N6247017R4001_Amend_0002.pdf
PDF 673 KB Posted
- Solicitation number
- N6247017R4001
About this file
This amendment modifies a solicitation for base operations support services at various Naval and Defense Intelligence Agency facilities. Key details include:
-
The solicitation seeks base operations support services including general information, management and administration, supply, facility investment, facility management, custodial, pest control, integrated solid waste management, grounds maintenance and landscaping, pavement clearance, utility management, chiller plant, and transportation services.
-
A pre-proposal conference will be held the week of September 17, 2018 with additional details to follow. Attendees must submit security paperwork by September 6.
-
Revisions include adding information on the pre-proposal conference, updating attachments with workload data, and revising the past performance evaluation factor.
-
Proposals are due around September 21, 2018 with award anticipated shortly after. Pricing will be evaluated based on the total price for basic and option requirements.
-
The Navy is the issuing agency and Naval Facilities Engineering Command Atlantic the administering organization. The amendment provides no further context on incumbent or additional details.
N6247017R4001_Amend_0002.pdf
View the file
Other files
Show all 37
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
Amendment 0002
NAVAL DISTRICT WASHINGTON REGIONAL BASE OPERATIONS SUPPORT (BOS) SERVICES
FOR NAVAL AND DEFENSE INTELLIGENCE AGENCY FACILITIES IN VARIOUS LOCATIONS IN THE DISTRICT OF COLUMBIA, VIRGINIA, AND MARYLAND
This amendment is issued to provide revisions to Sections A, J, and M. (SEE CONTINUATION PAGE)
CS: Matthew Lew is, matthew .r.lew is@navy.mil, 757-322-4185
1. CONTRACT ID CODE PAGE OF PAGES
J 1 11
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 31-Aug-2018
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street , County, State and Zip Code) X N6247017R4001
X 9B. DATED (SEE ITEM 11)
14-Aug-2018
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
31-Aug-2018
CODE
NAVAL FACILITIES ENGINEERING COMMAND
ATLANTIC
6506 HAMPTON BLVD
NORFOLK VA 23508-1278
N62470 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
N6247017R4001
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION SF 30 - BLOCK 14 CONTINUATION PAGE
The following have been added by full text:
AMENDMENT 0002
The purpose of this amendment is to disseminate the below information.
1.) Section A – Information regarding the pre-proposal conference has been provided as follows:
PRE-PROPOSAL CONFERENCE/SITE VISIT:
A multi-day pre-proposal conference (site visit) will be held the week of 17 September, 2018. The pre-proposal conference/site visit time(s), location(s), and schedule will be issued via future amendment.
All prospective Offerors are urged to attend this conference/site visit.
Attendees are required to submit the completed SECNAV 5512 (Attachment J-10) to Mr. Matthew Lewis via AMRDEC (https://safe.amrdec.army.mil/safe/Welcome.aspx) at matthew.r.lewis@navy.mil no later than 2:00 PM (EDT) on 06 September 2018. The following information is also required, on letterhead, for attendees to attend the pre-proposal conference and site visit: Name of Company, the names of the Attendee(s), telephone number, and email. Each company is allowed up to two (2) participants to attend.
Note that the cognizant security services reviewing Attachment J-10 above may elect to authorize only one individual from each firm to enter facilities with Top Secret (TS) or greater security restrictions. Further, firms submitting the SECNAV 5512 late or incorrectly will not be permitted to access sites with TS or greater security restrictions.
2.) Section J – The following attachment has been updated to provide J-1502000-04-04 Historical Service Order
Workload and J-1502000-04-05 Historical Project Order Workload.
J-1502000-04-NSMA-Facility-Investment (Amendment 0002)
3.) Section J- To disseminate responses to pre-award inquiry responses.
4.) Section M- Section M, Evaluation Factor 5- Past Performance, has been revised to more accurately reflect the requirements.
(Revisions are provided by the use of red font; deletions are indicated by the use of red strikethrough font.)
SECTION J - LIST OF DOCUMENTS, EXHIBITS AND OTHER ATTACHMENTS
The following have been added by full text:
PREAWARD INQUIRY RESPONSES
PRE-AWARD INQUIRY RESPONSES
Question REFERENCE QUESTION GOVERNMENT
No. Page Section Para. RESPONSE
1 610 L.6.a Tab K
1 The Government states, "in order to be eligible for award, your firm must possess a Top Secret Facility Clearance." If the bidding entity is a populated joint venture, does the joint venture itself require a Top Secret Facility Clearance or can the joint venture use the clearance from one or more of its entities?
