management
The Contractor shall provide management services to ensure utility operations for mapping, outages and metering reading services are accurate.
As part of Utility Operations Management, the Contractor shall provide updates to UEM for utility maps, ensure utility outages are documented and reported, meters accurately read and recorded.
Utility Operations Management is properly documented and updated as specified.
3.3.1
Utility Outage Scheduling and Coordination
The Contractor shall schedule and coordinate utility outages to ensure customer and mission operation disruptions are minimized and proper notifications are made in a timely manner.
The Contractor shall receive requests for, coordinate, plan, and schedule utility outages with construction and service work providers to minimize customer operational impact.
The Contractor shall plan and coordinate outages with affected customers no later than ten calendar days prior to a scheduled outage for routine requests and four
Affected customers are notified within the specified time prior to a scheduled outage.
Affected customers are kept notified of the outage status.
Item Title
Performance Objective Related Information
Performance Standard calendar days for urgent requests.
The Contractor shall monitor scheduled and unscheduled utility outages and keep affected customers informed of the outage status and time or date the interrupted utilities are anticipated to be restored.
Information related to utility outages shall be reported as specified in the Service Desk Guide for Utility Outages provided in J-1601000-07.
3.3.2 Meter Reading The Contractor shall
read and record data from utility meters to ensure accurate information is available for proper and timely utility billing.
The Contractor shall read utility meters monthly at NSA Northwest Annex.
All meter readings are to be completed on the scheduled day using Versaprobe Equipment. Versaprobe Equipment shall be returned to Utilities the same day meters are read.
Meters shall be read per schedule at all sites. The meter inventory is provided in J-1601000-08.
The Contractor shall submit a Monthly Meter Reading Report per Section F.
Meter readings are recorded accurately.
All meters are read according to schedule.
3.3.3
Utility Location Services
The Contractor shall provide utility location services to ensure underground utilities are protected from damage and proper notifications are made in a timely manner.
The Contractor shall provide utility location services in support of excavation permits per OPNAVINST 5100.23G Navy Occupational Safety & Health Program Manual
The Contractor shall mark the areas at the intended work site to identify any underground electrical, natural gas, steam, water, and wastewater utilities and provide documentation to the
Utility location documentation is accurate.
Utility location service are the specified times.
Item Title
Performance Objective Related Information
Performance Standard excavation permit office.
The Contractor shall mark utilities within five calendar days from receipt for routine requests and within 24 hours for urgent requests.
3.4 Utility
Infrastructure Condition Assessment
(UICAP)
Support
The Contractor shall perform UICAP services to ensure accurate asset inventory and condition information to properly support utility maintenance planning.
The Contractor shall perform UICAP services by maintaining an accurate asset inventory within MAXIMO and performing equipment condition assessments per NAVFAC P-603 Utilities Infrastructure Management Manual.
An initial utility asset inventory will be available in MAXIMO at contract start.
MAXIMO asset data is complete and accurate.
Asset condition assessment is complete and accurate.
MAXIMO data is updated within the specified time.
3.4.1
Inventory Management
The Contractor shall manage asset inventory to ensure asset information is available for effective management of utility systems.
The Contractor shall be responsible for all changes to utilities asset inventory updates within MAXIMO including adding, deactivating, and updating utilities assets.
The Contractor is responsible for updates to asset data for all utilities equipment regardless of whether or not they are maintained under this contract.
For assets installed, removed, or replaced outside of this contract, the Contractor shall receive and validate inventory information provided by the Government and update asset data within
MAXIMO.
The Contractor shall update MAXIMO upon identification of discrepancies in inventory (e.g. assets with incorrect data elements, assets that no longer exist, or assets found
MAXIMO asset data is updated within 10 days of identification or notification of change.
Asset data fields required in MAXIMO are complete and accurate.
Item Title
Performance Objective Related Information
Performance Standard that are not within current inventory).
Utility inventory shall include every Navy-owned operating utility asset that meets one or more of the following requirements:
1. Asset requires Recurring or Preventive Maintenance.
2. Asset performs a critical function within the system.
3. Asset would be repaired rather than replaced if it fails.
Note: For support structures that do not meet any of these three criteria, group them into a single asset with the appropriate quantity.
The Contractor shall submit a Summary of MAXIMO Asset Changes report per Section F.
