This document package includes a facility-related file and a pre-solicitation notice for base operations support services. The facility file contains property inventories, equipment lists, definitions, references, and standards for a Naval Support Facility in Suitland, Maryland. The pre-solicitation notice is for solicitation N62470-17-R-4001, which will be a single-award IDIQ contract to provide services such as general management, supply, facility investment, facility management, custodial services, pest control, waste management, grounds maintenance, utilities management, and transportation at Naval and Defense Intelligence Agency sites in Washington D.C., Virginia, and Maryland. Services will include recurring and non-recurring work items. The anticipated request for proposals date is August 1, 2018 with proposals due around September 21, 2018. The solicitation will be available electronically via NECO and FEDBIZOPPS.

J-1502000-02_Facility_Investment_NSF_Suitland_Amend_0010.docx

View the file

Other files

File Type Posted
J-1502000-06-06_Stump_Neck_Inventory_Amend_0011.xlsx XLSX spreadsheet
N6247017R4001_Amend_0011.pdf PDF
J-0200000-17_ELINS_Amend_0010.xlsx XLSX spreadsheet
J-1502000-07-04_NRL_Facility_Inventory_Amend_0010.xlsx XLSX spreadsheet
N6247017R4001_Amend_0010.pdf PDF
J-0200000-02-K_CBA_Local99_Navy__Yard_Amend_0009.pdf PDF
N6247017R4001_Amend_0009.pdf PDF
J-1502000-01_Facility_Investment_DIA_Amend_0009.pdf PDF
J-1502000-02_Facility_Investment_NSF_Suitland_Amend_0009.pdf PDF
J-0200000-02-K_CBA_Local99_Navy_Yard.PDF PDF
J-0200000-02-L_CBA_Local99_Navy_Yard.PDF PDF
N6247017R4001_0008.pdf PDF
J-0200000-02_-G_REVISED_Wage_Determination_2015-4303.pdf PDF
N62470-17-R-4001_0007.pdf PDF
J-14_Draft_DD_254.pdf PDF
J-3_SECTION_B_CLINS.pdf PDF
N6247017R4001_0006.pdf PDF
N6247017R4001_Amend_0005.pdf PDF
N6247017R4001_Amend_0004.pdf PDF
J-13_Site_Visit_List_of_Attendees.pdf PDF
J-12_Site_Visit_Presentation.pdf PDF
J-11_WNY_Site_Visit_Map.pdf PDF
N6247017R4001_Amend_0003.pdf PDF
J-9_Small_Business_Subcontracting_Plan.docx DOCX document
J-1503010-01_Custodial_DIA.pdf PDF
J-10_SECNAV_5512.pdf PDF
J-1502000-04_NSMA_Facility_Investment.pdf PDF
N6247017R4001_Amend_0002.pdf PDF
J-0200000-02-C_CBA_2016-9295_Local_147.pdf PDF
N6247017R4001_Amend_0001.pdf PDF
J-0200000-02-B_CBA-2016-9294_Local_32BJ.pdf PDF
J-0200000-02-A_CBA_2016-9293_Local_99A.pdf PDF
Att_J4_Corporate_Experience_Data_Sheet.docx DOCX document
Att_J2_Pre-Award_Inquiry_Form.xlsx XLSX spreadsheet
J-0200000-17_ELINS_Final.xlsx XLSX spreadsheet
N62470-17-R-4001_RBOS_RFP.pdf PDF
N6247017R4001_RBOS_PreSol_17R4001.pdf PDF
Show all 37

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SECTION J

DOCUMENTS, EXHIBITS, AND OTHER ATTACHMENTS

TABLE OF CONTENTS

ATTACHMENT NUMBER
ATTACHMENT TITLE
J-1502000-02-01
Definitions and Acronyms
J-1502000-02-02
References and Technical Documents
J-1502000-02-03
Facility Property Inventory
J-1502000-02-04
Historical Service Order Workload
J-1502000-02-05
Historical Project Work Order Workload
J-1502000-02-06
Temperature Standards
J-1502000-02-07
NSF Suitland Inventories
J-1502000-02-08
Fuel Delivery Points

