J-1502000 Amendment 0002.xlsx
XLSX spreadsheet 550 KB Posted
- Solicitation number
- N62470-19-R-2004
About this file
This document summarizes a federal solicitation for base operations support (BOS) services at Naval Support Activity (NSA) Northwest Annex in Chesapeake, Virginia. The solicitation was issued by the Department of the Navy Naval Facilities Engineering Command to provide BOS services including facility investment, maintenance and repair, utilities, custodial services, pest control, and waste management. The period of performance is a one year base period with four one-year options. The anticipated award date is July 2019 with an expected effective performance date of October 2019. The total contract value including options is estimated at $50 million.
View the file
Other files
Show 40 more
Latest 50 of 105 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Table Of Contents
| SECTION J | |
| DOCUMENTS, EXHIBITS, AND OTHER ATTACHMENTS | |
| TABLE OF CONTENTS | |
| ATTACHMENT NUMBER | ATTACHMENT TITLE |
| J-1502000-01 | Definitions and Acronyms |
| J-1502000-02 | References and Technical Documents |
| J-1502000-03 | Facilities Property Inventory |
| J-1502000-04 | Historical Service Order Workload |
| J-1502000-05 | Historical Project Order Workload |
| J-1502000-06 | Temperature Standards |
| J-1502000-07 | HVAC and Refrigeration System Inventory for PM |
| J-1502000-08 | Compressed Air Systems Equipment Inventory for PM |
| J-1502000-09 | Domestic Water Systems Equipment Inventory for PM |
| J-1502000-10 | Sump Pumps Inventory for PM |
| J-1502000-11 | Swimming Pool Equipment Inventory for PM |
| J-1502000-12 | Gate System Inventory for PM |
| J-1502000-13 | Laundry Room Equipment for PM |
| J-1502000-14 | Water Treatment Systems for PM |
| J-1502000-15 | Building Controls Systems Inventory for PM |
| J-1502000-16 | Historical IMP Repairs |
| J-1502000-17 | HVAC and Refrigeration System Inventory for IMP |
| J-1502000-18 | Chiller system inventory |
| J-1502000-19 | Fire Protection Systems inventory for IMP |
| J-1502000-20 | Boiler and UPV Inventory and Certification Dates for IMP |
| J-1502000-21 | Sample POL Checklists |
| J-1502000-22 | POL System Facilities and Distribution Systems inventory for IMP |
| J-1502000-23 | Auxiliary Generators Inventory for IMP |
| J-1502000-24 | Exterior Lighting Systems Inventory for IMP |
| J-1502000-25 | Uninterrupted Power Systems Inventory for IMP |
| J-1502000-26 | Cathodic Protection Systems Inventory for IMP |
| J-1502000-27 | Emergency Eyewash Station Inventory for IMP |
| J-1502000-28 | Grey Water Systems Equipment Inventory for IMP |
| J-1502000-29 | Sump Pumps Inventory for IMP |
| J-1502000-30 | Paint Booth Inventory for IMP |
| J-1502000-31 | Compressed Air Systems Equipment Inventory for IMP |
| J-1502000-32 | Grease Trap Inventory |
| J-1502000-33 | Exhaust Hood And Duct Inventory |
| J-1502000-34 | HVAC Systems Season Start-Up and Shutdown Inventory |
| J-1502000-35 | HVAC Water Testing And Treatment Services Inventory |
| J-1502000-36 | Boiler Seasonal Start-Up and Shutdown inventory |
| J-1502000-37 | Boiler Water Testing And Treatment Services Inventory |
| J-1502000-38 | Drinking Fountain And Water Cooler Inventory |
| J-1502000-39 | Roof Drainage System Inventory |
| J-1502000-40 | Dryer Vent Inventory |
| J-1502000-41 | Oil Water Separator Inventory |
J-1502000-01
| ATTACHMENT J-1502000-01 |
| DEFINITIONS AND ACRONYMS |
| DEFINITION | DESCRIPTION |
| CRANE, CATEGORY 1 | Portal cranes, Hammerhead cranes, Locomotive cranes, Derricks, Floating cranes (YD), Tower cranes, Container cranes, Mobile cranes (except those indicated as category 4), including truck, cruiser, crawler, warehouse/industrial cranes, and cranes used for dragline, pile driving, clamshell, magnet, bucket work, and Aircraft crash cranes. |
| CRANE, CATEGORY 2 & 3 | Cranes with rated capacities of 20,000 pounds or greater are category 2. Examples are Overhead traveling cranes, Gantry cranes (rail mounted), Wall cranes, Jib cranes, Pillar cranes, Pillar jib cranes, Monorails and associated hoists, fixed hoists, including chain falls. Pedestal mounted commercial boom assemblies (fixed length, telescoping, and articulating types) attached to stake trucks, trailers, flatbeds, or railcars, or stationary mounted to piers, etc., with OEM rated capacities less than 2,000 pounds. |
| CRANE, CATEGORY 4 | Commercial truck mounted cranes, Truck mounted articulating boom cranes, Pedestal mounted commercial boom assemblies (fixed length, telescoping, and articulating types) attached to stake trucks, trailers, flatbeds, or railcars, or stationary mounted to piers, etc., with OEM rated capacities of 2,000 pounds and greater. Commercial truck mounted cranes and truck mounted articulating boom cranes with OEM capacities of 2,000 pounds and greater require a licensed operator even if the cranes are down rated below 2,000 pounds capacity for administrative purposes. |
| EQUIPMENT, COLLATERAL | Encompasses built-in and large substantially affixed equipment/property that is normally acquired and installed as part of a facility project. |
| EQUIPMENT, INSTALLED | Encompasses building-type equipment, built-in equipment, and large, substantially affixed equipment/property, and is normally acquired and installed as part of a facility project. Installed equipment is normally required to make a facility useful and operable. Removing such equipment would impair the usefulness, safety, or environment of the facility or the facility restoration work required after its removal, is substantial. |
| EQUIPMENT, PERSONAL PROPERTY | Personal property equipment includes all equipment other than collateral equipment. Such equipment, when acquired and used in a facility or a test apparatus, can be severed and removed aster erection or installation without substantial loss of value or damage thereto or to the premises where installed. |
| FACILITIES LIFE CYCLE | A facilities life cycle is divided into four stages, requirements (planning and design), acquisition (construction and acceptance), stewardship (operations, maintenance and repair), and disposal. |
| FACILITIES MAINTENANCE MANAGEMENT | The planning, prioritizing, organizing, controlling, reporting, evaluating, and adjusting of facilities maintenance operations to support the CNO/NAVFAC facilities policy and objectives and satisfy customers’ facility needs. Defined by the International Facility Management Association as “the practice of coordinating the physical workplace with the people and work of the organization.” |
| INTEGRATED MAINTENANCE PROGRAM (IMP) | IMP is a recurring state-of-the-art, reliability-centered inspection, testing, maintenance and repair program that determines best practices for managing the functions and consequences of failures of facilities equipment and system components. IMP encompasses accepted commercial practices, including reactive, preventive, predictive and proactive maintenance, into one optimal program. The IMP approach gives the Contractor full responsibility to maintain systems and equipment and perform repairs whenever necessary to ensure equipment and systems are operational and remain in a constant state of readiness. Service calls will not be issued for accomplishment of repairs on systems and equipment maintained under IMP. |
| LIFE-CYCLE COSTS | A form of economic analysis that considers the total cost of owning, operating, and maintaining a building or system over its useful life. |
| MAINTENANCE, PREVENTIVE | Maintenance designed to increase the availability of the facilities/equipment by reducing the number of unexpected breakdowns or service interruptions. It is any planned maintenance activity that improves equipment life and avoid any unplanned maintenance requirements. |
| MANAGEMENT INFORMATION SYSTEMS-MAINTENANCE | A computerized system that will provide sufficient information for management to evaluate differences between budgets and actual costs and evaluate performance. |