The legal entity submitting a proposal must possess a Top Secret Facility Clearance at the time of proposal submission to be eligible for award. Reference Annex 0200000, Spec Item 2.8.7
The following have been modified:
LIST OF ATTACHMENTS
SECTION J
DOCUMENTS, EXHIBITS, AND OTHER ATTACHMENTS
TABLE OF CONTENTS
NOTE: The individual files for Section J are attached separately. (Note: The documents are provided under “additional documents” on NECO under the solicitation number.)
This contract incorporates by reference the following attachments as if they were fully set forth herein. Please see the following attachments as part of this solicitation:
SECTION J
DOCUMENTS, EXHIBITS, AND OTHER ATTACHMENTS
TABLE OF CONTENTS
ATTACHMENT
NUMBER
ATTACHMENT TITLE
J-1 One Day Pass Request
J-2 Pre-Award Inquiry Form
J-3 Section B CLINS
J.4 Corporate Experience Form (File is a separate Word attachment)
J-5 FTE
J-6 Past Performance Questionnaire
J-7 Small Business Subcontracting Record
J-8 Small Business Participation and Commitment Strategy
J-9 Small Business Subcontracting Plan
J-10 SECNAV 5512 (Amendment 0002)
J-0100000 General Information (Includes J-0100000-01, J-0100000-01a through J-0100000- 01e)
J-0200000 Management and Administration (Includes J-0200000-01 through J-0200000-04, J-0200000-10, J-0200000-12, J-0200000-14, J-0200000-16)
J-0200000-05 Government Furnished Property, Materials, and Services
J-0200000-06 Service Provider Information (File is a separate Excel attachment)
J-0200000-07 Asset Information (File is a separate Excel attachment)
J-0200000-08 Asset Specification (File is a separate Excel attachment)
J-0200000-09 Characteristic Meter Readings (File is a separate Excel attachment)
J-0200000-11 DIA Flat File Format (File is a separate Excel attachment)
J-0200000-13 Employee Listing (File is a separate Excel attachment)
J-0200000-15 Security Clearance Procedures (File is a separate Excel attachment)
J-0200000-17 Exhibit Line Item Numbers (File is a separate Excel attachment)
J-0200000-02-A Collective Bargaining Agreement 2016-9293 for Local 99A
J-0200000-02-B Collective Bargaining Agreement 2016-9294 for Local 32BJ
J-0200000-02-C Collective Bargaining Agreement 2016-9295 for Local 147
J-0200000-02-D Collective Bargaining Agreement for Local 99
J-0200000-02-E Wage Determination 2015-4269
J-0200000-02-F Wage Determination 2015-4281
J-0200000-02-G Wage Determination 2015-4303
J-0200000-02-H Collective Bargaining Agreement for Local 99 NSF Carderock Addendum
J-0200000-02-I Collective Bargaining Agreement 2016-9294 for Local 32BJ Amendment
J-0200000-02-J Collective Bargaining Agreement 2016-9295 for Local 147 Addendum
J-1001000-03 Material Management FWF (Includes J-1001000-03-01 and J-1001000-03-02)
J-1501000-00 Facility Management WNY AOR (Includes J-1501000-00-01, J-1501000-00-02, and J-1501000-00-04)
J-1501000-00-03 Facility Property Inventory WNY AOR (File is a separate Excel attachment)
J-1501000-00-05 Meter Group Descriptions and Direct Condition Rating Guidance (File is a separate Excel attachment)
J-1501000-00-06 General Direct Condition Rating Guidance (File is a separate Excel attachment)
J-1501000-00-07 Control Systems Inventory WNY AOR (File is a separate Excel attachment)
J-1502000-00 Facility Investment WNY AOR (Includes J-1502000-00-01, J-1502000-00-02, J- 1502000-00-04, and J-1502000-00-05)
J-1502000-00-03 Facility Property Inventory WNY AOR (File is a separate Excel attachment)
J-1502000-00-06 HVAC and Refrigeration System Inventory (File is a separate Excel attachment)
J-1502000-00-07 Boiler and UPV Inventory (File is a separate Excel attachment)
J-1502000-00-08 Lightning Arrestors Inventory(File is a separate Excel attachment)
J-1502000-00-09 Fire Protection Systems Inventory(File is a separate Excel attachment)
J-1502000-00-10 Compressed Air Inventory(File is a separate Excel attachment)
J-1502000-00-11 Auxiliary Generators Inventory (File is a separate Excel attachment)
J-1502000-00-12 Building Controls System Inventory (File is a separate Excel attachment)
J-1502000-00-13 Low and Medium Voltage Switchgear Inventory (File is a separate Excel attachment)