ATTACHMENT J-1502000-02-01

DEFINITIONS AND ACRONYMS

DEFINITION
DESCRIPTION
CRANE, CATEGORY 1
Portal cranes, Hammerhead cranes, Locomotive cranes, Derricks, Floating cranes (YD), Tower cranes, Container cranes, Mobile cranes (except those indicated as category 4), including truck, cruiser, crawler, warehouse/industrial cranes, and cranes used for dragline, pile driving, clamshell, magnet, bucket work, and Aircraft crash cranes.
CRANE, CATEGORY 2 & 3
Cranes with rated capacities of 20,000 pounds or greater are category 2. Examples are Overhead traveling cranes, Gantry cranes (rail mounted), Wall cranes, Jib cranes, Pillar cranes, Pillar jib cranes, Monorails and associated hoists, Fixed hoists, including; chain falls. Pedestal mounted commercial boom assemblies (fixed length, telescoping, and articulating types) attached to stake trucks, trailers, flatbeds, or railcars, or stationary mounted to piers, etc., with OEM rated capacities less than 2,000 pounds.
CRANE, CATEGORY 4
Commercial truck mounted cranes, Truck mounted articulating boom cranes, Pedestal mounted commercial boom assemblies (fixed length, telescoping, and articulating types) attached to stake trucks, trailers, flatbeds, or railcars, or stationary mounted to piers, etc., with OEM rated capacities of 2,000 pounds and greater. Commercial truck mounted cranes and truck mounted articulating boom cranes with OEM capacities of 2,000 pounds and greater require a licensed operator even if the cranes are down rated below 2,000 pounds capacity for administrative purposes.
EQUIPMENT, COLLATERAL
Encompasses built-in and large substantially affixed equipment/property that is normally acquired and installed as part of a facility project.
EQUIPMENT, INSTALLED
Encompasses building-type equipment, built-in equipment, and large, substantially affixed equipment/property, and is normally acquired and installed as part of a facility project. Installed equipment is normally required to make a facility useful and operable. Removing such equipment would impair the usefulness, safety, or environment of the facility or the facility restoration work required after its removal, is substantial.
EQUIPMENT, PERSONAL PROPERTY
Personal property equipment includes all equipment other than collateral equipment. Such equipment, when acquired and used in a facility or a test apparatus, can be severed and removed aster erection or installation without substantial loss of value or damage thereto or to the premises where installed.
FACILITIES LIFE CYCLE
A facilities life cycle is divided into four stages, requirements (planning and design), acquisition (construction and acceptance), stewardship (operations, maintenance and repair), and disposal.
FACILITIES MAINTENANCE MANAGEMENT
The planning, prioritizing, organizing, controlling, reporting, evaluating, and adjusting of facilities maintenance operations to support the CNO/NAVFAC facilities policy and objectives and satisfy customers’ facility needs. Defined by the International Facility Management Association as “the practice of coordinating the physical workplace with the people and work of the organization.”
LIFE-CYCLE COSTS
A form of economic analysis that considers the total cost of owning, operating, and maintaining a building or system over its useful life.
MAINTENANCE, PREVENTIVE
Maintenance designed to increase the availability of the facilities/equipment by reducing the number of unexpected breakdowns or service interruptions. It is any planned maintenance activity that improves equipment life and avoid any unplanned maintenance requirements.
MANAGEMENT INFORMATION SYSTEMS-MAINTENANCE
A computerized system that will provide sufficient information for management to evaluate differences between budgets and actual costs and evaluate performance.
REPAIR
Repair is the restoration of facilities or equipment to such a condition that it may be effectively utilized for its designated purposes by overhaul, reconstruction, or replacement of constituent parts or materials which have deteriorated by action of the elements or usage, and which have not been corrected through maintenance. This term also applies to replacement of the entire unit or system if beyond economical repair. The intent of repair is to have the equipment at normal working condition.
REPLACEMENT
Replacement, as a distinct work element, is confined to a program of planned replacement of a facility or its components. It may be further limited to major components such as air conditioning compressors, furnaces or hot water heaters. Replacement is performed when the equipment has reached the end of its useful life; when it no longer can perform due to degradation of its internal components and repair is no longer cost effective. Included under the replacement would be the major rebuilding of any component, since rebuilding also restores performance.
RESTORATION
Restoration of real property to such a condition that it can be used for its intended purpose. Includes repair or replacement work to restore facilities damaged by inadequate sustainment, excessive age, natural disaster, fire, accident or other causes.
SUSTAINMENT
Maintenance and repair activities necessary to keep a typical inventory of facilities in “normal working condition”. Sustainment includes regularly scheduled maintenance as well as cyclical major repairs or replacement of components that occur periodically over the expected service life of the facilities.
SERVICE ORDER CYCLE
Count down starts when the customer is notified that the work has been accepted to be accomplished to the time when the work chit is turned in by the craftsmen as complete is one complete cycle period for a service order.
WEIGHT HANDLING EQUIPMENT (WHE)
Weight handling equipment consists of cranes (e.g., portal cranes, jib cranes), rigging gear (e.g., slings, shackles), and associated equipment (e.g., portable hoists, dynamometers). For purposes of this technical sub-annex, WHE does not include mobile or transportable truck, crawler, and railway mounted locomotive cranes covered in 1700000 BSVE.