| REPAIR | Repair is the restoration of facilities or equipment to such a condition that it may be effectively utilized for its designated purposes by overhaul, reconstruction, or replacement of constituent parts or materials which have deteriorated by action of the elements or usage, and which have not been corrected through maintenance. This term also applies to replacement of the entire unit or system if beyond economical repair. The intent of repair is to have the equipment at normal working condition. |
| REPLACEMENT | Replacement, as a distinct work element, is confined to a program of planned replacement of a facility or its components. It may be further limited to major components such as air conditioning compressors, furnaces or hot water heaters. Replacement is performed when the equipment has reached the end of its useful life; when it no longer can perform due to degradation of its internal components and repair is no longer cost effective. Included under the replacement would be the major rebuilding of any component, since rebuilding also restores performance. |
| RESTORATION | Restoration of real property to such a condition that it can be used for its intended purpose. Includes repair or replacement work to restore facilities damaged by inadequate sustainment, excessive age, natural disaster, fire, accident or other causes. |
| SUSTAINMENT | Maintenance and repair activities necessary to keep a typical inventory of facilities in “normal working condition”. Sustainment includes regularly scheduled maintenance as well as cyclical major repairs or replacement of components that occur periodically over the expected service life of the facilities. |
| SERVICE ORDER CYCLE | Count down starts when the customer is notified that the work has been accepted to be accomplished to the time when the work chit is turned in by the craftsmen as complete is one complete cycle period for a service order. |
| WEIGHT HANDLING EQUIPMENT (WHE) | Weight handling equipment consists of cranes (e.g., portal cranes, jib cranes), rigging gear (e.g., slings, shackles), and associated equipment (e.g., portable hoists, dynamometers). For purposes of this technical sub-annex, WHE does not include mobile or transportable truck, crawler, and railway mounted locomotive cranes covered in 1700000 Transportation. |
| THE JOINT COMMISSION | United States-based nonprofit organization that accredits more than 21,000 US health care organizations and programs. |
| VERTICAL TRANSPORTATION EQUIPMENT (VTE) | Vertical transportation equipment consists of elevators, dumbwaiters, escalators, moving walks and material lifts, platform lifts, stairway chairlifts and dock levelers. |
| Acronym | Title |
| BPVC | Boiler and Pressure Vessel Code |
| HVAC | Heating, Ventilation, and Air Conditioning |
| RPIE | Real Property Inventory Equipment |
| SCADA | Supervisory Control And Data Acquisition |
| SRM | Sustainment, Restoration and Modernization |
| UFC | Unified Facilities Criteria |
| UPV | Unfired Pressure Vessel |
| VTE | Vertical Transportation Equipment |
J-1502000-02
| ATTACHMENT J-1502000-02 |
| REFERENCES AND TECHNICAL DOCUMENTS |
| Reference | Title |
| 29 CFR 1910.151 | Medical Services And First Aid |
| 40 CFR 60 | Standards Of Performance For New Stationary Sources (NSPS) |
| 40 CFR 63 | National Emission Standards For Hazardous Air Pollutants For Source Categories |
| 40 CFR 89 | Control Of Emissions From New And In-Use Nonroad Compression-Ignition Engines |
| 40 CFR 280 | Technical Standards And Corrective Action Requirements For Owners And Operators Of Underground Storage Tanks (UST) |
| 40 CFR Part 112 | Oil Pollution Prevention |
| 9 VAC 25-91-10 | VA AST REGS |
| API 570 | Piping Inspection Code |
| API 653 | Aboveground Storage Tank Inspector |
| API 1631 | Interior Lining Of Underground Storage Tanks |
| ANSI Z358.1-2009 | American National Standard For Emergency Eyewash And Shower Equipment |
| ASTM E 1990 | Standard Guide For Performing Evaluations Of Underground Storage Tank Systems |
| MIL-HDBK-419A | Grounding, Bonding, And Shielding For Electronic Equipments And Facilities |
| MIL-STD-188-124B | Grounding, Bonding And Shielding For Common Long Haul/Tactical Communication Systems Including Ground Based Communications-Electronics Facilities And Equipments |
| National Board Of Boiler And Pressure Vessel Inspectors Code | |
| NLPA 631 | Entry, Cleaning, Interior Inspection, Repair And Lining Of Underground Storage Tanks |
| NAVFACINST 11230.1 | Inspection, Certification And Audit Of Crane And Railroad Trackage- |
| NAVFACINST 11300.37 | Energy And Utilities Policy Manual |
| NAVFAC MO-200 | Facilities Engineering Electrical Exterior Facilities |
| NAVFAC MO-201 | Electric Power Distribution Systems Operations |
| NAVFAC MO-206 | Maintenance And Operation Of Air Compressor Plants |
| NAVFAC MO-209 | Maintenance Of Steam, Hot Water And Compressed Air |
| NAVFAC MO-210 | Maintenance And Operation Of Water Supply, Treatment, And Distribution Systems |
| NAVFAC MO-230 | Petroleum Fuel Facilities |
| NAVFAC MO-912 | Auxiliary Generators |
| NAVFAC MO-322 | Inspection Of Shore Facilities, Volume I And II |
| NAVFAC P-307 | Management Of Weight Handling Equipment |
| NAVFAC MO-230 | Petroleum Fuel Facilities |
| NAVFAC MO-102 | Maintenance And Repair Of Surface Areas |
| NAVMED P-5010-4 | Manual Of Naval Preventive Medicine Swimming Pools And Bathing Places |
| NAVSEA OP-5 | Ammunition And Explosives Safety Ashore |
| NFPA 30 | Flammable And Combustible Liquids Code |
| NFPA 30A | Code For Motor Fuel Dispensing Facilities And Repair Garages |
| NFPA 780 | Standard For The Installation Of Lightning Protection Systems |
| NFPA 99 | Health Care Facilities Code |
| NFPA Standard 96 | National Fire Protection Association, |
| NAVSUP P-558 | Fuel Management Ashore |
| NAVSUPINST 4750.1 | Automated Fuel Maintenance System |
| OPNAVINST 5090.1 | Environmental Readiness Program Manual |
| TM 5-693 | Uninterruptible Power Supply System Selection, Installation, And Maintenance For Command, Control, Communications, Computer, Intelligence, Surveillance, And Reconnaissance (C4ISR) Facilities |
| STI SP001 | Inspection Of Aboveground Storage Tanks (ASTS) |
| UFC 3-230-02 | Operation And Maintenance: Water Supply Systems |
| UFC 3-240-13FN | Industrial Water Treatment Operation And Maintenance |
| UFC 3-250-08FA | Standard Practice For Sealing Joints And Cracks In Rigid And Flexible Pavements |
| UFC 3-270-01 | Asphalt Maintenance And Repair Of Surface Areas |
| UFC 3-270-01 | Asphalt Maintenance And Repair |
| UFC 3-270-02 | Asphalt Crack Repair |
| UFC 3-410-01 | Design: Petroleum Fuel Facilities |
| UFC 3-410-06N | Central Heating Plants Operation And Maintenance |
| UFC 3-430-07 | Operations And Maintenance: Inspection And Certification Of Boilers And Unfired Pressure Vessels |
| UFC 3-460-03 | O&M: Maintenance Of Petroleum Systems |
| UFC 3-540-07 | Operation And Maintenance (O&M): Generators |
| UFC 3-570-06 | O&M: Cathodic Protection Systems |
| UFC 3-560-01 | Operation And Maintenance: Electrical Safety |
| UFC 4-010-06 | Cybersecurity Of Facility-Related Control Systems |
| UFC 3-600-02 | Operations And Maintenance: Inspection, Testing, And Maintenance Of Fire Protection Systems |
| UG-2029-ENV | Cross-Connection Control And Backflow Prevention Program Implementation At Navy Shore Facilities |
| UL 58 | Standard For Steel Underground Tanks For Flammable And Combustible Liquids |
J-1502000-03
| ATTACHMENT J-1502000-03 |
| FACILITY PROPERTY INVENTORY |
| Facility No. | Name/Description | Year Built | Facility Area Size | Unit of Measure | Tenant |
| 1 | Safety & Security | 1953 | 2332 | SF | CNRMA |
| 2 | Utility Bldg / 1000KV | 1953 | 4450 | SF | CNRMA |
| 3 | Gas Station Class VI Garage | 1953 | 2000 | SF | CNRMA |
| 4 | Exchange Retail Store | 1953 | 5721 | SF | CNRMA |
| 5 | Post Office / Fire Training | 1953 | 11560 | SF | CNRMA |
| 6 | Fire Station | 1953 | 3734 | SF | CNRMA |
| 6A | Fire Station Back Up Generator | CNRMA | |||
| 7 | Mess Hall-Galley | 1953 | 10960 | SF | CNRMA |
| 8 | PWO Admin / Training Facility | 1953 | 13800 | SF | CNRMA |
| 10 | Elevated Water Tank | 1953 | 135K | GL | NAVFAC |
| 11 | Potable Water Wells | 1953 | 304 | GL | NAVFAC |