J-1502000-00-14 NSF Arlington Plant System Inventory (File is a separate Excel attachment)
J-1502000-00-15 Backflow Prevention Device Inventory (File is a separate Excel attachment)
J-1502000-00-16 Water Testing and Treatment Inventory (File is a separate Excel attachment)
J-1501000-01 Facility Management DIA (Includes J-1501000-01-01through J-1501000-01-04)
J-1501000-01-05 Meter Group Descriptions and Direct Condition Rating Guidance (File is a separate Excel attachment)
J-1501000-01-06 General Direct Condition Rating Guidance (File is a separate Excel attachment)
J-1501000-01-07 Control Systems Inventory (File is a separate Excel attachment)
J-1502000-01 Facility Investment DIA (Includes J-1502000-01-01 through J-1502000-01-05)
J-1502000-01-06 DIA Inventory (File is a separate Excel attachment)
J-1502000-01-07 JUIAF Inventory (File is a separate Excel attachment)
J-1503010-01 Custodial DIA (Includes J-1503010-01-01, J-1503010-01-02, and J-1503010-01- 04)
J-1503010-01-03 Custodial Inventory and Frequencies JUIAF (File is a separate Excel attachment)
J-1503020-01 Pest Control DIA (Includes J-1503020-01-01 through J-1503020-01-10)
J-1503050-01 Grounds Maintenance and Landscaping DIA (Includes J-1503050-01-01 through J-1503050-01-04)
J-1503050-01-05 Site Maps (File is a separate PDF attachment)
J-1503060-01 Pavement Clearance DIA (Includes J-1503060-01-01 and J-1503060-01-03)
J-1503060-01-02 DIA Zone Map (File is a separate PDF attachment)
J-1501000-02 Facility Management NSF Suitland (Includes J-1501000-02-01 through J- 1501000-02-04)
J-1501000-02-05 Meter Group Descriptions and Direct Condition Rating Guidance (File is a separate Excel attachment)
J-1501000-02-06 General Direct Condition Rating Guidance (File is a separate Excel attachment)
J-1501000-02-07 Control Systems Inventory (File is a separate Excel attachment)
J-1502000-02 Facility Investment NSF Suitland (Includes J-1502000-02-01 and J-1502000-02- 03 through J-1502000-02-08)
J-1502000-02-02 NSF Suitland Inventories (File is a separate Excel attachment)
J-1503010-02 Custodial NSF Suitland (Includes J-1503010-02-01 and J-1503010-02-03 through J-1503010-02-05)
J-1503010-02-02 NSF Suitland Custodial Inventory(File is a separate Excel attachment)
J-1503020-02 Pest Control NSF Suitland (Includes J-1503020-02-01 through J-1503020-02-10)
J-1503030-02 Integrated Solid Waste Management NSF Suitland (Includes J-1503030-02-01 through J-1503030-02-03)
J-1503050-02 Grounds Maintenance & Landscaping NSF Suitland (Includes J-1503050-02-01 through J-1503050-02-05)
J-1503060-02 Pavement Clearance NSF Suitland (Includes J-1503060-02-01 and J-1503060-02- 02)
J-1503060-02-03 Pavement Clearance NSF Suitland Service Levels Description
J-1501000-03 Facility Management FWF (Includes J-1501000-03-01 through J-1501000-03-04)
J-1501000-03-05 Meter Group Descriptions and Direct Condition Rating Guidance (File is a separate Excel attachment)
J-1501000-03-06 General Direct Condition Rating Guidance (File is a separate Excel attachment)
J-1501000-03-07 Control Systems Inventory (File is a separate Excel attachment)
J-1502000-03 Facility Investment FWF (Includes J-1502000-03-01, J-1502000-03-02, and J- 1502000-03-04 through J-1502000-03-06)
J-1502000-03-03 FWF Inventory (File is a separate Excel attachment)
J-1503010-03 Custodial FWF (Includes J-1503010-03-01 and J-1503010-03-02)
J-1503010-03-03 FWF Inventory and Frequencies (File is a separate Excel attachment)
J-1503020-03 Pest Control FWF (Includes J-1503020-03-01 through J-1503020-03-10)
J-1503030-03 Integrated Solid Waste Management FWF (Includes J-1503030-03-01 through J- 1503030-03-03)
J-1503050-03 Grounds Maintenance & Landscaping FWF (Includes J-1503050-03-01 through J- 1503050-03-03)
J-1503050-03-04 Site Maps (File is a separate PDF attachment)
J-1503060-03 Pavement Clearance FWF
J-1503060-03-02 Pavement Clearance Map FWF (File is a separate PDF Attachment)
J-1501000-04 Facility Management NSMA (Includes J-1501000-04-01 through J-1501000-04- 04 and J-1501000-04-07)
J-1501000-04-05 Meter Group Descriptions and Direct Condition Rating Guidance (File is a separate Excel attachment)