The Contractor shall ensure that utility assets are properly tagged. The format for utilities asset tags and utility asset tagging guidance are in J-1601000-09.
Required data fields for updates to asset and specification information are indicated in J-0200000-06 and J-0200000-07. Attributes required for specification information are listed in J- 1601000-10.
The Government will provide format requirements for nomenclature of assignment of new asset numbers.
The process for providing MAXIMO asset updates are specified in Spec Item 2.6.6 in Annex 0200000.
3.4.2
Condition Assessment
The Contractor shall assess and document
The Contractor shall perform condition assessments on all
Degradation Index updates for all
Item Title
Performance Objective Related Information
Performance Standard asset condition to ensure accurate condition information is available for utility maintenance planning.
utility assets associated with systems identified in 1602000 Electrical, 1604000 Wastewater, 1605000 Steam, and 1606000 Water.
The Contractor shall assess an equipment Utilities Energy Management- Degradation Index (UEM-DI) upon a) completing the most intrusive Preventive Maintenance b) a corrective maintenance is performed on the asset; c) an engineering evaluation is performed on the asset; or d) the asset is replaced. A list of assets requiring condition assessment A list of assets requiring condition assessment will be provided upon award.
The description of the Utilities Energy Management-Degradation Index (UEM-DI) is provided in J-1601000-11.
required assets do not exceed 365 days.
Degradation Index updates for all required assets are performed after a) completing the most intrusive Preventive Maintenance b) a corrective maintenance is performed on the asset; c) an engineering evaluation is performed on the asset; or d) the asset is replaced Degradation Index Meter Reading data fields required in MAXIMO are complete and accurate.
Degredation Index rating is reflective of current asset status.
3.5 Utility Control
Systems
The Contractor shall provide Management for utility control systems to ensure the controls and utility systems are operating properly
The contractor is responsible to maintain all computers, printers (includes toner/ink), cables, tools, materials and skilled labor to troubleshoot utility control systems.
The Contractor continually monitors all systems and make adjustments as necessary to ensure all systems are being operated in the most energy efficient manner.
The contractor is responsible to report any system access violations or intrusions and to maintain system network accreditation.
No instance where utility control room is not manned 24 hours a day.
All systems are operating within design standards.
Any deviation is documented and resolved timely.
Notify COR/PAR of any outage or inoperable systems and any scheduled work to all Control Systems.
Item Title
Performance Objective Related Information
Performance Standard
Contractor will be required to work with Government personnel in regards to ensuring future DOD Cybersecurity initiatives.
The contractor shall provide firmware and software upgrades, for all systems, as available and proven for the duration of this contract at no additional cost to the Government. The Contractor shall provide all software upgrades for the control systems within 30 days of release. All updates to software/firmware are approved by the Government prior to install. The Contractor is fully responsible for and shall perform software upgrades up to a total of $10,000 in labor (including all burdens and mark-ups) cost, direct material and equipment cost, and subcontract costs.
Current version is SCADA System Seimens, Wonderware InTouch, 2014.
The Control Systems inventory is provided in J- 1502000-12.
ALL control systems are operating in full automatic mode in accordance with designed sequence of operation. Any overrides/bypass or other methods to bypass full auto are physically tagged accordingly with repair information.
Software upgraded as required.
Item
Title Performance Objective
Related Information Performance Standard
4 Non-recurring Work
Non-recurring work may be ordered utilizing DoD FedMALL in accordance with Section H or on a task order in accordance with the
PROCEDURES FOR
Refer to Non-recurring work ELINs for task listings, descriptions and related requirements. All periods of performance are measured from issue date of order to acceptance of the work. Performance Standards for Non-recurring work will be the same as those in Spec Item 3
ISSUING ORDERS
clause in Section G.
The order will specify the exact locations and types of work to be accomplished. The period of performance will be specified in each order.
where applicable.
SECTION J - LIST OF DOCUMENTS, EXHIBITS AND OTHER ATTACHMENTS
The following have been modified:
SECTION J
SECTION J
DOCUMENTS, EXHIBITS, AND OTHER ATTACHMENTS
TABLE OF CONTENTS
NOTE: The individual files for Section J are attached separately. Note: The documents are provided as separate documents under “attachments/links” section on Contract Opportunities under the solicitation number.