| 14 | Receiver Building | 1953 | 19514 | SF | NCWDG/GTE |
| 15 | Pesticide Storage / Mixing Facility | 1953 | 1440 | SF | CNRMA |
| 20 | Steam Pit / Valve House | 1955 | 80 | SF | CNRMA |
| 21 | Steam Pit / Valve House | 1955 | 80 | SF | CNRMA |
| 22 | Steam Pit / Valve House | 1955 | 80 | SF | CNRMA |
| 30 | Switching / Substation Bldg | 1957 | 180 | SF | CNRMA |
| 31A | General Supply Warehouse | 1987 | 8912 | SF | CNRMA |
| 38 | PW / Contractor Maintenance Shop | 1987 | 6700 | SF | CNRMA |
| 38A | Public Works Maintenance Shop | 1987 | 6700 | SF | CNRMA |
| 39 | Anti-Terrorism Warehouse | 1998 | 2500 | SF | CENSECFOR |
| 40 | Armory #1 (B-041) | 2008 | 200 | SF | CENSECFOR |
| 41 | Anti-Terrorism Training Facility | 1964 | 12473 | SF | CG MSRT |
| 41 | Anti-Terrorism Training Facility | 1964 | 23887 | SF | CENSECFOR |
| 41 | Anti-Terrorism Training Facility | 1964 | 3315 | SF | SPAWAR CENSECFOR |
| 41 | Anti-Terrorism Training Facility | 1964 | 63500 | SF | CNRMA |
| 42 | Public Restroom | 1999 | 384 | SF | CNRMA |
| 43 | Ship On Land (41 Complex) | 2000 | 3600 | SF | CENSECFOR |
| 45 | Armory (B-041) | 2008 | 200 | SF | CENSECFOR |
| 46 | Recreation Pavilion | 1963 | 800 | SF | CNRMA |
| 47 | Indoor Small Arms Range | 2010 | 4080 | SF | CENSECFOR |
| 48 | Softball Field (Wickham Field) | 1964 | 9800 | SF | CNRMA |
| 51 | Potable Water Well | 1964 | 394 | SF | NAVFAC |
| 52 | Vehicular Bridge | 1961 | 900 | SF | CNRMA |
| 58 | Activity Heat Fuel Storage | 1953 | 15000 | GL | CNRMA |
| 59 | Heat Fuel Storage Diesel / Bldg 2 | 1953 | 10000 | GL | CNRMA |
| 61 | Transformer Station/112KV | 1955 | 100 | SF | CNRMA |
| 62 | Transformer Station/225KV | 1955 | 100 | SF | CNRMA |
| 63 | Grease Trap | 1966 | 20 | SF | CNRMA |
| 64 | Substation/225 KV | 1966 | 100 | SF | NAVFAC |
| 65 | Fitness Center (attached to Bldg B-241) | 1966 | 12020 | SF | CNRMA |
| 66 | Barrack (Liberty Hall) | 1966 | 15155 | SF | CNRMA |
| 67A | Sewage Lift Station | 2001 | 195 | SF | NAVFAC |
| 131 | MOUS Compound | 2010 | CNRMA | ||
| 135A | Packaged Lift Station (B-041) | 1966 | 120 | SF | CNRMA |
| 136 | Stabilization Pond | 1966 | 101250 | SF | NAVFAC |
| 139 | Tennis Courts | 1967 | 18360 | SF | CNRMA |
| 140 | Bus Stop Shelter | 1968 | 72 | SF | CNRMA |
| 141 | SIGSEC Dept Storage | 1968 | 912 | SF | CNRMA |
| 144 | Barracks (BOQ) | 1969 | 5684 | SF | CNRMA |
| 145 | Administrative Bldg | 1970 | 7084 | SF | CNRMA |
| 145A | Bldg 145 Back Up Generator | CNRMA | |||
| 158 | Potable Water Well Bldg | 1970 | 100 | SF | NAVFAC |
| 159 | Chlorination & Transformer “B” | 1970 | 176 | SF | NAVFAC |
| 160 | Elevated Water Tank | 1970 | 135K | GL | NAVFAC |
| 161 | Potable Water Well Bldg | 1970 | 100 | SF | NAVFAC |
| 162 | Potable Water Well Bldg | 1970 | 100 | SF | NAVFAC |
| 163 | Transformer Pad/150KV (BOQ) | 1970 | 48 | SF | NAVFAC |
| 166 | Transformer Pad/75KV (ADMIN) | 1970 | 20 | SF | NAVFAC |
| 168A | Sewage Injector Station (B-031) | 1966 | 80 | SF | NAVFAC |
| 170 | 2000KV Trans Station HF/DF | 1970 | 180 | SF | NAVFAC |
| 173 | Public Toilet Stewart Camp | 1969 | 500 | SF | CNRMA |
| 174 | Vehicular Bridge Campground | 1969 | 750 | SF | CNRMA |
| 175 | Vehicular Bridge Dusty/Red River | 1964 | 300 | SF | CNRMA |
| 176 | Screened Pavilion Campsite | 1971 | 1075 | SF | CNRMA |
| 178 | Campground Meter Building | 1971 | 1075 | SF | CNRMA |
| 183 | Campground Ball Field | 1971 | 0.2 | AC | CNRMA |
| 184 | Recreation Grounds | 1971 | 10.6 | AC | CNRMA |
| 189 | NEX Retail Warehouse | 1971 | 480 | SF | NEX |
| 190 | Recreation Pavilion | 1971 | 540 | SF | CNRMA |
| 194 | Station Name Plaque | 1964 | 230 | SF | CNRMA |
| 201 | Chlorine Contact Tanks | 1972 | 292 | SF | NAVFAC |
| 202 | Chlorine House | 1972 | 99 | SF | NAVFAC |
| 205 | Dugout | 1964 | 120 | SF | CNRMA |
| 206 | Dugout | 1964 | 120 | SF | CNRMA |
| 210 | Public Toilet Wickham Field | 1974 | 160 | SF | CNRMA |
| 237 | EM Club | 1975 | 10632 | SF | CNRMA |
| 238 | Boat Maintenance Shop | 1976 | 4150 | SF | CG MSRT |
| 240 | Sewage Treatment Facility | 1976 | 2254 | SF | NAVFAC |
| 241 | Bowling / Snack Bar | 1978 | 5010 | SF | CNRMA |
| 243 | Rec Pavilion (behind Bldg B-238) | 1977 | 540 | SF | CNRMA |
| 246 | Sewage Pump Station | 1980 | 100 | SF | CG COMMCOM |
| 255 | Fuel Tank (by Bldg B-002) | 1972 | 15000 | GL | CNRMA |
| 256 | Fuel Tank (by Bldg B-015) | 1972 | 4000 | GL | CNRMA |
| 257 | NATO/Satellite Grnd Terminal | 1972 | 7491 | SF | MCSFTCo |
| 257A | NATO/Package Lift Station | 1976 | 250 | SF | CNRMA |
| 258 | NATO/Sentry House | 1972 | 144 | SF | CNRMA |
| 259 | NATO/Storage | 1977 | 231 | SF | CNRMA |
| 260 | NATO/Fuel Tank Gen | 1972 | 10,000 | GL | CNRMA |
| 261 | NATO/Fuel Tank Fen | 1972 | 10,000 | GL | CNRMA |
| 262 | NATO/Fuel Tank Heat | 1972 | 1,500 | GL | CNRMA |
| 267 | NCTAMS Satellite Control Facility | 1982 | 4929 | SF | CNRMA |
| 268 | Boat Maintenance Shop | 1981 | 1000 | SF | CG MSRT |
| 269 | MWR Admin | 1981 | 1400 | SF | CNRMA |
| 270 | Potable Water Well | 1981 | 100 | SF | NAVFAC |
| 271 | Microwave Tower B-14 Guyed | 1979 | 365 | LF | CNRMA |
| 272 | Sewage Pumping Station Cardinal | 1980 | 143 | SF | NAVFAC |
| 273 | Racquetball Court | 1981 | 2735 | SF | CNRMA |
| 275 | Gate House | 2002 | 250 | SF | CNRMA |
| 275A | Main Gate | 2008 | CNRMA | ||
| 275B | Gate Back Up Generator | 2008 | CNRMA | ||
| 275C | Popup Barriers / Drop Arm | 2008 | CNRMA | ||
| 275D | Maint Gate House Canopy | 2008 | CNRMA | ||
| 280 | Chapel/Religious Center | 1985 | 9250 | SF | CNRMA |
| 281 | MWR Equipment Rental Center | 1983 | 3720 | SF | CNRMA |
| 283 | AGST Fuel Tank Generator B-14 | 1990 | 8000 | GL | CNRMA |
| 284 | Sewage Pumping Station B-280 | 1983 | 120 | SF | NAVFAC |
| 285 | Guard Shack at B-14 | 2002 | 16 | SF | CNRMA |
| 286 | EM Club Storage | 1965 | 192 | SF | CNRMA |
| 287 | Public Works Maintenance/Equipment Storage | 1960 | 432 | SF | CNRMA |
| 288 | Public Works Equipment Parking | 1975 | 1730 | SY | CNRMA |
| 289 | Public Works Open Storage | 1970 | 550 | SY | CNRMA |
| 290 | Skeet Range (2 Towers Total) | 1975 | 256 | SF | CNRMA |
| 291 | Small Arms Range (Blue Range) | 1965 | 0.6 | AC | CNRMA |
| 294 | Housing Office | 1987 | 1850 | SF | CNRMA |
| 295 | Gun Skeet and Trap Bldg | 1987 | 960 | SF | CNRMA |
| 296 | Boat Maintenance Shop | 1964 | 740 | SF | CG MSRT |
| 297 | Well Potable Water #8 | 1986 | 56 | SF | NAVFAC |
| 298 | Well Potable Water #9 | 1986 | 56 | SF | NAVFAC |
| 299 | Well Potable Water #10 | 1986 | 56 | SF | NAVFAC |
| 300 | Public Works Grounds Equipment Shed | 1987 | 520 | SF | CNRMA |
| 301 | Flammable Storage (Supply) | 1987 | 220 | SF | CNRMA |
| 302 | Hazardous Waste Storage | 1988 | 180 | SF | CNRMA |
| 303 | Outdoors Recr. Vehicle Storage | 1988 | 1650 | SY | CNRMA |
| 304 | Antenna FSSC | 1989 | 2644000 | SF | FSSC |
| 305 | FSSC Storage Behind Bldg 310 | FSSC | |||
| 306 | Ground Water Storage Tank B-339 | 1988 | 12K | GL | NAVFAC |
| 308 | Ground Water Storage Tank | 1988 | 100K | GL | NAVFAC |
| 309 | Ammunition Locker | 1988 | 56 | SF | CNRMA |
| 310 | FSSC Admin and Training | 1988 | 30410 | SF | FSSC |
| 311 | Parking Lot | 1988 | 1840 | SY | CNRMA |
| 312 | Electronics Parts Storage | 1988 | 1440 | SF | CNRMA |
| 313 | Electronics Parts Storage | 1988 | 400 | SF | CNRMA |
| 316 | Fuel Oil Tank | 1978 | 1000 | GL | CNRMA |
| 317 | Fuel Oil Tank | 1976 | 1000 | GL | CNRMA |
| 319 | Fuel Oil Tank | 1981 | 275 | GL | CNRMA |
| 334 | Sewage Lift Station B-041 | 1989 | 16 | SF | CNRMA |
| 335 | Dechlorination Tank | 1989 | 150 | SF | NAVFAC |
| 336 | Package Lift Station B-344 | 1988 | 180 | SF | NAVFAC |
| 337 | Wickham Concession Stand | 1989 | 600 | SF | CNRMA |
| 339 | Water Treatment Plant | 1989 | 1200 | SF | NAVFAC |
| 340 | Fire Dept Diesel Tank by B-003 | 1989 | 500 | GL | CNRMA |
| 342 | Barracks (BOQ) | 1991 | 5870 | SF | CNRMA |
| 343 | Sewage Injection Station B-363 | 1987 | 100 | SF | FSSC |
| 344 | FSSC Operations | 1990 | 15666 | SF | FSSC |
| 346 | Fuel Tank by B-352 | 1990 | 4000 | GL | CNRMA |
| 347 | Fuel Tank by B-352 | 1990 | 8000 | GL | CNRMA |
| 348 | Gymnasium | 1990 | 10574 | SF | CNRMA |
| 348A | Pool Pump House | CNRMA | |||