J-1501000-04-06 General Direct Condition Rating Guidance (File is a separate Excel attachment)
J-1502000-04 NSMA Facility Investment (Includes J-1502000-04-01 through J-1502000-04-06) (Amendment 0002)
J-1502000-04-07 NSMA Inventory (File is a separate Excel attachment)
J-1503010-04 Custodial NSMA (Includes J-1503010-04-01 and J-1503010-04-02)
J-1503010-04-03 NSMA Custodial Frequencies and Inventory (File is a separate Excel attachment)
J-1503020-04 Pest Control NSMA (Includes J-1503020-04-01 through J-1503020-04-09)
J-1503030-04 Integrated Solid Waste Management NSMA (Includes J-1503030-04-01 through J-1503030-04-03)
J-1503050-04 Grounds Maintenance & Landscaping NSMA (Includes J-1503050-04-01 through J-1503050-04-04)
J-1503050-04-05 NSMA Grounds Maps (File is a separate PDF attachment)
J-1501000-05 Facility Management USMC (Includes J-1501000-05-01 through J-1501000-05- 04)
J-1501000-05-05 Meter Group Descriptions and Direct Condition Rating Guidance (File is a separate Excel attachment)
J-1501000-05-06 General Direct Condition Rating Guidance (File is a separate Excel attachment)
J-1501000-05-07 Control Systems Inventory (File is a separate Excel attachment)
J-1502000-05 Facility Investment USMC (Includes J-1502000-05-01 through J-1502000-05-04)
J-1502000-05-05 HVAC and Refrigeration System Inventory (File is a separate Excel attachment)
J-1502000-05-06 Boiler and Unfired Pressure Vessel Inventory and Certification Date (File is a separate Excel attachment)
J-1502000-05-07 Fire Protection System Inventory (File is a separate Excel attachment)
J-1502000-05-08 Vertical Transportation Equipment Inventory and Certification Date (File is a separate Excel attachment)
J-1502000-05-09 Auxiliary Generator Equipment Inventory (File is a separate Excel attachment)
J-1502000-05-10 Security Barrier Equipment Inventory (File is a separate Excel attachment)
J-1502000-05-11 Building Controls System Inventory (File is a separate Excel attachment)
J-1502000-05-12 Backflow Prevention Device Inventory (File is a separate Excel attachment)
J-1502000-05-13 Laundry Dryer Duct Inventory (File is a separate Excel attachment)
J-1502000-05-14 HVAC Water Testing and Treatment Inventory (File is a separate Excel attachment)
J-1503020-05 Pest Control USMC (Includes J-1503020-05-01 through J-1503020-05-14)
J-1503030-05 Integrated Solid Waste Management USMC (Includes J-1503030-05-01 through J-1503030-05-03)
J-1501000-06 Facility Management SN/IH (Includes J-1501000-06-01 through J-1501000-06- 03)
J-1501000-06-04 Meter Group Descriptions and Direct Condition Rating Guidance (File is a separate Excel attachment)
J-1501000-06-05 General Direct Condition Rating Guidance (File is a separate Excel attachment)
J-1501000-06-06 Control Systems Inventory (File is a separate Excel attachment)
J-1502000-06 Facility Investment SN/IH (Includes J-1502000-06-01 through J-1502000-06-04)
J-1502000-06-05 Facility Investment Indian Head Inventory (File is a separate Excel attachment)
J-1502000-06-06 Facility Investment Stump Neck Inventory (File is a separate Excel attachment)
J-1502000-07 Facility Investment NRL (Includes J-1502000-07-01 and J-1502000-07-02)
J-1502000-07-03 Fire Protection Inventory (File is a separate Excel attachment)
J-1601000-00 Utility Management WNY (Includes J-1601000-00-01 through J-1601000-00-05)
J-1607000-00 Chillers WNY (Including J-1607000-00-01 and J-1607000-00-02)
J-1607000-00-03 Chiller Plant and Distribution System Description and Inventory (File is a separate Excel attachment)
J-1700000-03 Transportation FWF (Includes J-1700000-03-01 through J-1700000-03-03)
SECTION M - EVALUATION FACTORS FOR AWARD
The following have been modified:
EVALUATION FACTORS FOR AWARD
M.1 BASIS FOR AWARD
1. The Government reserves the right to eliminate from consideration for award any or all offers at any time prior to award of the contract; to negotiate with offerors in the competitive range; and to award the contract to the offeror submitting the proposal determined to represent the best value—the proposal most advantageous to the Government, price and other factors considered.