This contract incorporates by reference the following attachments as if they were fully set forth herein. Please see the following attachments as part of this solicitation:
SECTION J
DOCUMENTS, EXHIBITS, AND OTHER ATTACHMENTS
TABLE OF CONTENTS
ATTACHMENT
NUMBER
ATTACHMENT TITLE
Section F Deliveries or Performance Tables J-1 Past Performance Questionnaire J-2 Corporate Experience Project Data Sheet J-3 Section B, Supplies or Services and Prices J-4 Full Time Equivalent (FTE) Worksheets J-5 Pre-Award Inquiry Form J-6 Basis of Estimate (BOE) Sample J-7 (Amendment 0001) Site Visit Registration Form J-8 Representation Regarding Certain Telecommunications and Video Surveillance
Services J-9 (Amendment 0001) SECNAV Form 5512 J-0200000 (J-0200000-01; J-0200000-03; J-0200000-04; J-0200000-09 through J-0200000-11; J-
0200000-13; J-0200000-16; J-0200000-17) J-0200000-02 Wage Determinations J-0200000-02-01 Wage Determination:SCA Determination J-0200000-02-02 Wage Determination:DBA Determination J-0200000-05 Service Provider Information (Excel) J-0200000-06 Asset Information (Excel)
J-0200000-07 Specification Information (Excel) J-0200000-08 Characteristic Meter Readings Information (Excel) J-0200000-12 Contractor Incident Reporting System (CIRS) (Excel) J-0200000-14 2019 Hazardous Materials Reutilization, Hazardous Waste Minimization and Disposal
Guide Plan (PDF document) J-0200000-15 CNRMA Installation Spill Reporting and Documentation SOP (PDF) J-0200000-18 (Amendment 0004) Exhibit Line Item Numbers (Excel) J-1501000 (J-0200000-01 through J-0200000-04) J-1501000-05 Meter Group Descriptions and Direct Condition Rating Guidance (Excel) J-1501000-06 General Direct Condition Rating Guidance (Excel) J-1502000 (Amendment 0002) (J-1502000-01 through J-1502000-41) (Excel)
J-1502000-21-01 Berm Discharge Log (PDF)
J-1502000-21-02 Checklist for Portable Containers (PDF)
J-1502000-21-03 Checklist for Aboveground Storage Tanks (PDF)
J-1502000-21-04 Petroleum, Oil, and Lubricants (POL) Standard Operating Procedures
J-1503010 (J-1503010-01 through J-1503010-05; J-1503010-07) J-1503010-06 (Amendment 0002) Custodial Inventory (Excel) J-1503020 (J-1503020-01 through J-1503020-13)
J-1503030 (J-1503030-01 through J-1503030-07; J-1503030-09 through J-1503030-10; J- 1503030-12 through J-1503030-13)
J-1503030-08 Solid Waste Disposal Report J-1503030-11 Oil Storage Tank Inspection Form J-1503040 (J-1503040-01 through J-1503040-05) J-1503050 (J-1503050-01 through J-1503050-11) J-1503060 (J-1503060-01 through J-1503060-03) J-1503060-04 Pavement Clearance Map (PDF) J-1601000 (Amendment 0004) (J-1601000-01 through J-1601000-04; J-1601000-06 through J-
1601000-10) J-1601000-05 Historical Utility Service Order Workload (Excel) J-1601000-11 Utility Control Systems Inventory (Excel) J-1602000 (J-1602000-01; J-1602000-02; J-1602000-03; J-1602000-04; J-1602000-05) J-1602000-03 Electrical Power Distribution System Descriptions and Inventory (Excel) J-1604000 (J-1604000-01 through J-1604000-04; J-1604000-06) J-1604000-03 Wastewater Treatment Plant and Collection System Description and Inventory (Excel) J-1604000-05 VPDES Permit (PDF) J-1604000-07 Spill Reporting SOP (PDF) J-1605000 (J-1605000-01 through J-1605000-06) J-1606000 (J-1606000-01 through J-1606000-04; J-1606000-07; J-1606000-09) J-1606000-03 Water Treatment Plant and Distribution System Description and Inventory J-1606000-05 Operation Permit #3550620 J-1606000-06 Bacteriological Sample Siting Plan (BSSP) J-1606000-08 (Amendment 0002) Fire Hydrants Inventory
(End of Summary of Changes)