| 350 | Package Lift Station B-310/B-238 | 1989 | 100 | SF | CNRMA |
| 351 | Barracks | 1991 | 29496 | SF | CNRMA |
| 352 | Satellite Terminal Facility | 1988 | 20370 | SF | CNRMA |
| 353 | Post-Aeration Tank | 1989 | 7500 | SF | NAVFAC |
| 354 | Fuel Tank by B-348 | 1991 | 2000 | GL | CNRMA |
| 355 | Fuel Tank | 1991 | 500 | GL | CNRMA |
| 356 | Fuel Tank by B-351 | 1991 | 2500 | GL | CNRMA |
| 358 | Tennis Court | 1995 | 10200 | SF | CNRMA |
| 359 | Sewage Lift Station (Holding Pond) | 1992 | 100 | SF | NAVFAC |
| 360 | USMC Academic Industrial Bldg | 1994 | 21600 | SF | MCSFTCo |
| 361 | Out. Small Arms Marine Range | 1990 | 1113750 | SF | MCSFTCo |
| 362 | Contractor Grounds Facility | 1994 | 1800 | SF | CNRMA |
| 363 | FSSC Warehouse | 1995 | 10000 | SF | FSSC |
| 364 | Hunting Dog Kennels | 1974 | 3840 | SF | CNRMA |
| 365 | Ammo Locker | 1995 | 56 | SF | MCSFTCo |
| 366 | Barracks | 1991 | 46915 | SF | MCSFTCo |
| 367 | Water Treatment Plant | 1992 | 1118 | SF | NAVFAC |
| 368 | Well House | 1992 | 99 | SF | NAVFAC |
| 370 | Well House | 1992 | 99 | SF | NAVFAC |
| 371 | Maintenance Lift Station on Relay | 1992 | 225 | SF | NAVFAC |
| 372 | Volleyball Court - Sand | 1994 | 3200 | SF | CNRMA |
| 373 | Potable Water Storage | 1992 | 100,000 | GL | NAVFAC |
| 374 | Family Services Center | 1995 | 1296 | SF | CNRMA |
| 376 | Volleyball Court – Sand | 1994 | 3200 | SF | CNRMA |
| 377 | Fuel Tank Bldg 366 | 1991 | 4000 | GL | CNRMA |
| 379 | Fuel Tank by B-41 | 1993 | 4000 | GL | CNRMA |
| 380 | Outdoor Basketball Court | 1994 | 4250 | SF | CNRMA |
| 382 | Aquatic Training Facility | 1993 | 10650 | SF | CNRMA |
| 383 | Child Development Center (CDC) | 1996 | 9750 | SF | CNRMA |
| 383C | CDC Back Up Generator | CNRMA | |||
| 385 | Self Help Equipment Storage | 1994 | 130 | SF | CNRMA |
| 389 | Pass & ID Office/Truck Control | 1992 | 672 | SF | CNRMA |
| 390 | Medical/Dental | 1995 | 16116 | SF | BUMED |
| 391 | Sewage Lift Station by B-295 | 1996 | 100 | SF | CNRMA |
| 392 | Sludge De-Watering Bldg | 1996 | 600 | SF | NAVFAC |
| 393 | Base Warehouse | 1997 | 6080 | SF | CNRMA |
| 394 | Storage-Environmental (TFS) | 1998 | 2400 | SF | CNRMA |
| 395 | MWR Warehouse | 1997 | 3000 | SF | CNRMA |
| 396 | Exchange Retail Store | 2017 | 6402 | SF | CNRMA |
| 396A | Gas Station Canopy | 2017 | 1456 | SF | CNRMA |
| 396B | Underground Storage Tank | 2017 | 9000/6000 Split | GL | CNRMA |
| 396C | Underground Storage Tank | 2017 | 15000 | GL | CNRMA |
| 397 | Carwash | 1999 | 800 | SF | CNRMA |
| 398 | IAMS Shoothouse | 1995 | 6599 | SF | MCSFTCo |
| 399 | IAMS Storage/Office | 1995 | 1384 | SF | MCSFTCo |
| 400 | IAMS Grounds Water Storage (Fire Protection) | 1995 | 100,000 | GL | MCSFTCo |
| 401 | Outdoor Volleyball – Sand - by B 348 | 1995 | 1800 | SF | CNRMA |
| 402 | Outdoor Basketball Court (Housing) | 1996 | 4700 | SF | CNRMA |
| 403 | Marine Storage (FTS) | 1998 | 2400 | SF | MCSFTCo |
| 404 | Conference Center | 1997 | 4307 | SF | CNRMA |
| 405 | Fuel Tank @ B-240 | 1995 | 3000 | GL | CNRMA |
| 407 | Flag Pole by B-7 | 1995 | 20 | SF | CNRMA |
| 408 | Picnic Pavilion by Pool | 1995 | 1320 | SF | CNRMA |
| 410 | Fuel Tank by B-360 | 1994 | 2500 | GL | CNRMA |
| 411 | Pool Shelter | 1995 | 420 | SF | CNRMA |
| 413 | Fuel Tank by B-383 | 1995 | 1000 | GL | CNRMA |
| 415 | IAMS Fuel Tank | 1996 | 1000 | GL | MCSFTCo |
| 416 | IAMS Firehouse | 1995 | 3200 | SF | MCSFTCo |
| 417 | IAMS Paint Ball Range | 1996 | 3700 | SF | MCSFTCo |
| 422 | Waste Oil Tank by B-238 | 1996 | 500 | GL | CNRMA |
| 423 | Waste Oil Tank by B-238 | 1996 | 500 | GL | CNRMA |
| 424 | Antifreeze Tank by B-238 | 1996 | 500 | GL | CNRMA |
| 425 | Barrack Storage (by Bldg 238) | CNRMA | |||
| 426 | Picnic Pavilion at B-207/208 | 1996 | 680 | SF | CNRMA |
| 427 | Fuel Tank by B-41 | 1996 | 500 | GL | CNRMA |
| 428 | Fuel Tank by B-41 | 1996 | 1500 | GL | CNRMA |
| 429 | Transformer 41 Overflow Parking | NAVFAC | |||
| 431 | Teton Warehouse | 1997 | 4000 | SF | CNRMA |
| 432 | Community Center | 1998 | 4070 | SF | CNRMA |
| 433 | Fuel Tank by 390 | 1997 | 2500 | GL | CNRMA |
| 434 | Anti-Terrorism Warehouse | 1998 | 3000 | SF | CENSECFOR |
| 435 | Packaged Lift Station Teton Warehouse | 1998 | 100 | SF | CNRMA |
| 436 | Fuel Tank at B-344 | 1998 | 4000 | GL | CNRMA |
| 437 | Sewage Lift Station IAMS Range | 1996 | 100 | SF | MCSFTCo |
| 438 | Sewage Lift Station at B-390 | 1998 | 100 | SF | BUMED |
| 439 | WWTP Lab | 1999 | 950 | SF | NAVFAC |
| 441 | CRIMP Bldg | 1998 | 240 | SF | CNRMA |
| 445 | Operation/Training Complex | 2002 | 166.7 | SF | NCWDG/GTE |
| 446 | FSSC Antenna Maintenance | 1999 | 2400 | SF | FSSC |
| 447 | Stateline Baseball Diamond | 1998 | 9800 | SF | CNRMA |
| 448 | Stateline Dugout | 1998 | 140 | SF | CNRMA |
| 449 | Stateline Dugout | 1998 | 140 | SF | CNRMA |
| 451 | Radio Rm | 2000 | 1000 | SF | CNRMA |
| 452 | Ops Building | 2009 | 2040 | SF | CNRMA |
| 453 | Earth Terminal | 2010 | 400 | SF | CNRMA |
| 454 | Earth Terminal | 2010 | 400 | SF | CNRMA |
| 455 | Earth Terminal | 2010 | 400 | SF | CNRMA |
| 456 | Fuel Tank | 2010 | 14000 | GL | CNRMA |
| 457 | Rubb Compound | 2002 | 117250 | SF | CG MSRT |
| 457A | Package Lift Station Rubb Compound | 2002 | 100 | SF | CG MSRT |
| 457G | MOUS Compound Generator | 2010 | 1750 | KW | CNRMA |
| 489 | Ship On Land (SOL) Mock-UP | 2007 | 3600 | SF | MCSFTCo |
| 500 | Joint Regional Corr. Facility (JRCF) | 2011 | 210149 | SF | CNRMA |
| 501 | Gate Sentry House JRCF | 2011 | 200 | SF | CNRMA |
| 502 | Outdoor Play Court JRCF | 2011 | 2160 | SF | CNRMA |
| 503 | Outdoor Play Court JRCF | 2011 | 2160 | SF | CNRMA |
| 504 | Outdoor Play Court JRCF | 2011 | 2160 | SF | CNRMA |
| 506 | Outdoor Play Court JRCF | 2011 | 4200 | SF | CNRMA |
| 507G | Standby Generator JRCF | 2011 | 1750 | KW | CNRMA |
| 508 | Propane Tank JRCF | 2011 | 30000 | GL | CNRMA |
| JRCF Prk | Parking Area JRCF | 2011 | 20000 | SY | CNRMA |
| JRCF Road | Wilderness Road | 2011 | 18000 | SY | CNRMA |
| CG-01 | Coast Guard Operations | 1976 | 16848 | SF | CG COMMCOM |
| CG-02 | Antenna | CG COMMCOM | |||
| CG-03 | Coast Guard Barracks | 1976 | 13104 | SF | CG SMTC |
| CG-04 | Packaged Lift Station | 1976 | 80 | SF | CG COMMCOM |
| CG-07 | Coast Guard Maintenance Shop | 1998 | 5525 | SF | CG COMMCOM |
J-1502000-04
| ATTACHMENT J-1502000-04 |
| HISTORICAL SERVICE ORDER WORKLOAD |
| Historical Service Order Workload | J-1502000-04-01 |
| Samples of Service Order Work Orders | J-1502000-04-02 |
J-1502000-04-01
| HISTORICAL SERVICE ODER WORKLOAD FOR FY13 | |||
| Funding Activity | Emergency Service Order* | Urgent Service Orders | Routine Service Orders |
| No. of Service Orders | No. of Service Orders | No. of Service Orders | |
| CNRMA | 10* | 37 | 820 |
| CNRMA - JRCF | 0 | 5 | 287 |
| CNRMA - CENSECFOR | 0 | 0 | 44 45 |
| CNRMA - FSSC | 0 | 3 | 188 |
| CNRMA - NSCF | 0 | 5 | 27 |
| CNRMA - SPAWAR | 0 | 0 | 1 |
| CNRMA - USM MCSFTCo | 0 | 6 | 220 |
| BUMED | 0 | 1 | 56 |
| CG MSRT | 0 | 0 | 13 |
| NCWDG/GTE | 0 | 0 | 6 |
| USCG COMMCOM | 0 | 2 | 10 |
| Total Service Orders FY13 | 10 | 59 | 1672 |
| HISTORICAL SERVICE ODER WORKLOAD FOR FY12 | |||
| Funding Activity | Emergency Service Orders | Urgent Service Orders | Routine Service Orders |
| No. of Service Orders | No. of Service Orders | No. of Service Orders | |
| CNRMA | 10* | 45 | 929 |
| CNRMA - JRCF | 0 | 6 | 184 |
| CNRMA - CENSECFOR | 0 | 4 | 75 |
| CNRMA - FSSC | 0 | 4 | 146 |
| CNRMA - NSCF | 0 | 1 | 20 |
| Funding Activity | Emergency Service Orders | Urgent Service Orders | Routine Service Orders |
| No. of Service Orders | No. of Service Orders | No. of Service Orders | |
| CNRMA - SPAWAR | 0 | 0 | 3 |
| CNRMA - CENSECFOR | 0 | 0 | 3 |
| CNRMA - USM MCSFTCo | 0 | 2 | 184 |
| BUMED | 0 | 2 | 72 |
| CG MSRT | 0 | 0 | 43 |
| NCWDG/GTE | 0 | 0 | 11 |
| USCG COMMCOM | 0 | 3 | 16 |
| Total Service Orders FY12 | 10 | 67 | 1683 |
* No historical data is available for Emergency Service Orders. It is estimated there will be 10 emergency service orders per year. CNRMA reserves the right to utilize estimated emergency service orders to any of the funding activities.