2. The Government intends to evaluate proposals and award a contract without discussions with offerors (except clarifications as described in FAR 15.306(a)). The Government reserves the right to conduct discussions if the Contracting Officer later determines them to be necessary. In addition, if the Contracting Officer determines that the number of proposals that would otherwise be in the competitive range exceeds the number at which an efficient competition can be conducted, the Contracting Officer may limit the number of proposals in the competitive range to the greatest number that will permit an efficient competition among the most highly rated proposals.
3. The tradeoff process is selected as appropriate for this acquisition. The Government considers it to be in its best interest to allow consideration of award to other than the lowest priced offeror or other than the highest technically rated offeror.
4. All technical factors when combined are of equal importance to the performance confidence assessment (past performance) rating; and all technical factors and the performance confidence assessment (past performance) rating, when combined are approximately equal to price.
5. Any proposal found to have a deficiency in meeting the stated solicitation requirements or performance objectives will be considered ineligible for award, unless the deficiency is corrected through discussions. Proposals may be found to have either a significant weakness or multiple weaknesses that impact either the individual factor rating or the overall rating for the proposal.
M.2 EVALUATION FACTORS
Price:
Basis of Evaluation: The Government will evaluate price based on the total price. Total price consists of the basic requirements and all option items (see Section B of the solicitation). The Government intends to evaluate all options and has included the provision FAR 52.217-5, Evaluation of Options (JUL 1990) in Section M of the solicitation. In accordance with FAR 52.217-5, evaluation of options will not obligate the Government to exercise the option(s). Analysis will be performed by one or more of the following techniques to ensure a fair and reasonable price:
(i) Comparison of proposed prices received in response to the RFP.
(ii) Comparison of proposed prices with the IGCE.
(iii) Comparison of proposed prices with available historical information.
(iv) Comparison of market survey results.
(v) Fair and reasonable CLIN and ELIN/unit pricing
Non-Price Factors:
Factor 1 – Corporate Experience:
Basis of Evaluation: The assessment of the Offeror’s relevant experience will be used as a means of evaluating the capability of the offeror to successfully meet the requirements of the RFP. The minimum standard for Corporate Experience has been met when the Offeror has demonstrated experience in successfully performing at least one (1) relevant contract of similar size, scope and complexity to this requirement. The Government will review only five (5) projects. Any projects submitted in excess of five (5) will not be considered.
Projects performed by the Offeror as a prime contractor may be considered more favorably than those performed by the Offeror as a subcontractor.
Factor 2 – Technical Approach/Management Approach:
Basis of Evaluation: The Government will evaluate the extent to which the offeror demonstrates an acceptable understanding of current industry standards, policies, procedures, and processes utilized in accomplishing the complexity and magnitude of service requirements set forth in the performance objectives and standards of the PWS. The Government will also evaluate the proposal to determine the degree to which the Offeror’s approach/methodology demonstrates the following: (1) adequate staffing levels supported by a reasonable Basis of Estimate (BOE); (2) the ability to successfully perform each technical specification and the ability to successfully manage and supervise workforce personnel across all technical specifications; (3) a plan for implementing data entry into MAXIMO, an Infrastructure Condition Assessment Program accordance with 1501000 Facility Management, and a the Utility Infrastructure Condition Assessment Plan requirements in 1601000 Utilities Management; (4) the ability to effectively manage subcontractors (if subcontractors are proposed); (5) a comprehensive quality management program; (6) a comprehensive phase-in plan; (7) the ability to manage risk; (8) an understanding of the service order and project work order requirements; (9) an understanding of the scope of project work orders, the limits of liability, and contractor financial responsibility when work exceeds the project work order limits; (10) the ability to implement and manage a PM Program; and (11) an understanding of the Inventory Data Quantity Variation requirement.