ATTACHMENT J-1502000-02-01

DEFINITIONS AND ACRONYMS

Acronym
Title
ADR
Automated Demand Response
ATSPP
Automated Transmission of Standby Power Programs
BCS
Building Control System
BPVC
Boiler and Pressure Vessel Code
CEMS
Centralized Elevator Monitoring System
CFC
Chlorofluorocarbon
DDC
Direct Digital Controls
EMCS
Energy Management and Controls System
FAS
Fire Alarm System
HCFC
Hydrochlorofluorocarbon
HTHW
High Temperature Hot Water
HVAC
Heating, Ventilation, and Air Conditioning
MLSC
Master Load-Shed Controls
MNS
Mass Notifications System
OEM
Original Equipment Manufacturer
OWS
Oil Water Separators
PM
Preventative Maintenance
PCS
Plant Control System
RPIE
Real Property Inventory Equipment
SCADA
Supervisory Control And Data Acquisition
SRM
Sustainment, Restoration and Modernization
UFC
Unified Facilities Criteria
UPS
Uninterrupted Power System
UPV
Unfired Pressure Vessel
VTE
Vertical Transportation Equipment
WHE
Weight Handling Equipment

ATTACHMENT J-1502000-02-02

REFERENCES AND TECHNICAL DOCUMENTS

Reference
Title
API 653
Aboveground Storage Tank Inspector
ASTM E1934
Standard Guide for Examining Electrical and Mechanical Equipment with Infrared Thermography
ASME A17.1
Safety Code for. Elevators and Escalators
ASME A17.2
Guide for Inspection of. Elevators, Escalators, and Moving Walks
ASME A18.1
Safety Standard for Platform Lifts and Stairway Chairlifts
COMAR 26.11.09.08
Control of NOx Emissions for Major Stationary Sources
COMAR 26.11.09.05
Visible Emissions
COMAR 26.11.03.06
Content of Part 70 Permits — Specific Requirements

DoDM 4165.8.

MIL-HDBK-419
Grounding, Bonding, and Shielding for Electronic Equipments and Facilities
MIL-STD-188-124B
Military Standard: Grounding, Bonding and Shielding for Common Long Haul/Tactical Communication Systems
MIL-HDBK-274(AS),
Department of Defense Handbook: Electrical Grounding for Aircraft Safety
NFPA Standard 96
Standard for Ventilation Control and Fire Protection of Commercial Cooking Operations
NAVFACINST 11300.37
Energy and Utilities Policy Manual
NAVFAC MO-201
Electric Power Distribution Systems
NAVFAC MO-230
Petroleum Fuel Facilities
NAVFAC MO-206
Maintenance and Operation of Air Compressor Plants
NAVFAC MO-209
Maintenance of Steam, Hot Water and Compressed Air Distribution Systems
NAVFAC MO-912
Maintenance and Operation of Air Compressor Plants
NAVFAC P-307
Management of Weight Handling Equipment
NAVSEA OP-5
Ammunition and Explosives Safety Ashore
NAVSUPINST 4750.1
Automated Fuel Maintenance System
NAVSUP P-558
Fuel Management Ashore
OPNAVINST 5090.1
Environmental Readiness Program Manual
STI SP001
Inspection of Aboveground Storage Tanks
TM 5-693
Uninterruptible Power Supply System Selection, Installation, and Maintenance for Command, Control, Communications, Intelligence, Surveillance, and Reconnaissance (C4ISR) Facilities
UFC-3-230-02
O&M: Water Supply Systems
UFC 3-410-01
Heating, Ventilating, and Air Conditioning Systems
UFC 3-410-06
Central Heating Plants Operation and Maintenance
UFC 3-430-07
Operations and Maintenance: Inspection and Certification of Boilers and Unfired Pressure Vessels
UFC 3-460-03
O&M: Maintenance of Petroleum Systems
UFC 3-501-01
Electrical Engineering
UFC 3-560-01
Operation and Maintenance: Electrical Safety
UFC 3-570-06
Cathodic Protection Systems
UFC 3-600-02
Operations and Maintenance: Inspection, Testing, and Maintenance of Fire Protection Systems
UFC 4-021-01
Design and O&M: Mass Notification Systems
UG-2029-ENV
Cross-Connection Control and Backflow Prevention Program

Implementation at Navy Shore Facilities

40 CFR 60
Standards of Performance for New Stationary Sources
40 CFR 63
National Emission Standards for Hazardous Air Pollutants for Source Categories
40 CFR 89
Control of Emissions From New and In-Use Nonroad Compression-Ignition Engines.