J-1502000-04-02
| Description | Location | Work Type | Sub-Work Type | Supervisor | Lead | Labor | Craft | Approved Date | Target Start | Target Finish | Asset | PM | Reported Date | Priority | MDI | Customer Ref # | Service Request # | Program Year | Service Provider Ref Code | GL Account | Site |
| THE EMERGENCY EXIT DOOR AT THE FAR END, VERY DIFFICULT TO OPEN./// ALL DOOR ARE BAD AND NEED TO BE REPLACED, WAITING ON ESTAIMATE | NORWEST-348 | ROUTINE | NORTHWEST | 5/4/16 10:35 AM | 5/18/18 11:41 AM | 5/4/16 10:35 AM | 1 | 39 | 11346926 | A.N4008500.10.TRACK1002006 | 10201 | ||||||||||
| Left side stairs near armory RM 113; Rubber on stairs need replacement " safety hazard" | NORWEST-360 | ROUTINE | NORTHWEST | 9/8/16 10:53 AM | 10/12/16 10:20 AM | 9/8/16 10:51 AM | 1 | 65 | 11888559 | A.N4008500.10.TRACK1002006 | 10201 | ||||||||||
| replace faulty valves in the basement of B-008 | NORWEST-8 | ROUTINE | NORTHWEST | 11/29/16 1:40 PM | 11/29/16 1:40 PM | 11/29/16 1:24 PM | 1 | 67 | 12139425 | A.N4008500.10.TRACK1002006 | 10201 | ||||||||||
| NAVY SIDE, All outside platform ladder well railings checked for rust/durability as 3 ladder wells are unsafe due to rusty railings | NORWEST-41 | ROUTINE | NORTHWEST | 2/9/17 12:47 PM | 3/11/17 12:51 PM | 2/9/17 12:44 PM | 1 | 80 | 12351485 | A.N4008500.10.TRACK1002006 | 10201 | ||||||||||
| Pot holes filled at various spots throughout the building compound | NORWEST-41 | ROUTINE | NORTHWEST | 2/9/17 1:05 PM | 3/11/17 1:06 PM | 2/9/17 12:51 PM | 1 | 80 | 12351515 | A.N4008500.10.TRACK1002006 | 10201 | ||||||||||
| ET-2, flourscent light out in the pedestal./// REPLACED LIGHTS AS NEEDED | NORWEST-452 | ROUTINE | NORTHWEST | 2/17/17 3:20 PM | 2/17/17 3:20 PM | 3/19/17 3:20 PM | 2/17/17 3:18 PM | 1 | 49 | 12376969 | A.N4008500.10.TRACK1002006 | 10201 | |||||||||
| WALL PAPER IS PEELING IN THE BOWLING CENTER | NORWEST-241 | ROUTINE | NORTHWEST | 6/20/17 9:00 AM | 2/27/17 3:31 PM | 7/20/17 9:00 AM | 2/27/17 3:30 PM | 1 | 12400486 | A.N4008500.10.TRACK1002006 | 10201 | ||||||||||
| investigate switchboard at bldg 14.// CARTER CAT INSTALLED NEW VOLTAGE REGULATORS, CHECKED OPS | NORWEST-14 | URGENT | FACILITIES | 4/10/17 3:29 PM | 4/10/17 3:29 PM | 4/11/17 7:45 AM | 1 | 86 | 12530337 | A.N4008500.10.TRACK1002006 | 10201 | ||||||||||
| run power for laser machine, in print shop.// A NEW 3 PH SERVICE NEEDS TO BE INSTALLED TO POWER NEW LASER, PRINTER. OUT OF SCOPE. | NORWEST-500 | ROUTINE | NORTHWEST | 5/3/17 3:22 PM | 6/2/17 3:27 PM | 5/3/17 3:21 PM | 1 | 86 | 284433 | 12606355 | A.N4008500.10.TRACK1002006 | 10201 | |||||||||
| CHECK VENTILATION SYSTEM FOR THE SCULLERY | NORWEST-7 | ROUTINE | NORTHWEST | 6/5/17 3:00 PM | 7/7/17 10:04 AM | 6/5/17 3:00 PM | 1 | 64 | 12715333 | A.N4008500.10.TRACK1002006 | 10201 | ||||||||||
| BOILER ROOM HAS INADEQUATE FIRE EXTINGUISHER | NORWEST-432 | ROUTINE | NORTHWEST | 6/28/17 3:27 PM | 7/28/17 3:28 PM | 6/28/17 3:25 PM | 1 | 45 | 12780452 | A.N4008500.10.TRACK1002006 | 10201 | ||||||||||
| REPAIR DOUBLE DOOR SQUAD BAY 4 | NORWEST-366 | ROUTINE | NORTHWEST | 7/21/17 1:55 PM | 8/20/17 1:56 PM | 7/21/17 1:51 PM | 1 | 71 | 13044509 | A.N4008500.10.TRACK1002006 | 10201 | ||||||||||
| LEAK IN THE ROOF BT THE FRONT DOOR NEXT TO LIGHT | NORWEST-432 | ROUTINE | NORTHWEST | 7/28/17 8:30 AM | 7/28/17 8:00 AM | 8/27/17 8:30 AM | 7/28/17 8:00 AM | 1 | 45 | 13231110 | A.N4008500.10.TRACK1002006 | 10201 | |||||||||
| FRONT DOORS STICKS, HARD TO OPEN, WON'T OPEN | NORWEST-348 | ROUTINE | NORTHWEST | 8/2/17 4:18 PM | 9/1/17 4:19 PM | 8/2/17 4:13 PM | 1 | 39 | 13201005 | A.N4008500.10.TRACK1002006 | 10201 | ||||||||||
| BROKEN WINDOW | NORWEST-268 | ROUTINE | NORTHWEST | 8/30/17 3:20 PM | 8/30/17 3:19 PM | 9/29/17 3:20 PM | 8/30/17 3:18 PM | 1 | 49 | 13467965 | A.N4008500.10.TRACK1002006 | 10201 | |||||||||
| CHANGE LOCK AT CYBER ALLEY | NORWEST-65 | ROUTINE | NORTHWEST | 9/20/17 1:20 PM | 10/2/17 10:20 AM | 9/20/17 1:20 PM | 1 | 39 | 13759967 | A.N4008500.10.TRACK1002006 | 10201 | ||||||||||
| THERE ARE 5 BROKEN FENCE POLES ON SOUTH END OF BUILDING | NORWEST-352 | ROUTINE | NORTHWEST | 9/22/17 2:54 PM | 9/22/17 2:51 PM | 10/22/17 2:54 PM | 9/22/17 2:42 PM | 1 | 95 | 13544427 | A.N4008500.10.TRACK1002006 | 10201 | |||||||||
| Need a washout cement slab for drain near the back Liberty doors located by the sheds | NORWEST-237 | ROUTINE | NORTHWEST | 9/28/17 10:00 AM | 9/28/17 9:51 AM | 10/28/17 10:00 AM | 9/27/17 4:00 PM | 1 | 61 | 13750359 | A.N4008500.10.TRACK1002006 | 10201 | |||||||||
| THE EXTERIOR OF THE BLDG HAS A LOT OF CRACKS, THE STUCCO AND PAINT IS PEALING,CAUSING WATER TO ENTER | NORWEST-237 | ROUTINE | NORTHWEST | 9/28/17 10:18 AM | 9/28/17 10:16 AM | 10/28/17 10:18 AM | 9/27/17 4:00 PM | 1 | 61 | 13750406 | A.N4008500.10.TRACK1002006 | 10201 | |||||||||
| replace the UPS A/C UNIT SYSTEM | NORWEST-344 | ROUTINE | NORTHWEST | 10/30/17 12:51 PM | 10/30/17 12:51 PM | 10/30/17 12:49 PM | 1 | 91 | 13847244 | A.N4008500.10.TRACK1002006 | 10201 | ||||||||||
| 1 GATE ON EACH SIDE (INBOUND AND OUTBOUND) WILL NOT OPERATE PROPERLY (MOTOR OR SENSOR) | NORWEST-399 | ROUTINE | NORTHWEST | 11/1/17 11:02 AM | 12/1/17 11:03 AM | 11/1/17 10:55 AM | 1 | 65 | 13854840 | A.N4008500.10.TRACK1002006 | 10201 | ||||||||||
| PEELING PAINT IN THE COZY ROOM | NORWEST-432 | ROUTINE | NORTHWEST | 11/8/17 9:35 AM | 11/8/17 9:27 AM | 12/8/17 9:35 AM | 11/8/17 9:27 AM | 1 | 45 | 13876489 | A.N4008500.10.TRACK1002006 | 10201 | |||||||||
| THERE ARE VARIOUS SPOT ON THE WALL IN THE SAC ROOM WITH PEELING WALL PAPER | NORWEST-432 | ROUTINE | NORTHWEST | 11/8/17 9:35 AM | 11/8/17 9:27 AM | 12/8/17 9:35 AM | 11/8/17 9:26 AM | 1 | 45 | 13876485 | A.N4008500.10.TRACK1002006 | 10201 | |||||||||
| have exhaust fans installed in male and female heads | NORWEST-5 | ROUTINE | NORTHWEST | 11/20/17 9:44 AM | 11/20/17 9:44 AM | 11/20/17 9:42 AM | 1 | 49 | 13911475 | A.N4008500.10.TRACK1002006 | 10201 | ||||||||||
| REPLACE SPLIT HVAC SYSTEM | NORWEST-432 | ROUTINE | NORTHWEST | 11/28/17 9:15 AM | 11/28/17 9:15 AM | 11/28/17 9:12 AM | 1 | 45 | 13932436 | A.N4008500.10.TRACK1002006 | 10201 | ||||||||||
| REPLACE HP PACKAGED UNIT | NORWEST-432 | ROUTINE | NORTHWEST | 11/28/17 9:18 AM | 11/28/17 9:18 AM | 11/28/17 9:17 AM | 1 | 45 | 13932453 | A.N4008500.10.TRACK1002006 | 10201 | ||||||||||
| NEED A PLASTIC COVER FOR THE PROTECTION OF THE DENTAL EQUIPMENT IN RM A-09 | NORWEST-390 | ROUTINE | NORTHWEST | 11/29/17 10:43 AM | 11/29/17 10:31 AM | 12/29/17 10:43 AM | 11/29/17 10:29 AM | 1 | 53 | 13937128 | A.N4008500.10.TRACK1002006 | 10201 | |||||||||
| REPLACE CAPACITORS ON UPS | NORWEST-14 | ROUTINE | NORTHWEST | 12/1/17 8:38 AM | 12/1/17 8:38 AM | 12/1/17 8:34 AM | 1 | 86 | 13944873 | A.N4008500.10.TRACK1002006 | 10201 | ||||||||||