Please note, statements such as “will comply”, or “noted and understood”, without supporting narrative to define compliance are not acceptable. Cursory responses or responses which merely reiterate or reformulate solicitation language may not be considered as satisfying the requirement of the RFP or as demonstrating the ability to perform.
Factor 3 – Safety:
Basis of Evaluation: The evaluation will collectively consider the following:
Experience Modification Rate (EMR) OSHA Days Away from Work, Restricted Duty, or Job Transfer (DART) Rate OSHA Total Recordable Case (TRC) Rate Offeror Technical Approach to Safety
The board will evaluate the EMR, DART and TRC Rates to determine if the Offeror has demonstrated a history of safe work practices taking into account any negative trends and extenuating circumstances that impact the rating.
The board will evaluate the narrative to determine the degree to which subcontractor safety performance will be considered in the selection of all levels of subcontractors on task orders under the contract, the degree to which innovations are being proposed that may enhance safety on this procurement, and to validate the contractor has addressed methodology to be used in the execution of an effective program that facilitates sound mishap prevention techniques/processes, employee reporting of unsafe conditions, unsafe activities, and near-miss mishaps. Those Offerors whose plan demonstrates a commitment to hire subcontractors with a culture of safety and who propose innovative methods to enhance a safe working environment may be given greater weight in the evaluation.
Other Sources of Information Available to the Government: Other sources for safety may include but are not limited to OSHA data, NAVFAC’s Contractor Incident Reporting System (CIRS) in Enterprise Safety Applications Management System (ESAMS), Contractor Performance Assessment Reporting System (CPARS) and other related databases. The Board may consider information from other sources of information available to the Government in evaluation of the EMR, DART and TRC Rates and the narrative.
Factor 4 – Small Business Utilization:
Basis of Evaluation: Offerors will be evaluated on the extent to which their proposals and other performance information available to the Government demonstrate a history of successfully supporting Government policies concerning utilization of small business concerns as subcontractors including, when applicable, achievements against established small business subcontracting plan goals. Offerors will also be evaluated on the levels of small business participation proposed and the degree of commitment to use named sources. The anticipated benefits of proposed initiatives and tools to enhance small business participation and capabilities will be considered.
The Government will assess proposal realism and the likelihood of success in achieving the small business objectives of this acquisition.
Forms to be used for offeror submission of Small Business Utilization Factor information are:
Attachment J-7 – Small Business Subcontracting Record Attachment J-8 – Small Business Participation and Commitment Strategy
Factor 5 – Past Performance:
Basis of Evaluation: The Government will evaluate how well the Offeror performed on the recent and relevant contracts submitted under Factor 1 – Corporate Experience and on other recent and relevant contracts documented in known sources. Relevancy is defined as set forth in Factor 1- Corporate Experience. There are three
(3) aspects of the past performance evaluation: recency, relevancy, and quality. The first is to evaluate the recency of the Offeror’s past performance. The second aspect is to determine how relevant the Offeror’s performance is to the effort to be acquired. For purposes of this evaluation, a recent and relevant contract is a contract as defined in Factor 1 – Corporate Experience. The third aspect of the evaluation is to establish the overall quality of the Offeror’s past performance and how well the contractor performed on the contracts. The past performance evaluation performed in support of a current source selection does not establish, create, or change the existing record and history of the Offeror's past performance on past contracts; rather, the past performance evaluation process gathers information from customers on how well the Offeror performed those past contracts.
The evaluation will consider the degree to which past performance evaluations provided by the contractor and any other past performance information reviewed by the Government (e.g., PPIRS, Federal Awardee Performance and Integrity Information System (FAPIIS), Electronic Subcontract Reporting System (eSRS), performance recognition documents, and information obtained from any other source) reflect a trend of satisfactory performance considering:
– A pattern of successful completion of tasks;
– A pattern of deliverables that are timely and of good quality;
– A pattern of cooperativeness and teamwork with the Government at all levels (task managers, contracting officers, auditors, etc.); and
– Recency of tasks performed that are identical to, similar to, or related to the task at hand.
In the case of offerors without a record of relevant past performance or for whom information on past performance is not available or so sparse that no meaningful past performance rating can be reasonable assigned, the Offeror may not be evaluated favorably or unfavorably on past performance (see FAR 15.305(a)(2)(iv)), and will receive a Neutral Confidence Rating.
(End of Summary of Changes)
File details come from the government source that posted it. Updated .