ATTACHMENT J-1502000-02-03

FACILITY PROPERTY INVENTORY

Facility No.
Name/Description
Location
Sq. Ft.
Year Built
Historic Preservation (Y/N)
1
Main Building: A, B, C, D-Wings

(4 Story Building + Penthouse)

Naval Support Facility Suitland
610,408
1993
N
1
Main Building: E-Wing

(4 Story Building)

Naval Support Facility Suitland
148,313
2012
N
2
Parking Structure (Garage)
Naval Support Facility Suitland
323,504
1993
N
3
Pass Office
Naval Support Facility Suitland
924
1993
N
4
Guard House – 1 (GH110)
Naval Support Facility Suitland
110
1993
N
5
Guard House – 2 (GH120)
Naval Support Facility Suitland
120
1993
N
6
Guard house – 3 (GH130)
Naval Support Facility Suitland
222
1993
N
7
Cooling Tower
Naval Support Facility Suitland
8,217
1993
N
26
Central Plant
Naval Support Facility Suitland
17,288
1993
N

ATTACHMENT J-1502000-02-04

HISTORICAL SERVICE ORDER WORKLOAD

Emergency Regular Hours $100 Threshold Emergency Afterhours $100 Threshold Immediate $100 Threshold Routine $500 Threshold Total

Calls
Average Completion Hours
Calls
Average Completion Hours
Calls
Average Completion Hours
Calls
Average Completion Hours
Calls

Electric

4
1
245
40
249

Fire

2
52
2

Grounds

13
28
13
Hvac
3
10.25
384
26
387

Hvac*

0
0

Mechanical

1
5.5
99
18
100

Pest

1
4.5
1

Plant

0
0
Plumbing
111
7
9
7.75
117
1.25
222
23
459

Security

1
1
8
14
9
Strctr
1
24
3
1
476
41
480
115
13.8
10
6.6
125
1.1
1450
22.4
1700
Service Type
Limit of Liability
Number of Calls/Orders
Emergency
0 - $200
115
Urgent
0 - $1,500
125
Routine 1
0 - $500
1450

ATTACHMENT J-1502000-02-05

HISTORICAL PROJECT WORK ORDER WORKLOAD

Level 2 $6000 Threshold Level 2 $3000 Threshold Total

Calls
Average Completion Hours
Calls
Average Completion Hours
Count
ELECTRIC
3
1.5
42
102
45

FIRE

0
0

GROUNDS

0
4
48
4
HVAC
6
1
60
217
66
HVAC*
1
648
1
1.5
2

MECHANICAL

0
11
27
11
PLANT
2
627
7
33
9
PLUMBING
3
24
17
0
20

SECURITY

0
1
1
1
STRCTR
3
258
40
97
43
18
141.8
183
47.9
201

NOTES

- Average time is between the reported time and the actual completion time, including parts order.

Service Type
Limit of Liability
Number of Calls/Orders
Project Work Order Level 1
$501 - $5,000
18
Project Work Order Level 2
$5,001 - $10,000
5

ATTACHMENTJ-1502000-02-06

TEMPERATURE STANDARDS

Area
Cooling Season*
Heating Season*
Living & Admin. Areas (Inactive Employment)
78
68
Working Areas (Active Employment)
78
68
Storage Areas
78
40
Computer Areas
70
68
Training Areas
75
68

*Degrees F. dry bulb

ATTACHMENT J-1502000-02-01-07

NSF Suitland Inventories

See also separate Excel spreadsheettitled J-1502000-02-07 NSF Suitland Inventory. The tabs for the spreadsheets are listed in the table below.

Tab
Inventory Title
01
HVAC and Refrigeration System Inventory
02
Interior and Exterior Lighting Systems Inventory
03
Boiler and UPV Inventory
04
Cathodic Protection Systems Inventory
05
Lightning Arrestors and Grounding Device Inventory
06
Fire Protection Systems Inventory
07
VTE Inventory
08
Compressed Air Systems Inventory
09
Auxiliary Generators Inventory
10
Medium and Low Voltage Switchgear Inventory
11
POL System Facilities and Distribution Systems Inventory
12
Uninterrupted Power Systems Inventory
13
Automatic Door Inventory
14
Roll-Up Doors Inventory
15
Photovoltaic Energy Systems Inventory
16
WHE Inventory
17
Eyewash Station Inventory
18
Plant System Inventory
19
Backflow Prevention Devices Inventory
20
Grease Trap Inventory
21
Exhaust Fans, Hoods and Ducts Inventory
22
Oil Water Separator Inventory
23
Fire Hydrant
24
Drinking Fountain and Water Cooler Inventory
25
Building Drainage Systems
26
Underground Storm Water Drainage Systems

ATTACHMENT J-1502000-02-08

Fuel Delivery Points image1.jpeg