| RMS 111 A, B, D. NEED TO HAVE SMOKE DETECTORS INSTALLED, NONE ARE PRESENT. PER INSPECTION | NORWEST-41 | ROUTINE | NORTHWEST | 12/7/17 9:44 AM | 12/7/17 9:43 AM | 1/6/18 9:44 AM | 12/7/17 9:39 AM | 1 | 80 | 13964125 | A.N4008500.10.TRACK1002006 | 10201 | |||||||||
| 507 FLOOR TILES SQUAD BAY 4 | NORWEST-366 | ROUTINE | NORTHWEST | 12/7/17 10:47 AM | 12/7/17 10:44 AM | 1/6/18 10:47 AM | 12/7/17 10:42 AM | 1 | 71 | 13964383 | A.N4008500.10.TRACK1002006 | 10201 | |||||||||
| RM 161 - ELECTRICAL WALL HEATERS ARE NOT WORKING (TOTAL 4) | NORWEST-310 | ROUTINE | NORTHWEST | 12/13/17 12:25 PM | 1/12/18 12:27 PM | 12/13/17 12:20 PM | 1 | 49 | 13985369 | A.N4008500.10.TRACK1002006 | 10201 | ||||||||||
| GARAGE DOOR BROKEN | NORWEST-6 | ROUTINE | NORTHWEST | 1/8/18 12:09 PM | 1/8/18 12:09 PM | 2/7/18 12:09 PM | 1/8/18 12:08 PM | 1 | 82 | 14059484 | A.N4008500.10.TRACK1002006 | 10201 | |||||||||
| FAUCET IN DENTAL THAT NEEDS TO BE REPLACED IN ORDER TO INSTALL NEW SYSTEM FOR | NORWEST-390 | ROUTINE | NORTHWEST | 1/22/18 1:05 PM | 1/22/18 9:50 AM | 2/21/18 1:05 PM | 1/22/18 9:48 AM | 1 | 53 | 14124019 | A.N4008500.10.TRACK1002006 | 10201 | |||||||||
| CLOSET ON THE LEFT IN LOBBY - CEILING TILE IS MISSING . WIRES ARE EXPOSED | NORWEST-342 | ROUTINE | NORTHWEST | 2/2/18 12:41 PM | 2/2/18 12:41 PM | 3/4/18 12:41 PM | 2/2/18 12:39 PM | 1 | 54 | 14211582 | A.N4008500.10.TRACK1002006 | 10201 | |||||||||
| 2 LIGHTS OUT - OIC STAIRWELL | NORWEST-41 | ROUTINE | NORTHWEST | 2/5/18 1:53 PM | 2/5/18 1:52 PM | 3/7/18 1:53 PM | 2/5/18 1:51 PM | 1 | 80 | 14229630 | A.N4008500.10.TRACK1002006 | 10201 | |||||||||
| ROLLING GATE WON'T OPEN. OFF RELAY ROAD | NORWEST-352 | ROUTINE | NORTHWEST | 7/19/18 11:26 AM | 2/5/18 2:08 PM | 8/18/18 11:26 AM | 2/5/18 2:05 PM | 1 | 95 | 14229744 | A.N4008500.10.TRACK1002006 | 10201 | |||||||||
| REPLACE GFE CABLE LOCATOR W/ NEW ONE. BLDG 38 | NORWEST-NORWEST | ROUTINE | NORTHWEST | 2/12/18 3:41 PM | 3/14/18 3:44 PM | 2/12/18 3:37 PM | 1 | 14281277 | A.N4008500.10.TRACK1002006 | 10201 | |||||||||||
| EXTERIOR VISITATION - TWO CRACKS IN WINDOW. | NORWEST-500 | ROUTINE | NORTHWEST | 2/16/18 1:20 PM | 3/18/18 1:23 PM | 2/16/18 1:18 PM | 1 | 86 | 14315046 | A.N4008500.10.TRACK1002006 | 10201 | ||||||||||
| WINDOW 3 IS BROKEN, OFFTRACK AND WON'T CLOSE PROPERLY | NORWEST-366 | ROUTINE | NORTHWEST | 2/26/18 3:17 PM | 3/28/18 3:18 PM | 2/26/18 3:15 PM | 1 | 71 | 14389875 | A.N4008500.10.TRACK1002006 | 10201 | ||||||||||
| REPAIR HVAC SYSTEMS AND CONTROLS | NORWEST-390 | ROUTINE | NORTHWEST | 3/1/18 9:18 AM | 3/1/18 9:18 AM | 3/1/18 9:15 AM | 1 | 53 | 14414056 | A.N4008500.10.TRACK1002006 | 10201 | ||||||||||
| CRACK SHOWER PAN IN MEN'S ROOM (LEFTSIDE) | NORWEST-6 | ROUTINE | NORTHWEST | 3/1/18 2:35 PM | 3/31/18 2:39 PM | 3/1/18 2:31 PM | 1 | 82 | 14416715 | A.N4008500.10.TRACK1002006 | 10201 | ||||||||||
| JUILET WEST- CONTROLLER FOR AUTOMATIC TRANFSER SWITCH IS INOP | NORWEST-500 | ROUTINE | NORTHWEST | 3/5/18 1:20 PM | 4/4/18 1:21 PM | 3/5/18 1:18 PM | 1 | 86 | 14447586 | A.N4008500.10.TRACK1002006 | 10201 | ||||||||||
| SPEED LINE - BREAKER TRIPS WHEN SOMETHING IS PLUGGED | NORWEST-7 | ROUTINE | NORTHWEST | 3/7/18 9:23 AM | 4/6/18 9:25 AM | 3/7/18 9:18 AM | 1 | 64 | 14464287 | A.N4008500.10.TRACK1002006 | 10201 | ||||||||||
| UP-GRADE HVAC SYSTEM | NORWEST-390 | ROUTINE | NORTHWEST | 3/20/18 9:17 AM | 3/20/18 9:17 AM | 3/20/18 9:16 AM | 1 | 53 | 14564939 | A.N4008500.10.TRACK1002006 | 10201 | ||||||||||
| TRAINING CLASS - CRACKED WINDOWS | NORWEST-500 | ROUTINE | NORTHWEST | 4/12/18 12:17 PM | 5/12/18 12:19 PM | 4/12/18 12:15 PM | 1 | 86 | 15075110 | A.N4008500.10.TRACK1002006 | 10201 | ||||||||||
| REPAIR AND TEST THE SPARE BREAKER REMOVED FROM SERVICE ON 4/16/18. | NORWEST-NORWEST | ROUTINE | NORTHWEST | 4/20/18 2:18 PM | 4/20/18 2:18 PM | 4/20/18 2:14 PM | 1 | 15141662 | A.N4008500.10.TRACK1002006 | 10201 | |||||||||||
| REPAIR / REPLACE SOFT START FOR BLDG 67A | NORWEST-67A | ROUTINE | NORTHWEST | 4/25/18 12:47 PM | 4/25/18 12:47 PM | 4/25/18 12:45 PM | 1 | 69 | 15176333 | A.N4008500.10.TRACK1002006 | 10201 | ||||||||||
| re-core the glass door at old nex bldg 4 | NORWEST-4 | ROUTINE | NORTHWEST | 5/10/18 2:48 PM | 5/10/18 2:48 PM | 5/10/18 2:46 PM | 1 | 64 | 15295657 | A.N4008500.10.TRACK1002006 | 10201 | ||||||||||
| INSOLATE WATER LINE FOR INTERIOR MAIN VALVE REPLACEMENT (BY OTHERS) | NORWEST-65 | ROUTINE | NORTHWEST | 6/27/18 3:06 PM | 5/24/18 2:55 PM | 7/27/18 3:06 PM | 5/24/18 2:52 PM | 1 | 39 | 15395687 | A.N4008500.10.TRACK1002006 | 10201 | |||||||||
| PROVIDE 4 TRUCK LOADS OF GRAVEL FOR AMRINE AT B-366 AND B-360 | NORWEST-366 | ROUTINE | NORTHWEST | 5/30/18 10:12 AM | 5/30/18 10:13 AM | 5/30/18 10:11 AM | 1 | 71 | 15432913 | A.N4008500.10.TRACK1002006 | 10201 | ||||||||||
| WATER DAMAGE TO BULK HEADS | NORWEST-1 | ROUTINE | NORTHWEST | 6/1/18 10:12 AM | 6/1/18 9:48 AM | 7/1/18 10:12 AM | 6/1/18 9:46 AM | 1 | 67 | 15446918 | A.N4008500.10.TRACK1002006 | 10201 | |||||||||
| MECHANICAL DAMPER 3E (MD-3E) IS NOT IN THE OPEN POSITION FIRE ALARM PANEL | NORWEST-500 | ROUTINE | NORTHWEST | 6/22/18 11:28 AM | 6/22/18 11:27 AM | 7/22/18 11:28 AM | 6/22/18 11:19 AM | 1 | 86 | 15556943 | A.N4008500.10.TRACK1002006 | 10201 | |||||||||
| PROVIDE FOR TEMPORARY REPAIR TO THE ELECTRICAL DISCONNECT FOR THE SCULLERY | NORWEST-237 | ROUTINE | NORTHWEST | 6/26/18 7:42 AM | 6/26/18 7:39 AM | 7/26/18 7:42 AM | 6/26/18 7:35 AM | 1 | 61 | 15562834 | A.N4008500.10.TRACK1002006 | 10201 | |||||||||
| LEFT FRONT DOOR NOT LATCHING ADD B-344 DOOR | NORWEST-310 | ROUTINE | NORTHWEST | 6/26/19 1:52 PM | 6/26/18 8:25 AM | 7/26/18 8:25 AM | 6/26/18 8:23 AM | 1 | 49 | 15562973 | A.N4008500.10.TRACK1002006 | 10201 | |||||||||
| INSTALL EYE WASH | NORWEST-446 | ROUTINE | NORTHWEST | 6/26/18 8:29 AM | 7/26/18 8:29 AM | 6/26/18 8:27 AM | 1 | 45 | 15562983 | A.N4008500.10.TRACK1002006 | 10201 | ||||||||||
| REPLACE THE HEAT AND COOLING COILS ON THE ROOF UNIT | NORWEST-14 | ROUTINE | NORTHWEST | 9/28/18 8:37 AM | 7/9/18 3:54 PM | 10/28/18 8:37 AM | 7/9/18 3:53 PM | 1 | 86 | 15613882 | A.N4008500.10.TRACK1002006 | 10201 | |||||||||
| CHECK LIGHTS IN OFFICE AREA - TOO BRIGHT. NEED SOFT WHITE LIGHTS | NORWEST-310 | ROUTINE | NORTHWEST | 7/10/18 10:56 AM | 7/10/18 10:54 AM | 8/9/18 10:56 AM | 7/10/18 10:45 AM | 1 | 49 | 15617529 | A.N4008500.10.TRACK1002006 | 10201 | |||||||||
| DOOR HANDLE BROKEN REAR OUTSIDE DOOR FACING FIELD. | NORWEST-360 | ROUTINE | NORTHWEST | 7/11/18 10:41 AM | 8/10/18 10:43 AM | 7/11/18 10:38 AM | 1 | 65 | 15622595 | A.N4008500.10.TRACK1002006 | 10201 | ||||||||||
| INSTALL TEMPORARY CHILLER AND REPLACE THE EXISTING CHILLER | NORWEST-390 | ROUTINE | NORTHWEST | 8/28/18 1:01 AM | 7/17/18 9:53 AM | 9/27/18 1:01 AM | 7/17/18 9:49 AM | 1 | 53 | 15646624 | A.N4008500.10.TRACK1002006 | 10201 | |||||||||
| REPLACE TWO WATER FOUNTAINS IN BLDG | NORWEST-366 | ROUTINE | NORTHWEST | 7/24/18 3:39 PM | 7/24/18 3:39 PM | 7/24/18 3:37 PM | 1 | 71 | 15679019 | A.N4008500.10.TRACK1002006 | 10201 | ||||||||||
| ROOF LEAK IN COMPUTER ROOM | NORWEST-237 | ROUTINE | NORTHWEST | 7/30/18 10:03 AM | 7/30/18 10:03 AM | 8/29/18 10:03 AM | 7/30/18 10:02 AM | 1 | 61 | 15701179 | A.N4008500.10.TRACK1002006 | 10201 | |||||||||
| REPAIR / REPLACE 5 HP PUMP FOR SLUDGE RETURN | NORWEST-240 | ROUTINE | NORTHWEST | 7/31/18 8:15 AM | 8/30/18 8:16 AM | 7/31/18 7:59 AM | 1 | 15705995 | A.N4008500.10.TRACK1002006 | 10201 | |||||||||||
| REPAIR / REPLACE 5 HP PUMP FOR EQUALIZATION TANK | NORWEST-240 | ROUTINE | NORTHWEST | 7/31/18 8:25 AM | 8/30/18 8:27 AM | 7/31/18 8:22 AM | 1 | 15706137 | A.N4008500.10.TRACK1002006 | 10201 | |||||||||||
| FILL IN POTHOLES AROUND ARMORY USING EXISTING ROCKS ON TH EOLD ANTENNA | NORWEST-41 | ROUTINE | NORTHWEST | 8/27/18 10:33 AM | 9/26/18 10:34 AM | 8/27/18 10:31 AM | 1 | 80 | 15844969 | A.N4008500.10.TRACK1002006 | 10201 | ||||||||||
| PROVIDE AND INSTALL ONE VFD RETROFIT LIT ON CIRCUIT CHL-29 | NORWEST-366 | ROUTINE | NORTHWEST | 9/21/18 9:27 AM | 10/21/18 9:28 AM | 9/21/18 9:24 AM | 1 | 71 | 15976297 | A.N4008500.10.TRACK1002006 | 10201 | ||||||||||
| REPAIR -GUTTER SEPERATING FROM BUILDING | NORWEST-268 | ROUTINE | NORTHWEST | 10/15/18 2:25 PM | 11/14/18 2:25 PM | 10/15/18 2:23 PM | 1 | 49 | 16111054 | A.N4008500.10.TRACK1002006 | 10201 | ||||||||||
| REPAIR BROKEN FENCE AND LIGHT POLE | NORWEST-383 | ROUTINE | NORTHWEST | 3/21/19 3:00 PM | 10/18/18 2:26 PM | 11/17/18 2:26 PM | 10/18/18 2:21 PM | 1 | 52 | 16191594 | 2019 | A.N4008500.10.TRACK1002006 | 10201 | ||||||||
| LIGHT COVERS ARE NOT SECURE TO LIGHT FIXTURES IN LOG CABIN | NORWEST-404 | ROUTINE | NORTHWEST | 4/19/19 10:38 AM | 11/1/18 9:16 AM | 12/1/18 9:16 AM | 11/1/18 9:13 AM | 1 | 45 | 16268494 | A.N4008500.10.TRACK1002006 | 10201 | |||||||||
| REPAIR FENCE RAILING THAT HAS BEEN KNOCK DOWN ON THE WEST END OF ARRAY RD | NORWEST-NORWEST | ROUTINE | NORTHWEST | 11/2/18 1:51 PM | 12/2/18 1:51 PM | 11/2/18 1:48 PM | 1 | 16276051 | A.N4008500.10.TRACK1002006 | 10201 | |||||||||||
| SIDE WALK LIFTING UP DUE TO TREE ROOTS | NORWEST-432 | ROUTINE | NORTHWEST | 11/7/18 3:20 PM | 11/7/18 3:20 PM | 12/7/18 3:20 PM | 11/7/18 3:18 PM | 1 | 45 | 16300027 | A.N4008500.10.TRACK1002006 | 10201 | |||||||||
| INVESTIGATE AND REPAIR BROKEN PIPING INSIDE LIFT STATION | NORWEST-CG7 | ROUTINE | NORTHWEST | 11/15/18 1:49 PM | 12/15/18 1:49 PM | 11/15/18 1:43 PM | 1 | 16334580 | A.N4008500.10.TRACK1002006 | 10201 | |||||||||||
| RECIEVE AND RELEASE URINALYSIS ROOM - TOILET HAS A LEAK SOMEWHERE AT THE BASE | NORWEST-500 | ROUTINE | NORTHWEST | 11/16/18 12:51 PM | 12/16/18 12:51 PM | 11/16/18 12:46 PM | 1 | 86 | 16339817 | A.N4008500.10.TRACK1002006 | 10201 | ||||||||||
| INVESTIGATE THE REASON FOR THE SHOWER TREES TO BE PROVIDING VARIOUS TEMPS FOR EACH TREE | NORWEST-366 | ROUTINE | NORTHWEST | 3/19/19 4:01 PM | 11/20/18 4:50 PM | 12/20/18 4:50 PM | 11/20/18 4:48 PM | 1 | 71 | 16357066 | A.N4008500.10.TRACK1002006 | 10201 | |||||||||
| CLEAN AND FLUSH THE LOOP SYSTEM IN THE BRIGG. TODAYS SAMPLE HAD EXCESSIVE TRASH AND METAL DEPOSITS IN THE WATER | NORWEST-500 | ROUTINE | NORTHWEST | 11/30/18 8:40 AM | 11/30/18 8:37 AM | 12/30/18 8:37 AM | 11/30/18 8:34 AM | 1 | 86 | 16398815 | A.N4008500.10.TRACK1002006 | 10201 | |||||||||
| REPLACE 4 STAIRWELL DOORS NORTH & SOUTH OF 360. REFER MAX# DHDYM6 ( XO55 ) | NORWEST-360 | ROUTINE | NORTHWEST | 12/4/18 9:30 AM | 12/4/18 9:30 AM | 12/4/18 9:26 AM | 1 | 65 | 16414971 | A.N4008500.10.TRACK1002006 | 10201 | ||||||||||
| PROVIDE ELECTRICAL SUPPORT TO THE 4 SHEDS BEING INSTALLED | NORWEST-352 | ROUTINE | NORTHWEST | 12/7/18 1:01 PM | 12/7/18 1:01 PM | 1/6/19 1:01 PM | 12/7/18 12:58 PM | 1 | 95 | 16430178 | A.N4008500.10.TRACK1002006 | 10201 | |||||||||
| MECH ROOM - REPAIR EXHAUST FANS | NORWEST-237 | ROUTINE | NORTHWEST | 12/14/18 2:47 PM | 12/14/18 2:46 PM | 1/13/19 2:46 PM | 12/14/18 2:45 PM | 1 | 61 | 16464187 | A.N4008500.10.TRACK1002006 | 10201 | |||||||||
| PLACE BOLLARDS ALONG DRIVE WAY TO THE GALLEY | NORWEST-7 | ROUTINE | NORTHWEST | 3/22/19 10:44 AM | 12/20/18 8:50 AM | 1/19/19 8:50 AM | 12/20/18 8:46 AM | 1 | 64 | 16490248 | A.N4008500.10.TRACK1002006 | 10201 | |||||||||
| IMP REPAIR: REPAIR STEAM LEAK OUTSIDE OF BLDG 5, REF# 440231 | NORWEST-5 | ROUTINE | NORTHWEST | 1/4/19 3:35 PM | 1/4/19 3:35 PM | 1/4/19 3:34 PM | 1 | 49 | 16551976 | A.N4008500.10.TRACK1002006 | 10201 | ||||||||||
| REPLACE / INSTALL 3 STOP VALVES IN THE WATER SYSTEM | NORWEST-500 | ROUTINE | NORTHWEST | 1/9/19 8:52 AM | 1/9/19 8:49 AM | 2/8/19 8:49 AM | 1/9/19 8:46 AM | 1 | 86 | 16573186 | A.N4008500.10.TRACK1002006 | 10201 | |||||||||
| RM 212 - SHOWER ON RIGHT SIDE INOP | NORWEST-366 | ROUTINE | NORTHWEST | 1/16/19 8:12 AM | 1/16/19 8:12 AM | 1/16/19 8:10 AM | 1 | 71 | 16607955 | A.N4008500.10.TRACK1002006 | 10201 | ||||||||||
| ELECTRICAL OUTAGE ON 2/25/19 TO START AT 0730 HOURS AND COMPLETE ON 1240 HRS | NORWEST-352 | ROUTINE | NORTHWEST | 1/18/19 10:31 AM | 1/18/19 10:22 AM | 2/17/19 10:22 AM | 1/18/19 10:19 AM | 1 | 95 | 16619278 | A.N4008500.10.TRACK1002006 | 10201 | |||||||||
| REPLACE WEATHER STRIPPING | NORWEST-348 | ROUTINE | NORTHWEST | 1/24/19 9:21 AM | 2/23/19 9:21 AM | 1/24/19 9:19 AM | 1 | 39 | 16641594 | A.N4008500.10.TRACK1002006 | 10201 | ||||||||||
| LEAK IN LOBBY AREA IN ENTRANCE | NORWEST-65 | ROUTINE | NORTHWEST | 1/24/19 9:30 AM | 1/24/19 9:29 AM | 2/23/19 9:29 AM | 1/24/19 9:27 AM | 1 | 39 | 16641654 | A.N4008500.10.TRACK1002006 | 10201 | |||||||||
| CLOGGED URINAL, MALE RESTROOM./// | NORWEST-65 | ROUTINE | NORTHWEST | 1/25/19 10:05 AM | 1/25/19 10:03 AM | 2/24/19 10:03 AM | 1/25/19 9:58 AM | 1 | 39 | 16647694 | A.N4008500.10.TRACK1002006 | 10201 | |||||||||
| SEAL WINDOWS FROM RAIN IN LOBBY AREA AND STAFF LOUNGE | NORWEST-66 | ROUTINE | NORTHWEST | 1/25/19 3:58 PM | 2/24/19 3:58 PM | 1/25/19 3:56 PM | 1 | 54 | 16649517 | A.N4008500.10.TRACK1002006 | 10201 | ||||||||||
| TERMINATE / DISCONNECT POWER | NORWEST-41 | ROUTINE | NORTHWEST | 1/28/19 11:00 AM | 2/27/19 11:00 AM | 1/28/19 10:38 AM | 1 | 80 | 16658387 | A.N4008500.10.TRACK1002006 | 10201 | ||||||||||
| BACK DOOR NOT LATCHING | NORWEST-344 | ROUTINE | NORTHWEST | 1/28/19 3:10 PM | 1/28/19 3:09 PM | 2/27/19 3:09 PM | 1/28/19 3:07 PM | 1 | 91 | 16659989 | A.N4008500.10.TRACK1002006 | 10201 | |||||||||
| PLEASE REPAIR THE HOT WATER SUPPLY / RETURN LEAK IN THE GARDEN BETWEEN BLDG 7 & 8 | NORWEST-8 | ROUTINE | NORTHWEST | 1/29/19 8:21 AM | 1/29/19 8:21 AM | 1/29/19 8:18 AM | 1 | 67 | 16663051 | A.N4008500.10.TRACK1002006 | 10201 | ||||||||||
| REPLACE 3 LIGHTS IN DIRECTOR OFFICE. | NORWEST-432 | ROUTINE | NORTHWEST | 1/30/19 2:13 PM | 1/30/19 1:38 PM | 3/1/19 1:38 PM | 1/30/19 1:35 PM | 1 | 45 | 16670635 | A.N4008500.10.TRACK1002006 | 10201 | |||||||||
| DEEP SINK IN BATHROOM BEHIND UTILITY 35 BAY IS CLOGGED | NORWEST-6 | ROUTINE | NORTHWEST | 2/1/19 12:42 PM | 1/31/19 2:54 PM | 3/2/19 2:54 PM | 1/31/19 2:51 PM | 1 | 82 | 16677348 | A.N4008500.10.TRACK1002006 | 10201 | |||||||||
| REPLACE LIGHTS ON 1ST AND 2ND FLOOR CG SIDE | NORWEST-41 | ROUTINE | NORTHWEST | 2/4/19 12:33 PM | 2/4/19 12:33 PM | 3/6/19 12:33 PM | 2/4/19 12:22 PM | 1 | 80 | 16692683 | A.N4008500.10.TRACK1002006 | 10201 | |||||||||
| SQB 1 - TOILET #6 LEAKS WHEN FLUSHING | NORWEST-366 | ROUTINE | NORTHWEST | 2/4/19 12:45 PM | 2/4/19 12:41 PM | 3/6/19 12:41 PM | 2/4/19 12:40 PM | 1 | 71 | 16692816 | A.N4008500.10.TRACK1002006 | 10201 | |||||||||
| REMOUNT FURNITURE IN PRE-TOD A - COMING LOOSE FROM WALL | NORWEST-383 | ROUTINE | NORTHWEST | 2/7/19 11:42 AM | 2/7/19 11:41 AM | 3/9/19 11:41 AM | 2/7/19 11:35 AM | 1 | 52 | 16709701 | A.N4008500.10.TRACK1002006 | 10201 | |||||||||
| REFILL PAPER TOWEL DISPENSER / PAPER WAS WET | NORWEST-383 | ROUTINE | NORTHWEST | 2/7/19 11:56 AM | 2/7/19 11:56 AM | 3/9/19 11:56 AM | 2/7/19 11:55 AM | 1 | 52 | 16709803 | A.N4008500.10.TRACK1002006 | 10201 | |||||||||
| JULIET - CELL #1 SINK HAS LOW FLOW | NORWEST-500 | ROUTINE | NORTHWEST | 2/7/19 12:08 PM | 2/7/19 12:08 PM | 3/9/19 12:08 PM | 2/7/19 12:04 PM | 1 | 86 | 16709832 | A.N4008500.10.TRACK1002006 | 10201 | |||||||||
| FIRE PUMP ROOM - DECK DRAIN CLOGGED | NORWEST-500 | ROUTINE | NORTHWEST | 2/7/19 1:49 PM | 2/7/19 1:47 PM | 3/9/19 1:47 PM | 2/7/19 1:45 PM | 1 | 86 | 16710496 | A.N4008500.10.TRACK1002006 | 10201 | |||||||||
| PLAYGROUND SLIDE MISSING SCREW ON SLIDE / BACKBOARD | NORWEST-383 | ROUTINE | NORTHWEST | 2/7/19 3:01 PM | 2/7/19 3:00 PM | 3/9/19 3:00 PM | 2/7/19 2:51 PM | 1 | 52 | 16710887 | A.N4008500.10.TRACK1002006 | 10201 | |||||||||
| PAROLE AND RELEASE - HANG WHITE BOARD, NEEDS ANCHORS. | NORWEST-500 | ROUTINE | NORTHWEST | 2/8/19 9:12 AM | 2/8/19 9:11 AM | 3/10/19 9:11 AM | 2/8/19 9:05 AM | 1 | 86 | 16714531 | A.N4008500.10.TRACK1002006 | 10201 | |||||||||
| LEAK IN KITCHEN SINK | NORWEST-374 | ROUTINE | NORTHWEST | 2/8/19 9:17 AM | 2/8/19 9:16 AM | 3/10/19 9:16 AM | 2/8/19 9:13 AM | 1 | 50 | 16714577 | A.N4008500.10.TRACK1002006 | 10201 | |||||||||
| LEAKING COMING FROM CEILING IN COPPER PIT AREA | NORWEST-7 | ROUTINE | NORTHWEST | 2/11/19 8:35 AM | 2/11/19 8:34 AM | 3/13/19 8:34 AM | 2/11/19 8:24 AM | 1 | 64 | 16722351 | A.N4008500.10.TRACK1002006 | 10201 | |||||||||
| LEAK IN POTS AND PANS AREA | NORWEST-7 | ROUTINE | NORTHWEST | 2/11/19 9:24 AM | 2/11/19 9:24 AM | 3/13/19 9:24 AM | 2/11/19 9:15 AM | 1 | 64 | 16722605 | A.N4008500.10.TRACK1002006 | 10201 | |||||||||
| REPAIR / REPLACE GLASS IN ENTRANCE / TOP LEFT CORNER, | NORWEST-383 | ROUTINE | NORTHWEST | 2/11/19 9:36 AM | 2/11/19 9:36 AM | 3/13/19 9:36 AM | 2/11/19 9:32 AM | 1 | 52 | 16722685 | A.N4008500.10.TRACK1002006 | 10201 | |||||||||
| FRONT DOOR IN THE MAIN ENTRANCE IS STICKING | NORWEST-432 | ROUTINE | NORTHWEST | 2/11/19 9:49 AM | 2/11/19 9:49 AM | 2/11/19 9:47 AM | 1 | 45 | 16722769 | A.N4008500.10.TRACK1002006 | 10201 | ||||||||||
| PLAYGROUND GATE DOES NOT LATCH. RIGHT SIDE FACING BLDG | NORWEST-432 | ROUTINE | NORTHWEST | 2/11/19 10:20 AM | 2/11/19 10:20 AM | 3/13/19 10:20 AM | 2/11/19 10:17 AM | 1 | 45 | 16722942 | A.N4008500.10.TRACK1002006 | 10201 | |||||||||
| REPLACE LIGHT COVER IN HALLWAY | NORWEST-145 | ROUTINE | NORTHWEST | 2/11/19 2:37 PM | 2/11/19 2:36 PM | 3/13/19 2:36 PM | 2/11/19 2:34 PM | 1 | 69 | 16724481 | A.N4008500.10.TRACK1002006 | 10201 | |||||||||
| MECHANICAL ROOM DOOR / ADJUST DOOR HANDLES | NORWEST-390 | ROUTINE | NORTHWEST | 2/12/19 8:43 AM | 2/12/19 8:42 AM | 3/14/19 8:42 AM | 2/12/19 8:37 AM | 1 | 53 | 16728089 | A.N4008500.10.TRACK1002006 | 10201 | |||||||||
| LEAK OVER GARAGE | NORWEST-238 | ROUTINE | NORTHWEST | 2/12/19 9:56 AM | 2/12/19 9:55 AM | 3/14/19 9:55 AM | 2/12/19 9:52 AM | 1 | 49 | 16728505 | A.N4008500.10.TRACK1002006 | 10201 | |||||||||
| SIDE ENTRANCE DOOR / ADJUST DOOR HANDLES | NORWEST-390 | ROUTINE | NORTHWEST | 2/12/19 10:12 AM | 2/12/19 10:11 AM | 3/14/19 10:11 AM | 2/12/19 10:10 AM | 1 | 53 | 16728605 | A.N4008500.10.TRACK1002006 | 10201 | |||||||||
| DENTAL STERILIZATION ROOM / ADJUST DOOR HANDLES | NORWEST-390 | ROUTINE | NORTHWEST | 2/12/19 10:17 AM | 2/12/19 10:15 AM | 3/14/19 10:15 AM | 2/12/19 10:13 AM | 1 | 53 | 16728621 | A.N4008500.10.TRACK1002006 | 10201 | |||||||||
| WATER FOUNTAIN RM 120 INOP | NORWEST-344 | ROUTINE | NORTHWEST | 2/12/19 3:42 PM | 2/12/19 3:39 PM | 3/14/19 3:39 PM | 2/12/19 3:34 PM | 1 | 91 | 16730421 | A.N4008500.10.TRACK1002006 | 10201 | |||||||||
| TOILETS IN GIRLS RESTROOM - 2ND AND 3RD - OVERFLOW | NORWEST-432 | ROUTINE | NORTHWEST | 2/12/19 3:53 PM | 2/12/19 3:53 PM | 3/14/19 3:53 PM | 2/12/19 3:51 PM | 1 | 45 | 16730507 | A.N4008500.10.TRACK1002006 | 10201 | |||||||||
| SQB1 - LIGHT OUT RIGHT SIDE / 4TH, 5TH, 6TH AND 9TH | NORWEST-366 | ROUTINE | NORTHWEST | 2/13/19 1:16 PM | 2/13/19 1:15 PM | 3/15/19 1:15 PM | 2/13/19 1:14 PM | 1 | 71 | 16734955 | A.N4008500.10.TRACK1002006 | 10201 | |||||||||
| SQB1 - LIGHT OUT MIDDLE SIDE / 3RD, 8TH AND LAST | NORWEST-366 | ROUTINE | NORTHWEST | 2/13/19 1:21 PM | 2/13/19 1:20 PM | 3/15/19 1:20 PM | 2/13/19 1:18 PM | 1 | 71 | 16734981 | A.N4008500.10.TRACK1002006 | 10201 | |||||||||
| SQB1 - LIGHT OUT LEFT SIDE / 7TH AND 10TH | NORWEST-366 | ROUTINE | NORTHWEST | 2/13/19 1:29 PM | 2/13/19 1:28 PM | 3/15/19 1:28 PM | 2/13/19 1:25 PM | 1 | 71 | 16735024 | A.N4008500.10.TRACK1002006 | 10201 | |||||||||
| SQB1 - LIGHT OUT MIDDLE / 3RD, 8TH AND LAST | NORWEST-366 | ROUTINE | NORTHWEST | 2/13/19 1:31 PM | 2/13/19 1:31 PM | 3/15/19 1:31 PM | 2/13/19 1:29 PM | 1 | 71 | 16735055 | A.N4008500.10.TRACK1002006 | 10201 | |||||||||
| 2ND DECK LAUNDRY RM / MIDDLE LIGHT OUT | NORWEST-366 | ROUTINE | NORTHWEST | 2/13/19 1:42 PM | 2/13/19 1:41 PM | 3/15/19 1:41 PM | 2/13/19 1:38 PM | 1 | 71 | 16735112 | A.N4008500.10.TRACK1002006 | 10201 | |||||||||
| SQB3 HEAD - 3RD AND 5TH LIGHT OUT | NORWEST-366 | ROUTINE | NORTHWEST | 2/13/19 1:45 PM | 2/13/19 1:44 PM | 3/15/19 1:44 PM | 2/13/19 1:43 PM | 1 | 71 | 16735146 | A.N4008500.10.TRACK1002006 | 10201 |
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .